Five-year airport development program fy 2010-2014 |
Previous | 1 of 7 | Next |
|
|
Small
Medium
Large
Extra Large
Full-size
Full-size archival image
|
This page
All
|
ARIZONA DEPARTMENT OF TRANSPORTATION AERONAUTICS DIVISION FIVE- YEAR AIRPORT DEVELOPMENT PROGRAM FY 2010 – 2014 Goodyear Airport Airport of the Year 2008 Arizona Department of Transportation Aeronautics Division Five - Year Airport Development Program FY 2010 - 2014 i Table of Contents Airport Development Program Overview .......................................................................... ii Airport Development Programming Guidelines................................................................. iv Glossary ............................................................................................................................... v Map of Primary & Secondary Airports .............................................................................. vi Airport Development Program 2009 - 2010 Airport Development Program........................................................................ 1 2010 - 2011 Airport Development Program...................................................................... 17 2011 - 2012 Airport Development Program...................................................................... 32 2012 - 2013 Airport Development Program...................................................................... 46 2013 - 2014 Airport Development Program...................................................................... 58 Alphabetical Listing by Airport, FY 2010 - 2014 ............................................................. 69 FY 2010 – 2014 Summary............................................................................................... 111 Arizona Department of Transportation Aeronautics Division Five - Year Airport Development Program FY 2010 - 2014 ii Program Overview In conjunction with the state’s public airport and the Federal Aviation Administration ( FAA), ADOT Aeronautics develops the Five- Year Airport Capital Improvement Program ( ACIP) to parallel the FAA’s Airport Capital Improvement Program and the ADOT Highway’s Program with the dual objective of maximizing the effective use of State dollars for airport development and maximizing FAA funding for Arizona airports. Federal monies are derived mainly from taxes on airline tickets and are distributed by the Federal Aviation Administration to local airports through the National Airport Improvement Program. State funds come mainly from flight property tax, aircraft lieu taxes and aviation fuel taxes. The ACIP development process allocates money from the State Aviation Fund and distributes these funds across three major categories of airport development assistance. The State Transportation Board approves this program annually. The three categories and their associated sub- categories are: 1. Airport Development Grants Program • Projects utilizing Federal, State and Local funds Safety, Security & Capacity Enhancement Maintenance Environmental, Planning and Land Acquisition • Projects utilizing State and Local funds only Safety, Security & Capacity Enhancement Environmental, Planning and Land Acquisition 2. Airport Preventive Maintenance Services ( APMS) • Projects maintaining and protecting aviation pavement surfaces 3. Airport Loan Program • Economic development/ revenue generating loans • Grant match loans Arizona Department of Transportation Aeronautics Division Five - Year Airport Development Program FY 2010 - 2014 iii Program Overview ( continued) Arizona airport sponsors of 58 public airports submitted 779 projects for consideration worth $ 1.4B over the 5- year program period. These projects represent all Federal and State funding desires on the part of the airport sponsors. This document, the State’s proposed Five- Year ACIP, totals $ 922.9 million. This is an approximately 46.8% increase from the previous year’s program. This is due to Sponsors doubling their request to the FAA over last year. State funding, proposed at $ 67.9M, is 45.9% lower than last year’s total of $ 125.5M. This 5- year investment of State funds will support about $ 817.0M in Federal aid and require about $ 37.9M from airport sponsors. The State’s Airport Assistance Programs for the Five- Year ACIP are designed to provide 50% of a sponsor’s share of a federally funded project. Expected sponsor obligations on federal projects beginning with FY 2010 will be 5.0% of a projects total cost, making the state share 2.5%. Each year, the ACIP will set aside between $ 3.0MS-$ 5.0M to match federal grants. As airport sponsors receive a federal grant, they will apply to the state for the matching funds. The Five- Year Program also provides for State funded grants. These documents show those projects for State- local funding that have met the State Transportation Board’s qualifying priority rating. When the Board approves the Five- Year Program, no projects for fiscal year 2010 will be issued new State/ Local grants. All other fiscal year’s projects are subject to subsequent annual review and approval by the State Transportation Board. This ACIP Document is formatted into four sections: Program Overview; Airport Development Program by fiscal year; Alphabetical Listing of projects by sponsor name; and a Summary of Project Totals. Although Subprogram categories are not listed, the individual information is retained in the State’s Aviation Database. The Five- Year Program’s contributions for Maintenance projects total $ 20.5M or 43.4%; Safety and Capacity Enhancement projects total $ 25.2M or 53.4%; and Environmental, Planning, and Land Acquisition projects total $ 1.5M or 3.1%. State- local funding distributions among the airport categories are: $ 15.8M designated for commercial service airports; $ 32.8M for reliever airports; $ 12.2M for public- general aviation airports and $ 1.4M for secondary airports. The maximum grant funds any one sponsor can receive can not exceed 10% of the available funds for airport development. The maximum State/ Local grant funds for the fiscal year 2010 Program is zero. Arizona Department of Transportation Aeronautics Division Five - Year Airport Development Program FY 2010 - 2014 iv Programming Guidelines 1. Projects proposed for inclusion in the program must be rated by the latest approved version of the Arizona Department of Transportation's ( ADOT) Airport Priority Rating System and confirmed as being recommended for inclusion in the program. 2. Projected public ownership of a facility and availability for public use are both required for programming a project at that facility. 3. There are three categories in the Program: • Airport Development Grants • Airport Preventative Maintenance Services ( APMS) • Airport Loans 4. There are three types of projects in the Grants category: • Projects that are related to Maintenance. • Projects that are related to Safety and/ or Capacity Enhancement. • Projects that are related to Environmental Studies, Planning or Land Acquisition. 5. Funds are to be programmed with approximately 80% to commercial service/ reliever airports, 18% to public, general aviation airports and 2% to secondary airports. 6. During each year of the program, funds to match FAA grants are set aside based on the amount of funds the FAA programs for airports in the state. These funds are to be programmed to provide up to 50% of the Local share of all eligible items contained in FAA airport project grants. 7. The program is developed with the intention to maximize the use of Federal funds at airports in Arizona. 8. In addition to federal match grants, the State may issue grants comprised of only state and local dollars. These grants are separate from federal match grants and are subject to a rigorous priority rating and may be awarded to airports whether they receive federal grants or not. These grants typically fund up to 90% of a primary airport project and 95% of a secondary airport project with no Federal participation. 9. The maximum grant funds any one airport sponsor may receive during any single fiscal year will not exceed 10% of the available monies in the Aviation Fund. 10. Consideration will be given to research and development projects that have a potential for significant economic and/ or technical benefit to Arizona airports and/ or airport users. 11. The Grants and APMS categories are facilities/ capital improvements programs that parallel the Federal Airport Improvement Program in terms of eligible grant items with the exception that the State does not fund capital equipment, routine operating maintenance items or revenue producing projects. The Airport Loan category is intended to accommodate revenue- producing projects specific to an airport’s economic welfare. 12. The program was developed using approved Transportation Board Policies. Where a diversion from the approved policy is requested by an airport sponsor, a new policy must be presented to the Board for their consideration and approval. 13. After a grant has been issued, the scope of work for the project receiving grant funds shall not be modified by the sponsor unless a grant amendment has been submitted to the Aeronautics Division for review and approved by the State Transportation Board, if necessary. Any grant funds remaining after the initial work in the grant has been completed shall be returned to the State Aviation Fund. Grant offers not executed for State/ Local projects within four months of receiving the offer, may be withdrawn and the funds will be made available for other eligible projects. 14. Grant duration is 4 years except for acquiring airport land, which is subject to individual review, but under no circumstances, may exceed 8 years. Arizona Department of Transportation Aeronautics Division Five - Year Airport Development Program FY 2010 - 2014 v Glossary of Terms ALP Airport Layout Plan Apron Aircraft Parking Area ARFF Aircraft Rescue and Fire Fighting ASR Airport Surveillance Radar ATCT Air Traffic Control Tower AWOS Automatic Weather Observation System DCC Defense Contractor Cargo EA Environmental Assessment EMAS Engineering Materials Arresting System FAA Federal Aviation Administration FBO Fixed Base Operator FOD Foreign Object Debris FAR Federal Aviation Regulations GA General Aviation GPS Global Positioning System GVGI Generic Visual Glideslope Indicator HIRL High Intensity Runway Lights ILS Instrument Landing System MIRL Medium Intensity Runway Lights MITL Medium Intensity Taxiway Lights NAVAID Navigational Aid NDB Non- Directional Beacon ( a navigational aid to find the airport) PAPI Precision Approach Path Indicator PCC Portland Cement Concrete Pave Pres Pavement Preservation Ph. 1 Phase 1 of a Multi- year Project REILS Runway End Identifier Lights ROFA Runway Obstacle Free Area RSA Runway Safety Area RSAT Runway Safety Action Team RPZ Runway Protection Zone RVZ Runway Visibility Zone Rwy Runway SASP State Airport System Plan Set Aside A fund allocation for a specific reason SRE Snow Removal Equipment TLOF Touchdown and Liftoff Area TVOR Terminal Very High Frequency Omni-directional Range Navigation Aid Twy Taxiway Arizona Department of Transportation Aeronautics Division Five - Year Airport Development Program FY 2010 - 2014 vi Arizona Department of Transportation - Aeronautics Division 1 FY 2010 State & Local Grants There are no grants schduled for Ficsal Year 2010 Arizona Department of Transportation - Aeronautics Division 2 Page is intentionally left Blank FY 2010 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total AVI SUQUILLA LA PAZ Apron: Expand Apron - Capacity Reconstruction and new construction of about 28,000 SY of asphalt concrete paved GA apron area including storm drainage improvements. $ 39,125 $ 39,125 $ 1,486,750 $ 1,565,000 Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Other Reconstruction of 8,000 SY of access road including curb and gutter, storm drainage improvements, asphalt concrete pavement and rerouting of electrical and communications lines. $ 18,375 $ 18,375 $ 698,250 $ 735,000 Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities> [ MAP] - Other Construction of about 5,600 ft of looped 12 inch fire line connected to CRIT public water system and construction of about 1,600 ft of sanitary sewer line in order to abandon existing septic system serving the GA terminal and GA hangar area. $ 23,000 $ 23,000 $ 874,000 $ 920,000 Other:< Construct/ Rehabilitate> Parking Lot [ non revenue producing- non hub/ MAP] - Other Rehabilitate and reconstruct 11,000 SY of public parking at the GA terminal and FBO area including asphalt concrete pavement, correcting existing drainage problems and relocating water/ sewer utilities. $ 10,750 $ 10,750 $ 408,500 $ 430,000 Airport Total: $ 91,250 $ 91,250 $ 3,467,500 $ 3,650,000 BENSON MUNICIPAL COCHISE Heliport:< Construct/ Expand/ Improve/ Modify/ Rehabilitate> Helipad/ Heliport - Standards Design Helipads on East end of Apron ( 50 ft x 50 ft) $ 1,250 $ 1,250 $ 47,500 $ 50,000 Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities> [ MAP] - Other Install Emergency Generator $ 8,750 $ 8,750 $ 332,500 $ 350,000 Planning:< Conduct/ Update> ( e. g., Pavement Maintenance Plan, PCI, NPDES, etc.) Conduct Airport Drainage Master Plan $ 3,750 $ 3,750 $ 142,500 $ 150,000 Runways:< Extend/ Widen/ Strengthen> Runway [ to meet standards] - Standards Install Airport Perimeter/ Security Fence and Gates ( 15,774 ft) $ 18,750 $ 18,750 $ 712,500 $ 750,000 Airport Total: $ 32,500 $ 32,500 $ 1,235,000 $ 1,300,000 BISBEE DOUGLAS INTL COCHISE Apron: Rehabilitate Apron - Reconstruction Pavement overlay 25,000 sy ( S. portion of PCC Apron) $ 20,000 $ 20,000 $ 760,000 $ 800,000 Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Master Plan Update $ 5,000 $ 5,000 $ 190,000 $ 200,000 Airport Total: $ 25,000 $ 25,000 $ 950,000 $ 1,000,000 BISBEE MUNI COCHISE Apron: Expand/ Strengthen Apron - Standards Reconstruct existing apron & expand apron to south ( approx. 22,300 SY of asphalt pavement). $ 5,625 $ 5,625 $ 213,750 $ 225,000 Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Update Master Plan $ 4,375 $ 4,375 $ 166,250 $ 175,000 Arizona Department of Transportation - Aeronautics Division 3 FY 2010 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Taxiways:< Extend/ Widen/ Strengthen> Taxiway - Standards Widen Twy A from 35 ft to 50 ft; Reconstruct existing pavement ( 5,900 ft x 50 ft) $ 5,000 $ 5,000 $ 190,000 $ 200,000 Airport Total: $ 15,000 $ 15,000 $ 570,000 $ 600,000 BUCKEYE MUNI MARICOPA Land: Acquire land/ easement for approaches Purchase approximately 25 acres of land north of the airport to secure RPZ and allow for future Rwy extension ( Phase 1). $ 137,500 $ 137,500 $ 5,225,000 $ 5,500,000 Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities> [ MAP] - Other Design and construct a well site and water storage tank to provide fire protection and domestice service for airport facilities. $ 75,000 $ 75,000 $ 2,850,000 $ 3,000,000 Runways:< Extend/ Widen/ Strengthen> Runway [ to meet standards] - Standards Design a Rwy widening and strengthening project to increase the total width to 100 ft and the strength to 75,000 lbs. $ 3,000 $ 3,000 $ 114,000 $ 120,000 Airport Total: $ 215,500 $ 215,500 $ 8,189,000 $ 8,620,000 CASA GRANDE MUNI PINAL Apron: Expand Apron - Capacity Design/ Construct 13,800 sy Apron, 7032 sy Vehicle Parking, Interior Fire Hydrants, Water, drainage, sewer & Electric South East & West of Native Air Complex $ 30,000 $ 30,000 $ 1,140,000 $ 1,200,000 Land: Acquire < land/ easement> for development/ relocation Purchase 225+/- Acres for Planned Rwy Ext. Land located NW, N, SW & S of the existing airport land. EA & New Airport Plan are underway & to be completed during 1st Qtr CY 2009. $ 112,500 $ 112,500 $ 4,275,000 $ 4,500,000 Other: Improve Airport < Drainage/ Erosion Control/ miscellaneous improvements> - Standards Design 80 ft x 6,800 ft relocation of Drainage Ditch running from NW to SW portion of airport that is currently protecting portions of land N. of Rwy 5- 23 and passing through existing Rwy 5 RPZ. $ 2,000 $ 2,000 $ 76,000 $ 80,000 Runways:< Construct/ Extend/ Improve> Runway Safety Area [ Non- Primary Airports] - Standards Extend Rwy 5- 23 100ft x 3,650 ft Rwy Ext. including relocation & 75 ft x 3,650 ft Twy B Ext., Relocated Rwy 23 threshold by 1,000 ft new Rwy Access/ Exit Twys & associated lighting, signage, marking, utilities, drainage, security fencing & service roadways $ 5,000 $ 5,000 $ 190,000 $ 200,000 Airport Total: $ 149,500 $ 149,500 $ 5,681,000 $ 5,980,000 CHANDLER MUNI MARICOPA Equipment: Install Weather Reporting Equipment { describe, e. g., AWOS } - Standards Design & Construct AWOS replacement. $ 4,325 $ 4,325 $ 164,350 $ 173,000 Other: Install < Guidance/ other> Signs [ not Part 139] - Standards Design replacement/ modification of approx. 75 airfield signs $ 1,988 $ 1,987 $ 75,525 $ 79,500 Taxiways: Construct Taxiway ( environmental mitigation) EA for planned Twy B extension from existing Twy N to approach end of Rwy 04L including connectors. $ 5,338 $ 5,337 $ 202,825 $ 213,500 Arizona Department of Transportation - Aeronautics Division 4 FY 2010 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Taxiways: Extend Taxiway - Capacity Design pavement for 5,500 LF x 40 ft Twy, connectors & runup areas ( 29,000 SY). $ 4,638 $ 4,637 $ 176,225 $ 185,500 Taxiways: Install Taxiway Lighting ( e. g., SMGCS, reflectors, MITL) - Standards Design MITL & signs for 5,500 LF Twy, connectors & runup areas. $ 3,550 $ 3,550 $ 134,900 $ 142,000 Airport Total: $ 19,839 $ 19,836 $ 753,825 $ 793,500 CIBECUE NAVAJO New Airports: Construct New Airport - Standards New Site for Cibecue Airport, approx. 163 Acres Phase I Grading and Drainage. $ 225,000 $ 225,000 $ 8,550,000 $ 9,000,000 Airport Total: $ 225,000 $ 225,000 $ 8,550,000 $ 9,000,000 COCHISE COUNTY COCHISE Apron: Construct Apron - Standards Overlay 4,500 sy on Twy and Apron area adjacent to fuel site and terminal area $ 12,500 $ 12,500 $ 475,000 $ 500,000 Runways: Rehabilitate Runway < Lighting/ Electrical Vault> Upgrade MIRL along Rwy 3- 21 with associated electrical upgrades $ 10,000 $ 10,000 $ 380,000 $ 400,000 Taxiways: Rehabilitate Taxiway - Reconstruct Reconstruct SW half of Twy A 11,860 sy $ 21,250 $ 21,250 $ 807,500 $ 850,000 Airport Total: $ 43,750 $ 43,750 $ 1,662,500 $ 1,750,000 COLORADO CITY MUNI MOHAVE Land: Acquire < land/ easement> for development/ relocation Land, Acquire land for taxiway expansions, BLM land transfers costs $ 3,000 $ 3,000 $ 114,000 $ 120,000 Runways: Rehabilitate Runway - Reconstruct Runway Pavement, Crack and Fog Seal $ 3,750 $ 3,750 $ 142,500 $ 150,000 Airport Total: $ 6,750 $ 6,750 $ 256,500 $ 270,000 COOLIDGE MUNI PINAL Apron: Rehabilitate Apron - Reconstruction Phase II of apron rehabilitation N and W of Main Hangar ( Ph I completed 2006) $ 35,750 $ 35,750 $ 1,358,500 $ 1,430,000 Runways: Install < full/ partial> Instrument Approach Aid - Standards Rwy 5- 23 & Rwy 17- 35 PAC/ SAC Survey $ 1,175 $ 1,175 $ 44,653 $ 47,003 Runways: Rehabilitate Runway - Reconstruct Reconstruct Rwy 5/ 23 ( 5,500 ft x 150 ft) $ 44,000 $ 44,000 $ 1,672,000 $ 1,760,000 Airport Total: $ 80,925 $ 80,925 $ 3,075,153 $ 3,237,003 COTTONWOOD YAVAPAI Equipment: Install Weather Reporting Equipment { describe, e. g., AWOS } - Standards Design and construct an AWOS. $ 8,375 $ 8,375 $ 318,250 $ 335,000 Airport Total: $ 8,375 $ 8,375 $ 318,250 $ 335,000 ELOY MUNI PINAL Taxiways: Install Taxiway Lighting ( MITL) [ non Part 139 CS] - Statutory Emphasis Programs Installation of MITLs and conduit/ cable; Installation of new rotating beacon and tower. $ 12,500 $ 12,500 $ 475,000 $ 500,000 Arizona Department of Transportation - Aeronautics Division 5 FY 2010 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Terminal Development: Construct Terminal Building - Capacity Design new terminal building, design utilities and parking lot to serve new terminal building $ 5,000 $ 5,000 $ 190,000 $ 200,000 Airport Total: $ 17,500 $ 17,500 $ 665,000 $ 700,000 ERIC MARCUS MUNICIPAL PIMA Apron: Construct Apron - Standards Crack seal repair Twy A- 3 ( appox 24,000 sf) $ 1,625 $ 1,625 $ 61,750 $ 65,000 Airport Total: $ 1,625 $ 1,625 $ 61,750 $ 65,000 ERNEST A. LOVE FIELD YAVAPAI Buildings:< Construct/ Expand/ Improve/ Modify/ Rehabilitat e> Aircraft Rescue & Fire Fighting Building [ Pt. 139 only] - Safety/ Security Build 13,000 SF ARFF Station at midfield. $ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000 Equipment: Acquire Aircraft Rescue & Fire Fighting Safety Equipment [ required by Part 139] - Safety/ Security Purchase new Index B ARFF truck. $ 12,500 $ 12,500 $ 475,000 $ 500,000 Equipment: Acquire Security Equipment/ Install Fencing [ required by Part 107] - Safety/ Security Build security upgrades to include 29,000 LF fencing, cameras, and access control devices. $ 50,000 $ 50,000 $ 1,900,000 $ 2,000,000 Equipment: Acquire Security Equipment/ Install Fencing [ required by Part 107] - Safety/ Security Design security upgrades to include 29,000 LF fencing, cameras, and access control devices. $ 3,750 $ 3,750 $ 142,500 $ 150,000 Land: Acquire land/ easement for approaches Acquire 61.3 Acres. $ 125,000 $ 125,000 $ 4,750,000 $ 5,000,000 Runways: Extend Runway- Capacity Design Drainage Improvements. $ 3,750 $ 3,750 $ 142,500 $ 150,000 Runways: Extend Runway- Capacity Design Rwy 21L/ 3R and Twys C, D & H extensions to minimum of 9,300 ft and 200K lbs. $ 8,750 $ 8,750 $ 332,500 $ 350,000 Runways: Install Runway Lighting ( HIRL, MIRL) [ Required by Part 139] - Safety/ Security Relocate Vault - Upgrade Rwy 3R/ 21L to HIRL. $ 6,250 $ 6,250 $ 237,500 $ 250,000 Airport Total: $ 272,500 $ 272,500 $ 10,355,000 $ 10,900,000 FALCON FLD MARICOPA Other: Install < Guidance Signs/ Runway Incursion Caution Bars> [ non Part 139 CS] - Statutory Emphasis Programs Design reconfiguration of existing Twy B and Installation of a Rwy guard light system. $ 3,750 $ 3,750 $ 142,500 $ 150,000 Other: Install < Guidance Signs/ Runway Incursion Caution Bars> [ non Part 139 CS] - Statutory Emphasis Programs Phase 1 - Reconfigure Twy B and Install Rwy guard lights along primary Rwy 4R- 22L. $ 37,500 $ 37,500 $ 1,425,000 $ 1,500,000 Runways:< Construct/ Extend/ Improve> Runway Safety Area [ Non- Primary Airports] - Standards Install upgrades to seven ( 7) storm drain inlets in the safety areas of the airport's Rwys $ 12,500 $ 12,500 $ 475,000 $ 500,000 Airport Total: $ 53,750 $ 53,750 $ 2,042,500 $ 2,150,000 FLAGSTAFF PULLIAM COCONINO Taxiways: Rehabilitate Taxiway - Reconstruct Reconstruct and repave existing segment of Taxiway A from connector A- 6 southward through A- 9. Work includes improving subgrade, drainage, paving and restriping. Also upgrade existing airfield runway and taxiway lighting and sign circuits. $ 137,638 $ 137,638 $ 5,230,245 $ 5,505,521 Arizona Department of Transportation - Aeronautics Division 6 FY 2010 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Airport Total: $ 137,638 $ 137,638 $ 5,230,245 $ 5,505,521 GILA BEND MUNI MARICOPA Land: Acquire land/ easement for approaches Acquire land in approaches for Rwy 4 and 22. $ 2,125 $ 2,125 $ 80,750 $ 85,000 Runways: Install < full/ partial> Instrument Approach Aid - Standards Install survey monuments on both ends of Rwy 4/ 22. $ 550 $ 550 $ 20,900 $ 22,000 Terminal Development:< Improve/ Modify/ Rehabilitate> Terminal Building - Capacity Rehabilitate existing Terminal Building in accordance with completed plans. $ 5,000 $ 5,000 $ 190,000 $ 200,000 Airport Total: $ 7,675 $ 7,675 $ 291,650 $ 307,000 GLENDALE MUNICIPAL MARICOPA Equipment: Acquire Security Equipment/ Install Fencing [ required by Part 107] - Safety/ Security Acquire Security Equipment ( cameras) along perimeter ( 81,000 LF) of Airport. $ 37,500 $ 37,500 $ 1,425,000 $ 1,500,000 Other:< Light/ Mark/ Remove> Obstructions - Standards Remove Blast Fence. $ 7,500 $ 7,500 $ 285,000 $ 300,000 Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Conduct Capacity Study. $ 2,500 $ 2,500 $ 95,000 $ 100,000 Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> Update Environmental Assessment. $ 5,000 $ 5,000 $ 190,000 $ 200,000 Runways: Construct Runway - Capacity Pave 21,000 SY Rwy Shoulders - Design Only. $ 1,875 $ 1,875 $ 71,250 $ 75,000 Runways: Construct Runway - Capacity Pave 21,000 SY Rwy Shoulders. $ 31,525 $ 31,525 $ 1,197,950 $ 1,261,000 Runways: Rehabilitate Runway - Reconstruct Pavement Maintenance - slurry seal hangars, Twy, and Rwy. $ 5,000 $ 5,000 $ 190,000 $ 200,000 Taxiways: Construct Taxiway - Capacity Pave 28,300 SY Twy Shoulders - Design Only. $ 1,875 $ 1,875 $ 71,250 $ 75,000 Taxiways: Construct Taxiway - Capacity Pave 28,300 SY Twy Shoulders. $ 42,700 $ 42,700 $ 1,622,600 $ 1,708,000 Airport Total: $ 135,475 $ 135,475 $ 5,148,050 $ 5,419,000 GRAND CANYON WEST MOHAVE Runways: Construct Runway [ includes relocation] - Standrads Runways: Shift and construct Runway 17/ 35, 5,000' x 75'. Project also includes grading, drainage, paving, lighting and visual aids - Phase II $ 250,000 $ 250,000 $ 9,500,000 $ 10,000,000 Airport Total: $ 250,000 $ 250,000 $ 9,500,000 $ 10,000,000 GREENLEE COUNTY GREENLEE Apron: Rehabilitate Apron - Reconstruction Rehabilitate 8,600 SY PCCP Apron $ 7,500 $ 7,500 $ 285,000 $ 300,000 Equipment: Acquire Security Equipment/ Install Fencing [ required by Part 107] - Safety/ Security Construct 9,700 LF Perimeter Fencing $ 12,500 $ 12,500 $ 475,000 $ 500,000 Other:< Light/ Mark/ Remove> Obstructions - Standards Obstruction Removal ( overhead electrical & phone box [ OFA]) $ 12,500 $ 12,500 $ 475,000 $ 500,000 Other: Improve Airport < Drainage/ Erosion Control/ miscellaneous improvements> - Standards Construct Drainage Improvements $ 23,750 $ 23,750 $ 902,500 $ 950,000 Arizona Department of Transportation - Aeronautics Division 7 FY 2010 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> EA for RPZ Rwy 7 & Road 78 Realignment & 18 acre land acquisition $ 2,500 $ 2,500 $ 95,000 $ 100,000 Runways: Install Runway < vertical/ visual> Guidance System [ PAPI/ VASI/ REIL/ ALS/ etc.] - Standards Construct Guidance Sign Installation $ 11,875 $ 11,875 $ 451,250 $ 475,000 Airport Total: $ 70,625 $ 70,625 $ 2,683,750 $ 2,825,000 H. A. CLARK MEMORIAL FIELD COCONINO Apron: Rehabilitate Apron - Reconstruction Reconstruct orginal apron ( approx 4,500 sy). $ 31,250 $ 31,250 $ 1,187,500 $ 1,250,000 Equipment: Acquire < Snow Removal Equipment/ Urea Truck/ etc.> - Standards Acquire Snow Removal Equipment $ 6,250 $ 6,250 $ 237,500 $ 250,000 Other: Construct Aircraft Rescue & Fire Fighting Training Facility/ Regional Burn Pit/ Mobile Training Facility - Standards This is the completion of the ARFF Building as designed. $ 6,250 $ 6,250 $ 237,500 $ 250,000 Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Prepare PArt 139 Certification Manual $ 1,250 $ 1,250 $ 47,500 $ 50,000 Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> Revalidate Environmental Assessment completed previously $ 1,875 $ 1,875 $ 71,250 $ 75,000 Airport Total: $ 46,875 $ 46,875 $ 1,781,250 $ 1,875,000 HOLBROOK MUNI NAVAJO Runways: Construct Runway [ includes relocation] - Standards Construct Crosswind Runway 11/ 29 4,900' x 60' ( including lighting, signage & visual aids) $ 112,500 $ 112,500 $ 4,275,000 $ 4,500,000 Taxiways: Construct Taxiway - Capacity Construct Parallel Taxiway to Runway 11/ 29 ( 4,900 x 35 ft) including lighting and signage $ 75,000 $ 75,000 $ 2,850,000 $ 3,000,000 Airport Total: $ 187,500 $ 187,500 $ 7,125,000 $ 7,500,000 KAYENTA NAVAJO Apron: Construct Apron - Standards Apron, Construct North East of existing apron, approx. 16,000 sy. $ 25,000 $ 25,000 $ 950,000 $ 1,000,000 Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Capacity Access Road, Construct main access road to Center Field, 2,000' x 24'. $ 25,000 $ 25,000 $ 950,000 $ 1,000,000 Airport Total: $ 50,000 $ 50,000 $ 1,900,000 $ 2,000,000 KINGMAN MOHAVE Apron: Construct Apron - Capacity Construct aircraft parking apron between Flightline Drive and the South Ramp ( approx. 14,000 sy). $ 27,500 $ 27,500 $ 1,045,000 $ 1,100,000 Apron: Rehabilitate Apron - Reconstruction Reconstruct the northern portion of the main aircraft parking ramp ( approx. 60,000 sy). $ 100,000 $ 100,000 $ 3,800,000 $ 4,000,000 Arizona Department of Transportation - Aeronautics Division 8 FY 2010 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Other: Install < Guidance Signs/ Runway Incursion Caution Bars> [ required by Part 139] - Safety/ Security Paint Rwy edge markings on 3- 21 and 17- 35, perform pavement maintenance and re- striping on Rwy 3- 21 and modify, relocate and add new guidance signs. $ 20,000 $ 20,000 $ 760,000 $ 800,000 Airport Total: $ 147,500 $ 147,500 $ 5,605,000 $ 5,900,000 LAKE HAVASU CITY MOHAVE Other: Install < Guidance/ other> Signs [ not Part 139] - Standards Airfield Signage Improvements and Modifications/ Pavement Modifications: ( a) Assess Airfield Information Signs and Replace; ( b) Construct Bravo Twy Edge Lighting; ( c) Install S- 1 Cutouts on Regulators; ( d) Add North Ramp Connects to Twy A; ( e) Add hydrant prote $ 7,100 $ 7,100 $ 269,800 $ 284,000 Airport Total: $ 7,100 $ 7,100 $ 269,800 $ 284,000 LAUGHLIN/ BULLHEAD INTERNATIONAL MOHAVE Buildings:< Construct/ Expand/ Improve/ Modify/ Rehabilitat e> Aircraft Rescue & Fire Fighting Building [ Pt. 139 only] - Safety/ Security Construct new ARFF Building ( Phase I). This project will include the site preparation, drainage, infrastructure, and new generator. $ 29,250 $ 29,250 $ 1,111,500 $ 1,170,000 Equipment: Acquire Aircraft Rescue & Fire Fighting Vehicle [ required by Part 139 only] - Safety/ Security The project includes the acquisition of a new ARFF Vehicle. $ 21,250 $ 21,250 $ 807,500 $ 850,000 Equipment: Acquire Equipment ( e. g., Sweepers, etc.) - Standards The project includes the acquisition of a high- speed pavement sweeper. $ 4,625 $ 4,625 $ 175,750 $ 185,000 Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> The project will involve the preparation of an Environmental Assessment for the acquisition of approximately 300 acres of property. $ 7,500 $ 7,500 $ 285,000 $ 300,000 Runways:< Construct/ Extend/ Improve> Runway Safety Area [ Primary Airports] - Safety/ Security This project will include misc. erosion protection and drainage improvements along Rwy 16- 34 ( Phase I). $ 23,684 $ 23,684 $ 900,000 $ 947,368 Runways: Extend Runway- Capacity The project will include the design necessary to extend Rwy 16- 34 1,000 ft to the south. $ 25,000 $ 25,000 $ 950,000 $ 1,000,000 Terminal Development: Expand Terminal Building - Capacity The project will involve enclosing the existing bag claim area ( 4,500 SF) and creating an all- weather environment for passengers. $ 25,625 $ 25,625 $ 973,750 $ 1,025,000 Airport Total: $ 136,934 $ 136,934 $ 5,203,500 $ 5,477,368 MARANA REGIONAL PIMA Buildings:< Construct/ Expand/ Improve/ Modify/ Rehabilitat e> Building - Standards Construct Air Traffic Control Tower $ 162,500 $ 162,500 $ 6,175,000 $ 6,500,000 Buildings:< Construct/ Expand/ Improve/ Modify/ Rehabilitat e> Building - Standards Construct public use terminal on east side of airport, 12,000SF $ 125,000 $ 125,000 $ 4,750,000 $ 5,000,000 Arizona Department of Transportation - Aeronautics Division 9 FY 2010 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Taxiways: Construct Taxiway - Capacity Construct Taxiway K. 50 feet x 1500 feet. The work to be done will include clearing and grubbing, preparing the subgrade to proposed elevations, placing aggregate base course and asphalt concrete pavement, upgrade taxiway edge lighting, and install strip $ 47,500 $ 47,500 $ 1,805,000 $ 1,900,000 Airport Total: $ 335,000 $ 335,000 $ 12,730,000 $ 13,400,000 Maricopa Municipal New Airports: Acquire [ existing] Airport - Standards This project involves the acquisiton of 342 acres of land from the Arizona State Land Department. $ 427,500 $ 427,500 $ 16,245,000 $ 17,100,000 New Airports: Construct New Airport - Capacity Design of projects included in the initial development of the airport. $ 52,058 $ 52,058 $ 1,978,185 $ 2,082,300 Airport Total: $ 479,558 $ 479,558 $ 18,223,185 $ 19,182,300 NOGALES INTL SANTA CRUZ Other: Improve Airport < Drainage/ Erosion Control/ miscellaneous improvements> - Standards Construct 1.75 acre slope stabilization & erosion control on East Side $ 36,500 $ 36,500 $ 1,387,000 $ 1,460,000 Airport Total: $ 36,500 $ 36,500 $ 1,387,000 $ 1,460,000 PAGE MUNI COCONINO Apron: Expand Apron - Capacity Construct approx. 19,000 syds of apron space between the North Apron Twy and Rwy 7- 25. $ 35,050 $ 35,050 $ 1,331,900 $ 1,402,000 Buildings:< Construct/ Expand/ Improve/ Modify/ Rehabilitat e> Building - Standards Relocate the portable hangars from the main ramp to the expanded north ramp between Rwy 7- 25 and the North Apron Twy. $ 9,950 $ 9,950 $ 378,100 $ 398,000 Airport Total: $ 45,000 $ 45,000 $ 1,710,000 $ 1,800,000 PAYSON GILA Apron: Construct Apron - Standards 10- 02 - Constructon expansion of the east side of Echo Ramp, approximately 5200 square yards of asphalt $ 15,750 $ 15,750 $ 598,500 $ 630,000 Land: Acquire < land/ easement> for development/ relocation 10- 01 - Purchase of 13.5 acres located adjacent to the south side of the airport at the west end. $ 55,000 $ 55,000 $ 2,090,000 $ 2,200,000 Other: Install < Guidance/ other> Signs [ not Part 139] - Standards 10- 04 - Signage and lighting along the runway and taxiway $ 7,750 $ 7,750 $ 294,500 $ 310,000 Runways:< Construct/ Extend/ Improve> Runway Safety Area [ Non- Primary Airports] - Standards 10- 03 - Install runup area at the east end of Taxiway ' A', 2600 square yards asphalt pavement $ 16,250 $ 16,250 $ 617,500 $ 650,000 Airport Total: $ 94,750 $ 94,750 $ 3,600,500 $ 3,790,000 PHOENIX DEER VALLEY MARICOPA Apron: Rehabilitate Apron - Reconstruction Rebuild ramp in the south and northwest areas - Phase 2. $ 180,350 $ 180,350 $ 6,853,300 $ 7,214,000 Arizona Department of Transportation - Aeronautics Division 10 FY 2010 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> Conduct an Environmental Assessment for future projects at the Airport. $ 12,500 $ 12,500 $ 475,000 $ 500,000 Runways:< Construct/ Extend/ Improve> Runway Safety Area [ Primary Airports] - Safety/ Security Complete improvements to the runway safety area, recommended by the RSAT - Phase 1. $ 115,000 $ 115,000 $ 4,370,000 $ 4,600,000 Runways:< Extend/ Widen/ Strengthen> Runway [ to meet standards] - Standards Construct aircraft run- up areas at the ends of Runway 7L- 25R and 7R- 25L. $ 50,000 $ 50,000 $ 1,900,000 $ 2,000,000 Airport Total: $ 357,850 $ 357,850 $ 13,598,300 $ 14,314,000 PHOENIX GOODYEAR MARICOPA Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> Conduct environmental study for projects not covered by a Categorical Exclusion. $ 12,500 $ 12,500 $ 475,000 $ 500,000 Taxiways:< Extend/ Widen/ Strengthen> Taxiway - Standards Stengthen taxiway connectors A- 5, A- 6, and A- 7 to meet Category D- IV airport design standards. Replace Taxiway A- 4 with two high speed taxiway exits. $ 80,450 $ 80,450 $ 3,057,100 $ 3,218,000 Airport Total: $ 92,950 $ 92,950 $ 3,532,100 $ 3,718,000 PHOENIX SKY HARBOR INTL MARICOPA Other: Noise Mitigation Measures [ miscellaneous] Sound mitigation and acquisition of eligible properties. $ 3,812,500 $ 3,812,500 $ 22,875,000 $ 30,500,000 Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Conduct FAR Part 150 study update. $ 187,500 $ 187,500 $ 1,125,000 $ 1,500,000 Runways:< Construct/ Extend/ Improve> Runway Safety Area [ Primary Airports] - Safety/ Security Install recommended alternative from environmental assessment to comply with 1,000 ft FAA RSA standards. $ 1,825,000 $ 1,825,000 $ 10,950,000 $ 14,600,000 Taxiways: Construct Taxiway - Capacity Construct acute angle taxiway connector between Runway 7R- 25L and Taxiway H. $ 506,250 $ 506,250 $ 3,037,500 $ 4,050,000 Airport Total: $ 6,331,250 $ 6,331,250 $ 37,987,500 $ 50,650,000 PHOENIX- MESA GATEWAY MARICOPA Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities> [ MAP] - Other Design/ Construct a 100,000 gal. expansion to the existing 150,000 gallon Jet- A fuel farm and rehabilitate fuel farm pavements. This is a MAP project request. $ 57,800 $ 57,800 $ 2,196,400 $ 2,312,000 Other:< Construct/ Rehabilitate> Parking Lot [ non revenue producing- non hub/ MAP] - Other Design approximately 1,700 parking spaces for terminal parking. This is a MAP project request. $ 7,100 $ 7,100 $ 269,800 $ 284,000 Other:< Construct/ Rehabilitate> Parking Lot [ non revenue producing- non hub/ MAP] - Other Terminal Parking Construction of approximately 1,700 parking spaces. This is a MAP project request. $ 108,750 $ 108,750 $ 4,132,500 $ 4,350,000 Other: Improve Airport < Drainage/ Erosion Control/ miscellaneous improvements> - Standards Airfield/ Apron Drainage Improvements from Twy V to Twy L $ 95,000 $ 95,000 $ 3,610,000 $ 3,800,000 Arizona Department of Transportation - Aeronautics Division 11 FY 2010 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Taxiways:< Extend/ Widen/ Strengthen> Taxiway - Standards Construct Twy B Ph IV between Twy L & Twy N with drainage 77,333 SY signage/ markings- 8% & lighting- 15% construction costs $ 269,847 $ 269,847 $ 10,254,186 $ 10,793,880 Taxiways:< Extend/ Widen/ Strengthen> Taxiway - Standards Txy L Construct from Twy A to South Tract, 75 ft W with 35 ft shoulders each side x 2600 ft L ( 21,700 SY), includes Twy A to allow for radius connections. $ 225,594 $ 225,594 $ 8,572,567 $ 9,023,755 Terminal Development: Expand Terminal Building - Capacity Construct West Terminal Expansion Ph II - Increase existing 34,000 SF of terminal space by 20,000 SF. This is a MAP project request. $ 163,500 $ 163,500 $ 6,213,000 $ 6,540,000 Terminal Development: Expand Terminal Building - Capacity Terminal Expansion Ph II Design adds 20,000 SF to existing 34,000 SF of terminal space. MAP project request. $ 16,625 $ 16,625 $ 631,750 $ 665,000 Airport Total: $ 944,216 $ 944,216 $ 35,880,203 $ 37,768,635 POLACCA NAVAJO Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> Conduct environmental assessment for Rwy and apron. $ 3,750 $ 3,750 $ 142,500 $ 150,000 Airport Total: $ 3,750 $ 3,750 $ 142,500 $ 150,000 RYAN FIELD PIMA Equipment: Acquire Security Equipment/ Install Perimeter Fencing [ not Part 107] - Standards Install new chain link fencing ( approx. 13,000 lf), 24in paved service road ( apprx. 18,000 lf 2in AC with 6in ABC), striping and signage, gates and plunge basins $ 67,042 $ 67,043 $ 2,547,615 $ 2,681,700 Other: Improve Airport < Drainage/ Erosion Control/ miscellaneous improvements> - Standards Convert airfield drainage system to closed storm drain system or treat the ends of exposed drainage culverts with grated drainage structures $ 25,000 $ 25,000 $ 950,000 $ 1,000,000 Runways: Rehabilitate Runway - Reconstruct Rwy 6L- 24R, Pulverize 3in AC pavement, regrade/ lime treat subgrade. Place new 3in AC pavement & 10in wide erosion control, paint striping and marking. $ 55,219 $ 55,219 $ 2,098,312 $ 2,208,750 Airport Total: $ 147,261 $ 147,262 $ 5,595,927 $ 5,890,450 SAFFORD REGIONAL GRAHAM Runways:< Extend/ Widen/ Strengthen> Runway [ to meet standards] - Standards Remove existing Rwy 12/ 30 pavement & base; reconstruct base & pavement. $ 64,848 $ 64,847 $ 2,464,205 $ 2,593,900 Airport Total: $ 64,848 $ 64,847 $ 2,464,205 $ 2,593,900 SAN MANUEL PINAL Other:< Light/ Mark/ Remove> Obstructions - Standards Obstruction Survey for Instrument Approach $ 1,875 $ 1,875 $ 71,250 $ 75,000 Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Airport Master Plan ( including Compatible Land Use Planning) $ 3,750 $ 3,750 $ 142,500 $ 150,000 Arizona Department of Transportation - Aeronautics Division 12 FY 2010 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Taxiways: Construct Taxiway - Capacity Construct Parallel Twy for Rwy 11/ 29 ( 4700 ft x 35 ft) $ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000 Terminal Development: Construct Terminal Building - Capacity Install terminal utilities ( Phase II) and install AWOS $ 12,500 $ 12,500 $ 475,000 $ 500,000 Airport Total: $ 80,625 $ 80,625 $ 3,063,750 $ 3,225,000 SCOTTSDALE MARICOPA Apron: Rehabilitate Apron - Reconstruction This project will involve reconstructing the large aircraft parking apron located on the west side of the airfield near the Landmark Aviation ( main) facility. 34,000 sq. yards. $ 57,500 $ 57,500 $ 2,185,000 $ 2,300,000 Runways: Rehabilitate Runway - Reconstruct Rwy 03/ 21. This project will involve removing and replacing the existing P402 Rwy surface course and associated Rwy markings. 114,000 sq. yds. $ 50,000 $ 50,000 $ 1,900,000 $ 2,000,000 Airport Total: $ 107,500 $ 107,500 $ 4,085,000 $ 4,300,000 SEDONA YAVAPAI Apron: Construct Apron - Capacity This project will expand Apron A to the southwest. It is the first phase of a two phase project. Phase I will include a 300 X 550 ft expansion. $ 38,678 $ 38,677 $ 1,469,745 $ 1,547,100 Other: Improve Airport < Drainage/ Erosion Control/ miscellaneous improvements> - Standards This project will include the grading and erosion control of the infield area between Twy A and the Rwy. $ 11,288 $ 11,287 $ 428,925 $ 451,500 Taxiways:< Extend/ Widen/ Strengthen> Taxiway - Standards Construct Txy A extension from Txy A8 to the Rwy 3 end, approx. 900 ft X 35 ft $ 12,799 $ 12,800 $ 486,376 $ 511,975 Taxiways: Extend Taxiway - Capacity Construct taxilanes B4, B5 and hangar pad extensions, approx. 400 X 100ft. $ 10,819 $ 10,820 $ 411,139 $ 432,778 Taxiways: Rehabilitate Taxiway - Reconstruct Design and construct pavement maintenance and treatment for Taxiway A. $ 4,375 $ 4,375 $ 166,250 $ 175,000 Airport Total: $ 77,959 $ 77,959 $ 2,962,435 $ 3,118,353 SHOW LOW REGIONAL NAVAJO Apron: Construct Apron - Capacity Construct East Apron approx. 16,000 sy ( Ph 1) ( 10- 2) $ 33,750 $ 33,750 $ 1,282,500 $ 1,350,000 Other: Construct Deicing Containment Facility - Standards Construct deicing facility on main terminal apron, 110 ft x 110 ft ( 10- 3) $ 6,250 $ 6,250 $ 237,500 $ 250,000 Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> EA for Rwy 18/ 36 & Parallel Twy D ( 10- 5) $ 8,750 $ 8,750 $ 332,500 $ 350,000 Taxiways: Construct Taxiway - Capacity Construct Twy D south of Twy A, 35 ft x 1000 ft ( 10- 4) $ 17,500 $ 17,500 $ 665,000 $ 700,000 Airport Total: $ 66,250 $ 66,250 $ 2,517,500 $ 2,650,000 Arizona Department of Transportation - Aeronautics Division 13 FY 2010 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total SIERRA VISTA MUNI- LIBBY AAF COCHISE Runways: Rehabilitate Runway - Reconstruct Rwy 12/ 30 Reconstruct 5365 ft x 100 ft ( approx. 60000 sy of Airport rwy). $ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000 Airport Total: $ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000 SPRINGERVILLE MUNI APACHE Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> An ALP review and update will be conducted in order to evaluate the capital needs of the Airport. $ 1,250 $ 1,250 $ 47,500 $ 50,000 Runways:< Construct/ Extend/ Improve> Runway Safety Area [ Non- Primary Airports] - Standards The RSA will be completed to meet standards ( Construction) $ 10,000 $ 10,000 $ 380,000 $ 400,000 Runways: Rehabilitate Runway - Reconstruct Runway to be phased for funding purposes and complete resurfacing phase 2 in 2010. $ 40,000 $ 40,000 $ 1,520,000 $ 1,600,000 Airport Total: $ 51,250 $ 51,250 $ 1,947,500 $ 2,050,000 ST JOHNS INDUSTRIAL AIR PARK APACHE Apron: Rehabilitate Apron - Reconstruction Apron, Construct South West of Rwy 14/ 32, approx. 500' x 200'. $ 37,525 $ 37,525 $ 1,425,950 $ 1,501,000 Other:< Light/ Mark/ Remove> Obstructions - Standards Other: Remove tall trees in terminal area. $ 1,250 $ 1,250 $ 47,500 $ 50,000 Taxiways: Rehabilitate Taxiway - Reconstruct Twys: Construct South West of Rwy 14/ 32, approx. 3,000' x 35'. $ 37,500 $ 37,500 $ 1,425,000 $ 1,500,000 Airport Total: $ 76,275 $ 76,275 $ 2,898,450 $ 3,051,000 TAYLOR NAVAJO Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities> [ MAP] - Other Relocate Fuel Farm/ Replace Fuel System $ 8,750 $ 8,750 $ 332,500 $ 350,000 Runways: Rehabilitate Runway - Reconstruct Reconstruct Rwy 3/ 21, 7,000 ft x 75 ft. $ 75,000 $ 75,000 $ 2,850,000 $ 3,000,000 Airport Total: $ 83,750 $ 83,750 $ 3,182,500 $ 3,350,000 TUCSON INTL PIMA Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Update the 2004 Master Plan $ 53,640 $ 53,640 $ 1,092,720 $ 1,200,000 Runways:< Construct/ Extend/ Improve> Runway Safety Area [ Primary Airports] - Safety/ Security Address any Runway Safety Area Drainage Improvements recommended by the Airfield Drainage Study currently underway $ 178,800 $ 178,800 $ 3,642,400 $ 4,000,000 Runways: Rehabilitate Runway - Reconstruct Reconstruct portion of keel section of Rwy 3/ 21 ( approx. 18,200 sy) and all/ part of Twys A2 & 3 ( approx. 10,000 sy) with AC. Remarking & regrooving ( rwy only) is part of the work. $ 61,307 $ 61,306 $ 1,248,902 $ 1,371,515 Taxiways: Rehabilitate Taxiway - Reconstruct Reconstruct all/ part Twys A, A7, A10, Air Freight, Customs, Condo & D ( approx. 215,800 sy) with AC and remark. $ 82,557 $ 82,557 $ 1,681,802 $ 1,846,916 Arizona Department of Transportation - Aeronautics Division 14 FY 2010 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Airport Total: $ 376,304 $ 376,303 $ 7,665,824 $ 8,418,431 WHITERIVER NAVAJO Equipment: Install Weather Reporting Equipment { describe, e. g., AWOS } - Standards Install AWOS III. $ 7,500 $ 7,500 $ 285,000 $ 300,000 Airport Total: $ 7,500 $ 7,500 $ 285,000 $ 300,000 WICKENBURG MUNI MARICOPA Apron: Construct Apron - Capacity This project involves the construction of a new 15,000 SY aircraft parking apron ( Phase II) at approximately mid- Field on the south side of the Rwy. $ 27,575 $ 27,575 $ 1,047,850 $ 1,103,000 Apron: Rehabilitate Apron - Reconstruction This project will provide for the pavement preservation of all apron and taxilane pavements ( approximately 100,000 SY) on the airport. $ 5,250 $ 5,250 $ 199,500 $ 210,000 Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Capacity Design a 1,300 foot extension to the access road on the south side of the airport. $ 1,100 $ 1,100 $ 41,800 $ 44,000 Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Update the Airport Master Plan. $ 5,250 $ 5,250 $ 199,500 $ 210,000 Airport Total: $ 39,175 $ 39,175 $ 1,488,650 $ 1,567,000 WINSLOW- LINDBERGH REGIONAL NAVAJO Apron: Rehabilitate Apron - Reconstruction Construct 16,600 SY South Apron - Phase II. $ 42,500 $ 42,500 $ 1,615,000 $ 1,700,000 Other: Improve Airport < Drainage/ Erosion Control/ miscellaneous improvements> - Standards Conduct airport drainage study to include levee assessment. $ 5,000 $ 5,000 $ 190,000 $ 200,000 Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> Environmental Assessment for Land Acquisitions. $ 5,000 $ 5,000 $ 190,000 $ 200,000 Runways: Rehabilitate Runway - Reconstruct Design 308,000 SY Pavement Rehabilitation for Rwys and Twys. $ 4,375 $ 4,375 $ 166,250 $ 175,000 Taxiways: Install Taxiway Lighting ( MITL) [ Required by Part 139] - Safety/ Security Install PAPI's for Rwys 4, 22 & 29 & taxiway edge lights ( MITL) required by Part 139 $ 15,000 $ 15,000 $ 570,000 $ 600,000 Airport Total: $ 71,875 $ 71,875 $ 2,731,250 $ 2,875,000 YUMA MCAS/ YUMA INTL YUMA Apron: Construct Apron - Capacity CONSTRUCT: 20,000 sy apron ( 10,000 rehab, 10,000 expand). Adjacent to Twy F3, south of 40th Street. $ 72,368 $ 72,369 $ 2,750,000 $ 2,894,737 Apron: Rehabilitate Apron - Reconstruction DESIGN 150 yd x 170 yd asphalt apron between GA hangar complex and CareFlight ( FBO), at the end of Fortuna Ave. Approx 1,200 lf of security fencing with gate and card reader needed. $ 6,579 $ 6,579 $ 250,000 $ 263,158 Arizona Department of Transportation - Aeronautics Division 15 FY 2010 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Airport Total: $ 78,947 $ 78,948 $ 3,000,000 $ 3,157,895 Total Fiscal Year Grants: $ 12,548,929 $ 12,548,926 $ 267,625,502 $ 292,723,356 Arizona Department of Transportation - Aeronautics Division 16 FY 2011 State & Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total ADOT Aeronautics APMS - Runway Pavement Preservation Consulting and construction services $ 3,042,630 $ 0 $ 0 $ 3,042,630 Planning: Planning Studies Conduct $ 500,000 $ 0 $ 0 $ 500,000 Airport Total: $ 3,542,630 $ 0 $ 0 $ 3,542,630 BENSON MUNICIPAL COCHISE Runways: Runway Construct Design Rwy 10/ 28 Extension - Ph I ( approx 1,400 LF) $ 135,000 $ 15,000 $ 0 $ 150,000 Airport Total: $ 135,000 $ 15,000 $ 0 $ 150,000 CHANDLER MUNI MARICOPA Terminal Development: Auto Parking Construct Design/ Const 50 unit parking lot - appr 2,350 SY paving. $ 227,700 $ 25,300 $ 0 $ 253,000 Airport Total: $ 227,700 $ 25,300 $ 0 $ 253,000 DOUGLAS MUNI COCHISE Other: Fencing ( Security) Install Install security fencing around hanger area, aircraft parking apron area, and new terminal area ( approx. 1,200 ft) $ 108,000 $ 12,000 $ 0 $ 120,000 Airport Total: $ 108,000 $ 12,000 $ 0 $ 120,000 ERNEST A. LOVE FIELD YAVAPAI Buildings: Buildings Construct/ relocate Design new 11,300 SY Maintenance Facility. $ 10,740 $ 189,260 $ 0 $ 200,000 Runways: Runway Construct Design to pave 8,000 LF of Rwy and Twy Shoulders. $ 180,000 $ 20,000 $ 0 $ 200,000 Terminal Development: Terminal Construct ( CS Only) Design new 21,000 SF Terminal Building. $ 405,000 $ 45,000 $ 0 $ 450,000 Airport Total: $ 595,740 $ 254,260 $ 0 $ 850,000 FALCON FLD MARICOPA Other: Instrument Approach System Install Design/ Install an AWOS system $ 225,000 $ 25,000 $ 0 $ 250,000 Airport Total: $ 225,000 $ 25,000 $ 0 $ 250,000 FLAGSTAFF PULLIAM COCONINO Apron: Apron Reconstruct Joint repairs between commercial ramp concrete slabs. Project would include replacing backer rod spacers and permanently sealing joints. $ 201,339 $ 22,371 $ 0 $ 223,710 Airport Total: $ 201,339 $ 22,371 $ 0 $ 223,710 MARANA REGIONAL PIMA Runways: Runway Structural Upgrade Overlay Runway 12- 30 6900 x 100 $ 595,740 $ 1,304,260 $ 0 $ 1,900,000 Arizona Department of Transportation - Aeronautics Division 17 FY 2011 State & Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Airport Total: $ 595,740 $ 1,304,260 $ 0 $ 1,900,000 PHOENIX DEER VALLEY MARICOPA Apron: Apron Reconstruct Rebuild ramp on the south and northwest areas - Phase 3. Approximate Total Area: 193,000 square yards. State/ local = 15,857 square yards. $ 499,500 $ 55,500 $ 0 $ 555,000 Airport Total: $ 499,500 $ 55,500 $ 0 $ 555,000 PHOENIX GOODYEAR MARICOPA Ground Transportation: Access Rd. Construct north side on- airport access road and utility extension - Phase 1. Roadway dimensions: Approximate Total Area: 6,600 feet in length by 24 feet in width ( 15,840 square feet or 17,600 square yards). $ 495,900 $ 55,100 $ 0 $ 551,000 Airport Total: $ 495,900 $ 55,100 $ 0 $ 551,000 RYAN FIELD PIMA Runways: Runway Construct Construct new 75 ft x 105 ft AC Rwy ext. on 6L/ 24R, new 35 ft x 105 ft AC ext. on Twy A; & new 35 ft x 650 ft AC Twys to replace the existing Twy A5 $ 595,740 $ 319,828 $ 0 $ 915,568 Airport Total: $ 595,740 $ 319,828 $ 0 $ 915,568 SEDONA YAVAPAI Apron: Apron Construct Design expansion of Apron A to the north including the demolition of the restaurant building. The expansion is approx. 500ft X 500ft and construction will be seperated into two phases. $ 99,000 $ 11,000 $ 0 $ 110,000 Airport Total: $ 99,000 $ 11,000 $ 0 $ 110,000 SELIGMAN YAVAPAI Other: Fencing ( Perimeter) Install Relocate and install additional fencing at both runway ends, and also install a culvert which would eliminate drainage channel. $ 71,250 $ 3,750 $ 0 $ 75,000 Airport Total: $ 71,250 $ 3,750 $ 0 $ 75,000 SIERRA VISTA MUNI- LIBBY AAF COCHISE Other: Fencing ( Wildlife) Install Install two wildlife fencing enclosures: on NE and on SE corners of Airport. ( approx. 300 ft x 300 ft each) $ 90,000 $ 10,000 $ 0 $ 100,000 Airport Total: $ 90,000 $ 10,000 $ 0 $ 100,000 Arizona Department of Transportation - Aeronautics Division 18 FY 2011 State & Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total TUCSON INTL PIMA Land: Land ( Protection) Acquisition Reimbursement of the purchase of approximately 8 acres in RPZ for Rwy 21. $ 595,740 $ 1,115,153 $ 0 $ 1,710,893 Airport Total: $ 595,740 $ 1,115,153 $ 0 $ 1,710,893 Total Fiscal Year Grants: $ 8,078,279 $ 3,228,522 $ 0 $ 11,306,801 Arizona Department of Transportation - Aeronautics Division 19 FY 2011 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total AVI SUQUILLA LA PAZ Buildings:< Construct/ Expand/ Improve/ Modify/ Rehabilitat e> Aircraft Rescue & Fire Fighting Building [ Pt. 139 only] - Safety/ Security Design and construction of 5,000 sf Aircraft Rescue and Fire Fighting ( ARFF) station. $ 46,875 $ 46,875 $ 1,781,250 $ 1,875,000 Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Service Road - Other Pave the perimeter road with aggregate base and asphalt concrete pavement - 16- ft wide, approximately 42,000 SY of pavement, extend culverts. $ 32,500 $ 32,500 $ 1,235,000 $ 1,300,000 Other: Improve Airport < Drainage/ Erosion Control/ miscellaneous improvements> - Standards The Rwy and Twy shoulders will be stabilized by soil cement at the top of the ditch break paralleling the runway and taxiways where the erosion is occuring - ditch backslopes will also be stabilized with soil cement. $ 27,500 $ 27,500 $ 1,045,000 $ 1,100,000 Taxiways: Rehabilitate Taxiway Lighting - Reconstruct Rehabilitate MITL system on old 4,800 ft Rwy and 4,800 ft parallel Twy and connecting Twys ( approximately 10,600 LF) - replace existing underground electrical conductor, transformers and lights with new materials. $ 11,625 $ 11,625 $ 441,750 $ 465,000 Airport Total: $ 118,500 $ 118,500 $ 4,503,000 $ 4,740,000 BAGDAD YAVAPAI Apron: Construct Apron - Standards Runway safety areas will be lengthened and widened to meet FAA design standards $ 11,875 $ 11,875 $ 451,250 $ 475,000 Airport Total: $ 11,875 $ 11,875 $ 451,250 $ 475,000 BENSON MUNICIPAL COCHISE Heliport:< Construct/ Expand/ Improve/ Modify/ Rehabilitate> Helipad/ Heliport - Standards Construct Helipads adjacent to east Apron ( 50 ft x 50 ft) $ 6,250 $ 6,250 $ 237,500 $ 250,000 Land: Acquire < land/ easement> for development/ relocation Acquire approx 83 acres to extend Rwy 10 and Parallel Twy ( both ends) $ 20,000 $ 20,000 $ 760,000 $ 800,000 Airport Total: $ 26,250 $ 26,250 $ 997,500 $ 1,050,000 BISBEE DOUGLAS INTL COCHISE Apron: Construct Apron - Capacity Reconstruct Apron 16,700 sy for light aircraft service and maintenance $ 20,000 $ 20,000 $ 760,000 $ 800,000 Airport Total: $ 20,000 $ 20,000 $ 760,000 $ 800,000 BISBEE MUNI COCHISE Other: Install < Guidance/ other> Signs [ not Part 139] - Standards Install new Rwy 17/ 35 signs at locations where existing signs are failing, install new signs at locations where they are needed but none are existing. $ 3,750 $ 3,750 $ 142,500 $ 150,000 Arizona Department of Transportation - Aeronautics Division 20 FY 2011 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> EA for 6.40 acres of land. $ 3,750 $ 3,750 $ 142,500 $ 150,000 Taxiways:< Extend/ Widen/ Strengthen> Taxiway - Standards Widen Twy A from 35 ft to 50 ft; Reconstruct the existing 35 ft width ( 5,900 ft x 50 ft). $ 30,000 $ 30,000 $ 1,140,000 $ 1,200,000 Taxiways: Install Taxiway Lighting ( MITL) [ non Part 139 CS] - Statutory Emphasis Programs Install MITLs, cable & conduit along Twy A & connecting Twys. Construct new vault and install new vault equipment. $ 17,875 $ 17,875 $ 679,250 $ 715,000 Airport Total: $ 55,375 $ 55,375 $ 2,104,250 $ 2,215,000 BUCKEYE MUNI MARICOPA Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Other Reconstruct the airport entrance road from the main apron to Palo Verde Road. ( approx. 1,700'). $ 25,000 $ 25,000 $ 950,000 $ 1,000,000 Land: Acquire land/ easement for approaches Purchase approximately 25 acres of land north of the airport to secure RPZ and allow for future Rwy extension ( Phase 2). $ 137,500 $ 137,500 $ 5,225,000 $ 5,500,000 Runways:< Extend/ Widen/ Strengthen> Runway [ to meet standards] - Standards Construct Rwy widening and strengthening to increase the total width to 100 ft and the strength to 75,000 lbs. $ 50,000 $ 50,000 $ 1,900,000 $ 2,000,000 Taxiways: Construct Taxiway - Capacity Design and construct Twy E, including Twy edge lighting. $ 30,000 $ 30,000 $ 1,140,000 $ 1,200,000 Airport Total: $ 242,500 $ 242,500 $ 9,215,000 $ 9,700,000 CHANDLER MUNI MARICOPA Apron: Construct Apron - Capacity Design 29,500 SY apron area. $ 5,950 $ 5,950 $ 226,100 $ 238,000 Other: Install < Guidance Signs/ Runway Incursion Caution Bars> [ non Part 139 CS] - Statutory Emphasis Programs Construct replacement/ modification of approx. 75 airfield signs. $ 15,388 $ 15,387 $ 584,725 $ 615,500 Taxiways: Extend Taxiway - Capacity Construct pavment for 5,500 LF x 40 ft Twy, connectors & runup areas ( 29,000 SY). $ 58,512 $ 58,513 $ 2,223,475 $ 2,340,500 Taxiways: Install Taxiway Lighting ( e. g., SMGCS, reflectors, MITL) - Standards Construct MITL & signs for 5,500 LF Twy & connectors. $ 44,875 $ 44,875 $ 1,705,250 $ 1,795,000 Airport Total: $ 124,725 $ 124,725 $ 4,739,550 $ 4,989,000 CIBECUE NAVAJO New Airports: Construct New Airport - Standards At new Cibecue Airport Site, Rwy 75' x 5,00' Phase II Paving and Fencing. $ 162,500 $ 162,500 $ 6,175,000 $ 6,500,000 Airport Total: $ 162,500 $ 162,500 $ 6,175,000 $ 6,500,000 COCHISE COUNTY COCHISE Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Update 1997 Master Plan $ 4,375 $ 4,375 $ 166,250 $ 175,000 Arizona Department of Transportation - Aeronautics Division 21 FY 2011 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Airport Total: $ 4,375 $ 4,375 $ 166,250 $ 175,000 COLORADO CITY MUNI MOHAVE Equipment: Acquire Security Equipment/ Install Perimeter Fencing [ not Part 107] - Standards Equipment, Perimeter Wildlife Fencing ( approx. 38,000 linear feet) $ 22,500 $ 22,500 $ 855,000 $ 900,000 Airport Total: $ 22,500 $ 22,500 $ 855,000 $ 900,000 COOLIDGE MUNI PINAL Equipment: Acquire Security Equipment/ Install Fencing [ required by Part 107] - Safety/ Security Install security fencing around the perimeter of the airport ( approx. 30,000 ft) $ 24,391 $ 24,390 $ 926,842 $ 975,623 Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Capacity Move A Street to perimeter of airport property N & E of Rwy 5- 23 $ 14,429 $ 14,429 $ 548,312 $ 577,170 Airport Total: $ 38,820 $ 38,819 $ 1,475,154 $ 1,552,793 COTTONWOOD YAVAPAI Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> Conduct an environmental assessment of 22 acres along the southwest side of the existing airport property. $ 5,000 $ 5,000 $ 190,000 $ 200,000 Airport Total: $ 5,000 $ 5,000 $ 190,000 $ 200,000 ELOY MUNI PINAL Apron: Rehabilitate Apron - Reconstruction Construct approx. 15,450 SY of asphalt pavement apron ( approx. 200 ft x 700 ft), and install apron lighting. $ 3,750 $ 3,750 $ 142,500 $ 150,000 Land: Acquire land/ easement for approaches Acquire approx. 21 acres land for RPZs of proposed Rwy 2- 20 extension $ 10,000 $ 10,000 $ 380,000 $ 400,000 Terminal Development: Construct Terminal Building - Capacity Construct new terminal building and parking/ utilities to serve new terminal building $ 30,000 $ 30,000 $ 1,140,000 $ 1,200,000 Airport Total: $ 43,750 $ 43,750 $ 1,662,500 $ 1,750,000 ERIC MARCUS MUNICIPAL PIMA Runways:< Extend/ Widen/ Strengthen> Runway [ to meet standards] - Standards Crack seal and seal coat Rwy ( approx. 228,000 sf). $ 6,250 $ 6,250 $ 237,500 $ 250,000 Airport Total: $ 6,250 $ 6,250 $ 237,500 $ 250,000 ERNEST A. LOVE FIELD YAVAPAI Apron: Construct Apron - Standards Construct Electrical Vault Relocation; Construct HIRL and sign install for Rwy 21L Extension. $ 25,000 $ 25,000 $ 950,000 $ 1,000,000 Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Service Road - Other Construct Service Road ( 12,500 x 50) for Rwy 21L Extension. $ 10,000 $ 10,000 $ 380,000 $ 400,000 Arizona Department of Transportation - Aeronautics Division 22 FY 2011 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Airport Total: $ 35,000 $ 35,000 $ 1,330,000 $ 1,400,000 FALCON FLD MARICOPA Other: Install < Guidance Signs/ Runway Incursion Caution Bars> [ non Part 139 CS] - Statutory Emphasis Programs Phase 2 - Reconfigure Twy B & Install Rwy guard lights along secondary Rwy 4L- 22R. $ 37,500 $ 37,500 $ 1,425,000 $ 1,500,000 Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> EA for Twy between airports Rwys ( approx. 5100 ft long & 75 ft wide. $ 2,500 $ 2,500 $ 95,000 $ 100,000 Runways: Construct Runway - Capacity Design high- speed Rwy exits between Rwy 4L- 22R and Twy E $ 1,875 $ 1,875 $ 71,250 $ 75,000 Airport Total: $ 41,875 $ 41,875 $ 1,591,250 $ 1,675,000 FLAGSTAFF PULLIAM COCONINO Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Capacity Mill and overlay or otherwise reconstruct Pulliam Drive from John Wesley Powell Blvd around in front of the Airport terminal building and back to where the road reconnects with itself approaching John Wesley Powell. $ 78,977 $ 78,976 $ 3,001,108 $ 3,159,061 Airport Total: $ 78,977 $ 78,976 $ 3,001,108 $ 3,159,061 GLENDALE MUNICIPAL MARICOPA Apron: Install Apron Lighting - Standards Install Lighting for 132,000 SY Apron. $ 7,550 $ 7,550 $ 286,900 $ 302,000 Land: Acquire land/ easement for approaches Acquire 18 acres north of Rwy 19 ( Acres 1- 18). $ 187,500 $ 187,500 $ 7,125,000 $ 7,500,000 Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> Environmental Assessment for Northwest Ramp and Eastside Twy. $ 6,250 $ 6,250 $ 237,500 $ 250,000 Runways: Rehabilitate Runway - Reconstruct Pavement Maintenance - slurry seal hangars, Twy, an Rwy. $ 5,000 $ 5,000 $ 190,000 $ 200,000 Airport Total: $ 206,300 $ 206,300 $ 7,839,400 $ 8,252,000 GRAND CANYON NATIONAL PARK COCONINO Terminal Development: Construct Terminal Building - Capacity Terminal location per ALP is mid field $ 100,000 $ 100,000 $ 3,800,000 $ 4,000,000 Airport Total: $ 100,000 $ 100,000 $ 3,800,000 $ 4,000,000 GRAND CANYON WEST MOHAVE Runways: Construct Runway [ includes relocation] - Standrads Runways: Shift and construct Runway 17/ 35, 5,000' x 75'. Project also includes connecting taxiways including grading, drainage, paving, lighting & visual aids ( Phase III) $ 250,000 $ 250,000 $ 9,500,000 $ 10,000,000 Airport Total: $ 250,000 $ 250,000 $ 9,500,000 $ 10,000,000 Arizona Department of Transportation - Aeronautics Division 23 FY 2011 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total GREENLEE COUNTY GREENLEE Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Other Design 3,100 ft x 24 ft entrance road relocation and 120 ft x 130 ft parking lot rehabilitation. $ 4,375 $ 4,375 $ 166,250 $ 175,000 Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities> [ MAP] - Other Utility Construction $ 5,000 $ 5,000 $ 190,000 $ 200,000 Airport Total: $ 9,375 $ 9,375 $ 356,250 $ 375,000 H. A. CLARK MEMORIAL FIELD COCONINO Land: Acquire land/ easement for approaches Acquire land off of rwy ends ( 277 acres) for rpz protection and accommodate rev generating activities. EA currently underway. $ 18,750 $ 18,750 $ 712,500 $ 750,000 Runways: Extend Runway- Capacity Extend Rwy 18 and parallel Txwy $ 50,000 $ 50,000 $ 1,900,000 $ 2,000,000 Runways: Install Runway < vertical/ visual> Guidance System [ PAPI/ VASI/ REIL/ ALS/ etc.] - Standards Upgrade PAPI to 4 Light System $ 1,875 $ 1,875 $ 71,250 $ 75,000 Airport Total: $ 70,625 $ 70,625 $ 2,683,750 $ 2,825,000 HOLBROOK MUNI NAVAJO Apron: Expand Apron - Capacity North east Apron Expansion ( 300 x 50 feet) $ 8,750 $ 8,750 $ 332,500 $ 350,000 Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Other Install Security Gates ( Main Gate) $ 2,250 $ 2,250 $ 85,500 $ 90,000 Heliport:< Construct/ Expand/ Improve/ Modify/ Rehabilitate> Helipad/ Heliport - Standards Install Helipad Lighting $ 1,125 $ 1,125 $ 42,750 $ 45,000 Other:< Light/ Mark/ Remove> Obstructions - Standards Relocate Fuel Station near Ramp Area $ 7,000 $ 7,000 $ 266,000 $ 280,000 Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> Environmental Assessment for North end Rwy 3/ 21 $ 4,375 $ 4,375 $ 166,250 $ 175,000 Airport Total: $ 23,500 $ 23,500 $ 893,000 $ 940,000 KAYENTA NAVAJO Buildings:< Construct/ Expand/ Improve/ Modify/ Rehabilitat e> Building - Standards Construct a building 60' x 40' to house SRE & Broom equipment. $ 10,000 $ 10,000 $ 380,000 $ 400,000 Equipment: Acquire Security Equipment/ Install Perimeter Fencing [ not Part 107] - Standards Wildlife fence airport perimeter, approx. 16,000 sy. $ 15,000 $ 15,000 $ 570,000 $ 600,000 Heliport:< Construct/ Expand/ Improve/ Modify/ Rehabilitate> Helipad/ Heliport - Capacity Construct helicopter parking pads north east of midfield apron. $ 12,500 $ 12,500 $ 475,000 $ 500,000 Taxiways: Construct Taxiway - Capacity Construct parallel Twy to Rwy 5/ 23 and connectors, 35' x 7,100' ( Grading and Drainage- Phase I). $ 30,000 $ 30,000 $ 1,140,000 $ 1,200,000 Airport Total: $ 67,500 $ 67,500 $ 2,565,000 $ 2,700,000 KINGMAN MOHAVE Arizona Department of Transportation - Aeronautics Division 24 FY 2011 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Apron: Rehabilitate Apron - Reconstruction Reconstruct the South Ramp ( approx. 66,100 sy). $ 100,000 $ 100,000 $ 3,800,000 $ 4,000,000 Land: Acquire land/ easement for approaches Purchase 80 acres northeast of the Rwy 21 end. $ 60,000 $ 60,000 $ 2,280,000 $ 2,400,000 Runways:< Extend/ Widen/ Strengthen> Runway [ to meet standards] - Standards Design a pavement strengthening for Rwy 3- 21 and Twy D. $ 5,000 $ 5,000 $ 190,000 $ 200,000 Airport Total: $ 165,000 $ 165,000 $ 6,270,000 $ 6,600,000 LAKE HAVASU CITY MOHAVE Land: Acquire < land/ easement> for development/ relocation Provide a Land Assessment ( Appraisal) of 23 Acres. $ 3,125 $ 3,125 $ 118,750 $ 125,000 Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities> [ MAP] - Other Replace existing metal airfield electrical vault with pre- engineered unit meeting current electrical codes. $ 8,000 $ 8,000 $ 304,000 $ 320,000 Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> Provide an Environmental Assessment of 23 Acres. $ 3,750 $ 3,750 $ 142,500 $ 150,000 Airport Total: $ 14,875 $ 14,875 $ 565,250 $ 595,000 LAUGHLIN/ BULLHEAD INTERNATIONAL MOHAVE Buildings:< Construct/ Expand/ Improve/ Modify/ Rehabilitat e> Aircraft Rescue & Fire Fighting Building [ Pt. 139 only] - Safety/ Security The project involves the construction of a new 8,000 SF ARFF Building. $ 60,000 $ 60,000 $ 2,280,000 $ 2,400,000 Land: Acquire < land/ easement> for development/ relocation The project involves the acquisition of 75 acres of ASLD property ( Phase 1). $ 93,750 $ 93,750 $ 3,562,500 $ 3,750,000 Runways: Extend Runway- Capacity This project will provide the site preparation/ earthwork for the 1,000 foot southerly extension to Rwy 16- 34. $ 125,000 $ 125,000 $ 4,750,000 $ 5,000,000 Airport Total: $ 278,750 $ 278,750 $ 10,592,500 $ 11,150,000 MARANA REGIONAL PIMA Land: Acquire < land/ easement> for development/ relocation Aquire Land - 244 Acres $ 152,500 $ 152,500 $ 5,795,000 $ 6,100,000 Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> EA for new Rwy & other airport projects $ 8,750 $ 8,750 $ 332,500 $ 350,000 Runways: Rehabilitate Runway - Reconstruct Reconstruct Rwy 3- 21 $ 10,000 $ 10,000 $ 380,000 $ 400,000 Taxiways: Construct Taxiway - Capacity Construct Twy H - NW of Rwy 3/ 21 $ 70,000 $ 70,000 $ 2,660,000 $ 2,800,000 Taxiways: Rehabilitate Taxiway - Reconstruct Rehabilitate Twy A, Twy B, Twy E $ 18,750 $ 18,750 $ 712,500 $ 750,000 Airport Total: $ 260,000 $ 260,000 $ 9,880,000 $ 10,400,000 Maricopa Municipal Equipment: Acquire Security Equipment/ Install Perimeter Fencing [ not Part 107] - Standards The project will include the installation of approximately 30,000 LF of perimeter fencing. $ 24,818 $ 24,818 $ 943,065 $ 992,700 Arizona Department of Transportation - Aeronautics Division 25 FY 2011 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total New Airports: Acquire [ existing] Airport - Standards The project involves the acquisition of 342 acres of ASLD property. $ 427,500 $ 427,500 $ 16,245,000 $ 17,100,000 New Airports: Construct New Airport - Capacity The project ivolves the grading and drainage of 644 acres of property for the initial airport development. $ 123,008 $ 123,008 $ 4,674,285 $ 4,920,300 Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities> [ MAP] - Other Installation of water, sewer, energy, and communication utilities for the initial 684 acres of new airport development. $ 14,175 $ 14,175 $ 538,650 $ 567,000 Airport Total: $ 589,500 $ 589,500 $ 22,401,000 $ 23,580,000 NOGALES INTL SANTA CRUZ Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Service Road - Other Construct 10,000 LF x 16 ft Perimeter Service Road around S End of Rwy 3- 21 $ 7,500 $ 7,500 $ 285,000 $ 300,000 Other: Improve Airport < Drainage/ Erosion Control/ miscellaneous improvements> - Standards Construct Water, Sanitary Sewer, Power & Comm. Extension to serve future hangar development in Terminal area $ 10,000 $ 10,000 $ 380,000 $ 400,000 Airport Total: $ 17,500 $ 17,500 $ 665,000 $ 700,000 PAGE MUNI COCONINO Apron: Expand/ Strengthen Apron - Standards Strengthen approximately 5,000 syds of the main apron to 75,000 lbs to accommodate larger aircraft. $ 15,000 $ 15,000 $ 570,000 $ 600,000 Runways: Rehabilitate Runway - Reconstruct Reconstruct the intersection of 15- 33 and 7- 25 and the east portion of 7- 25 to create a manageable slope for landing aircraft. $ 20,000 $ 20,000 $ 760,000 $ 800,000 Airport Total: $ 35,000 $ 35,000 $ 1,330,000 $ 1,400,000 PAYSON GILA Apron: Construct Apron - Standards 11- 02 - South of parallel taxiway, 21200 +/- square yards of asphalt pavement $ 5,000 $ 5,000 $ 190,000 $ 200,000 Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Service Road - Other 11- 01 - south side of airport, 2600 +/- sy of asphalt roadway and 2300 linear feet of fence $ 11,750 $ 11,750 $ 446,500 $ 470,000 Airport Total: $ 16,750 $ 16,750 $ 636,500 $ 670,000 PHOENIX DEER VALLEY MARICOPA Runways:< Construct/ Extend/ Improve> Runway Safety Area [ Primary Airports] - Safety/ Security Complete improvements to the runway safety area, recommended by the RSAT - Phase 2. $ 101,300 $ 101,300 $ 3,849,400 $ 4,052,000 Taxiways: Rehabilitate Taxiway - Reconstruct Reconstruct Taxiway A. $ 101,300 $ 101,300 $ 3,849,400 $ 4,052,000 Airport Total: $ 202,600 $ 202,600 $ 7,698,800 $ 8,104,000 PHOENIX GOODYEAR MARICOPA Equipment:< Acquire/ Install/ Rehabilitate> Emergency Generator - Standards Acquire emergency generator for ATCT. $ 2,500 $ 2,500 $ 95,000 $ 100,000 Arizona Department of Transportation - Aeronautics Division 26 FY 2011 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Capacity Construct north side on- airport access road and utility extension - Phase 1. $ 13,775 $ 13,775 $ 523,450 $ 551,000 Other: Environmental Mitigation Relocate Superfund cleanup wells. $ 8,750 $ 8,750 $ 332,500 $ 350,000 Runways:< Construct/ Extend/ Improve> Runway Safety Area [ Non- Primary Airports] - Standards Shift Runway 3- 21 by 300 feet to the southwest. $ 40,000 $ 40,000 $ 1,520,000 $ 1,600,000 Taxiways: Construct Taxiway - Capacity Construct west parallel taxiway and exits. $ 552,500 $ 552,500 $ 20,995,000 $ 22,100,000 Airport Total: $ 617,525 $ 617,525 $ 23,465,950 $ 24,701,000 PHOENIX SKY HARBOR INTL MARICOPA Apron: Rehabilitate Apron - Reconstruction Reconstruct West Cargo - East Apron in asphalt. $ 814,125 $ 814,125 $ 4,884,750 $ 6,513,000 Other: Noise Mitigation Measures [ miscellaneous] Sound mitigation and acquisition of eligible properties. $ 1,875,000 $ 1,875,000 $ 11,250,000 $ 15,000,000 Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Conduct Airport Master Plan $ 625,000 $ 625,000 $ 3,750,000 $ 5,000,000 Taxiways: Rehabilitate Taxiway - Reconstruct Replace Taxiway A asphalt with concrete and install new electrical airfield lighting. $ 1,938,719 $ 1,938,719 $ 11,632,312 $ 15,509,750 Airport Total: $ 5,252,844 $ 5,252,844 $ 31,517,062 $ 42,022,750 PHOENIX- MESA GATEWAY MARICOPA Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities> [ MAP] - Other Airfield/ Apron Drainage Improvements South of Twy L and including the South Industrial Area. $ 90,520 $ 90,520 $ 3,439,762 $ 3,620,802 Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities> [ MAP] - Other ATCT building code requirements assessment, foam basin construction and fire line extension construction are needed to comply with City of Mesa Bulding Code. MAP project requests. $ 77,895 $ 77,895 $ 2,960,010 $ 3,115,800 Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities> [ MAP] - Other Preliminary Planning required for east side terminal area infrastructure - utilities and drainage. Required before design phase. MAP project request. $ 16,250 $ 16,250 $ 617,500 $ 650,000 Other:< Light/ Mark/ Remove> Obstructions [ hazard only e. g., approaches] - Safety/ Security Design/ Construction of relocation of ASR pending site for East Side Terminal ( FAA may do this on their own) $ 55,000 $ 55,000 $ 2,090,000 $ 2,200,000 Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> EA for extension of Rwy 12L/ 30R, new terminal, fuel farm, roads, archeological areas, and other improvements. ( Archeological Clearance to be included). MAP project request. $ 33,575 $ 33,575 $ 1,275,850 $ 1,343,000 Taxiways:< Extend/ Widen/ Strengthen> Taxiway - Standards Design Twy C Extension from Twy J to Twy K & Txy K from Rwy 30L to Twy C. 10,000 SY PCCP, 9,334 SY Asphalt $ 12,500 $ 12,500 $ 475,000 $ 500,000 Taxiways: Rehabilitate Taxiway - Reconstruct Design/ Reconstruct Twy P, 75 ft W by 2,000 ft L with 35 ft shoulders each side. ( 16,700 SY) $ 154,650 $ 154,650 $ 5,876,700 $ 6,186,000 Taxiways: Rehabilitate Taxiway - Reconstruct Twy V Reconstruct Between Twy B & A ( intersecton West on Twy V) 75 ft W x 800 ft L with 35 ft shoulders each side ( 12,900 SY) $ 29,348 $ 29,349 $ 1,115,243 $ 1,173,940 Arizona Department of Transportation - Aeronautics Division 27 FY 2011 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Terminal Development: Construct Terminal Building - Capacity Preliminary Plan. for East Side Terminal Area. Conceptual Layout of Terminal bldg., roads, vehicle/ aircraft parking, support facilities. MAP project request. $ 10,800 $ 10,800 $ 410,400 $ 432,000 Airport Total: $ 480,538 $ 480,539 $ 18,260,465 $ 19,221,542 POLACCA NAVAJO Runways: Construct Runway - Capacity Construct Rwy ( 75' x 5,000') and apron ( Phase 1- Grading and Drainage). $ 150,000 $ 150,000 $ 5,700,000 $ 6,000,000 Airport Total: $ 150,000 $ 150,000 $ 5,700,000 $ 6,000,000 RYAN FIELD PIMA Equipment:< Acquire/ Install/ Rehabilitate> Emergency Generator - Standards Install 170 KW/ 192 KVA 120/ 208 volt three phase four wire standby generator $ 7,744 $ 7,744 $ 294,278 $ 309,766 Equipment:< Acquire/ Install/ Rehabilitate> Emergency Generator - Standards Install a 230 KW 120/ 240 volt single phase standby generator to provide backup for all current & future airfield lighting $ 5,209 $ 5,209 $ 197,942 $ 208,360 Equipment: Acquire Equipment ( e. g., Sweepers, etc.) - Standards Acquire a new Rwy sweeper $ 4,548 $ 4,548 $ 172,816 $ 181,912 Runways: Install Runway Lighting ( HIRL, MIRL, TDZ, LAHSO or CL) - Standards Install an electronic system to monitor and control the airfield lighting system $ 15,636 $ 15,636 $ 594,177 $ 625,449 Airport Total: $ 33,137 $ 33,137 $ 1,259,213 $ 1,325,487 SAFFORD REGIONAL GRAHAM Equipment: Acquire Equipment ( e. g., Sweepers, etc.) - Standards Acquire sweeper. $ 3,750 $ 3,750 $ 142,500 $ 150,000 Other:< Construct/ Rehabilitate> Parking Lot [ non revenue producing- non hub/ MAP] - Other Expand auto parking area & reconstruct existing auto parking area ( approx. 100 ft x 200 ft). $ 1,875 $ 1,875 $ 71,250 $ 75,000 Runways: Rehabilitate Runway < Lighting/ Electrical Vault> Remove/ Replace existing MITLs/ bases and associated conduit/ cable; install new vault equipment. $ 3,750 $ 3,750 $ 142,500 $ 150,000 Terminal Development: Construct Terminal Building - Capacity Design new terminal building and associated utilities. $ 6,250 $ 6,250 $ 237,500 $ 250,000 Airport Total: $ 15,625 $ 15,625 $ 593,750 $ 625,000 SAN MANUEL PINAL Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> EA of Airport Property plus parcel A and B ( 200 acres) $ 3,125 $ 3,125 $ 118,750 $ 125,000 Runways: Install Runway Lighting ( HIRL, MIRL, TDZ, LAHSO or CL) - Standards Install Runway Lighting, approx. 4,214 lf $ 16,250 $ 16,250 $ 617,500 $ 650,000 Airport Total: $ 19,375 $ 19,375 $ 736,250 $ 775,000 Arizona Department of Transportation - Aeronautics Division 28 FY 2011 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total SCOTTSDALE MARICOPA Apron: Rehabilitate Apron - Reconstruction This project will involve reconstructing the large aircraft parking apron located on the west side of the airfield near the Landmark Aviation ( south) facility 34,000 sy. $ 57,500 $ 57,500 $ 2,185,000 $ 2,300,000 Runways:< Construct/ Extend/ Improve> Runway Safety Area [ Primary Airports] - Safety/ Security This project will involve installing concrete pads or other similar material in the airport's retention basin. $ 6,750 $ 6,750 $ 256,500 $ 270,000 Airport Total: $ 64,250 $ 64,250 $ 2,441,500 $ 2,570,000 SEDONA YAVAPAI Apron: Construct Apron - Standards The project will expand Apron A to the southwest. It is the second phase of a two phase project. Phase 2 will include a 350 ft by 410 ft expansion. $ 33,405 $ 33,405 $ 1,269,400 $ 1,336,210 Apron: Rehabilitate Apron - Reconstruction Reconstruct Apron A, approx. 31,100 SY. $ 58,497 $ 58,496 $ 2,222,869 $ 2,339,862 Other:< Construct/ Rehabilitate> Parking Lot [ non revenue producing- non hub/ MAP] - Other Construct terminal parking lot expansion to the north approx. 200 ft X 250 ft. $ 13,056 $ 13,055 $ 496,110 $ 522,221 Taxiways: Construct Taxiway - Capacity Construct Taxilane B- 6 and new hangar pads. $ 7,500 $ 7,500 $ 285,000 $ 300,000 Airport Total: $ 112,458 $ 112,456 $ 4,273,379 $ 4,498,293 SHOW LOW REGIONAL NAVAJO Apron: Construct Apron - Capacity Construct East Apron Ph 2, approx. 13,000 square yards ( 11- 1) $ 20,000 $ 20,000 $ 760,000 $ 800,000 Equipment: Acquire < Snow Removal Equipment/ Urea Truck/ etc.> - Standards Acquire SRE Equipment ( 11- 2) $ 9,375 $ 9,375 $ 356,250 $ 375,000 Airport Total: $ 29,375 $ 29,375 $ 1,116,250 $ 1,175,000 SIERRA VISTA MUNI- LIBBY AAF COCHISE Taxiways: Rehabilitate Taxiway - Reconstruct Construct Twy J realignment between Rwy 12/ 30 & Twy G ( approx. 1570 ft x 75 ft, 13100 sy). $ 87,500 $ 87,500 $ 3,325,000 $ 3,500,000 Airport Total: $ 87,500 $ 87,500 $ 3,325,000 $ 3,500,000 SPRINGERVILLE MUNI APACHE Runways: Rehabilitate Runway - Reconstruct Runway 3/ 21 resurfacing phase 3 ( construction) $ 50,000 $ 50,000 $ 1,900,000 $ 2,000,000 Taxiways:< Extend/ Widen/ Strengthen> Taxiway - Standards Construct new taxilanes on the southeast side of Runway 11/ 29 ( Design only) $ 2,500 $ 2,500 $ 95,000 $ 100,000 Taxiways: Construct Taxiway [ includes relocation] Parallel taxiway for Runway 3/ 21 the project will be phased ( Design) $ 5,750 $ 5,750 $ 218,500 $ 230,000 Airport Total: $ 58,250 $ 58,250 $ 2,213,500 $ 2,330,000 ST JOHNS INDUSTRIAL AIR PARK APACHE Arizona Department of Transportation - Aeronautics Division 29 FY 2011 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Buildings:< Construct/ Expand/ Imp/ Modify/ Rehabilitate> < Snow Removal Equipment/ Chemical Storage Building/ etc.> - Standards Buildings: Construct South of Rwy 14/ 32, approx. 40' x 50'. $ 8,750 $ 8,750 $ 332,500 $ 350,000 Airport Total: $ 8,750 $ 8,750 $ 332,500 $ 350,000 TAYLOR NAVAJO Apron: Expand Apron - Capacity Expand NE of existing apron, approx. 7,000 sf. $ 50,000 $ 50,000 $ 1,900,000 $ 2,000,000 Other:< Light/ Mark/ Remove> Obstructions - Standards Remove tall trees in Terminal Area $ 1,250 $ 1,250 $ 47,500 $ 50,000 Other: Improve Airport < Drainage/ Erosion Control/ miscellaneous improvements> - Standards Remove mobile home from Terminal Area to off airport property, approx. 40' x 50'. $ 500 $ 500 $ 19,000 $ 20,000 Airport Total: $ 51,750 $ 51,750 $ 1,966,500 $ 2,070,000 TUCSON INTL PIMA Apron: Rehabilitate Apron - Reconstruction Remove and replace portion of apron with 16in PCC pavement. $ 98,177 $ 98,177 $ 2,000,000 $ 2,196,354 Buildings:< Construct/ Expand/ Improve/ Modify/ Rehabilitat e> Building - Standards Relocate EOC to old customs area and provide approx. 1,600 sf of operating space. $ 33,019 $ 33,019 $ 672,637 $ 738,675 Runways: Construct Runway - Capacity Design engineering, surveying & geo- technical services to establish grading, drainage, paving, lighting, signage, marking and appurtenances for the proposed construction of a parallel rwy. $ 403,986 $ 403,986 $ 8,229,747 $ 9,037,719 Runways: Construct Runway [ includes relocation] - Standrads Reconstruct existing twy, construct new access roads, taxiways, drainage, fencing, lighting, water service, sewer service, electric and telephone for new GA area. Demo existing yard building and relocate drainageway. $ 164,971 $ 164,970 $ 3,360,678 $ 3,690,619 Runways: Install Runway < vertical/ visual> Guidance System [ PAPI/ VASI/ REIL/ ALS/ etc.] - Standards Install lighting control and monitoring system for all Rwy and Twy lighting systems. $ 111,830 $ 111,830 $ 2,278,135 $ 2,501,795 Airport Total: $ 811,983 $ 811,982 $ 16,541,197 $ 18,165,162 WHITERIVER NAVAJO Taxiways: Construct Taxiway - Capacity Construct Connector Twy. $ 8,750 $ 8,750 $ 332,500 $ 350,000 Airport Total: $ 8,750 $ 8,750 $ 332,500 $ 350,000 WICKENBURG MUNI MARICOPA Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Capacity Construct a 1,300 foot extension to the access road on the south side of the airport. $ 14,075 $ 14,075 $ 534,850 $ 563,000 Airport Total: $ 14,075 $ 14,075 $ 534,850 $ 563,000 WINSLOW- LINDBERGH REGIONAL NAVAJO Arizona Department of Transportation - Aeronautics Division 30 FY 2011 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Equipment: Acquire Security Equipment/ Install Perimeter Fencing [ not Part 107] - Standards Install 3,500 LF Perimeter Fencing along the approach end of Rwy 29 - Phase II. $ 10,000 $ 10,000 $ 380,000 $ 400,000 Heliport:< Construct/ Expand/ Improve/ Modify/ Rehabilitate> Helipad/ Heliport - Capacity Construct 184' x 160' Heliport. $ 10,000 $ 10,000 $ 380,000 $ 400,000 Heliport:< Construct/ Expand/ Improve/ Modify/ Rehabilitate> Helipad/ Heliport - Capacity Construct electrical associated with 184' x 160' heliport. $ 2,500 $ 2,500 $ 95,000 $ 100,000 Land: Acquire land/ easement for approaches Acquire 30 acres land for RSA/ OFA. $ 6,250 $ 6,250 $ 237,500 $ 250,000 Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities> [ MAP] - Other Utility improvements for future airport development. $ 12,500 $ 12,500 $ 475,000 $ 500,000 Runways: Rehabilitate Runway - Reconstruct Construct 308,000 SY Airfield Pavement Preservation. $ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000 Taxiways: Construct Taxiway - Capacity Taxilanes off of South Apron for future airport development. $ 20,000 $ 20,000 $ 760,000 $ 800,000 Airport Total: $ 123,750 $ 123,750 $ 4,702,500 $ 4,950,000 YUMA MCAS/ YUMA INTL YUMA Apron: Construct Apron - Standards CONSTRUCT: DCC apron Phase 2 ( approximately 26,000 sy, 150 yd x 170 yd). Apron is adjacent to 40th Street apron constructed in 2007. $ 72,368 $ 72,369 $ 2,750,000 $ 2,894,737 Taxiways:< Extend/ Widen/ Strengthen> Taxiway - Standards DESIGN widening of Twys Z, Z2 and Z3 to Design Group III. Approximately 35,000 sy of asphalt needed to widen from 35 ft to 50 ft. $ 6,579 $ 6,579 $ 250,000 $ 263,158 Airport Total: $ 78,947 $ 78,948 $ 3,000,000 $ 3,157,895 Total Fiscal Year Grants: $ 11,364,429 $ 11,364,426 $ 249,443,128 $ 272,171,983 Arizona Department of Transportation - Aeronautics Division 31 FY 2012 State & Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total ADOT Aeronautics APMS - Runway Pavement Preservation $ 4,932,000 $ 548,000 $ 0 $ 5,480,000 Planning: Planning Studies Conduct $ 300,000 $ 0 $ 0 $ 300,000 Airport Total: $ 5,232,000 $ 548,000 $ 0 $ 5,780,000 BENSON MUNICIPAL COCHISE Apron: Apron Construct Design Apron Expansion ( approx. 23,000 sy, E. of existing Apron) $ 90,000 $ 10,000 $ 0 $ 100,000 Airport Total: $ 90,000 $ 10,000 $ 0 $ 100,000 CHANDLER MUNI MARICOPA Apron: Apron Construct Design 22,400 SY apron area. $ 162,000 $ 18,000 $ 0 $ 180,000 Apron: Apron Construct Design 26,100 SY apron area ( So. Side) $ 2,100 $ 206,900 $ 0 $ 209,000 Apron: Apron Construct Design 35,400 SY apron area. ( So. Side) $ 232,200 $ 25,800 $ 0 $ 258,000 Apron: Apron Construct Design 45,700 SY apron area. ( So. Side) $ 288,000 $ 32,000 $ 0 $ 320,000 Airport Total: $ 684,300 $ 282,700 $ 0 $ 967,000 ERIC MARCUS MUNICIPAL PIMA Other: Pavement Marking Install Re- paint non- precision Rwy markings ( includes existing Threshold markers, Rwy numbers, centerline & border striping), Add fixed distance markers. $ 22,500 $ 2,500 $ 0 $ 25,000 Airport Total: $ 22,500 $ 2,500 $ 0 $ 25,000 ERNEST A. LOVE FIELD YAVAPAI Taxiways: Taxiway Construct Design 1,200' x 50' Twy F Extension. $ 45,000 $ 5,000 $ 0 $ 50,000 Taxiways: Taxiway Construct Design 1,500 ft x 50 ft Twy B Extension. $ 45,000 $ 5,000 $ 0 $ 50,000 Airport Total: $ 90,000 $ 10,000 $ 0 $ 100,000 FALCON FLD MARICOPA Apron: Apron Construct Design apron expansion of existing Anzio Ramp & secondary ramp at old fuel farm location. ( 780 ft x 220 ft) $ 135,000 $ 15,000 $ 0 $ 150,000 Runways: REIL Upgrade/ Modification Design upgrade of existing 2- box PAPI units to 4- box PAPI units for Rwy 4R- 22L and relocate the REILs. $ 67,500 $ 7,500 $ 0 $ 75,000 Runways: Runway Construct Design 100 ft x 75 ft blast pads at ends of Rwy 4L/ 22R $ 67,500 $ 7,500 $ 0 $ 75,000 Airport Total: $ 270,000 $ 30,000 $ 0 $ 300,000 Arizona Department of Transportation - Aeronautics Division 32 FY 2012 State & Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total FLAGSTAFF PULLIAM COCONINO Taxiways: Taxiway Reconstruct Evaluate and Design existing taxilanes between and around hangars and shades. Construct drainage improvements $ 498,886 $ 55,432 $ 0 $ 554,318 Airport Total: $ 498,886 $ 55,432 $ 0 $ 554,318 GREENLEE COUNTY GREENLEE Runways: Runway Construct Design Rwy Extension ( 300 ft x 100 ft) and Twy Extension ( 500 ft x 50 ft) $ 157,500 $ 17,500 $ 0 $ 175,000 Airport Total: $ 157,500 $ 17,500 $ 0 $ 175,000 H. A. CLARK MEMORIAL FIELD COCONINO Apron: Apron Construct Design GA Apron Phased Expansion - North ( approx. 4,000 sy) $ 67,500 $ 7,500 $ 0 $ 75,000 Airport Total: $ 67,500 $ 7,500 $ 0 $ 75,000 MARANA REGIONAL PIMA Land: Land ( Protection) Acquisition Aquire land - 129 Acres $ 684,300 $ 2,540,700 $ 0 $ 3,225,000 Airport Total: $ 684,300 $ 2,540,700 $ 0 $ 3,225,000 PHOENIX DEER VALLEY MARICOPA Apron: Apron Reconstruct Reconstruct north ramp. Approximate Total Area: 388,000 square yards. State/ local = 15,857 square yards. $ 499,500 $ 55,500 $ 0 $ 555,000 Airport Total: $ 499,500 $ 55,500 $ 0 $ 555,000 PHOENIX GOODYEAR MARICOPA Terminal Development: Auto Parking Reconstruct Reconstruct employee paved parking lot. Approximate Total Area: 125,000 square feet or 13,888 square yards. $ 42,300 $ 4,700 $ 0 $ 47,000 Airport Total: $ 42,300 $ 4,700 $ 0 $ 47,000 PHOENIX SKY HARBOR INTL MARICOPA Apron: Apron Reconstruct Reconstruct West Hold Bay in asphalt - Phase 1. Total approximate area = 61,111 square yards. State/ Local approximate area = 17,343 square yards. $ 499,500 $ 55,500 $ 0 $ 555,000 Airport Total: $ 499,500 $ 55,500 $ 0 $ 555,000 PHOENIX- MESA GATEWAY MARICOPA Apron: Apron Construct Design/ construct compass rose for aircraft testing. $ 7,680 $ 836,500 $ 0 $ 844,180 Arizona Department of Transportation - Aeronautics Division 33 FY 2012 State & Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Other: Fire Protection Design/ Construct 2 additional pumps for fire protection system for South Central area and extend pipeline to remaining lots. $ 676,620 $ 75,180 $ 0 $ 751,800 Airport Total: $ 684,300 $ 911,680 $ 0 $ 1,595,980 RYAN FIELD PIMA Runways: MIRL/ HIRL Install Install MIRL on Rwy 6L/ 24R $ 675,000 $ 75,000 $ 0 $ 750,000 Taxiways: MITL/ HITL Install Install MITL for Twy A & connecting Twys from Rwy 6L/ 24R. Also included are entire lengths of Twys A2, A4, B2 & B4 $ 9,300 $ 740,700 $ 0 $ 750,000 Airport Total: $ 684,300 $ 815,700 $ 0 $ 1,500,000 SAFFORD REGIONAL GRAHAM Other: Fencing ( Perimeter) Install Install 6- foot chain link perimeter fence ( approx. 4,000 LF) with 3- strand barb- wire. $ 36,000 $ 4,000 $ 0 $ 40,000 Airport Total: $ 36,000 $ 4,000 $ 0 $ 40,000 SHOW LOW REGIONAL NAVAJO Runways: Runway Construct Design standard EMAS for Rwy 6 end ( 12- 1) $ 202,500 $ 22,500 $ 0 $ 225,000 Airport Total: $ 202,500 $ 22,500 $ 0 $ 225,000 TUCSON INTL PIMA Other: Perimeter Road Reconstruction Construct new 24 ft AC pavement perimeter road from Twy D3 to A13. $ 684,300 $ 609,513 $ 0 $ 1,293,813 Airport Total: $ 684,300 $ 609,513 $ 0 $ 1,293,813 WICKENBURG MUNI MARICOPA Heliport: Heliport Construct This project includes the construction ( Phase II) of the future Heliport development area ( 6,000 SY). The area is located northeast of the existing T-Hangar area. $ 567,000 $ 63,000 $ 0 $ 630,000 Airport Total: $ 567,000 $ 63,000 $ 0 $ 630,000 Total Fiscal Year Grants: $ 11,696,686 $ 6,046,425 $ 0 $ 17,743,111 Arizona Department of Transportation - Aeronautics Division 34 FY 2012 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total AVI SUQUILLA LA PAZ Taxiways:< Extend/ Widen/ Strengthen> Taxiway - Standards Completion of Parallel Twy to Rwy 1- 19 approximately 4800' x 50' - completes full parallel Twy to Rwy and allows Exit Twy A2 to be reconfigured or eliminated. $ 42,800 $ 42,800 $ 1,626,400 $ 1,712,000 Taxiways: Install Taxiway Lighting ( e. g., SMGCS, reflectors, MITL) - Standards MITL and Guidance signs for 4,800 LF parallel Twy constructed above to meet FAA standards. $ 8,125 $ 8,125 $ 308,750 $ 325,000 Airport Total: $ 50,925 $ 50,925 $ 1,935,150 $ 2,037,000 BENSON MUNICIPAL COCHISE Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Other Reconstruct/ Rehab Access Rd ( Approx. 750 LF) $ 3,750 $ 3,750 $ 142,500 $ 150,000 Land: Acquire < land/ easement> for development/ relocation Land Acquisition ( 239 acres) So. Side of Airport $ 37,500 $ 37,500 $ 1,425,000 $ 1,500,000 Runways: Extend Runway- Capacity Extend Rwy/ Twy Ph I ( approx 1,400 LF, West End) $ 41,250 $ 41,250 $ 1,567,500 $ 1,650,000 Runways: Install Runway < vertical/ visual> Guidance System [ PAPI/ VASI/ REIL/ ALS/ etc.] - Standards Upgrade PAPI to 4 Light System $ 1,875 $ 1,875 $ 71,250 $ 75,000 Taxiways: Construct Taxiway - Capacity Construct connector Twys/ Taxilanes ( approx. 80x35 & 120x75, Connect Rwy to Prtl. Twy E. of Rwy 10 end & Taxilane W of T- Hangar Pads) $ 8,750 $ 8,750 $ 332,500 $ 350,000 Airport Total: $ 93,125 $ 93,125 $ 3,538,750 $ 3,725,000 BISBEE DOUGLAS INTL COCHISE Apron: Construct Apron - Standards Pavement overlay 25,000 sy on existing PCC apron ( north end) $ 20,000 $ 20,000 $ 760,000 $ 800,000 Airport Total: $ 20,000 $ 20,000 $ 760,000 $ 800,000 BISBEE MUNI COCHISE Apron: Expand/ Strengthen Apron - Standards Expand main apron to accomodate existing hangar locations, reconstruct existing apron pavement ( 22,300 SY of asphalt pavement). $ 32,500 $ 32,500 $ 1,235,000 $ 1,300,000 Land: Acquire land/ easement for approaches Land acquistion - approximately 6.40 acres. $ 6,250 $ 6,250 $ 237,500 $ 250,000 Other:< Construct/ Rehabilitate> Parking Lot [ non revenue producing- non hub/ MAP] - Other Construct paved ( asphalt) parking lot adjacent to new terminal building ( approximately 65 ft x 465 ft). $ 1,875 $ 1,875 $ 71,250 $ 75,000 Other: Install < Guidance/ other> Signs [ not Part 139] - Standards Install new Rwy 17/ 35 guidance signs at locations where existing signs are broken, install new signs at locations where needed but do not currently have signs. $ 21,250 $ 21,250 $ 807,500 $ 850,000 Terminal Development: Construct Terminal Building - Capacity Construct new terminal building ( including utilities). $ 8,750 $ 8,750 $ 332,500 $ 350,000 Airport Total: $ 70,625 $ 70,625 $ 2,683,750 $ 2,825,000 Arizona Department of Transportation - Aeronautics Division 35 FY 2012 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total BUCKEYE MUNI MARICOPA Land: Acquire land/ easement for approaches Purchase approximately 25 acres of land north of the airport to secure RPZ and allow for future Rwy extension ( Phase 3). $ 137,500 $ 137,500 $ 5,225,000 $ 5,500,000 Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities> [ MAP] - Other Design and construct an aircraft wash rack adjacent to the south ramp. $ 7,500 $ 7,500 $ 285,000 $ 300,000 Other:< Construct/ Rehabilitate> Parking Lot [ non revenue producing- non hub/ MAP] - Other Design and construct an automobile parking area outside the interior security fence. $ 20,000 $ 20,000 $ 760,000 $ 800,000 Airport Total: $ 165,000 $ 165,000 $ 6,270,000 $ 6,600,000 CHANDLER MUNI MARICOPA Apron: Construct Apron - Capacity Construct 29,500 SY apron area. $ 73,875 $ 73,875 $ 2,807,250 $ 2,955,000 Runways:< Construct/ Extend/ Improve> Runway Safety Area [ Primary Airports] - Safety/ Security Design/ construct, mark 95,000 SY of stabilized shoulder ( emulsified asphalt & aggregate mix). $ 23,462 $ 23,463 $ 891,575 $ 938,500 Airport Total: $ 97,337 $ 97,338 $ 3,698,825 $ 3,893,500 CIBECUE NAVAJO New Airports: Construct New Airport - Standards New Cibecue Airport Site, Phase III Lighting and Visual Aids. $ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000 Airport Total: $ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000 COCHISE COUNTY COCHISE Runways: Rehabilitate Runway - Reconstruct Reconstruct NW section of Rwy 14- 32 ( open turf) $ 12,500 $ 12,500 $ 475,000 $ 500,000 Airport Total: $ 12,500 $ 12,500 $ 475,000 $ 500,000 COLORADO CITY MUNI MOHAVE Taxiways: Extend Taxiway - Capacity SE portion of parallel Twy on NE side of Rwy 11/ 29 $ 17,500 $ 17,500 $ 665,000 $ 700,000 Airport Total: $ 17,500 $ 17,500 $ 665,000 $ 700,000 COOLIDGE MUNI PINAL Taxiways: Construct Taxiway - Capacity Construct new Twy extending from Twy F ( 1,000 ft to E and then 800 ft to N) $ 24,176 $ 24,176 $ 918,680 $ 967,032 Airport Total: $ 24,176 $ 24,176 $ 918,680 $ 967,032 COTTONWOOD YAVAPAI Land: Acquire < land/ easement> for development/ relocation Purchase 11 acres of property at the southwest corner of the airport. $ 17,500 $ 17,500 $ 665,000 $ 700,000 Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Update the Airport Master Plan $ 5,000 $ 5,000 $ 190,000 $ 200,000 Airport Total: $ 22,500 $ 22,500 $ 855,000 $ 900,000 Arizona Department of Transportation - Aeronautics Division 36 FY 2012 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total ELOY MUNI PINAL Apron: Rehabilitate Apron - Reconstruction Reconstruction of approx. 15,450 SY of asphalt concrete pavement ( approx. 200 ft x 700 ft) apron, and installation of apron lighting $ 25,000 $ 25,000 $ 950,000 $ 1,000,000 Runways: Extend Runway- Capacity Construct Rwy 2- 20 extensions ( 750 ft on north side, 850 ft on south side), Construct Twy A extension, and Construct two new end connector Twys $ 40,000 $ 40,000 $ 1,520,000 $ 1,600,000 Airport Total: $ 65,000 $ 65,000 $ 2,470,000 $ 2,600,000 ERNEST A. LOVE FIELD YAVAPAI Other: Improve Airport < Drainage/ Erosion Control/ miscellaneous improvements> - Standards Construct Drainage Improvements as part of Rwy and Twy Extension. $ 37,500 $ 37,500 $ 1,425,000 $ 1,500,000 Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> Conduct Environmental Assessment Update for construction of Rwy 21L Extension and new Terminal Building. $ 6,250 $ 6,250 $ 237,500 $ 250,000 Runways: Construct Runway - Capacity Construct Rwy 21L and Twys C, D, & H extensions to minimum of 9,300 ft and 200K lbs. $ 250,000 $ 250,000 $ 9,500,000 $ 10,000,000 Terminal Development: Construct Terminal Building - Capacity Construct 21,000 SF Terminal Building. $ 332,500 $ 332,500 $ 12,635,000 $ 13,300,000 Airport Total: $ 626,250 $ 626,250 $ 23,797,500 $ 25,050,000 FALCON FLD MARICOPA Runways: Construct Runway - Capacity Construct 4- 6 high- speed Rwy exits on Rwy 4L- 22R. $ 19,700 $ 19,700 $ 748,600 $ 788,000 Taxiways: Construct Taxiway - Capacity Design a 5100 x 75 ft Twy between Rwys $ 6,250 $ 6,250 $ 237,500 $ 250,000 Airport Total: $ 25,950 $ 25,950 $ 986,100 $ 1,038,000 FLAGSTAFF PULLIAM COCONINO Taxiways: Rehabilitate Taxiway - Reconstruct Phase 1 - Rebuild existing taxilanes between and around hangars and shades. Construct drainage improvements throughout. $ 71,968 $ 71,969 $ 2,734,795 $ 2,878,732 Airport Total: $ 71,968 $ 71,969 $ 2,734,795 $ 2,878,732 GILA BEND MUNI MARICOPA Heliport:< Construct/ Expand/ Improve/ Modify/ Rehabilitate> Helipad/ Heliport - Capacity Construct a lighted helicopter pad including rotorcraft parking. $ 3,375 $ 3,375 $ 128,250 $ 135,000 Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Prepare an Environmental Assessment for the extension of Rwy 4/ 22 1,300 feet to the northeast. $ 3,000 $ 3,000 $ 114,000 $ 120,000 Runways: Install Runway < Vertical/ Visual> Guidance System [ PAPI/ VASI/ REIL/ ALS/ etc.] - Statutory Emphasis Programs Install REIL on both ends of Rwy 4/ 22. $ 1,750 $ 1,750 $ 66,500 $ 70,000 Airport Total: $ 8,125 $ 8,125 $ 308,750 $ 325,000 Arizona Department of Transportation - Aeronautics Division 37 FY 2012 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total GLENDALE MUNICIPAL MARICOPA Land: Acquire < land/ easement> for development/ relocation Acquire 7 acres - northwest corner. $ 70,825 $ 70,825 $ 2,691,350 $ 2,833,000 Land: Acquire land/ easement for approaches Acquire 18 acres of land north of Rwy 19 ( Acres 18- 36). $ 187,500 $ 187,500 $ 7,125,000 $ 7,500,000 Runways: Rehabilitate Runway - Reconstruct Pavement Maintenance - slurry seal hangars, Twy, and Rwy. $ 5,000 $ 5,000 $ 190,000 $ 200,000 Airport Total: $ 263,325 $ 263,325 $ 10,006,350 $ 10,533,000 GRAND CANYON NATIONAL PARK COCONINO Terminal Development: Construct Terminal Building - Capacity Terminal building located at mid point of airport per ALP. $ 100,000 $ 100,000 $ 3,800,000 $ 4,000,000 Airport Total: $ 100,000 $ 100,000 $ 3,800,000 $ 4,000,000 GRAND CANYON WEST MOHAVE Apron: Construct Apron - Standards Apron: Construct east edge of main apron, approx. 800' x 200' $ 11,250 $ 11,250 $ 427,500 $ 450,000 Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Update Airport Master Plan $ 5,000 $ 5,000 $ 190,000 $ 200,000 Runways: Construct Runway [ includes relocation] - Standrads Runways: Shift and construct Runway 17/ 35, 5,000' x 75'. Project also includes connecting taxiways including grading, drainage, paving, lighting and visual aids. ( Phase IV) $ 250,000 $ 250,000 $ 9,500,000 $ 10,000,000 Taxiways: Construct Taxiway [ includes relocation] Taxiways: Construct parallel taxiway to Runway 17/ 35, 5,000' x 75' and convert temporary runway to parallel taxiway A ( including lighting) $ 14,500 $ 14,500 $ 551,000 $ 580,000 Airport Total: $ 280,750 $ 280,750 $ 10,668,500 $ 11,230,000 GREENLEE COUNTY GREENLEE Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Other Construct 3,100 ft x 24 ft entrance road relocation and 120 ft x 130 ft parking lot rehabilitation. $ 13,750 $ 13,750 $ 522,500 $ 550,000 Runways: Extend Runway- Capacity Construct Runway Extension ( 300 ft x 100 ft) $ 18,750 $ 18,750 $ 712,500 $ 750,000 Runways: Install Runway Lighting ( HIRL, MIRL) [ Required by Part 139] - Safety/ Security Construct electrical associated with Rwy Extension $ 2,500 $ 2,500 $ 95,000 $ 100,000 Runways: Rehabilitate Runway - Reconstruct Design 82,000 SY pavement rehabilitation for Rwy and Twy $ 1,875 $ 1,875 $ 71,250 $ 75,000 Taxiways: Extend Taxiway - Capacity Construct 500 ft x 50 ft Twy A Extension $ 8,750 $ 8,750 $ 332,500 $ 350,000 Taxiways: Install Taxiway Lighting ( MITL) [ Required by Part 139] - Safety/ Security Construct electrical associated with Twy A Extension $ 1,875 $ 1,875 $ 71,250 $ 75,000 Airport Total: $ 47,500 $ 47,500 $ 1,805,000 $ 1,900,000 Arizona Department of Transportation - Aeronautics Division 38 FY 2012 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total H. A. CLARK MEMORIAL FIELD COCONINO Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Other Rehabilitate Airport Access Road ( approx 1,000 lf) $ 18,750 $ 18,750 $ 712,500 $ 750,000 Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Service Road - Other Construct Perimeter Road ( appox) 18,000 lf $ 18,750 $ 18,750 $ 712,500 $ 750,000 Airport Total: $ 37,500 $ 37,500 $ 1,425,000 $ 1,500,000 HOLBROOK MUNI NAVAJO Land: Acquire land/ easement for approaches Land Acqisition for Runway 3/ 21 Extention ( north end runway 3/ 21) $ 12,500 $ 12,500 $ 475,000 $ 500,000 Airport Total: $ 12,500 $ 12,500 $ 475,000 $ 500,000 KAYENTA NAVAJO Taxiways: Construct Taxiway - Capacity Construct parallel Twy to Runway 5/ 23 and connectors, 35' x 7,100' ( Paving- Phase II). $ 45,000 $ 45,000 $ 1,710,000 $ 1,800,000 Taxiways: Install Taxiway Lighting ( e. g., SMGCS, reflectors, MITL) - Standards Install along Rwy 5/ 23' s parallel Twy 35' x 7,100'. $ 10,000 $ 10,000 $ 380,000 $ 400,000 Airport Total: $ 55,000 $ 55,000 $ 2,090,000 $ 2,200,000 KINGMAN MOHAVE Other: Improve Airport < Drainage/ Erosion Control/ miscellaneous improvements> - Standards Phase 1 - Construct airfield drainage improvements. $ 25,000 $ 25,000 $ 950,000 $ 1,000,000 Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Update the Airport Master Plan. $ 5,000 $ 5,000 $ 190,000 $ 200,000 Runways:< Extend/ Widen/ Strengthen> Runway [ to meet standards] - Standards Construct pavement strenghtening of Rwy 3- 21 and Twy D. $ 67,500 $ 67,500 $ 2,565,000 $ 2,700,000 Airport Total: $ 97,500 $ 97,500 $ 3,705,000 $ 3,900,000 LAKE HAVASU CITY MOHAVE Apron: Construct Apron - Standards Redesignate portion of North Parking Apron to accommodate air cargo aircraft during loading and unloading operations. $ 5,275 $ 5,275 $ 200,450 $ 211,000 Apron: Install Apron Lighting - Standards Replace existing aircraft parking apron lights and beacon. $ 6,700 $ 6,700 $ 254,600 $ 268,000 Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Other Construct Auto Truck Access/ Parking on North Apron to accommodate air cargo ground vehicles during loading and unloading operations. $ 7,050 $ 7,050 $ 267,900 $ 282,000 Other:< Light/ Mark/ Remove> Obstructions - Standards Remove existing out- of- service 150,000 gallon water storage tank. $ 3,525 $ 3,525 $ 133,950 $ 141,000 Airport Total: $ 22,550 $ 22,550 $ 856,900 $ 902,000 Arizona Department of Transportation - Aeronautics Division 39 FY 2012 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total LAUGHLIN/ BULLHEAD INTERNATIONAL MOHAVE Land: Acquire < land/ easement> for development/ relocation The project involves the acquisition of 75 acres of ASLD property ( Phase 2). $ 93,750 $ 93,750 $ 3,562,500 $ 3,750,000 Runways: Extend Runway- Capacity This project involves the 1,000 foot extension ( 17,000 SY) to the south end of Rwy 16- 34. $ 137,500 $ 137,500 $ 5,225,000 $ 5,500,000 Runways: Install Runway Lighting ( HIRL, MIRL) [ Required by Part 139] - Safety/ Security This project will involve the installation of 1,000 feet of MIRL on the Rwy 16- 34 extension. $ 12,500 $ 12,500 $ 475,000 $ 500,000 Taxiways: Extend Taxiway - Capacity This project will include the 1,000 foot extension ( 6,000 SY) of the parallel Twy to Rwy 16- 34. $ 72,500 $ 72,500 $ 2,755,000 $ 2,900,000 Taxiways: Install Taxiway Lighting ( MITL) [ Required by Part 139] - Safety/ Security This project involoves the installation of 1,400 feet of MITL on the parallel Twy extension. $ 12,500 $ 12,500 $ 475,000 $ 500,000 Airport Total: $ 328,750 $ 328,750 $ 12,492,500 $ 13,150,000 MARANA REGIONAL PIMA Land: Acquire < land/ easement> for development/ relocation Aquire Land - 548 Acres $ 342,500 $ 342,500 $ 13,015,000 $ 13,700,000 Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Master plan update $ 6,875 $ 6,875 $ 261,250 $ 275,000 Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Part 150 Noise Study Update $ 8,125 $ 8,125 $ 308,750 $ 325,000 Taxiways: Construct Taxiway - Capacity Construct Taxiways $ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000 Airport Total: $ 420,000 $ 420,000 $ 15,960,000 $ 16,800,000 Maricopa Municipal Apron: Construct Apron - Capacity Construct 31,000 SY Aircraft Parking Apron ( 400' x600'). $ 46,193 $ 46,193 $ 1,755,315 $ 1,847,700 Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Capacity Construct Airport Access Road ( 4,600 LF). $ 10,193 $ 10,193 $ 387,315 $ 407,700 Land: Acquire land/ easement for approaches The project involves the acquisition of approximately 62 acres of property for approach protection. $ 77,500 $ 77,500 $ 2,945,000 $ 3,100,000 Other:< Construct/ Rehabilitate> Parking Lot [ non revenue producing- non hub/ MAP] - Other Construct public automobile parking lot ( 14,000 SY). $ 7,875 $ 7,875 $ 299,250 $ 315,000 Runways: Construct Runway - Capacity Construct New Rwy ( 5,500' x 100'). $ 105,875 $ 105,875 $ 4,023,250 $ 4,235,000 Runways: Install Runway < vertical/ visual> Guidance System [ PAPI/ VASI/ REIL/ ALS/ etc.] - Standards Install Airport Rotating Beacon. $ 1,800 $ 1,800 $ 68,400 $ 72,000 Runways: Install Runway < vertical/ visual> Guidance System [ PAPI/ VASI/ REIL/ ALS/ etc.] - Standards Install PAPIs on each Rwy end. $ 2,520 $ 2,520 $ 95,760 $ 100,800 Runways: Install Runway < vertical/ visual> Guidance System [ PAPI/ VASI/ REIL/ ALS/ etc.] - Standards Install REIL's for each Rwy end. $ 1,575 $ 1,575 $ 59,850 $ 63,000 Runways: Install Runway Lighting ( HIRL, MIRL, TDZ, LAHSO or CL) - Standards Install MIRL and marking ( 5,500' x 100'). $ 25,380 $ 25,380 $ 964,440 $ 1,015,200 Arizona Department of Transportation - Aeronautics Division 40 FY 2012 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Taxiways: Construct Taxiway - Capacity Construct 3 700' x35' T- Hangar Taxilanes ( 10,000 SY). $ 20,993 $ 20,993 $ 797,715 $ 839,700 Airport Total: $ 299,903 $ 299,903 $ 11,396,295 $ 11,996,100 PAGE MUNI COCONINO Apron: Expand/ Strengthen Apron - Standards Strengthen approximately 15,000 sq yds of the main apron to accommodate larger aircraft. $ 47,500 $ 47,500 $ 1,805,000 $ 1,900,000 Airport Total: $ 47,500 $ 47,500 $ 1,805,000 $ 1,900,000 PAYSON GILA Apron: Construct Apron - Standards Construct Alpha Ramp Phase 1 - East Half, South of Paralley Taxiway, Approximately 12200 Square Yards of Asphalt Pavement $ 30,000 $ 30,000 $ 1,140,000 $ 1,200,000 Taxiways: Rehabilitate Taxiway - Reconstruct Construct new taxiway east of new Alpha Ramp, 1200 +/- square yards of asphalt pavement $ 13,500 $ 13,500 $ 513,000 $ 540,000 Airport Total: $ 43,500 $ 43,500 $ 1,653,000 $ 1,740,000 PHOENIX DEER VALLEY MARICOPA Apron: Rehabilitate Apron - Reconstruction Reconstruct north ramp. $ 287,400 $ 287,400 $ 10,921,200 $ 11,496,000 Airport Total: $ 287,400 $ 287,400 $ 10,921,200 $ 11,496,000 PHOENIX GOODYEAR MARICOPA Apron: Construct Apron - Capacity Construct west public ramp - Phase 1. $ 97,500 $ 97,500 $ 3,705,000 $ 3,900,000 Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Capacity Reconstruct Public Access Road. $ 100,000 $ 100,000 $ 3,800,000 $ 4,000,000 Runways:< Construct/ Extend/ Improve> Runway Safety Area [ Non- Primary Airports] - Standards Shift Runway 3- 21 by 300 feet to the southwest. $ 46,775 $ 46,775 $ 1,777,450 $ 1,871,000 Taxiways:< Extend/ Widen/ Strengthen> Taxiway - Standards Strengthen Taxiway A to meet FAA standards for 270,000 pound dual tandem wheel aircraft. $ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000 Airport Total: $ 306,775 $ 306,775 $ 11,657,450 $ 12,271,000 PHOENIX SKY HARBOR INTL MARICOPA Other: Noise Mitigation Measures [ miscellaneous] Sound mitigation and acquisition of eligible properties. $ 1,875,000 $ 1,875,000 $ 11,250,000 $ 15,000,000 Taxiways: Extend Taxiway - Capacity Construct one acute angle taxiway connector between Runway 7R- 25L and Taxiway F, and construct three acute angle taxiway connectors between Runway 7L- 25R and Taxiway F. $ 1,100,000 $ 1,100,000 $ 6,600,000 $ 8,800,000 Airport Total: $ 2,975,000 $ 2,975,000 $ 17,850,000 $ 23,800,000 PHOENIX- MESA GATEWAY MARICOPA Arizona Department of Transportation - Aeronautics Division 41 FY 2012 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Apron: Construct Apron - Standards Construction of Twy A between Twy L & Twy P, PCCP 3,100 ft L by 75 ft W with 35 ft wide shoulders each side ( 39,000 SY) incl. lighting and drainage. $ 223,400 $ 223,400 $ 8,489,200 $ 8,936,000 Apron: Construct Apron - Standards Design apron for east side passenger terminal ( 82,200 SY) $ 12,500 $ 12,500 $ 475,000 $ 500,000 Equipment: Acquire Aircraft Rescue & Fire Fighting Vehicle [ required by Part 139 only] - Safety/ Security Acquire 1,500 Gallon ARFF Vehicle $ 20,000 $ 20,000 $ 760,000 $ 800,000 Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities> [ MAP] - Other Develop, design and construct fire protection system in South Industrial Area to accommodate foam systems associated with aircraft hangars. MAP project request. $ 200,475 $ 200,475 $ 7,618,050 $ 8,019,000 Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities> [ MAP] - Other Drainage Improvements for mid- airfield to SW. $ 33,059 $ 33,059 $ 1,256,251 $ 1,322,369 Other:< Construct/ Rehabilitate> Parking Lot [ non revenue producing- non hub/ MAP] - Other Design surface parking for East Terminal Area to accommodate 3,000 parking spaces. $ 12,500 $ 12,500 $ 475,000 $ 500,000 Planning: Conduct Noise Compatibility Plan study/ update FAR Part 150 plan Update $ 12,500 $ 12,500 $ 475,000 $ 500,000 Taxiways:< Extend/ Widen/ Strengthen> Taxiway - Standards Design Twy C Extension from Twy K to Rwy 30R. 55,555 SY PCCP, 51,800 SY asphalt $ 11,250 $ 11,250 $ 427,500 $ 450,000 Taxiways: Rehabilitate Taxiway - Reconstruct Twy G/ B Intersection Reconstruction. 30,117 SY $ 72,250 $ 72,250 $ 2,745,500 $ 2,890,000 Terminal Development: Construct Terminal Building - Capacity Design East Terminal Building 160,000 SF. $ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000 Airport Total: $ 660,434 $ 660,434 $ 25,096,501 $ 26,417,369 POLACCA NAVAJO Runways: Construct Runway - Capacity Construct Rwy ( 75' x 5,000') an apron ( Phase 2- Paving and Lighting). $ 100,000 $ 100,000 $ 3,800,000 $ 4,000,000 Airport Total: $ 100,000 $ 100,000 $ 3,800,000 $ 4,000,000 RYAN FIELD PIMA Other: Improve Airport < Drainage/ Erosion Control/ miscellaneous improvements> - Standards Airfield Drainage Improvements as recommended by the Airfield Drainage Study that is currently underway $ 25,000 $ 25,000 $ 950,000 $ 1,000,000 Airport Total: $ 25,000 $ 25,000 $ 950,000 $ 1,000,000 SAFFORD REGIONAL GRAHAM Land: Acquire land/ easement for approaches Land acquisition ( 18.85 acres). $ 5,000 $ 5,000 $ 190,000 $ 200,000 Other:< Construct/ Rehabilitate> Parking Lot [ non revenue producing- non hub/ MAP] - Other Expand parking lot ( asphalt) and reconstruct existing parking area ( approx. 100 ft x 200 ft). $ 8,750 $ 8,750 $ 332,500 $ 350,000 Runways: Install Runway Lighting ( HIRL, MIRL) [ non Part 139 CS] - Statutory Emphasis Programs Remove existing light fixtures/ bases and associated conduit/ cable, install new MITLs, bases, conduit/ cable, and install new vault equipment. $ 15,000 $ 15,000 $ 570,000 $ 600,000 Arizona Department of Transportation - Aeronautics Division 42 FY 2012 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Taxiways: Construct Taxiway - Capacity Grade and pave new 35 ft wide taxilanes for GA hangar area development. $ 1,250 $ 1,250 $ 47,500 $ 50,000 Terminal Development: Construct Terminal Building - Capacity Construct new terminal building and associated utilities. $ 37,500 $ 37,500 $ 1,425,000 $ 1,500,000 Airport Total: $ 67,500 $ 67,500 $ 2,565,000 $ 2,700,000 SAN MANUEL PINAL Land: Acquire < land/ easement> for development/ relocation Acquire Land, airport property plus parcel A and B ( 200 acres) $ 50,000 $ 50,000 $ 1,900,000 $ 2,000,000 Airport Total: $ 50,000 $ 50,000 $ 1,900,000 $ 2,000,000 SCOTTSDALE MARICOPA Apron: Rehabilitate Apron - Reconstruction This project will involve reconstructing the large aircraft parking apron located on the west side of the airfield near the Landmark Aviation ( north) facility 34,000 sy. $ 57,500 $ 57,500 $ 2,185,000 $ 2,300,000 Airport Total: $ 57,500 $ 57,500 $ 2,185,000 $ 2,300,000 SEDONA YAVAPAI Apron: Construct Apron - Standards Construct Phase 2 of the apron A expansion to the north. The expansion is approx. 500 ft X 250 ft and includes the demolition of the restaurant building. $ 31,076 $ 31,077 $ 1,180,902 $ 1,243,055 Apron: Construct Apron - Capacity Construct Phase I of the Apron A Expansion to the north. The expansion is approx. 500 ft X 250 ft and includes the demolition of the restaurant building. $ 31,076 $ 31,077 $ 1,180,902 $ 1,243,055 Other: Construct Aircraft Rescue & Fire Fighting Training Facility/ Regional Burn Pit/ Mobile Training Facility - Standards Construct a 10,000 SF facility adjacent to the apron near Txy A4. $ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000 Taxiways: Extend Taxiway - Capacity Construct extensions of Taxilanes B1, B2 and B3 and the adjacent hangar pads. The total area of the extensions is approx. 2,400 SY. $ 6,014 $ 6,015 $ 228,551 $ 240,580 Airport Total: $ 130,666 $ 130,669 $ 4,965,355 $ 5,226,690 SHOW LOW REGIONAL NAVAJO Runways: Construct Runway [ includes relocation] - Standrads Construct Rwy 18/ 36 & Parallel Twy D, ( 75 ft x 6100 ft and 35 ft x 5100 ft) ( 12- 3) $ 150,000 $ 150,000 $ 5,700,000 $ 6,000,000 Airport Total: $ 150,000 $ 150,000 $ 5,700,000 $ 6,000,000 SIERRA VISTA MUNI- LIBBY AAF COCHISE Taxiways:< Extend/ Widen/ Strengthen> Taxiway - Standards Design/ Construct Twy D Extensiont from NE end of existing Twy D. ( approx. 1000 ft x 75 ft, 8500 sy. of 12 in thick concrete.) $ 42,500 $ 42,500 $ 1,615,000 $ 1,700,000 Arizona Department of Transportation - Aeronautics Division 43 FY 2012 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Taxiways: Rehabilitate Taxiway Lighting - Reconstruct Construct Twy J Realignment Lighting & Signing ( apporx. 4,000 LF lighting and 10 new signs) $ 18,750 $ 18,750 $ 712,500 $ 750,000 Airport Total: $ 61,250 $ 61,250 $ 2,327,500 $ 2,450,000 SPRINGERVILLE MUNI APACHE Taxiways: Construct Taxiway - Capacity This project will include all construction for taxilanes on SE side of Runway 11/ 29. $ 27,500 $ 27,500 $ 1,045,000 $ 1,100,000 Taxiways: Construct Taxiway [ includes relocation] This project is a phased project and the design was completed prior ( Construction). $ 74,075 $ 74,075 $ 2,814,850 $ 2,963,000 Airport Total: $ 101,575 $ 101,575 $ 3,859,850 $ 4,063,000 ST JOHNS INDUSTRIAL AIR PARK APACHE Runways:< Construct/ Extend/ Improve> Runway Safety Area [ Non- Primary Airports] - Standards Rwys: Pave both ends of Rwy 14/ 32, 300' x 75' each end. $ 37,500 $ 37,500 $ 1,425,000 $ 1,500,000 Airport Total: $ 37,500 $ 37,500 $ 1,425,000 $ 1,500,000 TAYLOR NAVAJO Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> Aquire parcel 4,5,6& 7 for approach & BRL protection ( approx. 7 total acres). $ 2,500 $ 2,500 $ 95,000 $ 100,000 Airport Total: $ 2,500 $ 2,500 $ 95,000 $ 100,000 TUCSON INTL PIMA Apron: Rehabilitate Apron - Reconstruction Remove/ replace portion of apron with 16 in PCC pavement. $ 98,177 $ 98,177 $ 2,000,000 $ 2,196,354 Other:< Light/ Mark/ Remove> Obstructions - Standards Demolition of any building in the West Ramp area that are deemed obstructions for new parallel Rwy. $ 502,875 $ 502,875 $ 10,244,250 $ 11,250,000 Runways: Construct Runway - Capacity Construct a new PCC Rwy 11R/ 24L, conversion of existing Rwy 11R/ 29L to 75 ft parallel Twy and 75 ft cross Twy ( includes grading, drainage, paving, lighting, signage, marking, NAVAIDS and appurtenances) $ 2,626,821 $ 2,626,821 $ 53,511,926 $ 58,765,568 Airport Total: $ 3,227,873 $ 3,227,873 $ 65,756,176 $ 72,211,922 WHITERIVER NAVAJO Equipment: Acquire < Snow Removal Equipment/ Urea Truck/ etc.> - Standards Purchase SRE equipment to remove snow from airfield pavements. $ 7,500 $ 7,500 $ 285,000 $ 300,000 Airport Total: $ 7,500 $ 7,500 $ 285,000 $ 300,000 WICKENBURG MUNI MARICOPA Apron: Expand Apron - Capacity This project involves a 4,000 SY expansion of the south apron area. $ 7,875 $ 7,875 $ 299,250 $ 315,000 Arizona Department of Transportation - Aeronautics Division 44 FY 2012 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Capacity This project will involve the construction on a new terminal access road and parking lot ( 1,000 SY). $ 5,25
Object Description
TITLE | Five-year airport capital improvement program |
CREATOR | Arizona Department of Transportation |
SUBJECT | Airports--Arizona; Airports--Arizona--Design and construction--planning; Transportation--planning; Air travel--planning--Arizona; |
Browse Topic |
Transportation |
DESCRIPTION | This title contains one or more publications |
Language | English |
Publisher | Arizona Department of Transportation |
Material Collection | State Documents |
Source Identifier | TRT 5.3:F 48 |
Location | o639543053 |
REPOSITORY | Arizona State Library, Archives and Public Records--Law and Research Library |
Description
TITLE | Five-year airport development program fy 2010-2014 |
CREATOR | Arizona. Dept. of Transportation. Aeronautics Division. |
SUBJECT | Arizona. Aeronautics Division--Periodicals; Aeronautics and state--Arizona- Periodicals; |
Browse Topic |
Transportation |
DESCRIPTION | 119 pages (PDF version). File size: 950.802 KB. |
Language | English |
Publisher | Arizona. Dept. of Transportation. Aeronautics Division. |
TYPE | Text |
Material Collection |
State Documents |
Acquisition Note | Publication or link to publication sent to reports@lib.az.us |
RIGHTS MANAGEMENT | Copyright to this resource is held by the creating agency and is provided here for educational purposes only. It may not be downloaded, reproduced or distributed in any format without written permission of the creating agency. Any attempt to circumvent the access controls placed on this file is a violation of United States and international copyright laws, and is subject to criminal prosecution. |
DATE ORIGINAL | 200-? |
Time Period |
2000s (2000-2009) |
ORIGINAL FORMAT | Born digital |
Location | New |
DIGITAL IDENTIFIER | ACIP_PY_2010_Program_Final.pdf |
DIGITAL FORMAT | PDF (Portable Document Format) |
REPOSITORY | Arizona State Library. Archives and Public Records--Law and Research Library. |
File Size | 950.802 KB |
Full Text | ARIZONA DEPARTMENT OF TRANSPORTATION AERONAUTICS DIVISION FIVE- YEAR AIRPORT DEVELOPMENT PROGRAM FY 2010 – 2014 Goodyear Airport Airport of the Year 2008 Arizona Department of Transportation Aeronautics Division Five - Year Airport Development Program FY 2010 - 2014 i Table of Contents Airport Development Program Overview .......................................................................... ii Airport Development Programming Guidelines................................................................. iv Glossary ............................................................................................................................... v Map of Primary & Secondary Airports .............................................................................. vi Airport Development Program 2009 - 2010 Airport Development Program........................................................................ 1 2010 - 2011 Airport Development Program...................................................................... 17 2011 - 2012 Airport Development Program...................................................................... 32 2012 - 2013 Airport Development Program...................................................................... 46 2013 - 2014 Airport Development Program...................................................................... 58 Alphabetical Listing by Airport, FY 2010 - 2014 ............................................................. 69 FY 2010 – 2014 Summary............................................................................................... 111 Arizona Department of Transportation Aeronautics Division Five - Year Airport Development Program FY 2010 - 2014 ii Program Overview In conjunction with the state’s public airport and the Federal Aviation Administration ( FAA), ADOT Aeronautics develops the Five- Year Airport Capital Improvement Program ( ACIP) to parallel the FAA’s Airport Capital Improvement Program and the ADOT Highway’s Program with the dual objective of maximizing the effective use of State dollars for airport development and maximizing FAA funding for Arizona airports. Federal monies are derived mainly from taxes on airline tickets and are distributed by the Federal Aviation Administration to local airports through the National Airport Improvement Program. State funds come mainly from flight property tax, aircraft lieu taxes and aviation fuel taxes. The ACIP development process allocates money from the State Aviation Fund and distributes these funds across three major categories of airport development assistance. The State Transportation Board approves this program annually. The three categories and their associated sub- categories are: 1. Airport Development Grants Program • Projects utilizing Federal, State and Local funds Safety, Security & Capacity Enhancement Maintenance Environmental, Planning and Land Acquisition • Projects utilizing State and Local funds only Safety, Security & Capacity Enhancement Environmental, Planning and Land Acquisition 2. Airport Preventive Maintenance Services ( APMS) • Projects maintaining and protecting aviation pavement surfaces 3. Airport Loan Program • Economic development/ revenue generating loans • Grant match loans Arizona Department of Transportation Aeronautics Division Five - Year Airport Development Program FY 2010 - 2014 iii Program Overview ( continued) Arizona airport sponsors of 58 public airports submitted 779 projects for consideration worth $ 1.4B over the 5- year program period. These projects represent all Federal and State funding desires on the part of the airport sponsors. This document, the State’s proposed Five- Year ACIP, totals $ 922.9 million. This is an approximately 46.8% increase from the previous year’s program. This is due to Sponsors doubling their request to the FAA over last year. State funding, proposed at $ 67.9M, is 45.9% lower than last year’s total of $ 125.5M. This 5- year investment of State funds will support about $ 817.0M in Federal aid and require about $ 37.9M from airport sponsors. The State’s Airport Assistance Programs for the Five- Year ACIP are designed to provide 50% of a sponsor’s share of a federally funded project. Expected sponsor obligations on federal projects beginning with FY 2010 will be 5.0% of a projects total cost, making the state share 2.5%. Each year, the ACIP will set aside between $ 3.0MS-$ 5.0M to match federal grants. As airport sponsors receive a federal grant, they will apply to the state for the matching funds. The Five- Year Program also provides for State funded grants. These documents show those projects for State- local funding that have met the State Transportation Board’s qualifying priority rating. When the Board approves the Five- Year Program, no projects for fiscal year 2010 will be issued new State/ Local grants. All other fiscal year’s projects are subject to subsequent annual review and approval by the State Transportation Board. This ACIP Document is formatted into four sections: Program Overview; Airport Development Program by fiscal year; Alphabetical Listing of projects by sponsor name; and a Summary of Project Totals. Although Subprogram categories are not listed, the individual information is retained in the State’s Aviation Database. The Five- Year Program’s contributions for Maintenance projects total $ 20.5M or 43.4%; Safety and Capacity Enhancement projects total $ 25.2M or 53.4%; and Environmental, Planning, and Land Acquisition projects total $ 1.5M or 3.1%. State- local funding distributions among the airport categories are: $ 15.8M designated for commercial service airports; $ 32.8M for reliever airports; $ 12.2M for public- general aviation airports and $ 1.4M for secondary airports. The maximum grant funds any one sponsor can receive can not exceed 10% of the available funds for airport development. The maximum State/ Local grant funds for the fiscal year 2010 Program is zero. Arizona Department of Transportation Aeronautics Division Five - Year Airport Development Program FY 2010 - 2014 iv Programming Guidelines 1. Projects proposed for inclusion in the program must be rated by the latest approved version of the Arizona Department of Transportation's ( ADOT) Airport Priority Rating System and confirmed as being recommended for inclusion in the program. 2. Projected public ownership of a facility and availability for public use are both required for programming a project at that facility. 3. There are three categories in the Program: • Airport Development Grants • Airport Preventative Maintenance Services ( APMS) • Airport Loans 4. There are three types of projects in the Grants category: • Projects that are related to Maintenance. • Projects that are related to Safety and/ or Capacity Enhancement. • Projects that are related to Environmental Studies, Planning or Land Acquisition. 5. Funds are to be programmed with approximately 80% to commercial service/ reliever airports, 18% to public, general aviation airports and 2% to secondary airports. 6. During each year of the program, funds to match FAA grants are set aside based on the amount of funds the FAA programs for airports in the state. These funds are to be programmed to provide up to 50% of the Local share of all eligible items contained in FAA airport project grants. 7. The program is developed with the intention to maximize the use of Federal funds at airports in Arizona. 8. In addition to federal match grants, the State may issue grants comprised of only state and local dollars. These grants are separate from federal match grants and are subject to a rigorous priority rating and may be awarded to airports whether they receive federal grants or not. These grants typically fund up to 90% of a primary airport project and 95% of a secondary airport project with no Federal participation. 9. The maximum grant funds any one airport sponsor may receive during any single fiscal year will not exceed 10% of the available monies in the Aviation Fund. 10. Consideration will be given to research and development projects that have a potential for significant economic and/ or technical benefit to Arizona airports and/ or airport users. 11. The Grants and APMS categories are facilities/ capital improvements programs that parallel the Federal Airport Improvement Program in terms of eligible grant items with the exception that the State does not fund capital equipment, routine operating maintenance items or revenue producing projects. The Airport Loan category is intended to accommodate revenue- producing projects specific to an airport’s economic welfare. 12. The program was developed using approved Transportation Board Policies. Where a diversion from the approved policy is requested by an airport sponsor, a new policy must be presented to the Board for their consideration and approval. 13. After a grant has been issued, the scope of work for the project receiving grant funds shall not be modified by the sponsor unless a grant amendment has been submitted to the Aeronautics Division for review and approved by the State Transportation Board, if necessary. Any grant funds remaining after the initial work in the grant has been completed shall be returned to the State Aviation Fund. Grant offers not executed for State/ Local projects within four months of receiving the offer, may be withdrawn and the funds will be made available for other eligible projects. 14. Grant duration is 4 years except for acquiring airport land, which is subject to individual review, but under no circumstances, may exceed 8 years. Arizona Department of Transportation Aeronautics Division Five - Year Airport Development Program FY 2010 - 2014 v Glossary of Terms ALP Airport Layout Plan Apron Aircraft Parking Area ARFF Aircraft Rescue and Fire Fighting ASR Airport Surveillance Radar ATCT Air Traffic Control Tower AWOS Automatic Weather Observation System DCC Defense Contractor Cargo EA Environmental Assessment EMAS Engineering Materials Arresting System FAA Federal Aviation Administration FBO Fixed Base Operator FOD Foreign Object Debris FAR Federal Aviation Regulations GA General Aviation GPS Global Positioning System GVGI Generic Visual Glideslope Indicator HIRL High Intensity Runway Lights ILS Instrument Landing System MIRL Medium Intensity Runway Lights MITL Medium Intensity Taxiway Lights NAVAID Navigational Aid NDB Non- Directional Beacon ( a navigational aid to find the airport) PAPI Precision Approach Path Indicator PCC Portland Cement Concrete Pave Pres Pavement Preservation Ph. 1 Phase 1 of a Multi- year Project REILS Runway End Identifier Lights ROFA Runway Obstacle Free Area RSA Runway Safety Area RSAT Runway Safety Action Team RPZ Runway Protection Zone RVZ Runway Visibility Zone Rwy Runway SASP State Airport System Plan Set Aside A fund allocation for a specific reason SRE Snow Removal Equipment TLOF Touchdown and Liftoff Area TVOR Terminal Very High Frequency Omni-directional Range Navigation Aid Twy Taxiway Arizona Department of Transportation Aeronautics Division Five - Year Airport Development Program FY 2010 - 2014 vi Arizona Department of Transportation - Aeronautics Division 1 FY 2010 State & Local Grants There are no grants schduled for Ficsal Year 2010 Arizona Department of Transportation - Aeronautics Division 2 Page is intentionally left Blank FY 2010 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total AVI SUQUILLA LA PAZ Apron: Expand Apron - Capacity Reconstruction and new construction of about 28,000 SY of asphalt concrete paved GA apron area including storm drainage improvements. $ 39,125 $ 39,125 $ 1,486,750 $ 1,565,000 Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Other Reconstruction of 8,000 SY of access road including curb and gutter, storm drainage improvements, asphalt concrete pavement and rerouting of electrical and communications lines. $ 18,375 $ 18,375 $ 698,250 $ 735,000 Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities> [ MAP] - Other Construction of about 5,600 ft of looped 12 inch fire line connected to CRIT public water system and construction of about 1,600 ft of sanitary sewer line in order to abandon existing septic system serving the GA terminal and GA hangar area. $ 23,000 $ 23,000 $ 874,000 $ 920,000 Other:< Construct/ Rehabilitate> Parking Lot [ non revenue producing- non hub/ MAP] - Other Rehabilitate and reconstruct 11,000 SY of public parking at the GA terminal and FBO area including asphalt concrete pavement, correcting existing drainage problems and relocating water/ sewer utilities. $ 10,750 $ 10,750 $ 408,500 $ 430,000 Airport Total: $ 91,250 $ 91,250 $ 3,467,500 $ 3,650,000 BENSON MUNICIPAL COCHISE Heliport:< Construct/ Expand/ Improve/ Modify/ Rehabilitate> Helipad/ Heliport - Standards Design Helipads on East end of Apron ( 50 ft x 50 ft) $ 1,250 $ 1,250 $ 47,500 $ 50,000 Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities> [ MAP] - Other Install Emergency Generator $ 8,750 $ 8,750 $ 332,500 $ 350,000 Planning:< Conduct/ Update> ( e. g., Pavement Maintenance Plan, PCI, NPDES, etc.) Conduct Airport Drainage Master Plan $ 3,750 $ 3,750 $ 142,500 $ 150,000 Runways:< Extend/ Widen/ Strengthen> Runway [ to meet standards] - Standards Install Airport Perimeter/ Security Fence and Gates ( 15,774 ft) $ 18,750 $ 18,750 $ 712,500 $ 750,000 Airport Total: $ 32,500 $ 32,500 $ 1,235,000 $ 1,300,000 BISBEE DOUGLAS INTL COCHISE Apron: Rehabilitate Apron - Reconstruction Pavement overlay 25,000 sy ( S. portion of PCC Apron) $ 20,000 $ 20,000 $ 760,000 $ 800,000 Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Master Plan Update $ 5,000 $ 5,000 $ 190,000 $ 200,000 Airport Total: $ 25,000 $ 25,000 $ 950,000 $ 1,000,000 BISBEE MUNI COCHISE Apron: Expand/ Strengthen Apron - Standards Reconstruct existing apron & expand apron to south ( approx. 22,300 SY of asphalt pavement). $ 5,625 $ 5,625 $ 213,750 $ 225,000 Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Update Master Plan $ 4,375 $ 4,375 $ 166,250 $ 175,000 Arizona Department of Transportation - Aeronautics Division 3 FY 2010 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Taxiways:< Extend/ Widen/ Strengthen> Taxiway - Standards Widen Twy A from 35 ft to 50 ft; Reconstruct existing pavement ( 5,900 ft x 50 ft) $ 5,000 $ 5,000 $ 190,000 $ 200,000 Airport Total: $ 15,000 $ 15,000 $ 570,000 $ 600,000 BUCKEYE MUNI MARICOPA Land: Acquire land/ easement for approaches Purchase approximately 25 acres of land north of the airport to secure RPZ and allow for future Rwy extension ( Phase 1). $ 137,500 $ 137,500 $ 5,225,000 $ 5,500,000 Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities> [ MAP] - Other Design and construct a well site and water storage tank to provide fire protection and domestice service for airport facilities. $ 75,000 $ 75,000 $ 2,850,000 $ 3,000,000 Runways:< Extend/ Widen/ Strengthen> Runway [ to meet standards] - Standards Design a Rwy widening and strengthening project to increase the total width to 100 ft and the strength to 75,000 lbs. $ 3,000 $ 3,000 $ 114,000 $ 120,000 Airport Total: $ 215,500 $ 215,500 $ 8,189,000 $ 8,620,000 CASA GRANDE MUNI PINAL Apron: Expand Apron - Capacity Design/ Construct 13,800 sy Apron, 7032 sy Vehicle Parking, Interior Fire Hydrants, Water, drainage, sewer & Electric South East & West of Native Air Complex $ 30,000 $ 30,000 $ 1,140,000 $ 1,200,000 Land: Acquire < land/ easement> for development/ relocation Purchase 225+/- Acres for Planned Rwy Ext. Land located NW, N, SW & S of the existing airport land. EA & New Airport Plan are underway & to be completed during 1st Qtr CY 2009. $ 112,500 $ 112,500 $ 4,275,000 $ 4,500,000 Other: Improve Airport < Drainage/ Erosion Control/ miscellaneous improvements> - Standards Design 80 ft x 6,800 ft relocation of Drainage Ditch running from NW to SW portion of airport that is currently protecting portions of land N. of Rwy 5- 23 and passing through existing Rwy 5 RPZ. $ 2,000 $ 2,000 $ 76,000 $ 80,000 Runways:< Construct/ Extend/ Improve> Runway Safety Area [ Non- Primary Airports] - Standards Extend Rwy 5- 23 100ft x 3,650 ft Rwy Ext. including relocation & 75 ft x 3,650 ft Twy B Ext., Relocated Rwy 23 threshold by 1,000 ft new Rwy Access/ Exit Twys & associated lighting, signage, marking, utilities, drainage, security fencing & service roadways $ 5,000 $ 5,000 $ 190,000 $ 200,000 Airport Total: $ 149,500 $ 149,500 $ 5,681,000 $ 5,980,000 CHANDLER MUNI MARICOPA Equipment: Install Weather Reporting Equipment { describe, e. g., AWOS } - Standards Design & Construct AWOS replacement. $ 4,325 $ 4,325 $ 164,350 $ 173,000 Other: Install < Guidance/ other> Signs [ not Part 139] - Standards Design replacement/ modification of approx. 75 airfield signs $ 1,988 $ 1,987 $ 75,525 $ 79,500 Taxiways: Construct Taxiway ( environmental mitigation) EA for planned Twy B extension from existing Twy N to approach end of Rwy 04L including connectors. $ 5,338 $ 5,337 $ 202,825 $ 213,500 Arizona Department of Transportation - Aeronautics Division 4 FY 2010 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Taxiways: Extend Taxiway - Capacity Design pavement for 5,500 LF x 40 ft Twy, connectors & runup areas ( 29,000 SY). $ 4,638 $ 4,637 $ 176,225 $ 185,500 Taxiways: Install Taxiway Lighting ( e. g., SMGCS, reflectors, MITL) - Standards Design MITL & signs for 5,500 LF Twy, connectors & runup areas. $ 3,550 $ 3,550 $ 134,900 $ 142,000 Airport Total: $ 19,839 $ 19,836 $ 753,825 $ 793,500 CIBECUE NAVAJO New Airports: Construct New Airport - Standards New Site for Cibecue Airport, approx. 163 Acres Phase I Grading and Drainage. $ 225,000 $ 225,000 $ 8,550,000 $ 9,000,000 Airport Total: $ 225,000 $ 225,000 $ 8,550,000 $ 9,000,000 COCHISE COUNTY COCHISE Apron: Construct Apron - Standards Overlay 4,500 sy on Twy and Apron area adjacent to fuel site and terminal area $ 12,500 $ 12,500 $ 475,000 $ 500,000 Runways: Rehabilitate Runway < Lighting/ Electrical Vault> Upgrade MIRL along Rwy 3- 21 with associated electrical upgrades $ 10,000 $ 10,000 $ 380,000 $ 400,000 Taxiways: Rehabilitate Taxiway - Reconstruct Reconstruct SW half of Twy A 11,860 sy $ 21,250 $ 21,250 $ 807,500 $ 850,000 Airport Total: $ 43,750 $ 43,750 $ 1,662,500 $ 1,750,000 COLORADO CITY MUNI MOHAVE Land: Acquire < land/ easement> for development/ relocation Land, Acquire land for taxiway expansions, BLM land transfers costs $ 3,000 $ 3,000 $ 114,000 $ 120,000 Runways: Rehabilitate Runway - Reconstruct Runway Pavement, Crack and Fog Seal $ 3,750 $ 3,750 $ 142,500 $ 150,000 Airport Total: $ 6,750 $ 6,750 $ 256,500 $ 270,000 COOLIDGE MUNI PINAL Apron: Rehabilitate Apron - Reconstruction Phase II of apron rehabilitation N and W of Main Hangar ( Ph I completed 2006) $ 35,750 $ 35,750 $ 1,358,500 $ 1,430,000 Runways: Install < full/ partial> Instrument Approach Aid - Standards Rwy 5- 23 & Rwy 17- 35 PAC/ SAC Survey $ 1,175 $ 1,175 $ 44,653 $ 47,003 Runways: Rehabilitate Runway - Reconstruct Reconstruct Rwy 5/ 23 ( 5,500 ft x 150 ft) $ 44,000 $ 44,000 $ 1,672,000 $ 1,760,000 Airport Total: $ 80,925 $ 80,925 $ 3,075,153 $ 3,237,003 COTTONWOOD YAVAPAI Equipment: Install Weather Reporting Equipment { describe, e. g., AWOS } - Standards Design and construct an AWOS. $ 8,375 $ 8,375 $ 318,250 $ 335,000 Airport Total: $ 8,375 $ 8,375 $ 318,250 $ 335,000 ELOY MUNI PINAL Taxiways: Install Taxiway Lighting ( MITL) [ non Part 139 CS] - Statutory Emphasis Programs Installation of MITLs and conduit/ cable; Installation of new rotating beacon and tower. $ 12,500 $ 12,500 $ 475,000 $ 500,000 Arizona Department of Transportation - Aeronautics Division 5 FY 2010 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Terminal Development: Construct Terminal Building - Capacity Design new terminal building, design utilities and parking lot to serve new terminal building $ 5,000 $ 5,000 $ 190,000 $ 200,000 Airport Total: $ 17,500 $ 17,500 $ 665,000 $ 700,000 ERIC MARCUS MUNICIPAL PIMA Apron: Construct Apron - Standards Crack seal repair Twy A- 3 ( appox 24,000 sf) $ 1,625 $ 1,625 $ 61,750 $ 65,000 Airport Total: $ 1,625 $ 1,625 $ 61,750 $ 65,000 ERNEST A. LOVE FIELD YAVAPAI Buildings:< Construct/ Expand/ Improve/ Modify/ Rehabilitat e> Aircraft Rescue & Fire Fighting Building [ Pt. 139 only] - Safety/ Security Build 13,000 SF ARFF Station at midfield. $ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000 Equipment: Acquire Aircraft Rescue & Fire Fighting Safety Equipment [ required by Part 139] - Safety/ Security Purchase new Index B ARFF truck. $ 12,500 $ 12,500 $ 475,000 $ 500,000 Equipment: Acquire Security Equipment/ Install Fencing [ required by Part 107] - Safety/ Security Build security upgrades to include 29,000 LF fencing, cameras, and access control devices. $ 50,000 $ 50,000 $ 1,900,000 $ 2,000,000 Equipment: Acquire Security Equipment/ Install Fencing [ required by Part 107] - Safety/ Security Design security upgrades to include 29,000 LF fencing, cameras, and access control devices. $ 3,750 $ 3,750 $ 142,500 $ 150,000 Land: Acquire land/ easement for approaches Acquire 61.3 Acres. $ 125,000 $ 125,000 $ 4,750,000 $ 5,000,000 Runways: Extend Runway- Capacity Design Drainage Improvements. $ 3,750 $ 3,750 $ 142,500 $ 150,000 Runways: Extend Runway- Capacity Design Rwy 21L/ 3R and Twys C, D & H extensions to minimum of 9,300 ft and 200K lbs. $ 8,750 $ 8,750 $ 332,500 $ 350,000 Runways: Install Runway Lighting ( HIRL, MIRL) [ Required by Part 139] - Safety/ Security Relocate Vault - Upgrade Rwy 3R/ 21L to HIRL. $ 6,250 $ 6,250 $ 237,500 $ 250,000 Airport Total: $ 272,500 $ 272,500 $ 10,355,000 $ 10,900,000 FALCON FLD MARICOPA Other: Install < Guidance Signs/ Runway Incursion Caution Bars> [ non Part 139 CS] - Statutory Emphasis Programs Design reconfiguration of existing Twy B and Installation of a Rwy guard light system. $ 3,750 $ 3,750 $ 142,500 $ 150,000 Other: Install < Guidance Signs/ Runway Incursion Caution Bars> [ non Part 139 CS] - Statutory Emphasis Programs Phase 1 - Reconfigure Twy B and Install Rwy guard lights along primary Rwy 4R- 22L. $ 37,500 $ 37,500 $ 1,425,000 $ 1,500,000 Runways:< Construct/ Extend/ Improve> Runway Safety Area [ Non- Primary Airports] - Standards Install upgrades to seven ( 7) storm drain inlets in the safety areas of the airport's Rwys $ 12,500 $ 12,500 $ 475,000 $ 500,000 Airport Total: $ 53,750 $ 53,750 $ 2,042,500 $ 2,150,000 FLAGSTAFF PULLIAM COCONINO Taxiways: Rehabilitate Taxiway - Reconstruct Reconstruct and repave existing segment of Taxiway A from connector A- 6 southward through A- 9. Work includes improving subgrade, drainage, paving and restriping. Also upgrade existing airfield runway and taxiway lighting and sign circuits. $ 137,638 $ 137,638 $ 5,230,245 $ 5,505,521 Arizona Department of Transportation - Aeronautics Division 6 FY 2010 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Airport Total: $ 137,638 $ 137,638 $ 5,230,245 $ 5,505,521 GILA BEND MUNI MARICOPA Land: Acquire land/ easement for approaches Acquire land in approaches for Rwy 4 and 22. $ 2,125 $ 2,125 $ 80,750 $ 85,000 Runways: Install < full/ partial> Instrument Approach Aid - Standards Install survey monuments on both ends of Rwy 4/ 22. $ 550 $ 550 $ 20,900 $ 22,000 Terminal Development:< Improve/ Modify/ Rehabilitate> Terminal Building - Capacity Rehabilitate existing Terminal Building in accordance with completed plans. $ 5,000 $ 5,000 $ 190,000 $ 200,000 Airport Total: $ 7,675 $ 7,675 $ 291,650 $ 307,000 GLENDALE MUNICIPAL MARICOPA Equipment: Acquire Security Equipment/ Install Fencing [ required by Part 107] - Safety/ Security Acquire Security Equipment ( cameras) along perimeter ( 81,000 LF) of Airport. $ 37,500 $ 37,500 $ 1,425,000 $ 1,500,000 Other:< Light/ Mark/ Remove> Obstructions - Standards Remove Blast Fence. $ 7,500 $ 7,500 $ 285,000 $ 300,000 Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Conduct Capacity Study. $ 2,500 $ 2,500 $ 95,000 $ 100,000 Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> Update Environmental Assessment. $ 5,000 $ 5,000 $ 190,000 $ 200,000 Runways: Construct Runway - Capacity Pave 21,000 SY Rwy Shoulders - Design Only. $ 1,875 $ 1,875 $ 71,250 $ 75,000 Runways: Construct Runway - Capacity Pave 21,000 SY Rwy Shoulders. $ 31,525 $ 31,525 $ 1,197,950 $ 1,261,000 Runways: Rehabilitate Runway - Reconstruct Pavement Maintenance - slurry seal hangars, Twy, and Rwy. $ 5,000 $ 5,000 $ 190,000 $ 200,000 Taxiways: Construct Taxiway - Capacity Pave 28,300 SY Twy Shoulders - Design Only. $ 1,875 $ 1,875 $ 71,250 $ 75,000 Taxiways: Construct Taxiway - Capacity Pave 28,300 SY Twy Shoulders. $ 42,700 $ 42,700 $ 1,622,600 $ 1,708,000 Airport Total: $ 135,475 $ 135,475 $ 5,148,050 $ 5,419,000 GRAND CANYON WEST MOHAVE Runways: Construct Runway [ includes relocation] - Standrads Runways: Shift and construct Runway 17/ 35, 5,000' x 75'. Project also includes grading, drainage, paving, lighting and visual aids - Phase II $ 250,000 $ 250,000 $ 9,500,000 $ 10,000,000 Airport Total: $ 250,000 $ 250,000 $ 9,500,000 $ 10,000,000 GREENLEE COUNTY GREENLEE Apron: Rehabilitate Apron - Reconstruction Rehabilitate 8,600 SY PCCP Apron $ 7,500 $ 7,500 $ 285,000 $ 300,000 Equipment: Acquire Security Equipment/ Install Fencing [ required by Part 107] - Safety/ Security Construct 9,700 LF Perimeter Fencing $ 12,500 $ 12,500 $ 475,000 $ 500,000 Other:< Light/ Mark/ Remove> Obstructions - Standards Obstruction Removal ( overhead electrical & phone box [ OFA]) $ 12,500 $ 12,500 $ 475,000 $ 500,000 Other: Improve Airport < Drainage/ Erosion Control/ miscellaneous improvements> - Standards Construct Drainage Improvements $ 23,750 $ 23,750 $ 902,500 $ 950,000 Arizona Department of Transportation - Aeronautics Division 7 FY 2010 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> EA for RPZ Rwy 7 & Road 78 Realignment & 18 acre land acquisition $ 2,500 $ 2,500 $ 95,000 $ 100,000 Runways: Install Runway < vertical/ visual> Guidance System [ PAPI/ VASI/ REIL/ ALS/ etc.] - Standards Construct Guidance Sign Installation $ 11,875 $ 11,875 $ 451,250 $ 475,000 Airport Total: $ 70,625 $ 70,625 $ 2,683,750 $ 2,825,000 H. A. CLARK MEMORIAL FIELD COCONINO Apron: Rehabilitate Apron - Reconstruction Reconstruct orginal apron ( approx 4,500 sy). $ 31,250 $ 31,250 $ 1,187,500 $ 1,250,000 Equipment: Acquire < Snow Removal Equipment/ Urea Truck/ etc.> - Standards Acquire Snow Removal Equipment $ 6,250 $ 6,250 $ 237,500 $ 250,000 Other: Construct Aircraft Rescue & Fire Fighting Training Facility/ Regional Burn Pit/ Mobile Training Facility - Standards This is the completion of the ARFF Building as designed. $ 6,250 $ 6,250 $ 237,500 $ 250,000 Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Prepare PArt 139 Certification Manual $ 1,250 $ 1,250 $ 47,500 $ 50,000 Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> Revalidate Environmental Assessment completed previously $ 1,875 $ 1,875 $ 71,250 $ 75,000 Airport Total: $ 46,875 $ 46,875 $ 1,781,250 $ 1,875,000 HOLBROOK MUNI NAVAJO Runways: Construct Runway [ includes relocation] - Standards Construct Crosswind Runway 11/ 29 4,900' x 60' ( including lighting, signage & visual aids) $ 112,500 $ 112,500 $ 4,275,000 $ 4,500,000 Taxiways: Construct Taxiway - Capacity Construct Parallel Taxiway to Runway 11/ 29 ( 4,900 x 35 ft) including lighting and signage $ 75,000 $ 75,000 $ 2,850,000 $ 3,000,000 Airport Total: $ 187,500 $ 187,500 $ 7,125,000 $ 7,500,000 KAYENTA NAVAJO Apron: Construct Apron - Standards Apron, Construct North East of existing apron, approx. 16,000 sy. $ 25,000 $ 25,000 $ 950,000 $ 1,000,000 Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Capacity Access Road, Construct main access road to Center Field, 2,000' x 24'. $ 25,000 $ 25,000 $ 950,000 $ 1,000,000 Airport Total: $ 50,000 $ 50,000 $ 1,900,000 $ 2,000,000 KINGMAN MOHAVE Apron: Construct Apron - Capacity Construct aircraft parking apron between Flightline Drive and the South Ramp ( approx. 14,000 sy). $ 27,500 $ 27,500 $ 1,045,000 $ 1,100,000 Apron: Rehabilitate Apron - Reconstruction Reconstruct the northern portion of the main aircraft parking ramp ( approx. 60,000 sy). $ 100,000 $ 100,000 $ 3,800,000 $ 4,000,000 Arizona Department of Transportation - Aeronautics Division 8 FY 2010 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Other: Install < Guidance Signs/ Runway Incursion Caution Bars> [ required by Part 139] - Safety/ Security Paint Rwy edge markings on 3- 21 and 17- 35, perform pavement maintenance and re- striping on Rwy 3- 21 and modify, relocate and add new guidance signs. $ 20,000 $ 20,000 $ 760,000 $ 800,000 Airport Total: $ 147,500 $ 147,500 $ 5,605,000 $ 5,900,000 LAKE HAVASU CITY MOHAVE Other: Install < Guidance/ other> Signs [ not Part 139] - Standards Airfield Signage Improvements and Modifications/ Pavement Modifications: ( a) Assess Airfield Information Signs and Replace; ( b) Construct Bravo Twy Edge Lighting; ( c) Install S- 1 Cutouts on Regulators; ( d) Add North Ramp Connects to Twy A; ( e) Add hydrant prote $ 7,100 $ 7,100 $ 269,800 $ 284,000 Airport Total: $ 7,100 $ 7,100 $ 269,800 $ 284,000 LAUGHLIN/ BULLHEAD INTERNATIONAL MOHAVE Buildings:< Construct/ Expand/ Improve/ Modify/ Rehabilitat e> Aircraft Rescue & Fire Fighting Building [ Pt. 139 only] - Safety/ Security Construct new ARFF Building ( Phase I). This project will include the site preparation, drainage, infrastructure, and new generator. $ 29,250 $ 29,250 $ 1,111,500 $ 1,170,000 Equipment: Acquire Aircraft Rescue & Fire Fighting Vehicle [ required by Part 139 only] - Safety/ Security The project includes the acquisition of a new ARFF Vehicle. $ 21,250 $ 21,250 $ 807,500 $ 850,000 Equipment: Acquire Equipment ( e. g., Sweepers, etc.) - Standards The project includes the acquisition of a high- speed pavement sweeper. $ 4,625 $ 4,625 $ 175,750 $ 185,000 Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> The project will involve the preparation of an Environmental Assessment for the acquisition of approximately 300 acres of property. $ 7,500 $ 7,500 $ 285,000 $ 300,000 Runways:< Construct/ Extend/ Improve> Runway Safety Area [ Primary Airports] - Safety/ Security This project will include misc. erosion protection and drainage improvements along Rwy 16- 34 ( Phase I). $ 23,684 $ 23,684 $ 900,000 $ 947,368 Runways: Extend Runway- Capacity The project will include the design necessary to extend Rwy 16- 34 1,000 ft to the south. $ 25,000 $ 25,000 $ 950,000 $ 1,000,000 Terminal Development: Expand Terminal Building - Capacity The project will involve enclosing the existing bag claim area ( 4,500 SF) and creating an all- weather environment for passengers. $ 25,625 $ 25,625 $ 973,750 $ 1,025,000 Airport Total: $ 136,934 $ 136,934 $ 5,203,500 $ 5,477,368 MARANA REGIONAL PIMA Buildings:< Construct/ Expand/ Improve/ Modify/ Rehabilitat e> Building - Standards Construct Air Traffic Control Tower $ 162,500 $ 162,500 $ 6,175,000 $ 6,500,000 Buildings:< Construct/ Expand/ Improve/ Modify/ Rehabilitat e> Building - Standards Construct public use terminal on east side of airport, 12,000SF $ 125,000 $ 125,000 $ 4,750,000 $ 5,000,000 Arizona Department of Transportation - Aeronautics Division 9 FY 2010 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Taxiways: Construct Taxiway - Capacity Construct Taxiway K. 50 feet x 1500 feet. The work to be done will include clearing and grubbing, preparing the subgrade to proposed elevations, placing aggregate base course and asphalt concrete pavement, upgrade taxiway edge lighting, and install strip $ 47,500 $ 47,500 $ 1,805,000 $ 1,900,000 Airport Total: $ 335,000 $ 335,000 $ 12,730,000 $ 13,400,000 Maricopa Municipal New Airports: Acquire [ existing] Airport - Standards This project involves the acquisiton of 342 acres of land from the Arizona State Land Department. $ 427,500 $ 427,500 $ 16,245,000 $ 17,100,000 New Airports: Construct New Airport - Capacity Design of projects included in the initial development of the airport. $ 52,058 $ 52,058 $ 1,978,185 $ 2,082,300 Airport Total: $ 479,558 $ 479,558 $ 18,223,185 $ 19,182,300 NOGALES INTL SANTA CRUZ Other: Improve Airport < Drainage/ Erosion Control/ miscellaneous improvements> - Standards Construct 1.75 acre slope stabilization & erosion control on East Side $ 36,500 $ 36,500 $ 1,387,000 $ 1,460,000 Airport Total: $ 36,500 $ 36,500 $ 1,387,000 $ 1,460,000 PAGE MUNI COCONINO Apron: Expand Apron - Capacity Construct approx. 19,000 syds of apron space between the North Apron Twy and Rwy 7- 25. $ 35,050 $ 35,050 $ 1,331,900 $ 1,402,000 Buildings:< Construct/ Expand/ Improve/ Modify/ Rehabilitat e> Building - Standards Relocate the portable hangars from the main ramp to the expanded north ramp between Rwy 7- 25 and the North Apron Twy. $ 9,950 $ 9,950 $ 378,100 $ 398,000 Airport Total: $ 45,000 $ 45,000 $ 1,710,000 $ 1,800,000 PAYSON GILA Apron: Construct Apron - Standards 10- 02 - Constructon expansion of the east side of Echo Ramp, approximately 5200 square yards of asphalt $ 15,750 $ 15,750 $ 598,500 $ 630,000 Land: Acquire < land/ easement> for development/ relocation 10- 01 - Purchase of 13.5 acres located adjacent to the south side of the airport at the west end. $ 55,000 $ 55,000 $ 2,090,000 $ 2,200,000 Other: Install < Guidance/ other> Signs [ not Part 139] - Standards 10- 04 - Signage and lighting along the runway and taxiway $ 7,750 $ 7,750 $ 294,500 $ 310,000 Runways:< Construct/ Extend/ Improve> Runway Safety Area [ Non- Primary Airports] - Standards 10- 03 - Install runup area at the east end of Taxiway ' A', 2600 square yards asphalt pavement $ 16,250 $ 16,250 $ 617,500 $ 650,000 Airport Total: $ 94,750 $ 94,750 $ 3,600,500 $ 3,790,000 PHOENIX DEER VALLEY MARICOPA Apron: Rehabilitate Apron - Reconstruction Rebuild ramp in the south and northwest areas - Phase 2. $ 180,350 $ 180,350 $ 6,853,300 $ 7,214,000 Arizona Department of Transportation - Aeronautics Division 10 FY 2010 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> Conduct an Environmental Assessment for future projects at the Airport. $ 12,500 $ 12,500 $ 475,000 $ 500,000 Runways:< Construct/ Extend/ Improve> Runway Safety Area [ Primary Airports] - Safety/ Security Complete improvements to the runway safety area, recommended by the RSAT - Phase 1. $ 115,000 $ 115,000 $ 4,370,000 $ 4,600,000 Runways:< Extend/ Widen/ Strengthen> Runway [ to meet standards] - Standards Construct aircraft run- up areas at the ends of Runway 7L- 25R and 7R- 25L. $ 50,000 $ 50,000 $ 1,900,000 $ 2,000,000 Airport Total: $ 357,850 $ 357,850 $ 13,598,300 $ 14,314,000 PHOENIX GOODYEAR MARICOPA Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> Conduct environmental study for projects not covered by a Categorical Exclusion. $ 12,500 $ 12,500 $ 475,000 $ 500,000 Taxiways:< Extend/ Widen/ Strengthen> Taxiway - Standards Stengthen taxiway connectors A- 5, A- 6, and A- 7 to meet Category D- IV airport design standards. Replace Taxiway A- 4 with two high speed taxiway exits. $ 80,450 $ 80,450 $ 3,057,100 $ 3,218,000 Airport Total: $ 92,950 $ 92,950 $ 3,532,100 $ 3,718,000 PHOENIX SKY HARBOR INTL MARICOPA Other: Noise Mitigation Measures [ miscellaneous] Sound mitigation and acquisition of eligible properties. $ 3,812,500 $ 3,812,500 $ 22,875,000 $ 30,500,000 Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Conduct FAR Part 150 study update. $ 187,500 $ 187,500 $ 1,125,000 $ 1,500,000 Runways:< Construct/ Extend/ Improve> Runway Safety Area [ Primary Airports] - Safety/ Security Install recommended alternative from environmental assessment to comply with 1,000 ft FAA RSA standards. $ 1,825,000 $ 1,825,000 $ 10,950,000 $ 14,600,000 Taxiways: Construct Taxiway - Capacity Construct acute angle taxiway connector between Runway 7R- 25L and Taxiway H. $ 506,250 $ 506,250 $ 3,037,500 $ 4,050,000 Airport Total: $ 6,331,250 $ 6,331,250 $ 37,987,500 $ 50,650,000 PHOENIX- MESA GATEWAY MARICOPA Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities> [ MAP] - Other Design/ Construct a 100,000 gal. expansion to the existing 150,000 gallon Jet- A fuel farm and rehabilitate fuel farm pavements. This is a MAP project request. $ 57,800 $ 57,800 $ 2,196,400 $ 2,312,000 Other:< Construct/ Rehabilitate> Parking Lot [ non revenue producing- non hub/ MAP] - Other Design approximately 1,700 parking spaces for terminal parking. This is a MAP project request. $ 7,100 $ 7,100 $ 269,800 $ 284,000 Other:< Construct/ Rehabilitate> Parking Lot [ non revenue producing- non hub/ MAP] - Other Terminal Parking Construction of approximately 1,700 parking spaces. This is a MAP project request. $ 108,750 $ 108,750 $ 4,132,500 $ 4,350,000 Other: Improve Airport < Drainage/ Erosion Control/ miscellaneous improvements> - Standards Airfield/ Apron Drainage Improvements from Twy V to Twy L $ 95,000 $ 95,000 $ 3,610,000 $ 3,800,000 Arizona Department of Transportation - Aeronautics Division 11 FY 2010 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Taxiways:< Extend/ Widen/ Strengthen> Taxiway - Standards Construct Twy B Ph IV between Twy L & Twy N with drainage 77,333 SY signage/ markings- 8% & lighting- 15% construction costs $ 269,847 $ 269,847 $ 10,254,186 $ 10,793,880 Taxiways:< Extend/ Widen/ Strengthen> Taxiway - Standards Txy L Construct from Twy A to South Tract, 75 ft W with 35 ft shoulders each side x 2600 ft L ( 21,700 SY), includes Twy A to allow for radius connections. $ 225,594 $ 225,594 $ 8,572,567 $ 9,023,755 Terminal Development: Expand Terminal Building - Capacity Construct West Terminal Expansion Ph II - Increase existing 34,000 SF of terminal space by 20,000 SF. This is a MAP project request. $ 163,500 $ 163,500 $ 6,213,000 $ 6,540,000 Terminal Development: Expand Terminal Building - Capacity Terminal Expansion Ph II Design adds 20,000 SF to existing 34,000 SF of terminal space. MAP project request. $ 16,625 $ 16,625 $ 631,750 $ 665,000 Airport Total: $ 944,216 $ 944,216 $ 35,880,203 $ 37,768,635 POLACCA NAVAJO Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> Conduct environmental assessment for Rwy and apron. $ 3,750 $ 3,750 $ 142,500 $ 150,000 Airport Total: $ 3,750 $ 3,750 $ 142,500 $ 150,000 RYAN FIELD PIMA Equipment: Acquire Security Equipment/ Install Perimeter Fencing [ not Part 107] - Standards Install new chain link fencing ( approx. 13,000 lf), 24in paved service road ( apprx. 18,000 lf 2in AC with 6in ABC), striping and signage, gates and plunge basins $ 67,042 $ 67,043 $ 2,547,615 $ 2,681,700 Other: Improve Airport < Drainage/ Erosion Control/ miscellaneous improvements> - Standards Convert airfield drainage system to closed storm drain system or treat the ends of exposed drainage culverts with grated drainage structures $ 25,000 $ 25,000 $ 950,000 $ 1,000,000 Runways: Rehabilitate Runway - Reconstruct Rwy 6L- 24R, Pulverize 3in AC pavement, regrade/ lime treat subgrade. Place new 3in AC pavement & 10in wide erosion control, paint striping and marking. $ 55,219 $ 55,219 $ 2,098,312 $ 2,208,750 Airport Total: $ 147,261 $ 147,262 $ 5,595,927 $ 5,890,450 SAFFORD REGIONAL GRAHAM Runways:< Extend/ Widen/ Strengthen> Runway [ to meet standards] - Standards Remove existing Rwy 12/ 30 pavement & base; reconstruct base & pavement. $ 64,848 $ 64,847 $ 2,464,205 $ 2,593,900 Airport Total: $ 64,848 $ 64,847 $ 2,464,205 $ 2,593,900 SAN MANUEL PINAL Other:< Light/ Mark/ Remove> Obstructions - Standards Obstruction Survey for Instrument Approach $ 1,875 $ 1,875 $ 71,250 $ 75,000 Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Airport Master Plan ( including Compatible Land Use Planning) $ 3,750 $ 3,750 $ 142,500 $ 150,000 Arizona Department of Transportation - Aeronautics Division 12 FY 2010 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Taxiways: Construct Taxiway - Capacity Construct Parallel Twy for Rwy 11/ 29 ( 4700 ft x 35 ft) $ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000 Terminal Development: Construct Terminal Building - Capacity Install terminal utilities ( Phase II) and install AWOS $ 12,500 $ 12,500 $ 475,000 $ 500,000 Airport Total: $ 80,625 $ 80,625 $ 3,063,750 $ 3,225,000 SCOTTSDALE MARICOPA Apron: Rehabilitate Apron - Reconstruction This project will involve reconstructing the large aircraft parking apron located on the west side of the airfield near the Landmark Aviation ( main) facility. 34,000 sq. yards. $ 57,500 $ 57,500 $ 2,185,000 $ 2,300,000 Runways: Rehabilitate Runway - Reconstruct Rwy 03/ 21. This project will involve removing and replacing the existing P402 Rwy surface course and associated Rwy markings. 114,000 sq. yds. $ 50,000 $ 50,000 $ 1,900,000 $ 2,000,000 Airport Total: $ 107,500 $ 107,500 $ 4,085,000 $ 4,300,000 SEDONA YAVAPAI Apron: Construct Apron - Capacity This project will expand Apron A to the southwest. It is the first phase of a two phase project. Phase I will include a 300 X 550 ft expansion. $ 38,678 $ 38,677 $ 1,469,745 $ 1,547,100 Other: Improve Airport < Drainage/ Erosion Control/ miscellaneous improvements> - Standards This project will include the grading and erosion control of the infield area between Twy A and the Rwy. $ 11,288 $ 11,287 $ 428,925 $ 451,500 Taxiways:< Extend/ Widen/ Strengthen> Taxiway - Standards Construct Txy A extension from Txy A8 to the Rwy 3 end, approx. 900 ft X 35 ft $ 12,799 $ 12,800 $ 486,376 $ 511,975 Taxiways: Extend Taxiway - Capacity Construct taxilanes B4, B5 and hangar pad extensions, approx. 400 X 100ft. $ 10,819 $ 10,820 $ 411,139 $ 432,778 Taxiways: Rehabilitate Taxiway - Reconstruct Design and construct pavement maintenance and treatment for Taxiway A. $ 4,375 $ 4,375 $ 166,250 $ 175,000 Airport Total: $ 77,959 $ 77,959 $ 2,962,435 $ 3,118,353 SHOW LOW REGIONAL NAVAJO Apron: Construct Apron - Capacity Construct East Apron approx. 16,000 sy ( Ph 1) ( 10- 2) $ 33,750 $ 33,750 $ 1,282,500 $ 1,350,000 Other: Construct Deicing Containment Facility - Standards Construct deicing facility on main terminal apron, 110 ft x 110 ft ( 10- 3) $ 6,250 $ 6,250 $ 237,500 $ 250,000 Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> EA for Rwy 18/ 36 & Parallel Twy D ( 10- 5) $ 8,750 $ 8,750 $ 332,500 $ 350,000 Taxiways: Construct Taxiway - Capacity Construct Twy D south of Twy A, 35 ft x 1000 ft ( 10- 4) $ 17,500 $ 17,500 $ 665,000 $ 700,000 Airport Total: $ 66,250 $ 66,250 $ 2,517,500 $ 2,650,000 Arizona Department of Transportation - Aeronautics Division 13 FY 2010 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total SIERRA VISTA MUNI- LIBBY AAF COCHISE Runways: Rehabilitate Runway - Reconstruct Rwy 12/ 30 Reconstruct 5365 ft x 100 ft ( approx. 60000 sy of Airport rwy). $ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000 Airport Total: $ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000 SPRINGERVILLE MUNI APACHE Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> An ALP review and update will be conducted in order to evaluate the capital needs of the Airport. $ 1,250 $ 1,250 $ 47,500 $ 50,000 Runways:< Construct/ Extend/ Improve> Runway Safety Area [ Non- Primary Airports] - Standards The RSA will be completed to meet standards ( Construction) $ 10,000 $ 10,000 $ 380,000 $ 400,000 Runways: Rehabilitate Runway - Reconstruct Runway to be phased for funding purposes and complete resurfacing phase 2 in 2010. $ 40,000 $ 40,000 $ 1,520,000 $ 1,600,000 Airport Total: $ 51,250 $ 51,250 $ 1,947,500 $ 2,050,000 ST JOHNS INDUSTRIAL AIR PARK APACHE Apron: Rehabilitate Apron - Reconstruction Apron, Construct South West of Rwy 14/ 32, approx. 500' x 200'. $ 37,525 $ 37,525 $ 1,425,950 $ 1,501,000 Other:< Light/ Mark/ Remove> Obstructions - Standards Other: Remove tall trees in terminal area. $ 1,250 $ 1,250 $ 47,500 $ 50,000 Taxiways: Rehabilitate Taxiway - Reconstruct Twys: Construct South West of Rwy 14/ 32, approx. 3,000' x 35'. $ 37,500 $ 37,500 $ 1,425,000 $ 1,500,000 Airport Total: $ 76,275 $ 76,275 $ 2,898,450 $ 3,051,000 TAYLOR NAVAJO Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities> [ MAP] - Other Relocate Fuel Farm/ Replace Fuel System $ 8,750 $ 8,750 $ 332,500 $ 350,000 Runways: Rehabilitate Runway - Reconstruct Reconstruct Rwy 3/ 21, 7,000 ft x 75 ft. $ 75,000 $ 75,000 $ 2,850,000 $ 3,000,000 Airport Total: $ 83,750 $ 83,750 $ 3,182,500 $ 3,350,000 TUCSON INTL PIMA Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Update the 2004 Master Plan $ 53,640 $ 53,640 $ 1,092,720 $ 1,200,000 Runways:< Construct/ Extend/ Improve> Runway Safety Area [ Primary Airports] - Safety/ Security Address any Runway Safety Area Drainage Improvements recommended by the Airfield Drainage Study currently underway $ 178,800 $ 178,800 $ 3,642,400 $ 4,000,000 Runways: Rehabilitate Runway - Reconstruct Reconstruct portion of keel section of Rwy 3/ 21 ( approx. 18,200 sy) and all/ part of Twys A2 & 3 ( approx. 10,000 sy) with AC. Remarking & regrooving ( rwy only) is part of the work. $ 61,307 $ 61,306 $ 1,248,902 $ 1,371,515 Taxiways: Rehabilitate Taxiway - Reconstruct Reconstruct all/ part Twys A, A7, A10, Air Freight, Customs, Condo & D ( approx. 215,800 sy) with AC and remark. $ 82,557 $ 82,557 $ 1,681,802 $ 1,846,916 Arizona Department of Transportation - Aeronautics Division 14 FY 2010 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Airport Total: $ 376,304 $ 376,303 $ 7,665,824 $ 8,418,431 WHITERIVER NAVAJO Equipment: Install Weather Reporting Equipment { describe, e. g., AWOS } - Standards Install AWOS III. $ 7,500 $ 7,500 $ 285,000 $ 300,000 Airport Total: $ 7,500 $ 7,500 $ 285,000 $ 300,000 WICKENBURG MUNI MARICOPA Apron: Construct Apron - Capacity This project involves the construction of a new 15,000 SY aircraft parking apron ( Phase II) at approximately mid- Field on the south side of the Rwy. $ 27,575 $ 27,575 $ 1,047,850 $ 1,103,000 Apron: Rehabilitate Apron - Reconstruction This project will provide for the pavement preservation of all apron and taxilane pavements ( approximately 100,000 SY) on the airport. $ 5,250 $ 5,250 $ 199,500 $ 210,000 Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Capacity Design a 1,300 foot extension to the access road on the south side of the airport. $ 1,100 $ 1,100 $ 41,800 $ 44,000 Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Update the Airport Master Plan. $ 5,250 $ 5,250 $ 199,500 $ 210,000 Airport Total: $ 39,175 $ 39,175 $ 1,488,650 $ 1,567,000 WINSLOW- LINDBERGH REGIONAL NAVAJO Apron: Rehabilitate Apron - Reconstruction Construct 16,600 SY South Apron - Phase II. $ 42,500 $ 42,500 $ 1,615,000 $ 1,700,000 Other: Improve Airport < Drainage/ Erosion Control/ miscellaneous improvements> - Standards Conduct airport drainage study to include levee assessment. $ 5,000 $ 5,000 $ 190,000 $ 200,000 Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> Environmental Assessment for Land Acquisitions. $ 5,000 $ 5,000 $ 190,000 $ 200,000 Runways: Rehabilitate Runway - Reconstruct Design 308,000 SY Pavement Rehabilitation for Rwys and Twys. $ 4,375 $ 4,375 $ 166,250 $ 175,000 Taxiways: Install Taxiway Lighting ( MITL) [ Required by Part 139] - Safety/ Security Install PAPI's for Rwys 4, 22 & 29 & taxiway edge lights ( MITL) required by Part 139 $ 15,000 $ 15,000 $ 570,000 $ 600,000 Airport Total: $ 71,875 $ 71,875 $ 2,731,250 $ 2,875,000 YUMA MCAS/ YUMA INTL YUMA Apron: Construct Apron - Capacity CONSTRUCT: 20,000 sy apron ( 10,000 rehab, 10,000 expand). Adjacent to Twy F3, south of 40th Street. $ 72,368 $ 72,369 $ 2,750,000 $ 2,894,737 Apron: Rehabilitate Apron - Reconstruction DESIGN 150 yd x 170 yd asphalt apron between GA hangar complex and CareFlight ( FBO), at the end of Fortuna Ave. Approx 1,200 lf of security fencing with gate and card reader needed. $ 6,579 $ 6,579 $ 250,000 $ 263,158 Arizona Department of Transportation - Aeronautics Division 15 FY 2010 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Airport Total: $ 78,947 $ 78,948 $ 3,000,000 $ 3,157,895 Total Fiscal Year Grants: $ 12,548,929 $ 12,548,926 $ 267,625,502 $ 292,723,356 Arizona Department of Transportation - Aeronautics Division 16 FY 2011 State & Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total ADOT Aeronautics APMS - Runway Pavement Preservation Consulting and construction services $ 3,042,630 $ 0 $ 0 $ 3,042,630 Planning: Planning Studies Conduct $ 500,000 $ 0 $ 0 $ 500,000 Airport Total: $ 3,542,630 $ 0 $ 0 $ 3,542,630 BENSON MUNICIPAL COCHISE Runways: Runway Construct Design Rwy 10/ 28 Extension - Ph I ( approx 1,400 LF) $ 135,000 $ 15,000 $ 0 $ 150,000 Airport Total: $ 135,000 $ 15,000 $ 0 $ 150,000 CHANDLER MUNI MARICOPA Terminal Development: Auto Parking Construct Design/ Const 50 unit parking lot - appr 2,350 SY paving. $ 227,700 $ 25,300 $ 0 $ 253,000 Airport Total: $ 227,700 $ 25,300 $ 0 $ 253,000 DOUGLAS MUNI COCHISE Other: Fencing ( Security) Install Install security fencing around hanger area, aircraft parking apron area, and new terminal area ( approx. 1,200 ft) $ 108,000 $ 12,000 $ 0 $ 120,000 Airport Total: $ 108,000 $ 12,000 $ 0 $ 120,000 ERNEST A. LOVE FIELD YAVAPAI Buildings: Buildings Construct/ relocate Design new 11,300 SY Maintenance Facility. $ 10,740 $ 189,260 $ 0 $ 200,000 Runways: Runway Construct Design to pave 8,000 LF of Rwy and Twy Shoulders. $ 180,000 $ 20,000 $ 0 $ 200,000 Terminal Development: Terminal Construct ( CS Only) Design new 21,000 SF Terminal Building. $ 405,000 $ 45,000 $ 0 $ 450,000 Airport Total: $ 595,740 $ 254,260 $ 0 $ 850,000 FALCON FLD MARICOPA Other: Instrument Approach System Install Design/ Install an AWOS system $ 225,000 $ 25,000 $ 0 $ 250,000 Airport Total: $ 225,000 $ 25,000 $ 0 $ 250,000 FLAGSTAFF PULLIAM COCONINO Apron: Apron Reconstruct Joint repairs between commercial ramp concrete slabs. Project would include replacing backer rod spacers and permanently sealing joints. $ 201,339 $ 22,371 $ 0 $ 223,710 Airport Total: $ 201,339 $ 22,371 $ 0 $ 223,710 MARANA REGIONAL PIMA Runways: Runway Structural Upgrade Overlay Runway 12- 30 6900 x 100 $ 595,740 $ 1,304,260 $ 0 $ 1,900,000 Arizona Department of Transportation - Aeronautics Division 17 FY 2011 State & Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Airport Total: $ 595,740 $ 1,304,260 $ 0 $ 1,900,000 PHOENIX DEER VALLEY MARICOPA Apron: Apron Reconstruct Rebuild ramp on the south and northwest areas - Phase 3. Approximate Total Area: 193,000 square yards. State/ local = 15,857 square yards. $ 499,500 $ 55,500 $ 0 $ 555,000 Airport Total: $ 499,500 $ 55,500 $ 0 $ 555,000 PHOENIX GOODYEAR MARICOPA Ground Transportation: Access Rd. Construct north side on- airport access road and utility extension - Phase 1. Roadway dimensions: Approximate Total Area: 6,600 feet in length by 24 feet in width ( 15,840 square feet or 17,600 square yards). $ 495,900 $ 55,100 $ 0 $ 551,000 Airport Total: $ 495,900 $ 55,100 $ 0 $ 551,000 RYAN FIELD PIMA Runways: Runway Construct Construct new 75 ft x 105 ft AC Rwy ext. on 6L/ 24R, new 35 ft x 105 ft AC ext. on Twy A; & new 35 ft x 650 ft AC Twys to replace the existing Twy A5 $ 595,740 $ 319,828 $ 0 $ 915,568 Airport Total: $ 595,740 $ 319,828 $ 0 $ 915,568 SEDONA YAVAPAI Apron: Apron Construct Design expansion of Apron A to the north including the demolition of the restaurant building. The expansion is approx. 500ft X 500ft and construction will be seperated into two phases. $ 99,000 $ 11,000 $ 0 $ 110,000 Airport Total: $ 99,000 $ 11,000 $ 0 $ 110,000 SELIGMAN YAVAPAI Other: Fencing ( Perimeter) Install Relocate and install additional fencing at both runway ends, and also install a culvert which would eliminate drainage channel. $ 71,250 $ 3,750 $ 0 $ 75,000 Airport Total: $ 71,250 $ 3,750 $ 0 $ 75,000 SIERRA VISTA MUNI- LIBBY AAF COCHISE Other: Fencing ( Wildlife) Install Install two wildlife fencing enclosures: on NE and on SE corners of Airport. ( approx. 300 ft x 300 ft each) $ 90,000 $ 10,000 $ 0 $ 100,000 Airport Total: $ 90,000 $ 10,000 $ 0 $ 100,000 Arizona Department of Transportation - Aeronautics Division 18 FY 2011 State & Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total TUCSON INTL PIMA Land: Land ( Protection) Acquisition Reimbursement of the purchase of approximately 8 acres in RPZ for Rwy 21. $ 595,740 $ 1,115,153 $ 0 $ 1,710,893 Airport Total: $ 595,740 $ 1,115,153 $ 0 $ 1,710,893 Total Fiscal Year Grants: $ 8,078,279 $ 3,228,522 $ 0 $ 11,306,801 Arizona Department of Transportation - Aeronautics Division 19 FY 2011 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total AVI SUQUILLA LA PAZ Buildings:< Construct/ Expand/ Improve/ Modify/ Rehabilitat e> Aircraft Rescue & Fire Fighting Building [ Pt. 139 only] - Safety/ Security Design and construction of 5,000 sf Aircraft Rescue and Fire Fighting ( ARFF) station. $ 46,875 $ 46,875 $ 1,781,250 $ 1,875,000 Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Service Road - Other Pave the perimeter road with aggregate base and asphalt concrete pavement - 16- ft wide, approximately 42,000 SY of pavement, extend culverts. $ 32,500 $ 32,500 $ 1,235,000 $ 1,300,000 Other: Improve Airport < Drainage/ Erosion Control/ miscellaneous improvements> - Standards The Rwy and Twy shoulders will be stabilized by soil cement at the top of the ditch break paralleling the runway and taxiways where the erosion is occuring - ditch backslopes will also be stabilized with soil cement. $ 27,500 $ 27,500 $ 1,045,000 $ 1,100,000 Taxiways: Rehabilitate Taxiway Lighting - Reconstruct Rehabilitate MITL system on old 4,800 ft Rwy and 4,800 ft parallel Twy and connecting Twys ( approximately 10,600 LF) - replace existing underground electrical conductor, transformers and lights with new materials. $ 11,625 $ 11,625 $ 441,750 $ 465,000 Airport Total: $ 118,500 $ 118,500 $ 4,503,000 $ 4,740,000 BAGDAD YAVAPAI Apron: Construct Apron - Standards Runway safety areas will be lengthened and widened to meet FAA design standards $ 11,875 $ 11,875 $ 451,250 $ 475,000 Airport Total: $ 11,875 $ 11,875 $ 451,250 $ 475,000 BENSON MUNICIPAL COCHISE Heliport:< Construct/ Expand/ Improve/ Modify/ Rehabilitate> Helipad/ Heliport - Standards Construct Helipads adjacent to east Apron ( 50 ft x 50 ft) $ 6,250 $ 6,250 $ 237,500 $ 250,000 Land: Acquire < land/ easement> for development/ relocation Acquire approx 83 acres to extend Rwy 10 and Parallel Twy ( both ends) $ 20,000 $ 20,000 $ 760,000 $ 800,000 Airport Total: $ 26,250 $ 26,250 $ 997,500 $ 1,050,000 BISBEE DOUGLAS INTL COCHISE Apron: Construct Apron - Capacity Reconstruct Apron 16,700 sy for light aircraft service and maintenance $ 20,000 $ 20,000 $ 760,000 $ 800,000 Airport Total: $ 20,000 $ 20,000 $ 760,000 $ 800,000 BISBEE MUNI COCHISE Other: Install < Guidance/ other> Signs [ not Part 139] - Standards Install new Rwy 17/ 35 signs at locations where existing signs are failing, install new signs at locations where they are needed but none are existing. $ 3,750 $ 3,750 $ 142,500 $ 150,000 Arizona Department of Transportation - Aeronautics Division 20 FY 2011 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> EA for 6.40 acres of land. $ 3,750 $ 3,750 $ 142,500 $ 150,000 Taxiways:< Extend/ Widen/ Strengthen> Taxiway - Standards Widen Twy A from 35 ft to 50 ft; Reconstruct the existing 35 ft width ( 5,900 ft x 50 ft). $ 30,000 $ 30,000 $ 1,140,000 $ 1,200,000 Taxiways: Install Taxiway Lighting ( MITL) [ non Part 139 CS] - Statutory Emphasis Programs Install MITLs, cable & conduit along Twy A & connecting Twys. Construct new vault and install new vault equipment. $ 17,875 $ 17,875 $ 679,250 $ 715,000 Airport Total: $ 55,375 $ 55,375 $ 2,104,250 $ 2,215,000 BUCKEYE MUNI MARICOPA Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Other Reconstruct the airport entrance road from the main apron to Palo Verde Road. ( approx. 1,700'). $ 25,000 $ 25,000 $ 950,000 $ 1,000,000 Land: Acquire land/ easement for approaches Purchase approximately 25 acres of land north of the airport to secure RPZ and allow for future Rwy extension ( Phase 2). $ 137,500 $ 137,500 $ 5,225,000 $ 5,500,000 Runways:< Extend/ Widen/ Strengthen> Runway [ to meet standards] - Standards Construct Rwy widening and strengthening to increase the total width to 100 ft and the strength to 75,000 lbs. $ 50,000 $ 50,000 $ 1,900,000 $ 2,000,000 Taxiways: Construct Taxiway - Capacity Design and construct Twy E, including Twy edge lighting. $ 30,000 $ 30,000 $ 1,140,000 $ 1,200,000 Airport Total: $ 242,500 $ 242,500 $ 9,215,000 $ 9,700,000 CHANDLER MUNI MARICOPA Apron: Construct Apron - Capacity Design 29,500 SY apron area. $ 5,950 $ 5,950 $ 226,100 $ 238,000 Other: Install < Guidance Signs/ Runway Incursion Caution Bars> [ non Part 139 CS] - Statutory Emphasis Programs Construct replacement/ modification of approx. 75 airfield signs. $ 15,388 $ 15,387 $ 584,725 $ 615,500 Taxiways: Extend Taxiway - Capacity Construct pavment for 5,500 LF x 40 ft Twy, connectors & runup areas ( 29,000 SY). $ 58,512 $ 58,513 $ 2,223,475 $ 2,340,500 Taxiways: Install Taxiway Lighting ( e. g., SMGCS, reflectors, MITL) - Standards Construct MITL & signs for 5,500 LF Twy & connectors. $ 44,875 $ 44,875 $ 1,705,250 $ 1,795,000 Airport Total: $ 124,725 $ 124,725 $ 4,739,550 $ 4,989,000 CIBECUE NAVAJO New Airports: Construct New Airport - Standards At new Cibecue Airport Site, Rwy 75' x 5,00' Phase II Paving and Fencing. $ 162,500 $ 162,500 $ 6,175,000 $ 6,500,000 Airport Total: $ 162,500 $ 162,500 $ 6,175,000 $ 6,500,000 COCHISE COUNTY COCHISE Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Update 1997 Master Plan $ 4,375 $ 4,375 $ 166,250 $ 175,000 Arizona Department of Transportation - Aeronautics Division 21 FY 2011 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Airport Total: $ 4,375 $ 4,375 $ 166,250 $ 175,000 COLORADO CITY MUNI MOHAVE Equipment: Acquire Security Equipment/ Install Perimeter Fencing [ not Part 107] - Standards Equipment, Perimeter Wildlife Fencing ( approx. 38,000 linear feet) $ 22,500 $ 22,500 $ 855,000 $ 900,000 Airport Total: $ 22,500 $ 22,500 $ 855,000 $ 900,000 COOLIDGE MUNI PINAL Equipment: Acquire Security Equipment/ Install Fencing [ required by Part 107] - Safety/ Security Install security fencing around the perimeter of the airport ( approx. 30,000 ft) $ 24,391 $ 24,390 $ 926,842 $ 975,623 Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Capacity Move A Street to perimeter of airport property N & E of Rwy 5- 23 $ 14,429 $ 14,429 $ 548,312 $ 577,170 Airport Total: $ 38,820 $ 38,819 $ 1,475,154 $ 1,552,793 COTTONWOOD YAVAPAI Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> Conduct an environmental assessment of 22 acres along the southwest side of the existing airport property. $ 5,000 $ 5,000 $ 190,000 $ 200,000 Airport Total: $ 5,000 $ 5,000 $ 190,000 $ 200,000 ELOY MUNI PINAL Apron: Rehabilitate Apron - Reconstruction Construct approx. 15,450 SY of asphalt pavement apron ( approx. 200 ft x 700 ft), and install apron lighting. $ 3,750 $ 3,750 $ 142,500 $ 150,000 Land: Acquire land/ easement for approaches Acquire approx. 21 acres land for RPZs of proposed Rwy 2- 20 extension $ 10,000 $ 10,000 $ 380,000 $ 400,000 Terminal Development: Construct Terminal Building - Capacity Construct new terminal building and parking/ utilities to serve new terminal building $ 30,000 $ 30,000 $ 1,140,000 $ 1,200,000 Airport Total: $ 43,750 $ 43,750 $ 1,662,500 $ 1,750,000 ERIC MARCUS MUNICIPAL PIMA Runways:< Extend/ Widen/ Strengthen> Runway [ to meet standards] - Standards Crack seal and seal coat Rwy ( approx. 228,000 sf). $ 6,250 $ 6,250 $ 237,500 $ 250,000 Airport Total: $ 6,250 $ 6,250 $ 237,500 $ 250,000 ERNEST A. LOVE FIELD YAVAPAI Apron: Construct Apron - Standards Construct Electrical Vault Relocation; Construct HIRL and sign install for Rwy 21L Extension. $ 25,000 $ 25,000 $ 950,000 $ 1,000,000 Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Service Road - Other Construct Service Road ( 12,500 x 50) for Rwy 21L Extension. $ 10,000 $ 10,000 $ 380,000 $ 400,000 Arizona Department of Transportation - Aeronautics Division 22 FY 2011 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Airport Total: $ 35,000 $ 35,000 $ 1,330,000 $ 1,400,000 FALCON FLD MARICOPA Other: Install < Guidance Signs/ Runway Incursion Caution Bars> [ non Part 139 CS] - Statutory Emphasis Programs Phase 2 - Reconfigure Twy B & Install Rwy guard lights along secondary Rwy 4L- 22R. $ 37,500 $ 37,500 $ 1,425,000 $ 1,500,000 Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> EA for Twy between airports Rwys ( approx. 5100 ft long & 75 ft wide. $ 2,500 $ 2,500 $ 95,000 $ 100,000 Runways: Construct Runway - Capacity Design high- speed Rwy exits between Rwy 4L- 22R and Twy E $ 1,875 $ 1,875 $ 71,250 $ 75,000 Airport Total: $ 41,875 $ 41,875 $ 1,591,250 $ 1,675,000 FLAGSTAFF PULLIAM COCONINO Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Capacity Mill and overlay or otherwise reconstruct Pulliam Drive from John Wesley Powell Blvd around in front of the Airport terminal building and back to where the road reconnects with itself approaching John Wesley Powell. $ 78,977 $ 78,976 $ 3,001,108 $ 3,159,061 Airport Total: $ 78,977 $ 78,976 $ 3,001,108 $ 3,159,061 GLENDALE MUNICIPAL MARICOPA Apron: Install Apron Lighting - Standards Install Lighting for 132,000 SY Apron. $ 7,550 $ 7,550 $ 286,900 $ 302,000 Land: Acquire land/ easement for approaches Acquire 18 acres north of Rwy 19 ( Acres 1- 18). $ 187,500 $ 187,500 $ 7,125,000 $ 7,500,000 Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> Environmental Assessment for Northwest Ramp and Eastside Twy. $ 6,250 $ 6,250 $ 237,500 $ 250,000 Runways: Rehabilitate Runway - Reconstruct Pavement Maintenance - slurry seal hangars, Twy, an Rwy. $ 5,000 $ 5,000 $ 190,000 $ 200,000 Airport Total: $ 206,300 $ 206,300 $ 7,839,400 $ 8,252,000 GRAND CANYON NATIONAL PARK COCONINO Terminal Development: Construct Terminal Building - Capacity Terminal location per ALP is mid field $ 100,000 $ 100,000 $ 3,800,000 $ 4,000,000 Airport Total: $ 100,000 $ 100,000 $ 3,800,000 $ 4,000,000 GRAND CANYON WEST MOHAVE Runways: Construct Runway [ includes relocation] - Standrads Runways: Shift and construct Runway 17/ 35, 5,000' x 75'. Project also includes connecting taxiways including grading, drainage, paving, lighting & visual aids ( Phase III) $ 250,000 $ 250,000 $ 9,500,000 $ 10,000,000 Airport Total: $ 250,000 $ 250,000 $ 9,500,000 $ 10,000,000 Arizona Department of Transportation - Aeronautics Division 23 FY 2011 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total GREENLEE COUNTY GREENLEE Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Other Design 3,100 ft x 24 ft entrance road relocation and 120 ft x 130 ft parking lot rehabilitation. $ 4,375 $ 4,375 $ 166,250 $ 175,000 Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities> [ MAP] - Other Utility Construction $ 5,000 $ 5,000 $ 190,000 $ 200,000 Airport Total: $ 9,375 $ 9,375 $ 356,250 $ 375,000 H. A. CLARK MEMORIAL FIELD COCONINO Land: Acquire land/ easement for approaches Acquire land off of rwy ends ( 277 acres) for rpz protection and accommodate rev generating activities. EA currently underway. $ 18,750 $ 18,750 $ 712,500 $ 750,000 Runways: Extend Runway- Capacity Extend Rwy 18 and parallel Txwy $ 50,000 $ 50,000 $ 1,900,000 $ 2,000,000 Runways: Install Runway < vertical/ visual> Guidance System [ PAPI/ VASI/ REIL/ ALS/ etc.] - Standards Upgrade PAPI to 4 Light System $ 1,875 $ 1,875 $ 71,250 $ 75,000 Airport Total: $ 70,625 $ 70,625 $ 2,683,750 $ 2,825,000 HOLBROOK MUNI NAVAJO Apron: Expand Apron - Capacity North east Apron Expansion ( 300 x 50 feet) $ 8,750 $ 8,750 $ 332,500 $ 350,000 Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Other Install Security Gates ( Main Gate) $ 2,250 $ 2,250 $ 85,500 $ 90,000 Heliport:< Construct/ Expand/ Improve/ Modify/ Rehabilitate> Helipad/ Heliport - Standards Install Helipad Lighting $ 1,125 $ 1,125 $ 42,750 $ 45,000 Other:< Light/ Mark/ Remove> Obstructions - Standards Relocate Fuel Station near Ramp Area $ 7,000 $ 7,000 $ 266,000 $ 280,000 Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> Environmental Assessment for North end Rwy 3/ 21 $ 4,375 $ 4,375 $ 166,250 $ 175,000 Airport Total: $ 23,500 $ 23,500 $ 893,000 $ 940,000 KAYENTA NAVAJO Buildings:< Construct/ Expand/ Improve/ Modify/ Rehabilitat e> Building - Standards Construct a building 60' x 40' to house SRE & Broom equipment. $ 10,000 $ 10,000 $ 380,000 $ 400,000 Equipment: Acquire Security Equipment/ Install Perimeter Fencing [ not Part 107] - Standards Wildlife fence airport perimeter, approx. 16,000 sy. $ 15,000 $ 15,000 $ 570,000 $ 600,000 Heliport:< Construct/ Expand/ Improve/ Modify/ Rehabilitate> Helipad/ Heliport - Capacity Construct helicopter parking pads north east of midfield apron. $ 12,500 $ 12,500 $ 475,000 $ 500,000 Taxiways: Construct Taxiway - Capacity Construct parallel Twy to Rwy 5/ 23 and connectors, 35' x 7,100' ( Grading and Drainage- Phase I). $ 30,000 $ 30,000 $ 1,140,000 $ 1,200,000 Airport Total: $ 67,500 $ 67,500 $ 2,565,000 $ 2,700,000 KINGMAN MOHAVE Arizona Department of Transportation - Aeronautics Division 24 FY 2011 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Apron: Rehabilitate Apron - Reconstruction Reconstruct the South Ramp ( approx. 66,100 sy). $ 100,000 $ 100,000 $ 3,800,000 $ 4,000,000 Land: Acquire land/ easement for approaches Purchase 80 acres northeast of the Rwy 21 end. $ 60,000 $ 60,000 $ 2,280,000 $ 2,400,000 Runways:< Extend/ Widen/ Strengthen> Runway [ to meet standards] - Standards Design a pavement strengthening for Rwy 3- 21 and Twy D. $ 5,000 $ 5,000 $ 190,000 $ 200,000 Airport Total: $ 165,000 $ 165,000 $ 6,270,000 $ 6,600,000 LAKE HAVASU CITY MOHAVE Land: Acquire < land/ easement> for development/ relocation Provide a Land Assessment ( Appraisal) of 23 Acres. $ 3,125 $ 3,125 $ 118,750 $ 125,000 Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities> [ MAP] - Other Replace existing metal airfield electrical vault with pre- engineered unit meeting current electrical codes. $ 8,000 $ 8,000 $ 304,000 $ 320,000 Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> Provide an Environmental Assessment of 23 Acres. $ 3,750 $ 3,750 $ 142,500 $ 150,000 Airport Total: $ 14,875 $ 14,875 $ 565,250 $ 595,000 LAUGHLIN/ BULLHEAD INTERNATIONAL MOHAVE Buildings:< Construct/ Expand/ Improve/ Modify/ Rehabilitat e> Aircraft Rescue & Fire Fighting Building [ Pt. 139 only] - Safety/ Security The project involves the construction of a new 8,000 SF ARFF Building. $ 60,000 $ 60,000 $ 2,280,000 $ 2,400,000 Land: Acquire < land/ easement> for development/ relocation The project involves the acquisition of 75 acres of ASLD property ( Phase 1). $ 93,750 $ 93,750 $ 3,562,500 $ 3,750,000 Runways: Extend Runway- Capacity This project will provide the site preparation/ earthwork for the 1,000 foot southerly extension to Rwy 16- 34. $ 125,000 $ 125,000 $ 4,750,000 $ 5,000,000 Airport Total: $ 278,750 $ 278,750 $ 10,592,500 $ 11,150,000 MARANA REGIONAL PIMA Land: Acquire < land/ easement> for development/ relocation Aquire Land - 244 Acres $ 152,500 $ 152,500 $ 5,795,000 $ 6,100,000 Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> EA for new Rwy & other airport projects $ 8,750 $ 8,750 $ 332,500 $ 350,000 Runways: Rehabilitate Runway - Reconstruct Reconstruct Rwy 3- 21 $ 10,000 $ 10,000 $ 380,000 $ 400,000 Taxiways: Construct Taxiway - Capacity Construct Twy H - NW of Rwy 3/ 21 $ 70,000 $ 70,000 $ 2,660,000 $ 2,800,000 Taxiways: Rehabilitate Taxiway - Reconstruct Rehabilitate Twy A, Twy B, Twy E $ 18,750 $ 18,750 $ 712,500 $ 750,000 Airport Total: $ 260,000 $ 260,000 $ 9,880,000 $ 10,400,000 Maricopa Municipal Equipment: Acquire Security Equipment/ Install Perimeter Fencing [ not Part 107] - Standards The project will include the installation of approximately 30,000 LF of perimeter fencing. $ 24,818 $ 24,818 $ 943,065 $ 992,700 Arizona Department of Transportation - Aeronautics Division 25 FY 2011 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total New Airports: Acquire [ existing] Airport - Standards The project involves the acquisition of 342 acres of ASLD property. $ 427,500 $ 427,500 $ 16,245,000 $ 17,100,000 New Airports: Construct New Airport - Capacity The project ivolves the grading and drainage of 644 acres of property for the initial airport development. $ 123,008 $ 123,008 $ 4,674,285 $ 4,920,300 Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities> [ MAP] - Other Installation of water, sewer, energy, and communication utilities for the initial 684 acres of new airport development. $ 14,175 $ 14,175 $ 538,650 $ 567,000 Airport Total: $ 589,500 $ 589,500 $ 22,401,000 $ 23,580,000 NOGALES INTL SANTA CRUZ Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Service Road - Other Construct 10,000 LF x 16 ft Perimeter Service Road around S End of Rwy 3- 21 $ 7,500 $ 7,500 $ 285,000 $ 300,000 Other: Improve Airport < Drainage/ Erosion Control/ miscellaneous improvements> - Standards Construct Water, Sanitary Sewer, Power & Comm. Extension to serve future hangar development in Terminal area $ 10,000 $ 10,000 $ 380,000 $ 400,000 Airport Total: $ 17,500 $ 17,500 $ 665,000 $ 700,000 PAGE MUNI COCONINO Apron: Expand/ Strengthen Apron - Standards Strengthen approximately 5,000 syds of the main apron to 75,000 lbs to accommodate larger aircraft. $ 15,000 $ 15,000 $ 570,000 $ 600,000 Runways: Rehabilitate Runway - Reconstruct Reconstruct the intersection of 15- 33 and 7- 25 and the east portion of 7- 25 to create a manageable slope for landing aircraft. $ 20,000 $ 20,000 $ 760,000 $ 800,000 Airport Total: $ 35,000 $ 35,000 $ 1,330,000 $ 1,400,000 PAYSON GILA Apron: Construct Apron - Standards 11- 02 - South of parallel taxiway, 21200 +/- square yards of asphalt pavement $ 5,000 $ 5,000 $ 190,000 $ 200,000 Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Service Road - Other 11- 01 - south side of airport, 2600 +/- sy of asphalt roadway and 2300 linear feet of fence $ 11,750 $ 11,750 $ 446,500 $ 470,000 Airport Total: $ 16,750 $ 16,750 $ 636,500 $ 670,000 PHOENIX DEER VALLEY MARICOPA Runways:< Construct/ Extend/ Improve> Runway Safety Area [ Primary Airports] - Safety/ Security Complete improvements to the runway safety area, recommended by the RSAT - Phase 2. $ 101,300 $ 101,300 $ 3,849,400 $ 4,052,000 Taxiways: Rehabilitate Taxiway - Reconstruct Reconstruct Taxiway A. $ 101,300 $ 101,300 $ 3,849,400 $ 4,052,000 Airport Total: $ 202,600 $ 202,600 $ 7,698,800 $ 8,104,000 PHOENIX GOODYEAR MARICOPA Equipment:< Acquire/ Install/ Rehabilitate> Emergency Generator - Standards Acquire emergency generator for ATCT. $ 2,500 $ 2,500 $ 95,000 $ 100,000 Arizona Department of Transportation - Aeronautics Division 26 FY 2011 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Capacity Construct north side on- airport access road and utility extension - Phase 1. $ 13,775 $ 13,775 $ 523,450 $ 551,000 Other: Environmental Mitigation Relocate Superfund cleanup wells. $ 8,750 $ 8,750 $ 332,500 $ 350,000 Runways:< Construct/ Extend/ Improve> Runway Safety Area [ Non- Primary Airports] - Standards Shift Runway 3- 21 by 300 feet to the southwest. $ 40,000 $ 40,000 $ 1,520,000 $ 1,600,000 Taxiways: Construct Taxiway - Capacity Construct west parallel taxiway and exits. $ 552,500 $ 552,500 $ 20,995,000 $ 22,100,000 Airport Total: $ 617,525 $ 617,525 $ 23,465,950 $ 24,701,000 PHOENIX SKY HARBOR INTL MARICOPA Apron: Rehabilitate Apron - Reconstruction Reconstruct West Cargo - East Apron in asphalt. $ 814,125 $ 814,125 $ 4,884,750 $ 6,513,000 Other: Noise Mitigation Measures [ miscellaneous] Sound mitigation and acquisition of eligible properties. $ 1,875,000 $ 1,875,000 $ 11,250,000 $ 15,000,000 Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Conduct Airport Master Plan $ 625,000 $ 625,000 $ 3,750,000 $ 5,000,000 Taxiways: Rehabilitate Taxiway - Reconstruct Replace Taxiway A asphalt with concrete and install new electrical airfield lighting. $ 1,938,719 $ 1,938,719 $ 11,632,312 $ 15,509,750 Airport Total: $ 5,252,844 $ 5,252,844 $ 31,517,062 $ 42,022,750 PHOENIX- MESA GATEWAY MARICOPA Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities> [ MAP] - Other Airfield/ Apron Drainage Improvements South of Twy L and including the South Industrial Area. $ 90,520 $ 90,520 $ 3,439,762 $ 3,620,802 Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities> [ MAP] - Other ATCT building code requirements assessment, foam basin construction and fire line extension construction are needed to comply with City of Mesa Bulding Code. MAP project requests. $ 77,895 $ 77,895 $ 2,960,010 $ 3,115,800 Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities> [ MAP] - Other Preliminary Planning required for east side terminal area infrastructure - utilities and drainage. Required before design phase. MAP project request. $ 16,250 $ 16,250 $ 617,500 $ 650,000 Other:< Light/ Mark/ Remove> Obstructions [ hazard only e. g., approaches] - Safety/ Security Design/ Construction of relocation of ASR pending site for East Side Terminal ( FAA may do this on their own) $ 55,000 $ 55,000 $ 2,090,000 $ 2,200,000 Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> EA for extension of Rwy 12L/ 30R, new terminal, fuel farm, roads, archeological areas, and other improvements. ( Archeological Clearance to be included). MAP project request. $ 33,575 $ 33,575 $ 1,275,850 $ 1,343,000 Taxiways:< Extend/ Widen/ Strengthen> Taxiway - Standards Design Twy C Extension from Twy J to Twy K & Txy K from Rwy 30L to Twy C. 10,000 SY PCCP, 9,334 SY Asphalt $ 12,500 $ 12,500 $ 475,000 $ 500,000 Taxiways: Rehabilitate Taxiway - Reconstruct Design/ Reconstruct Twy P, 75 ft W by 2,000 ft L with 35 ft shoulders each side. ( 16,700 SY) $ 154,650 $ 154,650 $ 5,876,700 $ 6,186,000 Taxiways: Rehabilitate Taxiway - Reconstruct Twy V Reconstruct Between Twy B & A ( intersecton West on Twy V) 75 ft W x 800 ft L with 35 ft shoulders each side ( 12,900 SY) $ 29,348 $ 29,349 $ 1,115,243 $ 1,173,940 Arizona Department of Transportation - Aeronautics Division 27 FY 2011 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Terminal Development: Construct Terminal Building - Capacity Preliminary Plan. for East Side Terminal Area. Conceptual Layout of Terminal bldg., roads, vehicle/ aircraft parking, support facilities. MAP project request. $ 10,800 $ 10,800 $ 410,400 $ 432,000 Airport Total: $ 480,538 $ 480,539 $ 18,260,465 $ 19,221,542 POLACCA NAVAJO Runways: Construct Runway - Capacity Construct Rwy ( 75' x 5,000') and apron ( Phase 1- Grading and Drainage). $ 150,000 $ 150,000 $ 5,700,000 $ 6,000,000 Airport Total: $ 150,000 $ 150,000 $ 5,700,000 $ 6,000,000 RYAN FIELD PIMA Equipment:< Acquire/ Install/ Rehabilitate> Emergency Generator - Standards Install 170 KW/ 192 KVA 120/ 208 volt three phase four wire standby generator $ 7,744 $ 7,744 $ 294,278 $ 309,766 Equipment:< Acquire/ Install/ Rehabilitate> Emergency Generator - Standards Install a 230 KW 120/ 240 volt single phase standby generator to provide backup for all current & future airfield lighting $ 5,209 $ 5,209 $ 197,942 $ 208,360 Equipment: Acquire Equipment ( e. g., Sweepers, etc.) - Standards Acquire a new Rwy sweeper $ 4,548 $ 4,548 $ 172,816 $ 181,912 Runways: Install Runway Lighting ( HIRL, MIRL, TDZ, LAHSO or CL) - Standards Install an electronic system to monitor and control the airfield lighting system $ 15,636 $ 15,636 $ 594,177 $ 625,449 Airport Total: $ 33,137 $ 33,137 $ 1,259,213 $ 1,325,487 SAFFORD REGIONAL GRAHAM Equipment: Acquire Equipment ( e. g., Sweepers, etc.) - Standards Acquire sweeper. $ 3,750 $ 3,750 $ 142,500 $ 150,000 Other:< Construct/ Rehabilitate> Parking Lot [ non revenue producing- non hub/ MAP] - Other Expand auto parking area & reconstruct existing auto parking area ( approx. 100 ft x 200 ft). $ 1,875 $ 1,875 $ 71,250 $ 75,000 Runways: Rehabilitate Runway < Lighting/ Electrical Vault> Remove/ Replace existing MITLs/ bases and associated conduit/ cable; install new vault equipment. $ 3,750 $ 3,750 $ 142,500 $ 150,000 Terminal Development: Construct Terminal Building - Capacity Design new terminal building and associated utilities. $ 6,250 $ 6,250 $ 237,500 $ 250,000 Airport Total: $ 15,625 $ 15,625 $ 593,750 $ 625,000 SAN MANUEL PINAL Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> EA of Airport Property plus parcel A and B ( 200 acres) $ 3,125 $ 3,125 $ 118,750 $ 125,000 Runways: Install Runway Lighting ( HIRL, MIRL, TDZ, LAHSO or CL) - Standards Install Runway Lighting, approx. 4,214 lf $ 16,250 $ 16,250 $ 617,500 $ 650,000 Airport Total: $ 19,375 $ 19,375 $ 736,250 $ 775,000 Arizona Department of Transportation - Aeronautics Division 28 FY 2011 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total SCOTTSDALE MARICOPA Apron: Rehabilitate Apron - Reconstruction This project will involve reconstructing the large aircraft parking apron located on the west side of the airfield near the Landmark Aviation ( south) facility 34,000 sy. $ 57,500 $ 57,500 $ 2,185,000 $ 2,300,000 Runways:< Construct/ Extend/ Improve> Runway Safety Area [ Primary Airports] - Safety/ Security This project will involve installing concrete pads or other similar material in the airport's retention basin. $ 6,750 $ 6,750 $ 256,500 $ 270,000 Airport Total: $ 64,250 $ 64,250 $ 2,441,500 $ 2,570,000 SEDONA YAVAPAI Apron: Construct Apron - Standards The project will expand Apron A to the southwest. It is the second phase of a two phase project. Phase 2 will include a 350 ft by 410 ft expansion. $ 33,405 $ 33,405 $ 1,269,400 $ 1,336,210 Apron: Rehabilitate Apron - Reconstruction Reconstruct Apron A, approx. 31,100 SY. $ 58,497 $ 58,496 $ 2,222,869 $ 2,339,862 Other:< Construct/ Rehabilitate> Parking Lot [ non revenue producing- non hub/ MAP] - Other Construct terminal parking lot expansion to the north approx. 200 ft X 250 ft. $ 13,056 $ 13,055 $ 496,110 $ 522,221 Taxiways: Construct Taxiway - Capacity Construct Taxilane B- 6 and new hangar pads. $ 7,500 $ 7,500 $ 285,000 $ 300,000 Airport Total: $ 112,458 $ 112,456 $ 4,273,379 $ 4,498,293 SHOW LOW REGIONAL NAVAJO Apron: Construct Apron - Capacity Construct East Apron Ph 2, approx. 13,000 square yards ( 11- 1) $ 20,000 $ 20,000 $ 760,000 $ 800,000 Equipment: Acquire < Snow Removal Equipment/ Urea Truck/ etc.> - Standards Acquire SRE Equipment ( 11- 2) $ 9,375 $ 9,375 $ 356,250 $ 375,000 Airport Total: $ 29,375 $ 29,375 $ 1,116,250 $ 1,175,000 SIERRA VISTA MUNI- LIBBY AAF COCHISE Taxiways: Rehabilitate Taxiway - Reconstruct Construct Twy J realignment between Rwy 12/ 30 & Twy G ( approx. 1570 ft x 75 ft, 13100 sy). $ 87,500 $ 87,500 $ 3,325,000 $ 3,500,000 Airport Total: $ 87,500 $ 87,500 $ 3,325,000 $ 3,500,000 SPRINGERVILLE MUNI APACHE Runways: Rehabilitate Runway - Reconstruct Runway 3/ 21 resurfacing phase 3 ( construction) $ 50,000 $ 50,000 $ 1,900,000 $ 2,000,000 Taxiways:< Extend/ Widen/ Strengthen> Taxiway - Standards Construct new taxilanes on the southeast side of Runway 11/ 29 ( Design only) $ 2,500 $ 2,500 $ 95,000 $ 100,000 Taxiways: Construct Taxiway [ includes relocation] Parallel taxiway for Runway 3/ 21 the project will be phased ( Design) $ 5,750 $ 5,750 $ 218,500 $ 230,000 Airport Total: $ 58,250 $ 58,250 $ 2,213,500 $ 2,330,000 ST JOHNS INDUSTRIAL AIR PARK APACHE Arizona Department of Transportation - Aeronautics Division 29 FY 2011 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Buildings:< Construct/ Expand/ Imp/ Modify/ Rehabilitate> < Snow Removal Equipment/ Chemical Storage Building/ etc.> - Standards Buildings: Construct South of Rwy 14/ 32, approx. 40' x 50'. $ 8,750 $ 8,750 $ 332,500 $ 350,000 Airport Total: $ 8,750 $ 8,750 $ 332,500 $ 350,000 TAYLOR NAVAJO Apron: Expand Apron - Capacity Expand NE of existing apron, approx. 7,000 sf. $ 50,000 $ 50,000 $ 1,900,000 $ 2,000,000 Other:< Light/ Mark/ Remove> Obstructions - Standards Remove tall trees in Terminal Area $ 1,250 $ 1,250 $ 47,500 $ 50,000 Other: Improve Airport < Drainage/ Erosion Control/ miscellaneous improvements> - Standards Remove mobile home from Terminal Area to off airport property, approx. 40' x 50'. $ 500 $ 500 $ 19,000 $ 20,000 Airport Total: $ 51,750 $ 51,750 $ 1,966,500 $ 2,070,000 TUCSON INTL PIMA Apron: Rehabilitate Apron - Reconstruction Remove and replace portion of apron with 16in PCC pavement. $ 98,177 $ 98,177 $ 2,000,000 $ 2,196,354 Buildings:< Construct/ Expand/ Improve/ Modify/ Rehabilitat e> Building - Standards Relocate EOC to old customs area and provide approx. 1,600 sf of operating space. $ 33,019 $ 33,019 $ 672,637 $ 738,675 Runways: Construct Runway - Capacity Design engineering, surveying & geo- technical services to establish grading, drainage, paving, lighting, signage, marking and appurtenances for the proposed construction of a parallel rwy. $ 403,986 $ 403,986 $ 8,229,747 $ 9,037,719 Runways: Construct Runway [ includes relocation] - Standrads Reconstruct existing twy, construct new access roads, taxiways, drainage, fencing, lighting, water service, sewer service, electric and telephone for new GA area. Demo existing yard building and relocate drainageway. $ 164,971 $ 164,970 $ 3,360,678 $ 3,690,619 Runways: Install Runway < vertical/ visual> Guidance System [ PAPI/ VASI/ REIL/ ALS/ etc.] - Standards Install lighting control and monitoring system for all Rwy and Twy lighting systems. $ 111,830 $ 111,830 $ 2,278,135 $ 2,501,795 Airport Total: $ 811,983 $ 811,982 $ 16,541,197 $ 18,165,162 WHITERIVER NAVAJO Taxiways: Construct Taxiway - Capacity Construct Connector Twy. $ 8,750 $ 8,750 $ 332,500 $ 350,000 Airport Total: $ 8,750 $ 8,750 $ 332,500 $ 350,000 WICKENBURG MUNI MARICOPA Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Capacity Construct a 1,300 foot extension to the access road on the south side of the airport. $ 14,075 $ 14,075 $ 534,850 $ 563,000 Airport Total: $ 14,075 $ 14,075 $ 534,850 $ 563,000 WINSLOW- LINDBERGH REGIONAL NAVAJO Arizona Department of Transportation - Aeronautics Division 30 FY 2011 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Equipment: Acquire Security Equipment/ Install Perimeter Fencing [ not Part 107] - Standards Install 3,500 LF Perimeter Fencing along the approach end of Rwy 29 - Phase II. $ 10,000 $ 10,000 $ 380,000 $ 400,000 Heliport:< Construct/ Expand/ Improve/ Modify/ Rehabilitate> Helipad/ Heliport - Capacity Construct 184' x 160' Heliport. $ 10,000 $ 10,000 $ 380,000 $ 400,000 Heliport:< Construct/ Expand/ Improve/ Modify/ Rehabilitate> Helipad/ Heliport - Capacity Construct electrical associated with 184' x 160' heliport. $ 2,500 $ 2,500 $ 95,000 $ 100,000 Land: Acquire land/ easement for approaches Acquire 30 acres land for RSA/ OFA. $ 6,250 $ 6,250 $ 237,500 $ 250,000 Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities> [ MAP] - Other Utility improvements for future airport development. $ 12,500 $ 12,500 $ 475,000 $ 500,000 Runways: Rehabilitate Runway - Reconstruct Construct 308,000 SY Airfield Pavement Preservation. $ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000 Taxiways: Construct Taxiway - Capacity Taxilanes off of South Apron for future airport development. $ 20,000 $ 20,000 $ 760,000 $ 800,000 Airport Total: $ 123,750 $ 123,750 $ 4,702,500 $ 4,950,000 YUMA MCAS/ YUMA INTL YUMA Apron: Construct Apron - Standards CONSTRUCT: DCC apron Phase 2 ( approximately 26,000 sy, 150 yd x 170 yd). Apron is adjacent to 40th Street apron constructed in 2007. $ 72,368 $ 72,369 $ 2,750,000 $ 2,894,737 Taxiways:< Extend/ Widen/ Strengthen> Taxiway - Standards DESIGN widening of Twys Z, Z2 and Z3 to Design Group III. Approximately 35,000 sy of asphalt needed to widen from 35 ft to 50 ft. $ 6,579 $ 6,579 $ 250,000 $ 263,158 Airport Total: $ 78,947 $ 78,948 $ 3,000,000 $ 3,157,895 Total Fiscal Year Grants: $ 11,364,429 $ 11,364,426 $ 249,443,128 $ 272,171,983 Arizona Department of Transportation - Aeronautics Division 31 FY 2012 State & Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total ADOT Aeronautics APMS - Runway Pavement Preservation $ 4,932,000 $ 548,000 $ 0 $ 5,480,000 Planning: Planning Studies Conduct $ 300,000 $ 0 $ 0 $ 300,000 Airport Total: $ 5,232,000 $ 548,000 $ 0 $ 5,780,000 BENSON MUNICIPAL COCHISE Apron: Apron Construct Design Apron Expansion ( approx. 23,000 sy, E. of existing Apron) $ 90,000 $ 10,000 $ 0 $ 100,000 Airport Total: $ 90,000 $ 10,000 $ 0 $ 100,000 CHANDLER MUNI MARICOPA Apron: Apron Construct Design 22,400 SY apron area. $ 162,000 $ 18,000 $ 0 $ 180,000 Apron: Apron Construct Design 26,100 SY apron area ( So. Side) $ 2,100 $ 206,900 $ 0 $ 209,000 Apron: Apron Construct Design 35,400 SY apron area. ( So. Side) $ 232,200 $ 25,800 $ 0 $ 258,000 Apron: Apron Construct Design 45,700 SY apron area. ( So. Side) $ 288,000 $ 32,000 $ 0 $ 320,000 Airport Total: $ 684,300 $ 282,700 $ 0 $ 967,000 ERIC MARCUS MUNICIPAL PIMA Other: Pavement Marking Install Re- paint non- precision Rwy markings ( includes existing Threshold markers, Rwy numbers, centerline & border striping), Add fixed distance markers. $ 22,500 $ 2,500 $ 0 $ 25,000 Airport Total: $ 22,500 $ 2,500 $ 0 $ 25,000 ERNEST A. LOVE FIELD YAVAPAI Taxiways: Taxiway Construct Design 1,200' x 50' Twy F Extension. $ 45,000 $ 5,000 $ 0 $ 50,000 Taxiways: Taxiway Construct Design 1,500 ft x 50 ft Twy B Extension. $ 45,000 $ 5,000 $ 0 $ 50,000 Airport Total: $ 90,000 $ 10,000 $ 0 $ 100,000 FALCON FLD MARICOPA Apron: Apron Construct Design apron expansion of existing Anzio Ramp & secondary ramp at old fuel farm location. ( 780 ft x 220 ft) $ 135,000 $ 15,000 $ 0 $ 150,000 Runways: REIL Upgrade/ Modification Design upgrade of existing 2- box PAPI units to 4- box PAPI units for Rwy 4R- 22L and relocate the REILs. $ 67,500 $ 7,500 $ 0 $ 75,000 Runways: Runway Construct Design 100 ft x 75 ft blast pads at ends of Rwy 4L/ 22R $ 67,500 $ 7,500 $ 0 $ 75,000 Airport Total: $ 270,000 $ 30,000 $ 0 $ 300,000 Arizona Department of Transportation - Aeronautics Division 32 FY 2012 State & Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total FLAGSTAFF PULLIAM COCONINO Taxiways: Taxiway Reconstruct Evaluate and Design existing taxilanes between and around hangars and shades. Construct drainage improvements $ 498,886 $ 55,432 $ 0 $ 554,318 Airport Total: $ 498,886 $ 55,432 $ 0 $ 554,318 GREENLEE COUNTY GREENLEE Runways: Runway Construct Design Rwy Extension ( 300 ft x 100 ft) and Twy Extension ( 500 ft x 50 ft) $ 157,500 $ 17,500 $ 0 $ 175,000 Airport Total: $ 157,500 $ 17,500 $ 0 $ 175,000 H. A. CLARK MEMORIAL FIELD COCONINO Apron: Apron Construct Design GA Apron Phased Expansion - North ( approx. 4,000 sy) $ 67,500 $ 7,500 $ 0 $ 75,000 Airport Total: $ 67,500 $ 7,500 $ 0 $ 75,000 MARANA REGIONAL PIMA Land: Land ( Protection) Acquisition Aquire land - 129 Acres $ 684,300 $ 2,540,700 $ 0 $ 3,225,000 Airport Total: $ 684,300 $ 2,540,700 $ 0 $ 3,225,000 PHOENIX DEER VALLEY MARICOPA Apron: Apron Reconstruct Reconstruct north ramp. Approximate Total Area: 388,000 square yards. State/ local = 15,857 square yards. $ 499,500 $ 55,500 $ 0 $ 555,000 Airport Total: $ 499,500 $ 55,500 $ 0 $ 555,000 PHOENIX GOODYEAR MARICOPA Terminal Development: Auto Parking Reconstruct Reconstruct employee paved parking lot. Approximate Total Area: 125,000 square feet or 13,888 square yards. $ 42,300 $ 4,700 $ 0 $ 47,000 Airport Total: $ 42,300 $ 4,700 $ 0 $ 47,000 PHOENIX SKY HARBOR INTL MARICOPA Apron: Apron Reconstruct Reconstruct West Hold Bay in asphalt - Phase 1. Total approximate area = 61,111 square yards. State/ Local approximate area = 17,343 square yards. $ 499,500 $ 55,500 $ 0 $ 555,000 Airport Total: $ 499,500 $ 55,500 $ 0 $ 555,000 PHOENIX- MESA GATEWAY MARICOPA Apron: Apron Construct Design/ construct compass rose for aircraft testing. $ 7,680 $ 836,500 $ 0 $ 844,180 Arizona Department of Transportation - Aeronautics Division 33 FY 2012 State & Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Other: Fire Protection Design/ Construct 2 additional pumps for fire protection system for South Central area and extend pipeline to remaining lots. $ 676,620 $ 75,180 $ 0 $ 751,800 Airport Total: $ 684,300 $ 911,680 $ 0 $ 1,595,980 RYAN FIELD PIMA Runways: MIRL/ HIRL Install Install MIRL on Rwy 6L/ 24R $ 675,000 $ 75,000 $ 0 $ 750,000 Taxiways: MITL/ HITL Install Install MITL for Twy A & connecting Twys from Rwy 6L/ 24R. Also included are entire lengths of Twys A2, A4, B2 & B4 $ 9,300 $ 740,700 $ 0 $ 750,000 Airport Total: $ 684,300 $ 815,700 $ 0 $ 1,500,000 SAFFORD REGIONAL GRAHAM Other: Fencing ( Perimeter) Install Install 6- foot chain link perimeter fence ( approx. 4,000 LF) with 3- strand barb- wire. $ 36,000 $ 4,000 $ 0 $ 40,000 Airport Total: $ 36,000 $ 4,000 $ 0 $ 40,000 SHOW LOW REGIONAL NAVAJO Runways: Runway Construct Design standard EMAS for Rwy 6 end ( 12- 1) $ 202,500 $ 22,500 $ 0 $ 225,000 Airport Total: $ 202,500 $ 22,500 $ 0 $ 225,000 TUCSON INTL PIMA Other: Perimeter Road Reconstruction Construct new 24 ft AC pavement perimeter road from Twy D3 to A13. $ 684,300 $ 609,513 $ 0 $ 1,293,813 Airport Total: $ 684,300 $ 609,513 $ 0 $ 1,293,813 WICKENBURG MUNI MARICOPA Heliport: Heliport Construct This project includes the construction ( Phase II) of the future Heliport development area ( 6,000 SY). The area is located northeast of the existing T-Hangar area. $ 567,000 $ 63,000 $ 0 $ 630,000 Airport Total: $ 567,000 $ 63,000 $ 0 $ 630,000 Total Fiscal Year Grants: $ 11,696,686 $ 6,046,425 $ 0 $ 17,743,111 Arizona Department of Transportation - Aeronautics Division 34 FY 2012 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total AVI SUQUILLA LA PAZ Taxiways:< Extend/ Widen/ Strengthen> Taxiway - Standards Completion of Parallel Twy to Rwy 1- 19 approximately 4800' x 50' - completes full parallel Twy to Rwy and allows Exit Twy A2 to be reconfigured or eliminated. $ 42,800 $ 42,800 $ 1,626,400 $ 1,712,000 Taxiways: Install Taxiway Lighting ( e. g., SMGCS, reflectors, MITL) - Standards MITL and Guidance signs for 4,800 LF parallel Twy constructed above to meet FAA standards. $ 8,125 $ 8,125 $ 308,750 $ 325,000 Airport Total: $ 50,925 $ 50,925 $ 1,935,150 $ 2,037,000 BENSON MUNICIPAL COCHISE Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Other Reconstruct/ Rehab Access Rd ( Approx. 750 LF) $ 3,750 $ 3,750 $ 142,500 $ 150,000 Land: Acquire < land/ easement> for development/ relocation Land Acquisition ( 239 acres) So. Side of Airport $ 37,500 $ 37,500 $ 1,425,000 $ 1,500,000 Runways: Extend Runway- Capacity Extend Rwy/ Twy Ph I ( approx 1,400 LF, West End) $ 41,250 $ 41,250 $ 1,567,500 $ 1,650,000 Runways: Install Runway < vertical/ visual> Guidance System [ PAPI/ VASI/ REIL/ ALS/ etc.] - Standards Upgrade PAPI to 4 Light System $ 1,875 $ 1,875 $ 71,250 $ 75,000 Taxiways: Construct Taxiway - Capacity Construct connector Twys/ Taxilanes ( approx. 80x35 & 120x75, Connect Rwy to Prtl. Twy E. of Rwy 10 end & Taxilane W of T- Hangar Pads) $ 8,750 $ 8,750 $ 332,500 $ 350,000 Airport Total: $ 93,125 $ 93,125 $ 3,538,750 $ 3,725,000 BISBEE DOUGLAS INTL COCHISE Apron: Construct Apron - Standards Pavement overlay 25,000 sy on existing PCC apron ( north end) $ 20,000 $ 20,000 $ 760,000 $ 800,000 Airport Total: $ 20,000 $ 20,000 $ 760,000 $ 800,000 BISBEE MUNI COCHISE Apron: Expand/ Strengthen Apron - Standards Expand main apron to accomodate existing hangar locations, reconstruct existing apron pavement ( 22,300 SY of asphalt pavement). $ 32,500 $ 32,500 $ 1,235,000 $ 1,300,000 Land: Acquire land/ easement for approaches Land acquistion - approximately 6.40 acres. $ 6,250 $ 6,250 $ 237,500 $ 250,000 Other:< Construct/ Rehabilitate> Parking Lot [ non revenue producing- non hub/ MAP] - Other Construct paved ( asphalt) parking lot adjacent to new terminal building ( approximately 65 ft x 465 ft). $ 1,875 $ 1,875 $ 71,250 $ 75,000 Other: Install < Guidance/ other> Signs [ not Part 139] - Standards Install new Rwy 17/ 35 guidance signs at locations where existing signs are broken, install new signs at locations where needed but do not currently have signs. $ 21,250 $ 21,250 $ 807,500 $ 850,000 Terminal Development: Construct Terminal Building - Capacity Construct new terminal building ( including utilities). $ 8,750 $ 8,750 $ 332,500 $ 350,000 Airport Total: $ 70,625 $ 70,625 $ 2,683,750 $ 2,825,000 Arizona Department of Transportation - Aeronautics Division 35 FY 2012 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total BUCKEYE MUNI MARICOPA Land: Acquire land/ easement for approaches Purchase approximately 25 acres of land north of the airport to secure RPZ and allow for future Rwy extension ( Phase 3). $ 137,500 $ 137,500 $ 5,225,000 $ 5,500,000 Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities> [ MAP] - Other Design and construct an aircraft wash rack adjacent to the south ramp. $ 7,500 $ 7,500 $ 285,000 $ 300,000 Other:< Construct/ Rehabilitate> Parking Lot [ non revenue producing- non hub/ MAP] - Other Design and construct an automobile parking area outside the interior security fence. $ 20,000 $ 20,000 $ 760,000 $ 800,000 Airport Total: $ 165,000 $ 165,000 $ 6,270,000 $ 6,600,000 CHANDLER MUNI MARICOPA Apron: Construct Apron - Capacity Construct 29,500 SY apron area. $ 73,875 $ 73,875 $ 2,807,250 $ 2,955,000 Runways:< Construct/ Extend/ Improve> Runway Safety Area [ Primary Airports] - Safety/ Security Design/ construct, mark 95,000 SY of stabilized shoulder ( emulsified asphalt & aggregate mix). $ 23,462 $ 23,463 $ 891,575 $ 938,500 Airport Total: $ 97,337 $ 97,338 $ 3,698,825 $ 3,893,500 CIBECUE NAVAJO New Airports: Construct New Airport - Standards New Cibecue Airport Site, Phase III Lighting and Visual Aids. $ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000 Airport Total: $ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000 COCHISE COUNTY COCHISE Runways: Rehabilitate Runway - Reconstruct Reconstruct NW section of Rwy 14- 32 ( open turf) $ 12,500 $ 12,500 $ 475,000 $ 500,000 Airport Total: $ 12,500 $ 12,500 $ 475,000 $ 500,000 COLORADO CITY MUNI MOHAVE Taxiways: Extend Taxiway - Capacity SE portion of parallel Twy on NE side of Rwy 11/ 29 $ 17,500 $ 17,500 $ 665,000 $ 700,000 Airport Total: $ 17,500 $ 17,500 $ 665,000 $ 700,000 COOLIDGE MUNI PINAL Taxiways: Construct Taxiway - Capacity Construct new Twy extending from Twy F ( 1,000 ft to E and then 800 ft to N) $ 24,176 $ 24,176 $ 918,680 $ 967,032 Airport Total: $ 24,176 $ 24,176 $ 918,680 $ 967,032 COTTONWOOD YAVAPAI Land: Acquire < land/ easement> for development/ relocation Purchase 11 acres of property at the southwest corner of the airport. $ 17,500 $ 17,500 $ 665,000 $ 700,000 Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Update the Airport Master Plan $ 5,000 $ 5,000 $ 190,000 $ 200,000 Airport Total: $ 22,500 $ 22,500 $ 855,000 $ 900,000 Arizona Department of Transportation - Aeronautics Division 36 FY 2012 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total ELOY MUNI PINAL Apron: Rehabilitate Apron - Reconstruction Reconstruction of approx. 15,450 SY of asphalt concrete pavement ( approx. 200 ft x 700 ft) apron, and installation of apron lighting $ 25,000 $ 25,000 $ 950,000 $ 1,000,000 Runways: Extend Runway- Capacity Construct Rwy 2- 20 extensions ( 750 ft on north side, 850 ft on south side), Construct Twy A extension, and Construct two new end connector Twys $ 40,000 $ 40,000 $ 1,520,000 $ 1,600,000 Airport Total: $ 65,000 $ 65,000 $ 2,470,000 $ 2,600,000 ERNEST A. LOVE FIELD YAVAPAI Other: Improve Airport < Drainage/ Erosion Control/ miscellaneous improvements> - Standards Construct Drainage Improvements as part of Rwy and Twy Extension. $ 37,500 $ 37,500 $ 1,425,000 $ 1,500,000 Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> Conduct Environmental Assessment Update for construction of Rwy 21L Extension and new Terminal Building. $ 6,250 $ 6,250 $ 237,500 $ 250,000 Runways: Construct Runway - Capacity Construct Rwy 21L and Twys C, D, & H extensions to minimum of 9,300 ft and 200K lbs. $ 250,000 $ 250,000 $ 9,500,000 $ 10,000,000 Terminal Development: Construct Terminal Building - Capacity Construct 21,000 SF Terminal Building. $ 332,500 $ 332,500 $ 12,635,000 $ 13,300,000 Airport Total: $ 626,250 $ 626,250 $ 23,797,500 $ 25,050,000 FALCON FLD MARICOPA Runways: Construct Runway - Capacity Construct 4- 6 high- speed Rwy exits on Rwy 4L- 22R. $ 19,700 $ 19,700 $ 748,600 $ 788,000 Taxiways: Construct Taxiway - Capacity Design a 5100 x 75 ft Twy between Rwys $ 6,250 $ 6,250 $ 237,500 $ 250,000 Airport Total: $ 25,950 $ 25,950 $ 986,100 $ 1,038,000 FLAGSTAFF PULLIAM COCONINO Taxiways: Rehabilitate Taxiway - Reconstruct Phase 1 - Rebuild existing taxilanes between and around hangars and shades. Construct drainage improvements throughout. $ 71,968 $ 71,969 $ 2,734,795 $ 2,878,732 Airport Total: $ 71,968 $ 71,969 $ 2,734,795 $ 2,878,732 GILA BEND MUNI MARICOPA Heliport:< Construct/ Expand/ Improve/ Modify/ Rehabilitate> Helipad/ Heliport - Capacity Construct a lighted helicopter pad including rotorcraft parking. $ 3,375 $ 3,375 $ 128,250 $ 135,000 Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Prepare an Environmental Assessment for the extension of Rwy 4/ 22 1,300 feet to the northeast. $ 3,000 $ 3,000 $ 114,000 $ 120,000 Runways: Install Runway < Vertical/ Visual> Guidance System [ PAPI/ VASI/ REIL/ ALS/ etc.] - Statutory Emphasis Programs Install REIL on both ends of Rwy 4/ 22. $ 1,750 $ 1,750 $ 66,500 $ 70,000 Airport Total: $ 8,125 $ 8,125 $ 308,750 $ 325,000 Arizona Department of Transportation - Aeronautics Division 37 FY 2012 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total GLENDALE MUNICIPAL MARICOPA Land: Acquire < land/ easement> for development/ relocation Acquire 7 acres - northwest corner. $ 70,825 $ 70,825 $ 2,691,350 $ 2,833,000 Land: Acquire land/ easement for approaches Acquire 18 acres of land north of Rwy 19 ( Acres 18- 36). $ 187,500 $ 187,500 $ 7,125,000 $ 7,500,000 Runways: Rehabilitate Runway - Reconstruct Pavement Maintenance - slurry seal hangars, Twy, and Rwy. $ 5,000 $ 5,000 $ 190,000 $ 200,000 Airport Total: $ 263,325 $ 263,325 $ 10,006,350 $ 10,533,000 GRAND CANYON NATIONAL PARK COCONINO Terminal Development: Construct Terminal Building - Capacity Terminal building located at mid point of airport per ALP. $ 100,000 $ 100,000 $ 3,800,000 $ 4,000,000 Airport Total: $ 100,000 $ 100,000 $ 3,800,000 $ 4,000,000 GRAND CANYON WEST MOHAVE Apron: Construct Apron - Standards Apron: Construct east edge of main apron, approx. 800' x 200' $ 11,250 $ 11,250 $ 427,500 $ 450,000 Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Update Airport Master Plan $ 5,000 $ 5,000 $ 190,000 $ 200,000 Runways: Construct Runway [ includes relocation] - Standrads Runways: Shift and construct Runway 17/ 35, 5,000' x 75'. Project also includes connecting taxiways including grading, drainage, paving, lighting and visual aids. ( Phase IV) $ 250,000 $ 250,000 $ 9,500,000 $ 10,000,000 Taxiways: Construct Taxiway [ includes relocation] Taxiways: Construct parallel taxiway to Runway 17/ 35, 5,000' x 75' and convert temporary runway to parallel taxiway A ( including lighting) $ 14,500 $ 14,500 $ 551,000 $ 580,000 Airport Total: $ 280,750 $ 280,750 $ 10,668,500 $ 11,230,000 GREENLEE COUNTY GREENLEE Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Other Construct 3,100 ft x 24 ft entrance road relocation and 120 ft x 130 ft parking lot rehabilitation. $ 13,750 $ 13,750 $ 522,500 $ 550,000 Runways: Extend Runway- Capacity Construct Runway Extension ( 300 ft x 100 ft) $ 18,750 $ 18,750 $ 712,500 $ 750,000 Runways: Install Runway Lighting ( HIRL, MIRL) [ Required by Part 139] - Safety/ Security Construct electrical associated with Rwy Extension $ 2,500 $ 2,500 $ 95,000 $ 100,000 Runways: Rehabilitate Runway - Reconstruct Design 82,000 SY pavement rehabilitation for Rwy and Twy $ 1,875 $ 1,875 $ 71,250 $ 75,000 Taxiways: Extend Taxiway - Capacity Construct 500 ft x 50 ft Twy A Extension $ 8,750 $ 8,750 $ 332,500 $ 350,000 Taxiways: Install Taxiway Lighting ( MITL) [ Required by Part 139] - Safety/ Security Construct electrical associated with Twy A Extension $ 1,875 $ 1,875 $ 71,250 $ 75,000 Airport Total: $ 47,500 $ 47,500 $ 1,805,000 $ 1,900,000 Arizona Department of Transportation - Aeronautics Division 38 FY 2012 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total H. A. CLARK MEMORIAL FIELD COCONINO Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Other Rehabilitate Airport Access Road ( approx 1,000 lf) $ 18,750 $ 18,750 $ 712,500 $ 750,000 Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Service Road - Other Construct Perimeter Road ( appox) 18,000 lf $ 18,750 $ 18,750 $ 712,500 $ 750,000 Airport Total: $ 37,500 $ 37,500 $ 1,425,000 $ 1,500,000 HOLBROOK MUNI NAVAJO Land: Acquire land/ easement for approaches Land Acqisition for Runway 3/ 21 Extention ( north end runway 3/ 21) $ 12,500 $ 12,500 $ 475,000 $ 500,000 Airport Total: $ 12,500 $ 12,500 $ 475,000 $ 500,000 KAYENTA NAVAJO Taxiways: Construct Taxiway - Capacity Construct parallel Twy to Runway 5/ 23 and connectors, 35' x 7,100' ( Paving- Phase II). $ 45,000 $ 45,000 $ 1,710,000 $ 1,800,000 Taxiways: Install Taxiway Lighting ( e. g., SMGCS, reflectors, MITL) - Standards Install along Rwy 5/ 23' s parallel Twy 35' x 7,100'. $ 10,000 $ 10,000 $ 380,000 $ 400,000 Airport Total: $ 55,000 $ 55,000 $ 2,090,000 $ 2,200,000 KINGMAN MOHAVE Other: Improve Airport < Drainage/ Erosion Control/ miscellaneous improvements> - Standards Phase 1 - Construct airfield drainage improvements. $ 25,000 $ 25,000 $ 950,000 $ 1,000,000 Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Update the Airport Master Plan. $ 5,000 $ 5,000 $ 190,000 $ 200,000 Runways:< Extend/ Widen/ Strengthen> Runway [ to meet standards] - Standards Construct pavement strenghtening of Rwy 3- 21 and Twy D. $ 67,500 $ 67,500 $ 2,565,000 $ 2,700,000 Airport Total: $ 97,500 $ 97,500 $ 3,705,000 $ 3,900,000 LAKE HAVASU CITY MOHAVE Apron: Construct Apron - Standards Redesignate portion of North Parking Apron to accommodate air cargo aircraft during loading and unloading operations. $ 5,275 $ 5,275 $ 200,450 $ 211,000 Apron: Install Apron Lighting - Standards Replace existing aircraft parking apron lights and beacon. $ 6,700 $ 6,700 $ 254,600 $ 268,000 Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Other Construct Auto Truck Access/ Parking on North Apron to accommodate air cargo ground vehicles during loading and unloading operations. $ 7,050 $ 7,050 $ 267,900 $ 282,000 Other:< Light/ Mark/ Remove> Obstructions - Standards Remove existing out- of- service 150,000 gallon water storage tank. $ 3,525 $ 3,525 $ 133,950 $ 141,000 Airport Total: $ 22,550 $ 22,550 $ 856,900 $ 902,000 Arizona Department of Transportation - Aeronautics Division 39 FY 2012 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total LAUGHLIN/ BULLHEAD INTERNATIONAL MOHAVE Land: Acquire < land/ easement> for development/ relocation The project involves the acquisition of 75 acres of ASLD property ( Phase 2). $ 93,750 $ 93,750 $ 3,562,500 $ 3,750,000 Runways: Extend Runway- Capacity This project involves the 1,000 foot extension ( 17,000 SY) to the south end of Rwy 16- 34. $ 137,500 $ 137,500 $ 5,225,000 $ 5,500,000 Runways: Install Runway Lighting ( HIRL, MIRL) [ Required by Part 139] - Safety/ Security This project will involve the installation of 1,000 feet of MIRL on the Rwy 16- 34 extension. $ 12,500 $ 12,500 $ 475,000 $ 500,000 Taxiways: Extend Taxiway - Capacity This project will include the 1,000 foot extension ( 6,000 SY) of the parallel Twy to Rwy 16- 34. $ 72,500 $ 72,500 $ 2,755,000 $ 2,900,000 Taxiways: Install Taxiway Lighting ( MITL) [ Required by Part 139] - Safety/ Security This project involoves the installation of 1,400 feet of MITL on the parallel Twy extension. $ 12,500 $ 12,500 $ 475,000 $ 500,000 Airport Total: $ 328,750 $ 328,750 $ 12,492,500 $ 13,150,000 MARANA REGIONAL PIMA Land: Acquire < land/ easement> for development/ relocation Aquire Land - 548 Acres $ 342,500 $ 342,500 $ 13,015,000 $ 13,700,000 Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Master plan update $ 6,875 $ 6,875 $ 261,250 $ 275,000 Planning:< Conduct/ Update> < Airport Master Plan Study { ALP, EA, etc.}> Part 150 Noise Study Update $ 8,125 $ 8,125 $ 308,750 $ 325,000 Taxiways: Construct Taxiway - Capacity Construct Taxiways $ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000 Airport Total: $ 420,000 $ 420,000 $ 15,960,000 $ 16,800,000 Maricopa Municipal Apron: Construct Apron - Capacity Construct 31,000 SY Aircraft Parking Apron ( 400' x600'). $ 46,193 $ 46,193 $ 1,755,315 $ 1,847,700 Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Capacity Construct Airport Access Road ( 4,600 LF). $ 10,193 $ 10,193 $ 387,315 $ 407,700 Land: Acquire land/ easement for approaches The project involves the acquisition of approximately 62 acres of property for approach protection. $ 77,500 $ 77,500 $ 2,945,000 $ 3,100,000 Other:< Construct/ Rehabilitate> Parking Lot [ non revenue producing- non hub/ MAP] - Other Construct public automobile parking lot ( 14,000 SY). $ 7,875 $ 7,875 $ 299,250 $ 315,000 Runways: Construct Runway - Capacity Construct New Rwy ( 5,500' x 100'). $ 105,875 $ 105,875 $ 4,023,250 $ 4,235,000 Runways: Install Runway < vertical/ visual> Guidance System [ PAPI/ VASI/ REIL/ ALS/ etc.] - Standards Install Airport Rotating Beacon. $ 1,800 $ 1,800 $ 68,400 $ 72,000 Runways: Install Runway < vertical/ visual> Guidance System [ PAPI/ VASI/ REIL/ ALS/ etc.] - Standards Install PAPIs on each Rwy end. $ 2,520 $ 2,520 $ 95,760 $ 100,800 Runways: Install Runway < vertical/ visual> Guidance System [ PAPI/ VASI/ REIL/ ALS/ etc.] - Standards Install REIL's for each Rwy end. $ 1,575 $ 1,575 $ 59,850 $ 63,000 Runways: Install Runway Lighting ( HIRL, MIRL, TDZ, LAHSO or CL) - Standards Install MIRL and marking ( 5,500' x 100'). $ 25,380 $ 25,380 $ 964,440 $ 1,015,200 Arizona Department of Transportation - Aeronautics Division 40 FY 2012 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Taxiways: Construct Taxiway - Capacity Construct 3 700' x35' T- Hangar Taxilanes ( 10,000 SY). $ 20,993 $ 20,993 $ 797,715 $ 839,700 Airport Total: $ 299,903 $ 299,903 $ 11,396,295 $ 11,996,100 PAGE MUNI COCONINO Apron: Expand/ Strengthen Apron - Standards Strengthen approximately 15,000 sq yds of the main apron to accommodate larger aircraft. $ 47,500 $ 47,500 $ 1,805,000 $ 1,900,000 Airport Total: $ 47,500 $ 47,500 $ 1,805,000 $ 1,900,000 PAYSON GILA Apron: Construct Apron - Standards Construct Alpha Ramp Phase 1 - East Half, South of Paralley Taxiway, Approximately 12200 Square Yards of Asphalt Pavement $ 30,000 $ 30,000 $ 1,140,000 $ 1,200,000 Taxiways: Rehabilitate Taxiway - Reconstruct Construct new taxiway east of new Alpha Ramp, 1200 +/- square yards of asphalt pavement $ 13,500 $ 13,500 $ 513,000 $ 540,000 Airport Total: $ 43,500 $ 43,500 $ 1,653,000 $ 1,740,000 PHOENIX DEER VALLEY MARICOPA Apron: Rehabilitate Apron - Reconstruction Reconstruct north ramp. $ 287,400 $ 287,400 $ 10,921,200 $ 11,496,000 Airport Total: $ 287,400 $ 287,400 $ 10,921,200 $ 11,496,000 PHOENIX GOODYEAR MARICOPA Apron: Construct Apron - Capacity Construct west public ramp - Phase 1. $ 97,500 $ 97,500 $ 3,705,000 $ 3,900,000 Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Capacity Reconstruct Public Access Road. $ 100,000 $ 100,000 $ 3,800,000 $ 4,000,000 Runways:< Construct/ Extend/ Improve> Runway Safety Area [ Non- Primary Airports] - Standards Shift Runway 3- 21 by 300 feet to the southwest. $ 46,775 $ 46,775 $ 1,777,450 $ 1,871,000 Taxiways:< Extend/ Widen/ Strengthen> Taxiway - Standards Strengthen Taxiway A to meet FAA standards for 270,000 pound dual tandem wheel aircraft. $ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000 Airport Total: $ 306,775 $ 306,775 $ 11,657,450 $ 12,271,000 PHOENIX SKY HARBOR INTL MARICOPA Other: Noise Mitigation Measures [ miscellaneous] Sound mitigation and acquisition of eligible properties. $ 1,875,000 $ 1,875,000 $ 11,250,000 $ 15,000,000 Taxiways: Extend Taxiway - Capacity Construct one acute angle taxiway connector between Runway 7R- 25L and Taxiway F, and construct three acute angle taxiway connectors between Runway 7L- 25R and Taxiway F. $ 1,100,000 $ 1,100,000 $ 6,600,000 $ 8,800,000 Airport Total: $ 2,975,000 $ 2,975,000 $ 17,850,000 $ 23,800,000 PHOENIX- MESA GATEWAY MARICOPA Arizona Department of Transportation - Aeronautics Division 41 FY 2012 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Apron: Construct Apron - Standards Construction of Twy A between Twy L & Twy P, PCCP 3,100 ft L by 75 ft W with 35 ft wide shoulders each side ( 39,000 SY) incl. lighting and drainage. $ 223,400 $ 223,400 $ 8,489,200 $ 8,936,000 Apron: Construct Apron - Standards Design apron for east side passenger terminal ( 82,200 SY) $ 12,500 $ 12,500 $ 475,000 $ 500,000 Equipment: Acquire Aircraft Rescue & Fire Fighting Vehicle [ required by Part 139 only] - Safety/ Security Acquire 1,500 Gallon ARFF Vehicle $ 20,000 $ 20,000 $ 760,000 $ 800,000 Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities> [ MAP] - Other Develop, design and construct fire protection system in South Industrial Area to accommodate foam systems associated with aircraft hangars. MAP project request. $ 200,475 $ 200,475 $ 7,618,050 $ 8,019,000 Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities> [ MAP] - Other Drainage Improvements for mid- airfield to SW. $ 33,059 $ 33,059 $ 1,256,251 $ 1,322,369 Other:< Construct/ Rehabilitate> Parking Lot [ non revenue producing- non hub/ MAP] - Other Design surface parking for East Terminal Area to accommodate 3,000 parking spaces. $ 12,500 $ 12,500 $ 475,000 $ 500,000 Planning: Conduct Noise Compatibility Plan study/ update FAR Part 150 plan Update $ 12,500 $ 12,500 $ 475,000 $ 500,000 Taxiways:< Extend/ Widen/ Strengthen> Taxiway - Standards Design Twy C Extension from Twy K to Rwy 30R. 55,555 SY PCCP, 51,800 SY asphalt $ 11,250 $ 11,250 $ 427,500 $ 450,000 Taxiways: Rehabilitate Taxiway - Reconstruct Twy G/ B Intersection Reconstruction. 30,117 SY $ 72,250 $ 72,250 $ 2,745,500 $ 2,890,000 Terminal Development: Construct Terminal Building - Capacity Design East Terminal Building 160,000 SF. $ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000 Airport Total: $ 660,434 $ 660,434 $ 25,096,501 $ 26,417,369 POLACCA NAVAJO Runways: Construct Runway - Capacity Construct Rwy ( 75' x 5,000') an apron ( Phase 2- Paving and Lighting). $ 100,000 $ 100,000 $ 3,800,000 $ 4,000,000 Airport Total: $ 100,000 $ 100,000 $ 3,800,000 $ 4,000,000 RYAN FIELD PIMA Other: Improve Airport < Drainage/ Erosion Control/ miscellaneous improvements> - Standards Airfield Drainage Improvements as recommended by the Airfield Drainage Study that is currently underway $ 25,000 $ 25,000 $ 950,000 $ 1,000,000 Airport Total: $ 25,000 $ 25,000 $ 950,000 $ 1,000,000 SAFFORD REGIONAL GRAHAM Land: Acquire land/ easement for approaches Land acquisition ( 18.85 acres). $ 5,000 $ 5,000 $ 190,000 $ 200,000 Other:< Construct/ Rehabilitate> Parking Lot [ non revenue producing- non hub/ MAP] - Other Expand parking lot ( asphalt) and reconstruct existing parking area ( approx. 100 ft x 200 ft). $ 8,750 $ 8,750 $ 332,500 $ 350,000 Runways: Install Runway Lighting ( HIRL, MIRL) [ non Part 139 CS] - Statutory Emphasis Programs Remove existing light fixtures/ bases and associated conduit/ cable, install new MITLs, bases, conduit/ cable, and install new vault equipment. $ 15,000 $ 15,000 $ 570,000 $ 600,000 Arizona Department of Transportation - Aeronautics Division 42 FY 2012 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Taxiways: Construct Taxiway - Capacity Grade and pave new 35 ft wide taxilanes for GA hangar area development. $ 1,250 $ 1,250 $ 47,500 $ 50,000 Terminal Development: Construct Terminal Building - Capacity Construct new terminal building and associated utilities. $ 37,500 $ 37,500 $ 1,425,000 $ 1,500,000 Airport Total: $ 67,500 $ 67,500 $ 2,565,000 $ 2,700,000 SAN MANUEL PINAL Land: Acquire < land/ easement> for development/ relocation Acquire Land, airport property plus parcel A and B ( 200 acres) $ 50,000 $ 50,000 $ 1,900,000 $ 2,000,000 Airport Total: $ 50,000 $ 50,000 $ 1,900,000 $ 2,000,000 SCOTTSDALE MARICOPA Apron: Rehabilitate Apron - Reconstruction This project will involve reconstructing the large aircraft parking apron located on the west side of the airfield near the Landmark Aviation ( north) facility 34,000 sy. $ 57,500 $ 57,500 $ 2,185,000 $ 2,300,000 Airport Total: $ 57,500 $ 57,500 $ 2,185,000 $ 2,300,000 SEDONA YAVAPAI Apron: Construct Apron - Standards Construct Phase 2 of the apron A expansion to the north. The expansion is approx. 500 ft X 250 ft and includes the demolition of the restaurant building. $ 31,076 $ 31,077 $ 1,180,902 $ 1,243,055 Apron: Construct Apron - Capacity Construct Phase I of the Apron A Expansion to the north. The expansion is approx. 500 ft X 250 ft and includes the demolition of the restaurant building. $ 31,076 $ 31,077 $ 1,180,902 $ 1,243,055 Other: Construct Aircraft Rescue & Fire Fighting Training Facility/ Regional Burn Pit/ Mobile Training Facility - Standards Construct a 10,000 SF facility adjacent to the apron near Txy A4. $ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000 Taxiways: Extend Taxiway - Capacity Construct extensions of Taxilanes B1, B2 and B3 and the adjacent hangar pads. The total area of the extensions is approx. 2,400 SY. $ 6,014 $ 6,015 $ 228,551 $ 240,580 Airport Total: $ 130,666 $ 130,669 $ 4,965,355 $ 5,226,690 SHOW LOW REGIONAL NAVAJO Runways: Construct Runway [ includes relocation] - Standrads Construct Rwy 18/ 36 & Parallel Twy D, ( 75 ft x 6100 ft and 35 ft x 5100 ft) ( 12- 3) $ 150,000 $ 150,000 $ 5,700,000 $ 6,000,000 Airport Total: $ 150,000 $ 150,000 $ 5,700,000 $ 6,000,000 SIERRA VISTA MUNI- LIBBY AAF COCHISE Taxiways:< Extend/ Widen/ Strengthen> Taxiway - Standards Design/ Construct Twy D Extensiont from NE end of existing Twy D. ( approx. 1000 ft x 75 ft, 8500 sy. of 12 in thick concrete.) $ 42,500 $ 42,500 $ 1,615,000 $ 1,700,000 Arizona Department of Transportation - Aeronautics Division 43 FY 2012 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Taxiways: Rehabilitate Taxiway Lighting - Reconstruct Construct Twy J Realignment Lighting & Signing ( apporx. 4,000 LF lighting and 10 new signs) $ 18,750 $ 18,750 $ 712,500 $ 750,000 Airport Total: $ 61,250 $ 61,250 $ 2,327,500 $ 2,450,000 SPRINGERVILLE MUNI APACHE Taxiways: Construct Taxiway - Capacity This project will include all construction for taxilanes on SE side of Runway 11/ 29. $ 27,500 $ 27,500 $ 1,045,000 $ 1,100,000 Taxiways: Construct Taxiway [ includes relocation] This project is a phased project and the design was completed prior ( Construction). $ 74,075 $ 74,075 $ 2,814,850 $ 2,963,000 Airport Total: $ 101,575 $ 101,575 $ 3,859,850 $ 4,063,000 ST JOHNS INDUSTRIAL AIR PARK APACHE Runways:< Construct/ Extend/ Improve> Runway Safety Area [ Non- Primary Airports] - Standards Rwys: Pave both ends of Rwy 14/ 32, 300' x 75' each end. $ 37,500 $ 37,500 $ 1,425,000 $ 1,500,000 Airport Total: $ 37,500 $ 37,500 $ 1,425,000 $ 1,500,000 TAYLOR NAVAJO Planning: Conduct < Environmental Assessment/ Environmental Impact Statement/ Feasibility> < study/ update> Aquire parcel 4,5,6& 7 for approach & BRL protection ( approx. 7 total acres). $ 2,500 $ 2,500 $ 95,000 $ 100,000 Airport Total: $ 2,500 $ 2,500 $ 95,000 $ 100,000 TUCSON INTL PIMA Apron: Rehabilitate Apron - Reconstruction Remove/ replace portion of apron with 16 in PCC pavement. $ 98,177 $ 98,177 $ 2,000,000 $ 2,196,354 Other:< Light/ Mark/ Remove> Obstructions - Standards Demolition of any building in the West Ramp area that are deemed obstructions for new parallel Rwy. $ 502,875 $ 502,875 $ 10,244,250 $ 11,250,000 Runways: Construct Runway - Capacity Construct a new PCC Rwy 11R/ 24L, conversion of existing Rwy 11R/ 29L to 75 ft parallel Twy and 75 ft cross Twy ( includes grading, drainage, paving, lighting, signage, marking, NAVAIDS and appurtenances) $ 2,626,821 $ 2,626,821 $ 53,511,926 $ 58,765,568 Airport Total: $ 3,227,873 $ 3,227,873 $ 65,756,176 $ 72,211,922 WHITERIVER NAVAJO Equipment: Acquire < Snow Removal Equipment/ Urea Truck/ etc.> - Standards Purchase SRE equipment to remove snow from airfield pavements. $ 7,500 $ 7,500 $ 285,000 $ 300,000 Airport Total: $ 7,500 $ 7,500 $ 285,000 $ 300,000 WICKENBURG MUNI MARICOPA Apron: Expand Apron - Capacity This project involves a 4,000 SY expansion of the south apron area. $ 7,875 $ 7,875 $ 299,250 $ 315,000 Arizona Department of Transportation - Aeronautics Division 44 FY 2012 Federal/ State/ Local Grants Airport Name Project Component County Project Description State Share Local Share Federal Share Project Total Ground Transportation:< Construct/ Expand/ Improve/ Modify/ Reha bilitate> Access Road - Capacity This project will involve the construction on a new terminal access road and parking lot ( 1,000 SY). $ 5,25 |