Local government 24-month project schedule / February 2009 |
Previous | 1 of 33 | Next |
|
This page
All
Subset |
FEBRUARY 20, 2009
LOCAL GOVERNMENT
24- Month Project Schedule
Arizona Department of Transportation
Intermodal Transportation Division
Program & Project Management
http:// www. azdot. gov/ Highways/ ppms/
The contents of this report for this month ( Data Date: ) are as follows:
Projects Added
Projects Deleted
Projects Rescheduled
Projects on Hold
Main body of the report.
If you need further assistance, have any questions, comments or concerns, or need a hardcopy of the report, please feel free to call us at: ( 602)
712- 7678.
PROGRAM AND PROJECT MANAGEMENT TEAM
ARIZONA DEPARTMENT OF TRANSPORTATION
INTERMODAL TRANSPORTATION DIVISION
HIGHWAYS
FEBRUARY 2008
TO: ALL USERS OF THE LOCAL GOVERNMENT REPORT.
FROM: PROGRAM AND PROJECT MANAGEMENT SECTION ( PPMS)
http:// www. azdot. gov/ Highways/ ppms/
This information is also available on ADOT’s Internet @:
02/ 06/ 2009
DATA DATE: Reflects the status of activities and PRB actions as of the date. Bid Advertisements are as of the end of the month.
CPS ID: Four- character key field used by the scheduling system to identify a project.
FLOAT: + The length of time ( duration in work days) that certain activities on a project can be delayed without affecting the completion of
. the project ( bid date).
0 The project is on schedule. Floats between “- 9” and “ 0” appear as “ 0”.
- The number of days the project is behind schedule. This can be corrected only if the remaining activities with negative float
are . completed in less time ( duration) than originally estimated; or, if the bid date is re- scheduled.
EST. COST: The programmed project cost including construction engineering.
X--> Y X - The number of times the project was moved since its original inclusion in the 5- Year Program.
Y - The number of months the project has moved from the original schedule date.
CRITICAL
ACTIVITIES: The names of the responsible Agencies for the first, second and third activity on the Critical Path. This partial Critical Path is
. printed only if the FLOAT is negative. The Agencies are:
GLOSSARY OF TERMS USED IN
THE 24 MONTH PROJECT SCHEDULE
LG: Local Government UR: Utilities & Railroad
LA: Local Agency ( Sponsor) RW: Right- of- Way ( ADOT)
EP: Environmental Planning( ADOT) CS: Contracts & Specifications ( ADOT)
( mm/ yy): Month and year in which the project last moved.
The date under the “ Stage IV PS& E” heading is a target date. Consultant projects are tracked to this date rather than the bid advertisement date. The
actual date that plans are received in C& S is reflected in the comments.
The report is sorted by Bid Date ( first sort), by Sponsor ( second sort), and by Project Number ( third sort).
AJO Ajo DGS Douglas INA Ind. Nation- Navajo PAT Patagonia SOM Somerton
AAP Apache County DUN Duncan ITO Ind. Nation- Tohono O'odham PAY Payson STC South Tucson
APJ Apache Junction EGR Eagar IWM Ind. Nation- White Mountain PEO Peoria SPV Springerville
AVN Avondale ELM El Mirage JER Jerome PHX Phoenix SUP Superior
BEN Benson ELY Eloy KRN Kearny PIM Pima SUR Surprise
BIS Bisbee FLA Flagstaff KNG Kingman PPM Pima County TAY Taylor
BKY Buckeye FLO Florence LLA La Paz County PPN Pinal County TMP Tempe
BUL Bullhead City/ Riviera FTH Fountain Hills LHV Lake Havasu City PLS Pinetop/ Lakeside THE Thatcher
CMV Camp Verde FRD Fredonia LPK Litchfield Park PRS Prescott TOL Tolleson
CFE Carefree GBD Gila Bend MAM Mammoth PRV Prescott Valley TMB Tombstone
CSG Casa Grande GGI Gila County MRN Marana QTZ Quartzsite TBC Tuba City
CVK Cave Creek GIL Gilbert MMA Maricopa County QCR Queen Creek TUC Tucson
CHN Chandler GLN Glendale MES Mesa SAF Safford WEL Welton
CHV Chino Valley GLB Globe MIA Miami SAH Sahuarita WBG Wickenburg
CLD Clarkdale GDY Goodyear MMO Mohave County STJ Saint Johns WIX Willcox
CLF Clifton GGH Graham County NNA Navajo County SLS San Luis WIL Williams
CCH Cochise County GRV Green Valley NOG Nogales SSC Santa Cruz County WKL Winkelman
CCN Coconino County GGE Greenlee County NFD North Fire/ Rescue District SCT Scottsdale WIN Winslow
CLC Colorado City GUA Guadalupe ORV Oro Valley SED Sedona YYV Yavapai County
CLG Coolidge HAY Hayden PAG Page SLW Show Low YTN Youngtown
CWD Cottonwood HOL Holbrook PVY Paradise Valley SVS Sierra Vista YUM Yuma
HCY Huachuca City PKR Parker SNW Snowflake YYU Yuma County
LOCAL ABBREVIATIONS ( L. A.)
CPSID:
RTE: CO: TRACS:
PROJECT NUMBER:
PROJECT NAME:
TYPE OF WORK:
PROJECT MANAGER:
PROJECT COST:
MP:
PROJECTS ADDED THIS MONTH
COMMENTS:
( in thousands) BID DATE:
CPS
ID:
RTE: CO: TRACS:
PROJECT NUMBER: PROJECT NAME:
TYPE OF WORK:
PROGRAM COST: PROJECT MANAGER:
MP:
PROJECTS DELETED THIS MONTH
COMMENTS:
ORIGINAL
BID DATE:
CPS
ID:
RTE: CO: TRACS:
PROJECT NUMBER: PROJECT NAME:
TYPE OF WORK:
PROGRAM COST: PROJECT MANAGER:
MP:
PROJECTS RESCHEDULED THIS MONTH
COMMENTS: FROM: TO:
RESCHEDULED:
BID DATE:
NV1H
0000 MA SS57701C
CM - SCT- 0( 015) X SCOTTSDALE ROAD
CONSTRUCT ITS PROJECT
$ 1,822 PROJ MGR: SNARR PH: 712- 7025
0.0
MAR 09 SEP 09
XN1H
0000 MA SS66001C
CM - FTH- 0( 202) A FOUNTAIN HILLS BOULEVARD
SIDEWALK CONSTRUCTION
$ 354 PROJ MGR: SNARR PH: 712- 7025
FTH
MAR 09 JUN 09
NH1G
0000 GH SH27701C
STP- GGH- 0( 006) A SAFFORD- BRYCE RD & SAFFORD LANDFILL ROAD
PETERSON WASH CULVERT EXTENSION
$ 1,374 PROJ MGR: MILES PH: 712- 8336
GGH
MAR 09 JUN 09
FR1H
0000 MA SH43101C
HES - GLN- 0( 030) A 51ST AVENUE & NORTHERN AVENUE
INTERSECTION IMPROVEMENTS
$ 400 PROJ MGR: MILES PH: 712- 8336
GLN
MAR 09 JUN 09
FP1H
0000 MA SH43201C
HES - GLN- 0( 030) A 51ST AVENUE & CAMELBACK AVENUE
INTERSECTION IMPROVMENTS
$ 400 PROJ MGR: MILES PH: 712- 8336
GLN
MAR 09 JUN 09
VY1H
0000 MA SS62701C
CM - PHX- 0( 202) A 19TH AVENUE THUNDERBIRD RD WIDENING
INTERSECTION IMPROVEMENTS
$ 1,590 PROJ MGR: MILES PH: 712- 8336
PHX
MAR 09 MAY 09
PS002
CPS
ID:
RTE: CO: TRACS:
PROJECT NUMBER: PROJECT NAME:
TYPE OF WORK:
PROGRAM COST: PROJECT MANAGER:
MP:
PROJECTS RESCHEDULED THIS MONTH
COMMENTS: FROM: TO:
RESCHEDULED:
BID DATE:
VM1H
0000 MA SS64801C
CM - SCT- 0( 201) A INDIAN BEND WASH; CHAP - JACK RDS
MULTI- USE PATHWAY
$ 494 PROJ MGR: MILES PH: 712- 8336
SCT
MAR 09 JUN 09
PS002
CPSID:
RTE: CO: TRACS:
PROJECT NUMBER: PROJECT NAME:
TYPE OF WORK:
PROGRAM COST: PROJECT MANAGER:
MP:
PROJECTS ON HOLD
COMMENTS:
ORIGINAL
BID DATE:
ZQ1F
0000 MA SS54401C
STP- GDY- 0( 009) A YUMA RD @ BULLARD WASH
CONST BOX CULVERTS
$ 746 PROJ MGR: SNARR PH: 712- 7025
GDY OCT 05
NS1H
0000 MA SS55701C
CM - GDY- 0( 011) A CHANDLER HEIGHTS ROAD
PAVE DIRT ROAD
$ 256 PROJ MGR: SNARR PH: 712- 7025
GDY MAY 08
SU1F
0000 MA SS48501C
CM- MES- 0( 020) A SOUTH CANAL
DESIGN MULTI- USE PATH PH I
$ 1,652 PROJ MGR: SNARR PH: 712- 7025
MES DEC 06
PL1H
0000 MA SS59801C
EAST WEST PEDESTRIAN PATH
CONSTRUCT MULTI USE PATH
PROJ MGR: DICKSON PH: 712- 8683
MES DEC 05
MM1G
0000 MA SS51501C
CM- MES- 0( 023) A CONSOLIDATED CANAL PHASE 3
MULTI- USE PATH
PROJ MGR: SNARR PH: 712- 7025
MES AUG 05
CX1G
0000 PM SB41301C
BR- MRN- 0( 014) A INA BRIDGE OVER SANTA CRUZ
BRIDGE REPLACEMENT
$ 4,000 PROJ MGR: SNARR PH: 712- 7025
MRN SEPT 04
WO1E
0000 PM SS50101C
STP- PPM- 0( 152) P RIVER ROAD AT VENTANA CANYON
BRIDGE REPLACEMENT
$ 4,682 PROJ MGR: DICKSON PH: 712- 8683
PPM JUN 03
CPSID:
RTE: CO: TRACS:
PROJECT NUMBER: PROJECT NAME:
TYPE OF WORK:
PROGRAM COST: PROJECT MANAGER:
MP:
PROJECTS ON HOLD
COMMENTS:
ORIGINAL
BID DATE:
KR1F
0000 PM SB40301C
BR - PPM- 0( 71) P SILVER BELL @ BLANCO WASH
BRIDGE REPLACEMENT
$ 1,000 PROJ MGR: DICKSON PH: 712- 8683
PPM JUN 03
SG1J
0000 MA SS70201C
CM - QCR- 0( 202) A CHANDLER HEIGHTS RD - POWER TO HAWES
PAVE DIRT SHOULDERS
$ 223 PROJ MGR: MILES PH: 712- 8336
QCR
UD1F
0000 SC SL43501C
TEA- SSC- 0( 007) A TUBAC - ANZA PLAZA
PEDESTRIAN PATHWAY
$ 192 PROJ MGR: CLARK PH: 520- 388- 4252
SSC AUG 03
CPSID:
RTE: L. A.: TRACS:
PROJECT NUMBER
PROJECT NAME:
TYPE OF WORK:
PROJECT MANAGER:
PROJECT
COST:
( in thousands) COMMENTS:
MOVE
ARROW
ARIZONA DEPARTMENT OF TRANSPORTATION
24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT)
JANUARY 2009 BID ADVERTISEMENT DATE
TX1J
0000 SS70801C
PURCHASE TRAFFIC DETECTION CAMERAS
VARIOUS LOCATIONS
PROJ MGR: MILES PH: 712- 8336
$ 550
CHN --->
CPSID:
RTE: L. A.: TRACS:
PROJECT NUMBER
PROJECT NAME:
TYPE OF WORK:
PROJECT MANAGER:
PROJECT
COST:
( in thousands) COMMENTS:
MOVE
ARROW
ARIZONA DEPARTMENT OF TRANSPORTATION
24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT)
FEBRUARY 2009 BID ADVERTISEMENT DATE
VA1H
0000 SS64501C
CM - AVN- 0( 200) A MCDOWELL RD
PEDESTRIAN IMPROVEMENTS
PROJ MGR: SNARR PH: 712- 7025
$ 194
AVN
( 12/ 08)
3 ---> 12
PS & E REVIEW
RA1J
0000
STP - TUC- 0( 222) A ITS TRAFFIC SIGNAL TIMING STUDY
TIMING STUDY - VARIOUS LOCATIONS
PROJ MGR: MILES PH: 712- 8336
$ 300
TUC
( 11/ 08)
1 ---> 5
AT 75% DESIGN STAGE
QG1J
0000 SS69201C
STP - TUC- 0( 223) A ITS TRAFFIC SIGNAL EXPANSION - VARIOUS LOCATIONS
EQUIPMENT PURCHASES
PROJ MGR: MILES PH: 712- 8336
$ 212
TUC
( 11/ 08)
1 ---> 5
CONSTRUCTION SET FOR MAY/ JUNE
2009
PZ1G
0000 SB41501C
BR - YYU- 0( 031) A OLD US 80 @ RED TOP WASH
BRIDGE REPLACEMENT
PROJ MGR: MILES PH: 712- 8336
$ 1,000
YYU
( 11/ 08)
1 ---> 4
FINAL PS & E REVIEW
CPSID:
RTE: L. A.: TRACS:
PROJECT NUMBER
PROJECT NAME:
TYPE OF WORK:
PROJECT MANAGER:
PROJECT
COST:
( in thousands) COMMENTS:
MOVE
ARROW
ARIZONA DEPARTMENT OF TRANSPORTATION
24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT)
MARCH 2009 BID ADVERTISEMENT DATE
UZ1H
0000 SS64401C
CM - GIL- 0( 200) A GILBERT HERITAGE DISTRICT
PEDESTRIAN SIDEWALK, LANDSCAPE
PROJ MGR: SNARR PH: 712- 7025
GIL
( 12/ 08)
3 ---> 13
RECEIVED CERTIFICATION. REVIEW
60% PLANS.
WD1H
0000 SS64301C
CM - PEO- 0( 200) A SKUNK CREEK- 75TH AVE TO NEW RIVER
CONSTRUCT MULTI- USE PATH
PROJ MGR: MILES PH: 712- 8336
$ 1,350
PEO
( 11/ 08)
1 ---> 5
SET TO ADVERTISE IN 2 - 3 WEEKS
ZN1E
0000 SB41001C
BR - PPN- 0-( 169) KELVIN BRIDGE - # 8441
BRIDGE REPLACEMENT
PROJ MGR: SNARR PH: 712- 7025
$ 1,317
PPN
( 09/ 08)
10 ---> 69
R/ W ISSUES RESOLVED
RC1J
0000 SS69801C
CM - PVY- 0( 201) A 12 VARIOUS LOCATIONS
TRAFFIC - VIDEO DETECTION SYSTEM
PROJ MGR: MILES PH: 712- 8336
$ 128
PVY
( 11/ 08)
1 ---> 6
CONSTRUCTION INSTALLATION IN
PROGRESS,
CPSID:
RTE: L. A.: TRACS:
PROJECT NUMBER
PROJECT NAME:
TYPE OF WORK:
PROJECT MANAGER:
PROJECT
COST:
( in thousands) COMMENTS:
MOVE
ARROW
ARIZONA DEPARTMENT OF TRANSPORTATION
24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT)
APRIL 2009 BID ADVERTISEMENT DATE
XB1H
0000 SS45102C
CM - FTH- 0( 000) A SHEA BOULEVARD
CONSTRUCT BIKE LANE
PROJ MGR: SNARR PH: 712- 7025
$ 440
0.0
( 12/ 08)
6 ---> 21
REBID PROJECT
VB1H
0000 SS64601C
STP - FTH- 0( 200) A SHEA BLVD
ROADWAY WIDENING
PROJ MGR: SNARR PH: 712- 7025
$ 1,076
FTH
( 01/ 09)
3 ---> 14
95 % REVIEW.
SN1H
0000 SS62301C
CM - GLN- 0( 035) A SPORTS FACILITIES FIBER OPTIC
FIBER OPTIC CABLE INSTALLATION
PROJ MGR: DICKSON PH: 712- 8683
$ 600
GLN
( 01/ 09)
8 ---> 21
CPSID:
RTE: L. A.: TRACS:
PROJECT NUMBER
PROJECT NAME:
TYPE OF WORK:
PROJECT MANAGER:
PROJECT
COST:
( in thousands) COMMENTS:
MOVE
ARROW
ARIZONA DEPARTMENT OF TRANSPORTATION
24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT)
MAY 2009 BID ADVERTISEMENT DATE
VY1H
0000 SS62701C
CM - PHX- 0( 202) A 19TH AVENUE THUNDERBIRD RD WIDENING
INTERSECTION IMPROVEMENTS
PROJ MGR: MILES PH: 712- 8336
$ 1,590
PHX
( 02/ 09)
3 ---> 8
COMPLETED REVIEW PROCESS. ON
HOLD TBMP.
CPSID:
RTE: L. A.: TRACS:
PROJECT NUMBER
PROJECT NAME:
TYPE OF WORK:
PROJECT MANAGER:
PROJECT
COST:
( in thousands) COMMENTS:
MOVE
ARROW
ARIZONA DEPARTMENT OF TRANSPORTATION
24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT)
JUNE 2009 BID ADVERTISEMENT DATE
QD1J
0000 SS70101C
CM - MMA-( 209) A RIO VERDE DRIVE
PAVE SHOULDERS
PROJ MGR: SNARR PH: 712- 7025
0.0 --->
DCR APPROVED CA MARICOPA
COUNTY
QA1J
0000 SS68601C
CM - CUK- 0( 200) A VARIOUS LOCATIONS
PAVE DIRT ROADS
PROJ MGR: SNARR PH: 712- 7025
$ 250
0.0 --->
KICK OFF MEETING
NN1J
0000 SS68501C
CM - BKY- 0( 200) A PEDESTRIAN IMPROVEMENTS - 7TH ST AND EASON AVE
PEDESTRIAN IMPROVEMENT PROJECT
PROJ MGR: MILES PH: 712- 8336
$ 316
BKY --->
TU1J
0000 SS70901C
PAVE DIRT SHOULDERS - VARIOUS LOCATIONS
PAVE DIRT SHOULDERS
PROJ MGR: MILES PH: 712- 8336
$ 226
BKY --->
REQUESTED & ASSIGNED NEW
FEDERAL PROJECT & TRACS NUMBER
TZ1J
0000 SS71101C
CM - CHN- 0( 207) A PRICE RD TO HAMILTON ST
WESTERN CANAL- MULTI- USE PATH ( 1)
PROJ MGR: MILES PH: 712- 8336
$ 1,292
CHN --->
PROJECT AUTHORIZED SEPT 2008
TY1J
0000 SS71001C
CM - CHN- 0( 206) A PRICE ROAD TO HAMILTON STREET
WESTERN CANAL - MULTI- USE PATH ( 2)
PROJ MGR: MILES PH: 712- 8336
$ 1,302
CHN --->
PROJECT AUTHORIZED SEPT 2008
TQ1J
0000
CM - CHN- 0( 208) A LOOP 101 @ GALVESTON ST
MULTI- USE PATH & BRIDGE
PROJ MGR: MILES PH: 712- 8336
$ 656
CHN --->
PROJECT AUTHORIZED SEPT 2008
TW1J
0000 SS70701C
CM - CHN- 0( 204) A WESTERN CANAL @ ALMA SCHOOL & DOBSON
PEDESTRIAN SIGNAL - TRANSPORTATION IMPROVEMENT
PROJ MGR: MILES PH: 712- 8336
$ 388
CHN --->
PROJECT AUTHORIZED DEC 2008
CPSID:
RTE: L. A.: TRACS:
PROJECT NUMBER
PROJECT NAME:
TYPE OF WORK:
PROJECT MANAGER:
PROJECT
COST:
( in thousands) COMMENTS:
MOVE
ARROW
ARIZONA DEPARTMENT OF TRANSPORTATION
24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT)
TV1J
0000 SS70601C
CM - CHN- 0( 203) A COMMONWEALTH AVE ROADWAY IMPROVEMENT
HAMILTON ST - ITHICA PL ( PAVING)
PROJ MGR: MILES PH: 712- 8336
$ 842
CHN --->
DCR APPROVAL PENDING
XN1H
0000 SS66001C
CM - FTH- 0( 202) A FOUNTAIN HILLS BOULEVARD
SIDEWALK CONSTRUCTION
PROJ MGR: SNARR PH: 712- 7025
$ 354
FTH
( 02/ 09)
2 ---> 10
60 % REVIEW COMMENTS
NU1H
0000 SS56001C
GDY- 0- 417 VAN BUREN @ BULLARD WASH
BRIDGE APPROACHES
PROJ MGR: SNARR PH: 712- 7025
$ 746
GDY
( 03/ 08)
2 ---> 24
NH1G
0000 SH27701C
STP- GGH- 0( 006) A SAFFORD- BRYCE RD & SAFFORD LANDFILL ROAD
PETERSON WASH CULVERT EXTENSION
PROJ MGR: MILES PH: 712- 8336
$ 1,374
GGH
( 02/ 09)
2 ---> 8
FINAL P& S REVIEW COMMENTS
BEING REVIEWED
NZ1E
0000 SB40001C
BR - GGI- 0( 005) A ICE HOUSE CANYON WASH BR # 8193
BRIDGE REPLACEMENT
PROJ MGR: SNARR PH: 712- 7025
$ 98
GGI
( 03/ 08)
8 ---> 66
REVISED DCR - INITIAL COMMENTS
TO CONSULTANT
NY1E
0000 SH27901C
HES- GGI- 0( 006) A JESSE HAYES ROAD
ROADWAY IMPROVEMENTS
PROJ MGR: SNARR PH: 712- 7025
$ 307
GGI
( 03/ 08)
8 ---> 64
ROADWAY IMPROVEMENTS HES
FUNDING REVISED DCR - INITIAL
COMMENTS TO CONSULTANT.
BV1G
0000 SS54601C
CM- GIL- 0( 014) A EASTERN CANAL, BASELINE- GUADALUPE
CONST MULTI USE PATH
PROJ MGR: SNARR PH: 712- 7025
$ 550
GIL
( 03/ 08)
5 ---> 54
DCR APPROVED
OS1G
0000 SS54701C
CM - GIL- 0( 012) A EASTERN CANAL ( GUADALUPE- ELLIOT)
CONSTRUCT MULTI- USE PATH
PROJ MGR: SNARR PH: 712- 7025
$ 636
GIL
( 03/ 08)
2 ---> 24
DCR APPROVAL
CPSID:
RTE: L. A.: TRACS:
PROJECT NUMBER
PROJECT NAME:
TYPE OF WORK:
PROJECT MANAGER:
PROJECT
COST:
( in thousands) COMMENTS:
MOVE
ARROW
ARIZONA DEPARTMENT OF TRANSPORTATION
24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT)
OR1G
0000 SS54801C
CM - GIL- 0( 013) A EASTERN CANAL ( ELLIOT TO WARNER)
CONSTRUCT MULTI- USE PATH
PROJ MGR: SNARR PH: 712- 7025
$ 500
GIL
( 03/ 08)
1 ---> 12
DCR APPROVAL
FP1H
0000 SH43201C
HES - GLN- 0( 030) A 51ST AVENUE & CAMELBACK AVENUE
INTERSECTION IMPROVMENTS
PROJ MGR: MILES PH: 712- 8336
$ 400
GLN
( 02/ 09)
3 ---> 8
100 % REVIEW COMMENTS
RETURNED FEB 2009.
FR1H
0000 SH43101C
HES - GLN- 0( 030) A 51ST AVENUE & NORTHERN AVENUE
INTERSECTION IMPROVEMENTS
PROJ MGR: MILES PH: 712- 8336
$ 400
GLN
( 02/ 09)
3 ---> 8
100 % REVIEW COMMENTS
RETURNED FEB 2009.
MA1H
0000 SS59101C
CM - GLN- 0( 033) A 63RD AVE / LOOP 101
CONSTRUCT MULTI- USE PATH AND BRIDGE
PROJ MGR: DICKSON PH: 712- 8683
$ 6,116
GLN
( 01/ 09)
7 ---> 20
ENV CLEARANCE APPROVED, R/ W
CLEARANCE APPROVED, UTILITY
CLEARANCE APPROVED. FUNDS
OBLIGATED.
NT1J
0000 SS68701C
CM - MMA- 0( 206) A REACT IN GLENDALE, PEORIA, AND SCOTTSDALE
INCIDENT MANAGEMENT PARTNERSHIP
PROJ MGR: SNARR PH: 712- 7025
$ 853
MMA --->
PROJECT & TRACS NUMBERS
MARICOPA COUNTY IS CA
OY1H
0000 SH44101C
HBS - PHX- 0( 200) A MCDOWELL RD & 35TH AVENUE
STREET LIGHTS CONSTRUCTION
PROJ MGR: MILES PH: 712- 8336
$ 117
PHX --->
FUNDS OBLIGATED 5/ 22/ 08
TR1J
0000 SB43301C
CM - PHX- 0( 221) B PONTIS & VIRTIS BRIDGE MANAGEMENT SOFTWARE
VARIOUS LOCATIONS
PROJ MGR: MILES PH: 712- 8336
$ 69
PHX --->
PROJECT AUTHORIZED SEPT 2008
TS1J
0000 SB43401C
CM - PHX- 0( 222) B BRIDGE INSPECTION EQUIPMENT
VARIOUS LOCATIONS
PROJ MGR: MILES PH: 712- 8336
$ 90
PHX --->
PROJECT AUTHORIZED SEPT 2008
CPSID:
RTE: L. A.: TRACS:
PROJECT NUMBER
PROJECT NAME:
TYPE OF WORK:
PROJECT MANAGER:
PROJECT
COST:
( in thousands) COMMENTS:
MOVE
ARROW
ARIZONA DEPARTMENT OF TRANSPORTATION
24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT)
SF1J
0000 SS69301C
STP - PPM- 0( 209) A COTARO FAMS ROAD / MAGEE ROAD
ROAD WIDENING, REALIGNMENTS, IMPROVEMENTS
PROJ MGR: MILES PH: 712- 8336
$ 3,425
PPM --->
TT1J
0000 SS71301C
CM - PPM- 0( 210) A SAFETY AND EDUCATION PROGRAM
VARIOUS LOCATIONS
PROJ MGR: MILES PH: 712- 8336
$ 70
PPM --->
PROJECT AUTHORIZED JAN 2009
SH1J
0000 SS70401C
CM - QCR- 0( 203) A HUNT HIGHWAY - POWER TO ELLSWORTH
PAVE DIRT SHOULDERS
PROJ MGR: MILES PH: 712- 8336
$ 410
QCR --->
KQ1H
0000
STP - QCR- 0( 001) A RIGGS RD, ELLSWORTH TO MERIDIAN
CONSTRUCT NEW RDWAY
PROJ MGR: DICKSON PH: 712- 8683
$ 660
QCR
( 01/ 09)
2 ---> 10
STAGE IV SUBMITTAL. TO BE
ADVERTISED BY QUEEN CREEK OR
MCDOT.
VM1H
0000 SS64801C
CM - SCT- 0( 201) A INDIAN BEND WASH; CHAP - JACK RDS
MULTI- USE PATHWAY
PROJ MGR: MILES PH: 712- 8336
$ 494
SCT
( 02/ 09)
3 ---> 11
95% PLANS REVIEWED & RETURNED
SEPT 2008
GY1J
0000 SS67601C
CM - SUR- 0( 204) X GREENWAY ROAD
FIBER OPTIC INTERCONNECTS
PROJ MGR: SNARR PH: 712- 7025
$ 500
SUP
( 12/ 08)
1 ---> 6
60 % REVIEW.
CPSID:
RTE: L. A.: TRACS:
PROJECT NUMBER
PROJECT NAME:
TYPE OF WORK:
PROJECT MANAGER:
PROJECT
COST:
( in thousands) COMMENTS:
MOVE
ARROW
ARIZONA DEPARTMENT OF TRANSPORTATION
24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT)
JULY 2009 BID ADVERTISEMENT DATE
VI1J
0000 SS71701C
CM - GDV- 0( 201) A DYNAMIC MESSAGE SIGNS
VARIOUS LOCATIONS
PROJ MGR: SNARR PH: 712- 7025
$ 166
0.0 --->
PROJECT #' S PURCHASE
CPSID:
RTE: L. A.: TRACS:
PROJECT NUMBER
PROJECT NAME:
TYPE OF WORK:
PROJECT MANAGER:
PROJECT
COST:
( in thousands) COMMENTS:
MOVE
ARROW
ARIZONA DEPARTMENT OF TRANSPORTATION
24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT)
AUGUST 2009 BID ADVERTISEMENT DATE
XA1H
0000 SS65301C
OM - SUR- 0( 200) A PAVE DIRT ROADS - SURPRISE
PAVE DIRT ROADS
PROJ MGR: SNARR PH: 712- 7025
$ 510
0.0
( 08/ 08)
1 ---> 12
XM1H
0000 SS65901C
CM - FTH- 0( 201) A SAGUARO BOULEVARD
PAVE DIRT ALLEYS
PROJ MGR: SNARR PH: 712- 7025
$ 133
FTH
( 08/ 08)
1 ---> 12
KICK OFF MEETING
XC1H
0000 SS65701C
CM - PEO- 0( 201) A 84TH AVENUE
STREETSCAPE
PROJ MGR: SNARR PH: 712- 7025
$ 1,164
PEO
( 08/ 08)
1 ---> 12
DCR APPROVED
CPSID:
RTE: L. A.: TRACS:
PROJECT NUMBER
PROJECT NAME:
TYPE OF WORK:
PROJECT MANAGER:
PROJECT
COST:
( in thousands) COMMENTS:
MOVE
ARROW
ARIZONA DEPARTMENT OF TRANSPORTATION
24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT)
SEPTEMBER 2009 BID ADVERTISEMENT DATE
NV1H
0000 SS57701C
CM - SCT- 0( 015) X SCOTTSDALE ROAD
CONSTRUCT ITS PROJECT
PROJ MGR: SNARR PH: 712- 7025
$ 1,822
0.0
( 02/ 09)
6 ---> 27
60% PLANS FOR REVIEW
RB1J
0000 SS70501C
CM - PHX- 0( 218) A ACDC AT 7TH AVE ( BIKE UNDERPASS)
ACDC BIKE UNDERPASS
PROJ MGR: MILES PH: 712- 8336
$ 175
PHX
( 08/ 08)
1 ---> 12
DCR APPROVED DEC 2008
CPSID:
RTE: L. A.: TRACS:
PROJECT NUMBER
PROJECT NAME:
TYPE OF WORK:
PROJECT MANAGER:
PROJECT
COST:
( in thousands) COMMENTS:
MOVE
ARROW
ARIZONA DEPARTMENT OF TRANSPORTATION
24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT)
NOVEMBER 2009 BID ADVERTISEMENT DATE
VJ1J
0000 SS71601C
CM - PHX- 0( 224) A PAVE DIRT ALLEYS
VARIOUS LOCATIONS
PROJ MGR: MILES PH: 712- 8336
$ 467
0.0 --->
PHX CERTIFICATION ACCEPTED.
OPEN PROJECT NUMBERS
CPSID:
RTE: L. A.: TRACS:
PROJECT NUMBER
PROJECT NAME:
TYPE OF WORK:
PROJECT MANAGER:
PROJECT
COST:
( in thousands) COMMENTS:
MOVE
ARROW
ARIZONA DEPARTMENT OF TRANSPORTATION
24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT)
DECEMBER 2009 BID ADVERTISEMENT DATE
BC1J
0000 SB42801C
BR - MMA- 0( 202) A OLD US 80 BRIDGE
BRIDGE REHABILITATION
PROJ MGR: SNARR PH: 712- 7025
$ 7,450
0.0
( 12/ 08)
1 ---> 12
KICK OFF MEETING. CERTIFICATION
ACCEPTANCE.
CPSID:
RTE: L. A.: TRACS:
PROJECT NUMBER
PROJECT NAME:
TYPE OF WORK:
PROJECT MANAGER:
PROJECT
COST:
( in thousands) COMMENTS:
MOVE
ARROW
ARIZONA DEPARTMENT OF TRANSPORTATION
24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT)
JUNE 2010 BID ADVERTISEMENT DATE
VL1J
0000 SS72001C
CM - SUR- 0( 206) A WEST OF 219TH AVENUE
PAVE DIRT ROADS
PROJ MGR: SNARR PH: 712- 7025
$ 1,602
0.0 --->
KICK OFF MEETING HELD.
VK1J
0000 SS71803D
HPP - GGI- 0( 204) A TONTO CREEK BRIDGE
DESIGN BRIDGE APPROACHES
PROJ MGR: SNARR PH: 712- 7025
$ 2,690
0.0 --->
PROJECT #' S, JPA FOR DESIGN
REQUESTED
VT1J
0000 SS72101C
CM - PEO( 230) A HYBRID FIBER- TO- WIRELESS COMMUNICATION SYSTEM
TRAFFIC SIGNAL NETWORK
PROJ MGR: SNARR PH: 712- 7025
$ 296
PEO --->
PROJECT #' S
CPSID:
RTE: L. A.: TRACS:
PROJECT NUMBER
PROJECT NAME:
TYPE OF WORK:
PROJECT MANAGER:
PROJECT
COST:
( in thousands) COMMENTS:
MOVE
ARROW
ARIZONA DEPARTMENT OF TRANSPORTATION
24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT)
JULY 2010 BID ADVERTISEMENT DATE
XA1J
0000 SS72601C
CM - CHN- 0( 210) A CHANDLER BLVD TRAFFIC SIGNAL INTERCONNECT
FIBER OPTIC - DELAWARE ST TO GILBERT RD
PROJ MGR: MILES PH: 712- 8336
$ 310
CHN --->
PROJECT & TRACS #' S ASSIGNED
WS1J
0000 SS72401C
CM - ELM- 0( 201) A 129TH AVENUE
PAVE UNPAVED ROADS
PROJ MGR: SNARR PH: 712- 7025
$ 1,250
ELM --->
PROJECT & TRACS #' S
WR1J
0000 SS72301C
CM - ELM- 0( 200) A 125TH & 127TH AVENUE
PAVE UNPAVED ROADS
PROJ MGR: SNARR PH: 712- 7025
$ 1,000
ELM --->
PROJECT & TRACS #' S
WY1J
0000 SS73201C
CM - MES- 0( 205) X ITS SIGNAL CONVERSIONS - PHASE 4B
FIBER OPTIC LINK
PROJ MGR: SNARR PH: 712- 7025
$ 710
MES --->
CERTIFICATION ACCEPTANCE
PROJECT & TRACS #' S
WX1J
0000 SS73101C
CM - MES- 0( 206) X ITS SIGNAL CONVERSIONS - PHASE 4A
FIBER OPTIC LINK
PROJ MGR: SNARR PH: 712- 7025
$ 651
MES --->
CERTIFICATION ACCEPTANCE
PROJECT & TRACS #' S
XB1J
0000 SS72801C
CM - PEO- 0( 204) A OLIVE AVENUE - UNDERPASS
NEW RIVER TRAIL UNDERPASS CONSTRUCTION
PROJ MGR: MILES PH: 712- 8336
$ 700
PEO --->
PROJECT & TRACS #' S ASSIGNED
WZ1J
0000 SS72501C
STP - PHX- 0( 228) A MCDOWELL ROAD & 32ND STREET
INTERRSECTION IMPROVEMENT
PROJ MGR: MILES PH: 712- 8336
$ 500
PHX --->
PROJECTS & TRACS #' S ASSIGNED
WQ1J
0000 SS72201C
CM - SCT- 0( 205) A INDIAN BEND ROAD
MCCORMICK STILLMAN RR PARK
PROJ MGR: SNARR PH: 712- 7025
$ 1,000
SCT --->
PA FOR REVIEW
CPSID:
RTE: L. A.: TRACS:
PROJECT NUMBER
PROJECT NAME:
TYPE OF WORK:
PROJECT MANAGER:
PROJECT
COST:
( in thousands) COMMENTS:
MOVE
ARROW
ARIZONA DEPARTMENT OF TRANSPORTATION
24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT)
WT1J
0000 SS72701C
CM - SUP- 0( 207) X PEORIA AVENUE
FIBER OPTIC INTERCONNECTS
PROJ MGR: SNARR PH: 712- 7025
$ 700
SUP --->
PROJECT & TRACS #' S
WV1J
0000 SS73003D
STP - TUC- 0( 226) A PANTANO BOULEVARD
DESIGN PAVEMENT RECONSTRUCTION
PROJ MGR: SNARR PH: 712- 7025
$ 250
TUC --->
CERTIFICATION ACCEPTANCE
PROJECT & TRACS #' S
WU1J
0000 SS73001C
STP - TUC- 0( 226) A PANTANO BOULEVARD
PAVEMENT RECONSTRUCTION
PROJ MGR: SNARR PH: 712- 7025
$ 3,750
TUC --->
CERTIFICATION ACCEPTANCE
PROJECT & TRACS #' S
INDEX
ARIZONA DEPARTMENT OF TRANSPORTATION
PROGRAM PROJECT MANAGEMENT SECTION
* INDEX SORTED LOCAL GOVERNMENT AGENCY*
LOCAL TRACS # PROJECT # PROJECT NAME TYPE OF WORK BID DATE
CPS ID AGENCY CO FISCAL YR
VK1J 0.0 GI SS71803D HPP - GGI- 0( 204) A TONTO CREEK BRIDGE DESIGN BRIDGE APPROACHES JUN 10 2010
QD1J 0.0 MA SS70101C CM - MMA-( 209) A RIO VERDE DRIVE PAVE SHOULDERS JUN 09 2009
NV1H 0.0 MA SS57701C CM - SCT- 0( 015) X SCOTTSDALE ROAD CONSTRUCT ITS PROJECT SEP 09 2010
BC1J 0.0 MA SB42801C BR - MMA- 0( 202) A OLD US 80 BRIDGE BRIDGE REHABILITATION DEC 09 2010
QA1J 0.0 MA SS68601C CM - CUK- 0( 200) A VARIOUS LOCATIONS PAVE DIRT ROADS JUN 09 2009
VJ1J 0.0 MA SS71601C CM - PHX- 0( 224) A PAVE DIRT ALLEYS VARIOUS LOCATIONS NOV 09 2010
VL1J 0.0 MA SS72001C CM - SUR- 0( 206) A WEST OF 219TH AVENUE PAVE DIRT ROADS JUN 10 2010
XA1H 0.0 MA SS65301C OM - SUR- 0( 200) A PAVE DIRT ROADS - SURPRISE PAVE DIRT ROADS AUG 09 2009
VI1J 0.0 MA SS71701C CM - GDV- 0( 201) A DYNAMIC MESSAGE SIGNS VARIOUS LOCATIONS JUL 09 2010
XB1H 0.0 MA SS45102C CM - FTH- 0( 000) A SHEA BOULEVARD CONSTRUCT BIKE LANE APR 09 2009
VA1H AVN MA SS64501C CM - AVN- 0( 200) A MCDOWELL RD PEDESTRIAN IMPROVEMENTS FEB 09 2009
NN1J BKY MA SS68501C CM - BKY- 0( 200) A PEDESTRIAN IMPROVEMENTS - 7TH ST AND EASON AVE PEDESTRIAN IMPROVEMENT PROJECT JUN 09 2009
TU1J BKY MA SS70901C PAVE DIRT SHOULDERS - VARIOUS LOCATIONS PAVE DIRT SHOULDERS JUN 09 2009
TZ1J CHN MA SS71101C CM - CHN- 0( 207) A PRICE RD TO HAMILTON ST WESTERN CANAL- MULTI- USE PATH ( 1) JUN 09 2009
TW1J CHN MA SS70701C CM - CHN- 0( 204) A WESTERN CANAL @ ALMA SCHOOL & DOBSON PEDESTRIAN SIGNAL - TRANSPORTATION IMPROVEMEN JUN 09 2009
XA1J CHN MA SS72601C CM - CHN- 0( 210) A CHANDLER BLVD TRAFFIC SIGNAL INTERCONNECT FIBER OPTIC - DELAWARE ST TO GILBERT RD JUL 10 2011
TV1J CHN MA SS70601C CM - CHN- 0( 203) A COMMONWEALTH AVE ROADWAY IMPROVEMENT HAMILTON ST - ITHICA PL ( PAVING) JUN 09 2009
TQ1J CHN MA CM - CHN- 0( 208) A LOOP 101 @ GALVESTON ST MULTI- USE PATH & BRIDGE JUN 09 2009
TY1J CHN MA SS71001C CM - CHN- 0( 206) A PRICE ROAD TO HAMILTON STREET WESTERN CANAL - MULTI- USE PATH ( 2) JUN 09 2009
WS1J ELM MA SS72401C CM - ELM- 0( 201) A 129TH AVENUE PAVE UNPAVED ROADS JUL 10 2011
WR1J ELM MA SS72301C CM - ELM- 0( 200) A 125TH & 127TH AVENUE PAVE UNPAVED ROADS JUL 10 2011
VB1H FTH MA SS64601C STP - FTH- 0( 200) A SHEA BLVD ROADWAY WIDENING APR 09 2009
XM1H FTH MA SS65901C CM - FTH- 0( 201) A SAGUARO BOULEVARD PAVE DIRT ALLEYS AUG 09 2009
XN1H FTH MA SS66001C CM - FTH- 0( 202) A FOUNTAIN HILLS BOULEVARD SIDEWALK CONSTRUCTION JUN 09 2009
NS1H GDY MA SS55701C CM - GDY- 0( 011) A CHANDLER HEIGHTS ROAD PAVE DIRT ROAD HOLD 2009
ZQ1F GDY MA SS54401C STP- GDY- 0( 009) A YUMA RD @ BULLARD WASH CONST BOX CULVERTS HOLD 2006
NU1H GDY MA SS56001C GDY- 0- 417 VAN BUREN @ BULLARD WASH BRIDGE APPROACHES JUN 09 2009
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
PROGRAM PROJECT MANAGEMENT SECTION
* INDEX SORTED LOCAL GOVERNMENT AGENCY*
LOCAL TRACS # PROJECT # PROJECT NAME TYPE OF WORK BID DATE
CPS ID AGENCY CO FISCAL YR
NH1G GGH GH SH27701C STP- GGH- 0( 006) A SAFFORD- BRYCE RD & SAFFORD LANDFILL ROAD PETERSON WASH CULVERT EXTENSION JUN 09 2009
NY1E GGI GI SH27901C HES- GGI- 0( 006) A JESSE HAYES ROAD ROADWAY IMPROVEMENTS JUN 09 2009
NZ1E GGI GI SB40001C BR - GGI- 0( 005) A ICE HOUSE CANYON WASH BR # 8193 BRIDGE REPLACEMENT JUN 09 2009
OR1G GIL MA SS54801C CM - GIL- 0( 013) A EASTERN CANAL ( ELLIOT TO WARNER) CONSTRUCT MULTI- USE PATH JUN 09 2008
OS1G GIL MA SS54701C CM - GIL- 0( 012) A EASTERN CANAL ( GUADALUPE- ELLIOT) CONSTRUCT MULTI- USE PATH JUN 09 2009
BV1G GIL MA SS54601C CM- GIL- 0( 014) A EASTERN CANAL, BASELINE- GUADALUPE CONST MULTI USE PATH JUN 09 2009
UZ1H GIL MA SS64401C CM - GIL- 0( 200) A GILBERT HERITAGE DISTRICT PEDESTRIAN SIDEWALK, LANDSCAPE MAR 09 2009
SN1H GLN MA SS62301C CM - GLN- 0( 035) A SPORTS FACILITIES FIBER OPTIC FIBER OPTIC CABLE INSTALLATION APR 09 2009
FP1H GLN MA SH43201C HES - GLN- 0( 030) A 51ST AVENUE & CAMELBACK AVENUE INTERSECTION IMPROVMENTS JUN 09 2009
MA1H GLN MA SS59101C CM - GLN- 0( 033) A 63RD AVE / LOOP 101 CONSTRUCT MULTI- USE PATH AND BRIDGE JUN 09 2009
FR1H GLN MA SH43101C HES - GLN- 0( 030) A 51ST AVENUE & NORTHERN AVENUE INTERSECTION IMPROVEMENTS JUN 09 2009
MM1G MES MA SS51501C CM- MES- 0( 023) A CONSOLIDATED CANAL PHASE 3 MULTI- USE PATH HOLD 20
SU1F MES MA SS48501C CM- MES- 0( 020) A SOUTH CANAL DESIGN MULTI- USE PATH PH I HOLD 2007
WX1J MES MA SS73101C CM - MES- 0( 206) X ITS SIGNAL CONVERSIONS - PHASE 4A FIBER OPTIC LINK JUL 10 2011
WY1J MES MA SS73201C CM - MES- 0( 205) X ITS SIGNAL CONVERSIONS - PHASE 4B FIBER OPTIC LINK JUL 10 2011
PL1H MES MA SS59801C EAST WEST PEDESTRIAN PATH CONSTRUCT MULTI USE PATH HOLD 20
NT1J MMA MA SS68701C CM - MMA- 0( 206) A REACT IN GLENDALE, PEORIA, AND SCOTTSDALE INCIDENT MANAGEMENT PARTNERSHIP JUN 09 2009
CX1G MRN PM SB41301C BR- MRN- 0( 014) A INA BRIDGE OVER SANTA CRUZ BRIDGE REPLACEMENT HOLD 2006
VT1J PEO MA SS72101C CM - PEO( 230) A HYBRID FIBER- TO- WIRELESS COMMUNICATION SYSTEM TRAFFIC SIGNAL NETWORK JUN 10 2010
WD1H PEO MA SS64301C CM - PEO- 0( 200) A SKUNK CREEK- 75TH AVE TO NEW RIVER CONSTRUCT MULTI- USE PATH MAR 09 2009
XB1J PEO MA SS72801C CM - PEO- 0( 204) A OLIVE AVENUE - UNDERPASS NEW RIVER TRAIL UNDERPASS CONSTRUCTION JUL 10 2011
XC1H PEO MA SS65701C CM - PEO- 0( 201) A 84TH AVENUE STREETSCAPE AUG 09 2009
TS1J PHX MA SB43401C CM - PHX- 0( 222) B BRIDGE INSPECTION EQUIPMENT VARIOUS LOCATIONS JUN 09 2009
OY1H PHX MA SH44101C HBS - PHX- 0( 200) A MCDOWELL RD & 35TH AVENUE STREET LIGHTS CONSTRUCTION JUN 09 2009
VY1H PHX MA SS62701C CM - PHX- 0( 202) A 19TH AVENUE THUNDERBIRD RD WIDENING INTERSECTION IMPROVEMENTS MAY 09 2009
WZ1J PHX MA SS72501C STP - PHX- 0( 228) A MCDOWELL ROAD & 32ND STREET INTERRSECTION IMPROVEMENT JUL 10 2011
RB1J PHX MA SS70501C CM - PHX- 0( 218) A ACDC AT 7TH AVE ( BIKE UNDERPASS) ACDC BIKE UNDERPASS SEP 09 2009
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
PROGRAM PROJECT MANAGEMENT SECTION
* INDEX SORTED LOCAL GOVERNMENT AGENCY*
LOCAL TRACS # PROJECT # PROJECT NAME TYPE OF WORK BID DATE
CPS ID AGENCY CO FISCAL YR
TR1J PHX MA SB43301C CM - PHX- 0( 221) B PONTIS & VIRTIS BRIDGE MANAGEMENT SOFTWARE VARIOUS LOCATIONS JUN 09 2009
KR1F PPM PM SB40301C BR - PPM- 0( 71) P SILVER BELL @ BLANCO WASH BRIDGE REPLACEMENT HOLD 2005
TT1J PPM PM SS71301C CM - PPM- 0( 210) A SAFETY AND EDUCATION PROGRAM VARIOUS LOCATIONS JUN 09 2009
WO1E PPM PM SS50101C STP- PPM- 0( 152) P RIVER ROAD AT VENTANA CANYON BRIDGE REPLACEMENT HOLD 2004
SF1J PPM PM SS69301C STP - PPM- 0( 209) A COTARO FAMS ROAD / MAGEE ROAD ROAD WIDENING, REALIGNMENTS, IMPROVEMENTS JUN 09 2009
ZN1E PPN PN SB41001C BR - PPN- 0-( 169) KELVIN BRIDGE - # 8441 BRIDGE REPLACEMENT MAR 09 2009
RC1J PVY MA SS69801C CM - PVY- 0( 201) A 12 VARIOUS LOCATIONS TRAFFIC - VIDEO DETECTION SYSTEM MAR 09 2009
KQ1H QCR MA STP - QCR- 0( 001) A RIGGS RD, ELLSWORTH TO MERIDIAN CONSTRUCT NEW RDWAY JUN 09 2009
SG1J QCR MA SS70201C CM - QCR- 0( 202) A CHANDLER HEIGHTS RD - POWER TO HAWES PAVE DIRT SHOULDERS HOLD 2009
SH1J QCR MA SS70401C CM - QCR- 0( 203) A HUNT HIGHWAY - POWER TO ELLSWORTH PAVE DIRT SHOULDERS JUN 09 2009
WQ1J SCT MA SS72201C CM - SCT- 0( 205) A INDIAN BEND ROAD MCCORMICK STILLMAN RR PARK JUL 10 2011
VM1H SCT MA SS64801C CM - SCT- 0( 201) A INDIAN BEND WASH; CHAP - JACK RDS MULTI- USE PATHWAY JUN 09 2009
UD1F SSC SC SL43501C TEA- SSC- 0( 007) A TUBAC - ANZA PLAZA PEDESTRIAN PATHWAY HOLD 2004
GY1J SUP MA SS67601C CM - SUR- 0( 204) X GREENWAY ROAD FIBER OPTIC INTERCONNECTS JUN 09 2009
WT1J SUP MA SS72701C CM - SUP- 0( 207) X PEORIA AVENUE FIBER OPTIC INTERCONNECTS JUL 10 2011
WU1J TUC PM SS73001C STP - TUC- 0( 226) A PANTANO BOULEVARD PAVEMENT RECONSTRUCTION JUL 10 2011
WV1J TUC PM SS73003D STP - TUC- 0( 226) A PANTANO BOULEVARD DESIGN PAVEMENT RECONSTRUCTION JUL 10 2011
QG1J TUC PM SS69201C STP - TUC- 0( 223) A ITS TRAFFIC SIGNAL EXPANSION - VARIOUS LOCATIONS EQUIPMENT PURCHASES FEB 09 2009
RA1J TUC PM STP - TUC- 0( 222) A ITS TRAFFIC SIGNAL TIMING STUDY TIMING STUDY - VARIOUS LOCATIONS FEB 09 2009
PZ1G YYU YU SB41501C BR - YYU- 0( 031) A OLD US 80 @ RED TOP WASH BRIDGE REPLACEMENT FEB 09 2009
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
http:// www. azdo t . g. ov/ Highways/ ppms/
Object Description
| Rating | |
| TITLE | Local government 24-month project schedule |
| CREATOR | Arizona. Dept. of Transportation, Intermodal Transportation Division. |
| SUBJECT | Transportation--Arizona. |
| Browse Topic |
Transportation |
| DESCRIPTION | This item contains one or more publications. |
| Language | English |
| Publisher | Arizona. Dept. of Transportation, Intermodal Transportation Division. |
| Material Collection |
State Documents |
| Source Identifier | TRT 7.2:P 65 |
| Location | ocn439074639 |
| REPOSITORY | Arizona State Library. Archives and Public Records--Law and Research Library. |
Description
| TITLE | Local government 24-month project schedule / February 2009 |
| DESCRIPTION | 32 pages (PDF version); 127.9 KB |
| TYPE | Text |
| RIGHTS MANAGEMENT | Copyright to this resource is held by the creating agency and is provided here for educational purposes only. I may not be downloaded, reproduced, or distributed in any format without written permission of the creating agency. Any attempt to circumvent the access controls placed on this file is a violation of United States and international copyright laws, and is subject to criminal prosecution |
| DATE ORIGINAL | 2009-02 |
| Time Period |
2000s (2000-2009) |
| ORIGINAL FORMAT | Born Digital |
| Source Identifier | TRT 7.2:p 65 |
| Location | ocn439074639 |
| DIGITAL IDENTIFIER | ps2whole.pdf |
| DIGITAL FORMAT |
PDF (Portable Document Format) |
| REPOSITORY | Arizona State Library, Archives and Public Records—Law and Research Library. |
| File Size | 127.855 KB |
| Full Text | FEBRUARY 20, 2009 LOCAL GOVERNMENT 24- Month Project Schedule Arizona Department of Transportation Intermodal Transportation Division Program & Project Management http:// www. azdot. gov/ Highways/ ppms/ The contents of this report for this month ( Data Date: ) are as follows: Projects Added Projects Deleted Projects Rescheduled Projects on Hold Main body of the report. If you need further assistance, have any questions, comments or concerns, or need a hardcopy of the report, please feel free to call us at: ( 602) 712- 7678. PROGRAM AND PROJECT MANAGEMENT TEAM ARIZONA DEPARTMENT OF TRANSPORTATION INTERMODAL TRANSPORTATION DIVISION HIGHWAYS FEBRUARY 2008 TO: ALL USERS OF THE LOCAL GOVERNMENT REPORT. FROM: PROGRAM AND PROJECT MANAGEMENT SECTION ( PPMS) http:// www. azdot. gov/ Highways/ ppms/ This information is also available on ADOT’s Internet @: 02/ 06/ 2009 DATA DATE: Reflects the status of activities and PRB actions as of the date. Bid Advertisements are as of the end of the month. CPS ID: Four- character key field used by the scheduling system to identify a project. FLOAT: + The length of time ( duration in work days) that certain activities on a project can be delayed without affecting the completion of . the project ( bid date). 0 The project is on schedule. Floats between “- 9” and “ 0” appear as “ 0”. - The number of days the project is behind schedule. This can be corrected only if the remaining activities with negative float are . completed in less time ( duration) than originally estimated; or, if the bid date is re- scheduled. EST. COST: The programmed project cost including construction engineering. X--> Y X - The number of times the project was moved since its original inclusion in the 5- Year Program. Y - The number of months the project has moved from the original schedule date. CRITICAL ACTIVITIES: The names of the responsible Agencies for the first, second and third activity on the Critical Path. This partial Critical Path is . printed only if the FLOAT is negative. The Agencies are: GLOSSARY OF TERMS USED IN THE 24 MONTH PROJECT SCHEDULE LG: Local Government UR: Utilities & Railroad LA: Local Agency ( Sponsor) RW: Right- of- Way ( ADOT) EP: Environmental Planning( ADOT) CS: Contracts & Specifications ( ADOT) ( mm/ yy): Month and year in which the project last moved. The date under the “ Stage IV PS& E” heading is a target date. Consultant projects are tracked to this date rather than the bid advertisement date. The actual date that plans are received in C& S is reflected in the comments. The report is sorted by Bid Date ( first sort), by Sponsor ( second sort), and by Project Number ( third sort). AJO Ajo DGS Douglas INA Ind. Nation- Navajo PAT Patagonia SOM Somerton AAP Apache County DUN Duncan ITO Ind. Nation- Tohono O'odham PAY Payson STC South Tucson APJ Apache Junction EGR Eagar IWM Ind. Nation- White Mountain PEO Peoria SPV Springerville AVN Avondale ELM El Mirage JER Jerome PHX Phoenix SUP Superior BEN Benson ELY Eloy KRN Kearny PIM Pima SUR Surprise BIS Bisbee FLA Flagstaff KNG Kingman PPM Pima County TAY Taylor BKY Buckeye FLO Florence LLA La Paz County PPN Pinal County TMP Tempe BUL Bullhead City/ Riviera FTH Fountain Hills LHV Lake Havasu City PLS Pinetop/ Lakeside THE Thatcher CMV Camp Verde FRD Fredonia LPK Litchfield Park PRS Prescott TOL Tolleson CFE Carefree GBD Gila Bend MAM Mammoth PRV Prescott Valley TMB Tombstone CSG Casa Grande GGI Gila County MRN Marana QTZ Quartzsite TBC Tuba City CVK Cave Creek GIL Gilbert MMA Maricopa County QCR Queen Creek TUC Tucson CHN Chandler GLN Glendale MES Mesa SAF Safford WEL Welton CHV Chino Valley GLB Globe MIA Miami SAH Sahuarita WBG Wickenburg CLD Clarkdale GDY Goodyear MMO Mohave County STJ Saint Johns WIX Willcox CLF Clifton GGH Graham County NNA Navajo County SLS San Luis WIL Williams CCH Cochise County GRV Green Valley NOG Nogales SSC Santa Cruz County WKL Winkelman CCN Coconino County GGE Greenlee County NFD North Fire/ Rescue District SCT Scottsdale WIN Winslow CLC Colorado City GUA Guadalupe ORV Oro Valley SED Sedona YYV Yavapai County CLG Coolidge HAY Hayden PAG Page SLW Show Low YTN Youngtown CWD Cottonwood HOL Holbrook PVY Paradise Valley SVS Sierra Vista YUM Yuma HCY Huachuca City PKR Parker SNW Snowflake YYU Yuma County LOCAL ABBREVIATIONS ( L. A.) CPSID: RTE: CO: TRACS: PROJECT NUMBER: PROJECT NAME: TYPE OF WORK: PROJECT MANAGER: PROJECT COST: MP: PROJECTS ADDED THIS MONTH COMMENTS: ( in thousands) BID DATE: CPS ID: RTE: CO: TRACS: PROJECT NUMBER: PROJECT NAME: TYPE OF WORK: PROGRAM COST: PROJECT MANAGER: MP: PROJECTS DELETED THIS MONTH COMMENTS: ORIGINAL BID DATE: CPS ID: RTE: CO: TRACS: PROJECT NUMBER: PROJECT NAME: TYPE OF WORK: PROGRAM COST: PROJECT MANAGER: MP: PROJECTS RESCHEDULED THIS MONTH COMMENTS: FROM: TO: RESCHEDULED: BID DATE: NV1H 0000 MA SS57701C CM - SCT- 0( 015) X SCOTTSDALE ROAD CONSTRUCT ITS PROJECT $ 1,822 PROJ MGR: SNARR PH: 712- 7025 0.0 MAR 09 SEP 09 XN1H 0000 MA SS66001C CM - FTH- 0( 202) A FOUNTAIN HILLS BOULEVARD SIDEWALK CONSTRUCTION $ 354 PROJ MGR: SNARR PH: 712- 7025 FTH MAR 09 JUN 09 NH1G 0000 GH SH27701C STP- GGH- 0( 006) A SAFFORD- BRYCE RD & SAFFORD LANDFILL ROAD PETERSON WASH CULVERT EXTENSION $ 1,374 PROJ MGR: MILES PH: 712- 8336 GGH MAR 09 JUN 09 FR1H 0000 MA SH43101C HES - GLN- 0( 030) A 51ST AVENUE & NORTHERN AVENUE INTERSECTION IMPROVEMENTS $ 400 PROJ MGR: MILES PH: 712- 8336 GLN MAR 09 JUN 09 FP1H 0000 MA SH43201C HES - GLN- 0( 030) A 51ST AVENUE & CAMELBACK AVENUE INTERSECTION IMPROVMENTS $ 400 PROJ MGR: MILES PH: 712- 8336 GLN MAR 09 JUN 09 VY1H 0000 MA SS62701C CM - PHX- 0( 202) A 19TH AVENUE THUNDERBIRD RD WIDENING INTERSECTION IMPROVEMENTS $ 1,590 PROJ MGR: MILES PH: 712- 8336 PHX MAR 09 MAY 09 PS002 CPS ID: RTE: CO: TRACS: PROJECT NUMBER: PROJECT NAME: TYPE OF WORK: PROGRAM COST: PROJECT MANAGER: MP: PROJECTS RESCHEDULED THIS MONTH COMMENTS: FROM: TO: RESCHEDULED: BID DATE: VM1H 0000 MA SS64801C CM - SCT- 0( 201) A INDIAN BEND WASH; CHAP - JACK RDS MULTI- USE PATHWAY $ 494 PROJ MGR: MILES PH: 712- 8336 SCT MAR 09 JUN 09 PS002 CPSID: RTE: CO: TRACS: PROJECT NUMBER: PROJECT NAME: TYPE OF WORK: PROGRAM COST: PROJECT MANAGER: MP: PROJECTS ON HOLD COMMENTS: ORIGINAL BID DATE: ZQ1F 0000 MA SS54401C STP- GDY- 0( 009) A YUMA RD @ BULLARD WASH CONST BOX CULVERTS $ 746 PROJ MGR: SNARR PH: 712- 7025 GDY OCT 05 NS1H 0000 MA SS55701C CM - GDY- 0( 011) A CHANDLER HEIGHTS ROAD PAVE DIRT ROAD $ 256 PROJ MGR: SNARR PH: 712- 7025 GDY MAY 08 SU1F 0000 MA SS48501C CM- MES- 0( 020) A SOUTH CANAL DESIGN MULTI- USE PATH PH I $ 1,652 PROJ MGR: SNARR PH: 712- 7025 MES DEC 06 PL1H 0000 MA SS59801C EAST WEST PEDESTRIAN PATH CONSTRUCT MULTI USE PATH PROJ MGR: DICKSON PH: 712- 8683 MES DEC 05 MM1G 0000 MA SS51501C CM- MES- 0( 023) A CONSOLIDATED CANAL PHASE 3 MULTI- USE PATH PROJ MGR: SNARR PH: 712- 7025 MES AUG 05 CX1G 0000 PM SB41301C BR- MRN- 0( 014) A INA BRIDGE OVER SANTA CRUZ BRIDGE REPLACEMENT $ 4,000 PROJ MGR: SNARR PH: 712- 7025 MRN SEPT 04 WO1E 0000 PM SS50101C STP- PPM- 0( 152) P RIVER ROAD AT VENTANA CANYON BRIDGE REPLACEMENT $ 4,682 PROJ MGR: DICKSON PH: 712- 8683 PPM JUN 03 CPSID: RTE: CO: TRACS: PROJECT NUMBER: PROJECT NAME: TYPE OF WORK: PROGRAM COST: PROJECT MANAGER: MP: PROJECTS ON HOLD COMMENTS: ORIGINAL BID DATE: KR1F 0000 PM SB40301C BR - PPM- 0( 71) P SILVER BELL @ BLANCO WASH BRIDGE REPLACEMENT $ 1,000 PROJ MGR: DICKSON PH: 712- 8683 PPM JUN 03 SG1J 0000 MA SS70201C CM - QCR- 0( 202) A CHANDLER HEIGHTS RD - POWER TO HAWES PAVE DIRT SHOULDERS $ 223 PROJ MGR: MILES PH: 712- 8336 QCR UD1F 0000 SC SL43501C TEA- SSC- 0( 007) A TUBAC - ANZA PLAZA PEDESTRIAN PATHWAY $ 192 PROJ MGR: CLARK PH: 520- 388- 4252 SSC AUG 03 CPSID: RTE: L. A.: TRACS: PROJECT NUMBER PROJECT NAME: TYPE OF WORK: PROJECT MANAGER: PROJECT COST: ( in thousands) COMMENTS: MOVE ARROW ARIZONA DEPARTMENT OF TRANSPORTATION 24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT) JANUARY 2009 BID ADVERTISEMENT DATE TX1J 0000 SS70801C PURCHASE TRAFFIC DETECTION CAMERAS VARIOUS LOCATIONS PROJ MGR: MILES PH: 712- 8336 $ 550 CHN ---> CPSID: RTE: L. A.: TRACS: PROJECT NUMBER PROJECT NAME: TYPE OF WORK: PROJECT MANAGER: PROJECT COST: ( in thousands) COMMENTS: MOVE ARROW ARIZONA DEPARTMENT OF TRANSPORTATION 24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT) FEBRUARY 2009 BID ADVERTISEMENT DATE VA1H 0000 SS64501C CM - AVN- 0( 200) A MCDOWELL RD PEDESTRIAN IMPROVEMENTS PROJ MGR: SNARR PH: 712- 7025 $ 194 AVN ( 12/ 08) 3 ---> 12 PS & E REVIEW RA1J 0000 STP - TUC- 0( 222) A ITS TRAFFIC SIGNAL TIMING STUDY TIMING STUDY - VARIOUS LOCATIONS PROJ MGR: MILES PH: 712- 8336 $ 300 TUC ( 11/ 08) 1 ---> 5 AT 75% DESIGN STAGE QG1J 0000 SS69201C STP - TUC- 0( 223) A ITS TRAFFIC SIGNAL EXPANSION - VARIOUS LOCATIONS EQUIPMENT PURCHASES PROJ MGR: MILES PH: 712- 8336 $ 212 TUC ( 11/ 08) 1 ---> 5 CONSTRUCTION SET FOR MAY/ JUNE 2009 PZ1G 0000 SB41501C BR - YYU- 0( 031) A OLD US 80 @ RED TOP WASH BRIDGE REPLACEMENT PROJ MGR: MILES PH: 712- 8336 $ 1,000 YYU ( 11/ 08) 1 ---> 4 FINAL PS & E REVIEW CPSID: RTE: L. A.: TRACS: PROJECT NUMBER PROJECT NAME: TYPE OF WORK: PROJECT MANAGER: PROJECT COST: ( in thousands) COMMENTS: MOVE ARROW ARIZONA DEPARTMENT OF TRANSPORTATION 24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT) MARCH 2009 BID ADVERTISEMENT DATE UZ1H 0000 SS64401C CM - GIL- 0( 200) A GILBERT HERITAGE DISTRICT PEDESTRIAN SIDEWALK, LANDSCAPE PROJ MGR: SNARR PH: 712- 7025 GIL ( 12/ 08) 3 ---> 13 RECEIVED CERTIFICATION. REVIEW 60% PLANS. WD1H 0000 SS64301C CM - PEO- 0( 200) A SKUNK CREEK- 75TH AVE TO NEW RIVER CONSTRUCT MULTI- USE PATH PROJ MGR: MILES PH: 712- 8336 $ 1,350 PEO ( 11/ 08) 1 ---> 5 SET TO ADVERTISE IN 2 - 3 WEEKS ZN1E 0000 SB41001C BR - PPN- 0-( 169) KELVIN BRIDGE - # 8441 BRIDGE REPLACEMENT PROJ MGR: SNARR PH: 712- 7025 $ 1,317 PPN ( 09/ 08) 10 ---> 69 R/ W ISSUES RESOLVED RC1J 0000 SS69801C CM - PVY- 0( 201) A 12 VARIOUS LOCATIONS TRAFFIC - VIDEO DETECTION SYSTEM PROJ MGR: MILES PH: 712- 8336 $ 128 PVY ( 11/ 08) 1 ---> 6 CONSTRUCTION INSTALLATION IN PROGRESS, CPSID: RTE: L. A.: TRACS: PROJECT NUMBER PROJECT NAME: TYPE OF WORK: PROJECT MANAGER: PROJECT COST: ( in thousands) COMMENTS: MOVE ARROW ARIZONA DEPARTMENT OF TRANSPORTATION 24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT) APRIL 2009 BID ADVERTISEMENT DATE XB1H 0000 SS45102C CM - FTH- 0( 000) A SHEA BOULEVARD CONSTRUCT BIKE LANE PROJ MGR: SNARR PH: 712- 7025 $ 440 0.0 ( 12/ 08) 6 ---> 21 REBID PROJECT VB1H 0000 SS64601C STP - FTH- 0( 200) A SHEA BLVD ROADWAY WIDENING PROJ MGR: SNARR PH: 712- 7025 $ 1,076 FTH ( 01/ 09) 3 ---> 14 95 % REVIEW. SN1H 0000 SS62301C CM - GLN- 0( 035) A SPORTS FACILITIES FIBER OPTIC FIBER OPTIC CABLE INSTALLATION PROJ MGR: DICKSON PH: 712- 8683 $ 600 GLN ( 01/ 09) 8 ---> 21 CPSID: RTE: L. A.: TRACS: PROJECT NUMBER PROJECT NAME: TYPE OF WORK: PROJECT MANAGER: PROJECT COST: ( in thousands) COMMENTS: MOVE ARROW ARIZONA DEPARTMENT OF TRANSPORTATION 24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT) MAY 2009 BID ADVERTISEMENT DATE VY1H 0000 SS62701C CM - PHX- 0( 202) A 19TH AVENUE THUNDERBIRD RD WIDENING INTERSECTION IMPROVEMENTS PROJ MGR: MILES PH: 712- 8336 $ 1,590 PHX ( 02/ 09) 3 ---> 8 COMPLETED REVIEW PROCESS. ON HOLD TBMP. CPSID: RTE: L. A.: TRACS: PROJECT NUMBER PROJECT NAME: TYPE OF WORK: PROJECT MANAGER: PROJECT COST: ( in thousands) COMMENTS: MOVE ARROW ARIZONA DEPARTMENT OF TRANSPORTATION 24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT) JUNE 2009 BID ADVERTISEMENT DATE QD1J 0000 SS70101C CM - MMA-( 209) A RIO VERDE DRIVE PAVE SHOULDERS PROJ MGR: SNARR PH: 712- 7025 0.0 ---> DCR APPROVED CA MARICOPA COUNTY QA1J 0000 SS68601C CM - CUK- 0( 200) A VARIOUS LOCATIONS PAVE DIRT ROADS PROJ MGR: SNARR PH: 712- 7025 $ 250 0.0 ---> KICK OFF MEETING NN1J 0000 SS68501C CM - BKY- 0( 200) A PEDESTRIAN IMPROVEMENTS - 7TH ST AND EASON AVE PEDESTRIAN IMPROVEMENT PROJECT PROJ MGR: MILES PH: 712- 8336 $ 316 BKY ---> TU1J 0000 SS70901C PAVE DIRT SHOULDERS - VARIOUS LOCATIONS PAVE DIRT SHOULDERS PROJ MGR: MILES PH: 712- 8336 $ 226 BKY ---> REQUESTED & ASSIGNED NEW FEDERAL PROJECT & TRACS NUMBER TZ1J 0000 SS71101C CM - CHN- 0( 207) A PRICE RD TO HAMILTON ST WESTERN CANAL- MULTI- USE PATH ( 1) PROJ MGR: MILES PH: 712- 8336 $ 1,292 CHN ---> PROJECT AUTHORIZED SEPT 2008 TY1J 0000 SS71001C CM - CHN- 0( 206) A PRICE ROAD TO HAMILTON STREET WESTERN CANAL - MULTI- USE PATH ( 2) PROJ MGR: MILES PH: 712- 8336 $ 1,302 CHN ---> PROJECT AUTHORIZED SEPT 2008 TQ1J 0000 CM - CHN- 0( 208) A LOOP 101 @ GALVESTON ST MULTI- USE PATH & BRIDGE PROJ MGR: MILES PH: 712- 8336 $ 656 CHN ---> PROJECT AUTHORIZED SEPT 2008 TW1J 0000 SS70701C CM - CHN- 0( 204) A WESTERN CANAL @ ALMA SCHOOL & DOBSON PEDESTRIAN SIGNAL - TRANSPORTATION IMPROVEMENT PROJ MGR: MILES PH: 712- 8336 $ 388 CHN ---> PROJECT AUTHORIZED DEC 2008 CPSID: RTE: L. A.: TRACS: PROJECT NUMBER PROJECT NAME: TYPE OF WORK: PROJECT MANAGER: PROJECT COST: ( in thousands) COMMENTS: MOVE ARROW ARIZONA DEPARTMENT OF TRANSPORTATION 24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT) TV1J 0000 SS70601C CM - CHN- 0( 203) A COMMONWEALTH AVE ROADWAY IMPROVEMENT HAMILTON ST - ITHICA PL ( PAVING) PROJ MGR: MILES PH: 712- 8336 $ 842 CHN ---> DCR APPROVAL PENDING XN1H 0000 SS66001C CM - FTH- 0( 202) A FOUNTAIN HILLS BOULEVARD SIDEWALK CONSTRUCTION PROJ MGR: SNARR PH: 712- 7025 $ 354 FTH ( 02/ 09) 2 ---> 10 60 % REVIEW COMMENTS NU1H 0000 SS56001C GDY- 0- 417 VAN BUREN @ BULLARD WASH BRIDGE APPROACHES PROJ MGR: SNARR PH: 712- 7025 $ 746 GDY ( 03/ 08) 2 ---> 24 NH1G 0000 SH27701C STP- GGH- 0( 006) A SAFFORD- BRYCE RD & SAFFORD LANDFILL ROAD PETERSON WASH CULVERT EXTENSION PROJ MGR: MILES PH: 712- 8336 $ 1,374 GGH ( 02/ 09) 2 ---> 8 FINAL P& S REVIEW COMMENTS BEING REVIEWED NZ1E 0000 SB40001C BR - GGI- 0( 005) A ICE HOUSE CANYON WASH BR # 8193 BRIDGE REPLACEMENT PROJ MGR: SNARR PH: 712- 7025 $ 98 GGI ( 03/ 08) 8 ---> 66 REVISED DCR - INITIAL COMMENTS TO CONSULTANT NY1E 0000 SH27901C HES- GGI- 0( 006) A JESSE HAYES ROAD ROADWAY IMPROVEMENTS PROJ MGR: SNARR PH: 712- 7025 $ 307 GGI ( 03/ 08) 8 ---> 64 ROADWAY IMPROVEMENTS HES FUNDING REVISED DCR - INITIAL COMMENTS TO CONSULTANT. BV1G 0000 SS54601C CM- GIL- 0( 014) A EASTERN CANAL, BASELINE- GUADALUPE CONST MULTI USE PATH PROJ MGR: SNARR PH: 712- 7025 $ 550 GIL ( 03/ 08) 5 ---> 54 DCR APPROVED OS1G 0000 SS54701C CM - GIL- 0( 012) A EASTERN CANAL ( GUADALUPE- ELLIOT) CONSTRUCT MULTI- USE PATH PROJ MGR: SNARR PH: 712- 7025 $ 636 GIL ( 03/ 08) 2 ---> 24 DCR APPROVAL CPSID: RTE: L. A.: TRACS: PROJECT NUMBER PROJECT NAME: TYPE OF WORK: PROJECT MANAGER: PROJECT COST: ( in thousands) COMMENTS: MOVE ARROW ARIZONA DEPARTMENT OF TRANSPORTATION 24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT) OR1G 0000 SS54801C CM - GIL- 0( 013) A EASTERN CANAL ( ELLIOT TO WARNER) CONSTRUCT MULTI- USE PATH PROJ MGR: SNARR PH: 712- 7025 $ 500 GIL ( 03/ 08) 1 ---> 12 DCR APPROVAL FP1H 0000 SH43201C HES - GLN- 0( 030) A 51ST AVENUE & CAMELBACK AVENUE INTERSECTION IMPROVMENTS PROJ MGR: MILES PH: 712- 8336 $ 400 GLN ( 02/ 09) 3 ---> 8 100 % REVIEW COMMENTS RETURNED FEB 2009. FR1H 0000 SH43101C HES - GLN- 0( 030) A 51ST AVENUE & NORTHERN AVENUE INTERSECTION IMPROVEMENTS PROJ MGR: MILES PH: 712- 8336 $ 400 GLN ( 02/ 09) 3 ---> 8 100 % REVIEW COMMENTS RETURNED FEB 2009. MA1H 0000 SS59101C CM - GLN- 0( 033) A 63RD AVE / LOOP 101 CONSTRUCT MULTI- USE PATH AND BRIDGE PROJ MGR: DICKSON PH: 712- 8683 $ 6,116 GLN ( 01/ 09) 7 ---> 20 ENV CLEARANCE APPROVED, R/ W CLEARANCE APPROVED, UTILITY CLEARANCE APPROVED. FUNDS OBLIGATED. NT1J 0000 SS68701C CM - MMA- 0( 206) A REACT IN GLENDALE, PEORIA, AND SCOTTSDALE INCIDENT MANAGEMENT PARTNERSHIP PROJ MGR: SNARR PH: 712- 7025 $ 853 MMA ---> PROJECT & TRACS NUMBERS MARICOPA COUNTY IS CA OY1H 0000 SH44101C HBS - PHX- 0( 200) A MCDOWELL RD & 35TH AVENUE STREET LIGHTS CONSTRUCTION PROJ MGR: MILES PH: 712- 8336 $ 117 PHX ---> FUNDS OBLIGATED 5/ 22/ 08 TR1J 0000 SB43301C CM - PHX- 0( 221) B PONTIS & VIRTIS BRIDGE MANAGEMENT SOFTWARE VARIOUS LOCATIONS PROJ MGR: MILES PH: 712- 8336 $ 69 PHX ---> PROJECT AUTHORIZED SEPT 2008 TS1J 0000 SB43401C CM - PHX- 0( 222) B BRIDGE INSPECTION EQUIPMENT VARIOUS LOCATIONS PROJ MGR: MILES PH: 712- 8336 $ 90 PHX ---> PROJECT AUTHORIZED SEPT 2008 CPSID: RTE: L. A.: TRACS: PROJECT NUMBER PROJECT NAME: TYPE OF WORK: PROJECT MANAGER: PROJECT COST: ( in thousands) COMMENTS: MOVE ARROW ARIZONA DEPARTMENT OF TRANSPORTATION 24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT) SF1J 0000 SS69301C STP - PPM- 0( 209) A COTARO FAMS ROAD / MAGEE ROAD ROAD WIDENING, REALIGNMENTS, IMPROVEMENTS PROJ MGR: MILES PH: 712- 8336 $ 3,425 PPM ---> TT1J 0000 SS71301C CM - PPM- 0( 210) A SAFETY AND EDUCATION PROGRAM VARIOUS LOCATIONS PROJ MGR: MILES PH: 712- 8336 $ 70 PPM ---> PROJECT AUTHORIZED JAN 2009 SH1J 0000 SS70401C CM - QCR- 0( 203) A HUNT HIGHWAY - POWER TO ELLSWORTH PAVE DIRT SHOULDERS PROJ MGR: MILES PH: 712- 8336 $ 410 QCR ---> KQ1H 0000 STP - QCR- 0( 001) A RIGGS RD, ELLSWORTH TO MERIDIAN CONSTRUCT NEW RDWAY PROJ MGR: DICKSON PH: 712- 8683 $ 660 QCR ( 01/ 09) 2 ---> 10 STAGE IV SUBMITTAL. TO BE ADVERTISED BY QUEEN CREEK OR MCDOT. VM1H 0000 SS64801C CM - SCT- 0( 201) A INDIAN BEND WASH; CHAP - JACK RDS MULTI- USE PATHWAY PROJ MGR: MILES PH: 712- 8336 $ 494 SCT ( 02/ 09) 3 ---> 11 95% PLANS REVIEWED & RETURNED SEPT 2008 GY1J 0000 SS67601C CM - SUR- 0( 204) X GREENWAY ROAD FIBER OPTIC INTERCONNECTS PROJ MGR: SNARR PH: 712- 7025 $ 500 SUP ( 12/ 08) 1 ---> 6 60 % REVIEW. CPSID: RTE: L. A.: TRACS: PROJECT NUMBER PROJECT NAME: TYPE OF WORK: PROJECT MANAGER: PROJECT COST: ( in thousands) COMMENTS: MOVE ARROW ARIZONA DEPARTMENT OF TRANSPORTATION 24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT) JULY 2009 BID ADVERTISEMENT DATE VI1J 0000 SS71701C CM - GDV- 0( 201) A DYNAMIC MESSAGE SIGNS VARIOUS LOCATIONS PROJ MGR: SNARR PH: 712- 7025 $ 166 0.0 ---> PROJECT #' S PURCHASE CPSID: RTE: L. A.: TRACS: PROJECT NUMBER PROJECT NAME: TYPE OF WORK: PROJECT MANAGER: PROJECT COST: ( in thousands) COMMENTS: MOVE ARROW ARIZONA DEPARTMENT OF TRANSPORTATION 24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT) AUGUST 2009 BID ADVERTISEMENT DATE XA1H 0000 SS65301C OM - SUR- 0( 200) A PAVE DIRT ROADS - SURPRISE PAVE DIRT ROADS PROJ MGR: SNARR PH: 712- 7025 $ 510 0.0 ( 08/ 08) 1 ---> 12 XM1H 0000 SS65901C CM - FTH- 0( 201) A SAGUARO BOULEVARD PAVE DIRT ALLEYS PROJ MGR: SNARR PH: 712- 7025 $ 133 FTH ( 08/ 08) 1 ---> 12 KICK OFF MEETING XC1H 0000 SS65701C CM - PEO- 0( 201) A 84TH AVENUE STREETSCAPE PROJ MGR: SNARR PH: 712- 7025 $ 1,164 PEO ( 08/ 08) 1 ---> 12 DCR APPROVED CPSID: RTE: L. A.: TRACS: PROJECT NUMBER PROJECT NAME: TYPE OF WORK: PROJECT MANAGER: PROJECT COST: ( in thousands) COMMENTS: MOVE ARROW ARIZONA DEPARTMENT OF TRANSPORTATION 24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT) SEPTEMBER 2009 BID ADVERTISEMENT DATE NV1H 0000 SS57701C CM - SCT- 0( 015) X SCOTTSDALE ROAD CONSTRUCT ITS PROJECT PROJ MGR: SNARR PH: 712- 7025 $ 1,822 0.0 ( 02/ 09) 6 ---> 27 60% PLANS FOR REVIEW RB1J 0000 SS70501C CM - PHX- 0( 218) A ACDC AT 7TH AVE ( BIKE UNDERPASS) ACDC BIKE UNDERPASS PROJ MGR: MILES PH: 712- 8336 $ 175 PHX ( 08/ 08) 1 ---> 12 DCR APPROVED DEC 2008 CPSID: RTE: L. A.: TRACS: PROJECT NUMBER PROJECT NAME: TYPE OF WORK: PROJECT MANAGER: PROJECT COST: ( in thousands) COMMENTS: MOVE ARROW ARIZONA DEPARTMENT OF TRANSPORTATION 24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT) NOVEMBER 2009 BID ADVERTISEMENT DATE VJ1J 0000 SS71601C CM - PHX- 0( 224) A PAVE DIRT ALLEYS VARIOUS LOCATIONS PROJ MGR: MILES PH: 712- 8336 $ 467 0.0 ---> PHX CERTIFICATION ACCEPTED. OPEN PROJECT NUMBERS CPSID: RTE: L. A.: TRACS: PROJECT NUMBER PROJECT NAME: TYPE OF WORK: PROJECT MANAGER: PROJECT COST: ( in thousands) COMMENTS: MOVE ARROW ARIZONA DEPARTMENT OF TRANSPORTATION 24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT) DECEMBER 2009 BID ADVERTISEMENT DATE BC1J 0000 SB42801C BR - MMA- 0( 202) A OLD US 80 BRIDGE BRIDGE REHABILITATION PROJ MGR: SNARR PH: 712- 7025 $ 7,450 0.0 ( 12/ 08) 1 ---> 12 KICK OFF MEETING. CERTIFICATION ACCEPTANCE. CPSID: RTE: L. A.: TRACS: PROJECT NUMBER PROJECT NAME: TYPE OF WORK: PROJECT MANAGER: PROJECT COST: ( in thousands) COMMENTS: MOVE ARROW ARIZONA DEPARTMENT OF TRANSPORTATION 24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT) JUNE 2010 BID ADVERTISEMENT DATE VL1J 0000 SS72001C CM - SUR- 0( 206) A WEST OF 219TH AVENUE PAVE DIRT ROADS PROJ MGR: SNARR PH: 712- 7025 $ 1,602 0.0 ---> KICK OFF MEETING HELD. VK1J 0000 SS71803D HPP - GGI- 0( 204) A TONTO CREEK BRIDGE DESIGN BRIDGE APPROACHES PROJ MGR: SNARR PH: 712- 7025 $ 2,690 0.0 ---> PROJECT #' S, JPA FOR DESIGN REQUESTED VT1J 0000 SS72101C CM - PEO( 230) A HYBRID FIBER- TO- WIRELESS COMMUNICATION SYSTEM TRAFFIC SIGNAL NETWORK PROJ MGR: SNARR PH: 712- 7025 $ 296 PEO ---> PROJECT #' S CPSID: RTE: L. A.: TRACS: PROJECT NUMBER PROJECT NAME: TYPE OF WORK: PROJECT MANAGER: PROJECT COST: ( in thousands) COMMENTS: MOVE ARROW ARIZONA DEPARTMENT OF TRANSPORTATION 24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT) JULY 2010 BID ADVERTISEMENT DATE XA1J 0000 SS72601C CM - CHN- 0( 210) A CHANDLER BLVD TRAFFIC SIGNAL INTERCONNECT FIBER OPTIC - DELAWARE ST TO GILBERT RD PROJ MGR: MILES PH: 712- 8336 $ 310 CHN ---> PROJECT & TRACS #' S ASSIGNED WS1J 0000 SS72401C CM - ELM- 0( 201) A 129TH AVENUE PAVE UNPAVED ROADS PROJ MGR: SNARR PH: 712- 7025 $ 1,250 ELM ---> PROJECT & TRACS #' S WR1J 0000 SS72301C CM - ELM- 0( 200) A 125TH & 127TH AVENUE PAVE UNPAVED ROADS PROJ MGR: SNARR PH: 712- 7025 $ 1,000 ELM ---> PROJECT & TRACS #' S WY1J 0000 SS73201C CM - MES- 0( 205) X ITS SIGNAL CONVERSIONS - PHASE 4B FIBER OPTIC LINK PROJ MGR: SNARR PH: 712- 7025 $ 710 MES ---> CERTIFICATION ACCEPTANCE PROJECT & TRACS #' S WX1J 0000 SS73101C CM - MES- 0( 206) X ITS SIGNAL CONVERSIONS - PHASE 4A FIBER OPTIC LINK PROJ MGR: SNARR PH: 712- 7025 $ 651 MES ---> CERTIFICATION ACCEPTANCE PROJECT & TRACS #' S XB1J 0000 SS72801C CM - PEO- 0( 204) A OLIVE AVENUE - UNDERPASS NEW RIVER TRAIL UNDERPASS CONSTRUCTION PROJ MGR: MILES PH: 712- 8336 $ 700 PEO ---> PROJECT & TRACS #' S ASSIGNED WZ1J 0000 SS72501C STP - PHX- 0( 228) A MCDOWELL ROAD & 32ND STREET INTERRSECTION IMPROVEMENT PROJ MGR: MILES PH: 712- 8336 $ 500 PHX ---> PROJECTS & TRACS #' S ASSIGNED WQ1J 0000 SS72201C CM - SCT- 0( 205) A INDIAN BEND ROAD MCCORMICK STILLMAN RR PARK PROJ MGR: SNARR PH: 712- 7025 $ 1,000 SCT ---> PA FOR REVIEW CPSID: RTE: L. A.: TRACS: PROJECT NUMBER PROJECT NAME: TYPE OF WORK: PROJECT MANAGER: PROJECT COST: ( in thousands) COMMENTS: MOVE ARROW ARIZONA DEPARTMENT OF TRANSPORTATION 24 MONTH PROJECT SCHEDULE ( LOCAL GOVERNMENT) WT1J 0000 SS72701C CM - SUP- 0( 207) X PEORIA AVENUE FIBER OPTIC INTERCONNECTS PROJ MGR: SNARR PH: 712- 7025 $ 700 SUP ---> PROJECT & TRACS #' S WV1J 0000 SS73003D STP - TUC- 0( 226) A PANTANO BOULEVARD DESIGN PAVEMENT RECONSTRUCTION PROJ MGR: SNARR PH: 712- 7025 $ 250 TUC ---> CERTIFICATION ACCEPTANCE PROJECT & TRACS #' S WU1J 0000 SS73001C STP - TUC- 0( 226) A PANTANO BOULEVARD PAVEMENT RECONSTRUCTION PROJ MGR: SNARR PH: 712- 7025 $ 3,750 TUC ---> CERTIFICATION ACCEPTANCE PROJECT & TRACS #' S INDEX ARIZONA DEPARTMENT OF TRANSPORTATION PROGRAM PROJECT MANAGEMENT SECTION * INDEX SORTED LOCAL GOVERNMENT AGENCY* LOCAL TRACS # PROJECT # PROJECT NAME TYPE OF WORK BID DATE CPS ID AGENCY CO FISCAL YR VK1J 0.0 GI SS71803D HPP - GGI- 0( 204) A TONTO CREEK BRIDGE DESIGN BRIDGE APPROACHES JUN 10 2010 QD1J 0.0 MA SS70101C CM - MMA-( 209) A RIO VERDE DRIVE PAVE SHOULDERS JUN 09 2009 NV1H 0.0 MA SS57701C CM - SCT- 0( 015) X SCOTTSDALE ROAD CONSTRUCT ITS PROJECT SEP 09 2010 BC1J 0.0 MA SB42801C BR - MMA- 0( 202) A OLD US 80 BRIDGE BRIDGE REHABILITATION DEC 09 2010 QA1J 0.0 MA SS68601C CM - CUK- 0( 200) A VARIOUS LOCATIONS PAVE DIRT ROADS JUN 09 2009 VJ1J 0.0 MA SS71601C CM - PHX- 0( 224) A PAVE DIRT ALLEYS VARIOUS LOCATIONS NOV 09 2010 VL1J 0.0 MA SS72001C CM - SUR- 0( 206) A WEST OF 219TH AVENUE PAVE DIRT ROADS JUN 10 2010 XA1H 0.0 MA SS65301C OM - SUR- 0( 200) A PAVE DIRT ROADS - SURPRISE PAVE DIRT ROADS AUG 09 2009 VI1J 0.0 MA SS71701C CM - GDV- 0( 201) A DYNAMIC MESSAGE SIGNS VARIOUS LOCATIONS JUL 09 2010 XB1H 0.0 MA SS45102C CM - FTH- 0( 000) A SHEA BOULEVARD CONSTRUCT BIKE LANE APR 09 2009 VA1H AVN MA SS64501C CM - AVN- 0( 200) A MCDOWELL RD PEDESTRIAN IMPROVEMENTS FEB 09 2009 NN1J BKY MA SS68501C CM - BKY- 0( 200) A PEDESTRIAN IMPROVEMENTS - 7TH ST AND EASON AVE PEDESTRIAN IMPROVEMENT PROJECT JUN 09 2009 TU1J BKY MA SS70901C PAVE DIRT SHOULDERS - VARIOUS LOCATIONS PAVE DIRT SHOULDERS JUN 09 2009 TZ1J CHN MA SS71101C CM - CHN- 0( 207) A PRICE RD TO HAMILTON ST WESTERN CANAL- MULTI- USE PATH ( 1) JUN 09 2009 TW1J CHN MA SS70701C CM - CHN- 0( 204) A WESTERN CANAL @ ALMA SCHOOL & DOBSON PEDESTRIAN SIGNAL - TRANSPORTATION IMPROVEMEN JUN 09 2009 XA1J CHN MA SS72601C CM - CHN- 0( 210) A CHANDLER BLVD TRAFFIC SIGNAL INTERCONNECT FIBER OPTIC - DELAWARE ST TO GILBERT RD JUL 10 2011 TV1J CHN MA SS70601C CM - CHN- 0( 203) A COMMONWEALTH AVE ROADWAY IMPROVEMENT HAMILTON ST - ITHICA PL ( PAVING) JUN 09 2009 TQ1J CHN MA CM - CHN- 0( 208) A LOOP 101 @ GALVESTON ST MULTI- USE PATH & BRIDGE JUN 09 2009 TY1J CHN MA SS71001C CM - CHN- 0( 206) A PRICE ROAD TO HAMILTON STREET WESTERN CANAL - MULTI- USE PATH ( 2) JUN 09 2009 WS1J ELM MA SS72401C CM - ELM- 0( 201) A 129TH AVENUE PAVE UNPAVED ROADS JUL 10 2011 WR1J ELM MA SS72301C CM - ELM- 0( 200) A 125TH & 127TH AVENUE PAVE UNPAVED ROADS JUL 10 2011 VB1H FTH MA SS64601C STP - FTH- 0( 200) A SHEA BLVD ROADWAY WIDENING APR 09 2009 XM1H FTH MA SS65901C CM - FTH- 0( 201) A SAGUARO BOULEVARD PAVE DIRT ALLEYS AUG 09 2009 XN1H FTH MA SS66001C CM - FTH- 0( 202) A FOUNTAIN HILLS BOULEVARD SIDEWALK CONSTRUCTION JUN 09 2009 NS1H GDY MA SS55701C CM - GDY- 0( 011) A CHANDLER HEIGHTS ROAD PAVE DIRT ROAD HOLD 2009 ZQ1F GDY MA SS54401C STP- GDY- 0( 009) A YUMA RD @ BULLARD WASH CONST BOX CULVERTS HOLD 2006 NU1H GDY MA SS56001C GDY- 0- 417 VAN BUREN @ BULLARD WASH BRIDGE APPROACHES JUN 09 2009 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION PROGRAM PROJECT MANAGEMENT SECTION * INDEX SORTED LOCAL GOVERNMENT AGENCY* LOCAL TRACS # PROJECT # PROJECT NAME TYPE OF WORK BID DATE CPS ID AGENCY CO FISCAL YR NH1G GGH GH SH27701C STP- GGH- 0( 006) A SAFFORD- BRYCE RD & SAFFORD LANDFILL ROAD PETERSON WASH CULVERT EXTENSION JUN 09 2009 NY1E GGI GI SH27901C HES- GGI- 0( 006) A JESSE HAYES ROAD ROADWAY IMPROVEMENTS JUN 09 2009 NZ1E GGI GI SB40001C BR - GGI- 0( 005) A ICE HOUSE CANYON WASH BR # 8193 BRIDGE REPLACEMENT JUN 09 2009 OR1G GIL MA SS54801C CM - GIL- 0( 013) A EASTERN CANAL ( ELLIOT TO WARNER) CONSTRUCT MULTI- USE PATH JUN 09 2008 OS1G GIL MA SS54701C CM - GIL- 0( 012) A EASTERN CANAL ( GUADALUPE- ELLIOT) CONSTRUCT MULTI- USE PATH JUN 09 2009 BV1G GIL MA SS54601C CM- GIL- 0( 014) A EASTERN CANAL, BASELINE- GUADALUPE CONST MULTI USE PATH JUN 09 2009 UZ1H GIL MA SS64401C CM - GIL- 0( 200) A GILBERT HERITAGE DISTRICT PEDESTRIAN SIDEWALK, LANDSCAPE MAR 09 2009 SN1H GLN MA SS62301C CM - GLN- 0( 035) A SPORTS FACILITIES FIBER OPTIC FIBER OPTIC CABLE INSTALLATION APR 09 2009 FP1H GLN MA SH43201C HES - GLN- 0( 030) A 51ST AVENUE & CAMELBACK AVENUE INTERSECTION IMPROVMENTS JUN 09 2009 MA1H GLN MA SS59101C CM - GLN- 0( 033) A 63RD AVE / LOOP 101 CONSTRUCT MULTI- USE PATH AND BRIDGE JUN 09 2009 FR1H GLN MA SH43101C HES - GLN- 0( 030) A 51ST AVENUE & NORTHERN AVENUE INTERSECTION IMPROVEMENTS JUN 09 2009 MM1G MES MA SS51501C CM- MES- 0( 023) A CONSOLIDATED CANAL PHASE 3 MULTI- USE PATH HOLD 20 SU1F MES MA SS48501C CM- MES- 0( 020) A SOUTH CANAL DESIGN MULTI- USE PATH PH I HOLD 2007 WX1J MES MA SS73101C CM - MES- 0( 206) X ITS SIGNAL CONVERSIONS - PHASE 4A FIBER OPTIC LINK JUL 10 2011 WY1J MES MA SS73201C CM - MES- 0( 205) X ITS SIGNAL CONVERSIONS - PHASE 4B FIBER OPTIC LINK JUL 10 2011 PL1H MES MA SS59801C EAST WEST PEDESTRIAN PATH CONSTRUCT MULTI USE PATH HOLD 20 NT1J MMA MA SS68701C CM - MMA- 0( 206) A REACT IN GLENDALE, PEORIA, AND SCOTTSDALE INCIDENT MANAGEMENT PARTNERSHIP JUN 09 2009 CX1G MRN PM SB41301C BR- MRN- 0( 014) A INA BRIDGE OVER SANTA CRUZ BRIDGE REPLACEMENT HOLD 2006 VT1J PEO MA SS72101C CM - PEO( 230) A HYBRID FIBER- TO- WIRELESS COMMUNICATION SYSTEM TRAFFIC SIGNAL NETWORK JUN 10 2010 WD1H PEO MA SS64301C CM - PEO- 0( 200) A SKUNK CREEK- 75TH AVE TO NEW RIVER CONSTRUCT MULTI- USE PATH MAR 09 2009 XB1J PEO MA SS72801C CM - PEO- 0( 204) A OLIVE AVENUE - UNDERPASS NEW RIVER TRAIL UNDERPASS CONSTRUCTION JUL 10 2011 XC1H PEO MA SS65701C CM - PEO- 0( 201) A 84TH AVENUE STREETSCAPE AUG 09 2009 TS1J PHX MA SB43401C CM - PHX- 0( 222) B BRIDGE INSPECTION EQUIPMENT VARIOUS LOCATIONS JUN 09 2009 OY1H PHX MA SH44101C HBS - PHX- 0( 200) A MCDOWELL RD & 35TH AVENUE STREET LIGHTS CONSTRUCTION JUN 09 2009 VY1H PHX MA SS62701C CM - PHX- 0( 202) A 19TH AVENUE THUNDERBIRD RD WIDENING INTERSECTION IMPROVEMENTS MAY 09 2009 WZ1J PHX MA SS72501C STP - PHX- 0( 228) A MCDOWELL ROAD & 32ND STREET INTERRSECTION IMPROVEMENT JUL 10 2011 RB1J PHX MA SS70501C CM - PHX- 0( 218) A ACDC AT 7TH AVE ( BIKE UNDERPASS) ACDC BIKE UNDERPASS SEP 09 2009 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION PROGRAM PROJECT MANAGEMENT SECTION * INDEX SORTED LOCAL GOVERNMENT AGENCY* LOCAL TRACS # PROJECT # PROJECT NAME TYPE OF WORK BID DATE CPS ID AGENCY CO FISCAL YR TR1J PHX MA SB43301C CM - PHX- 0( 221) B PONTIS & VIRTIS BRIDGE MANAGEMENT SOFTWARE VARIOUS LOCATIONS JUN 09 2009 KR1F PPM PM SB40301C BR - PPM- 0( 71) P SILVER BELL @ BLANCO WASH BRIDGE REPLACEMENT HOLD 2005 TT1J PPM PM SS71301C CM - PPM- 0( 210) A SAFETY AND EDUCATION PROGRAM VARIOUS LOCATIONS JUN 09 2009 WO1E PPM PM SS50101C STP- PPM- 0( 152) P RIVER ROAD AT VENTANA CANYON BRIDGE REPLACEMENT HOLD 2004 SF1J PPM PM SS69301C STP - PPM- 0( 209) A COTARO FAMS ROAD / MAGEE ROAD ROAD WIDENING, REALIGNMENTS, IMPROVEMENTS JUN 09 2009 ZN1E PPN PN SB41001C BR - PPN- 0-( 169) KELVIN BRIDGE - # 8441 BRIDGE REPLACEMENT MAR 09 2009 RC1J PVY MA SS69801C CM - PVY- 0( 201) A 12 VARIOUS LOCATIONS TRAFFIC - VIDEO DETECTION SYSTEM MAR 09 2009 KQ1H QCR MA STP - QCR- 0( 001) A RIGGS RD, ELLSWORTH TO MERIDIAN CONSTRUCT NEW RDWAY JUN 09 2009 SG1J QCR MA SS70201C CM - QCR- 0( 202) A CHANDLER HEIGHTS RD - POWER TO HAWES PAVE DIRT SHOULDERS HOLD 2009 SH1J QCR MA SS70401C CM - QCR- 0( 203) A HUNT HIGHWAY - POWER TO ELLSWORTH PAVE DIRT SHOULDERS JUN 09 2009 WQ1J SCT MA SS72201C CM - SCT- 0( 205) A INDIAN BEND ROAD MCCORMICK STILLMAN RR PARK JUL 10 2011 VM1H SCT MA SS64801C CM - SCT- 0( 201) A INDIAN BEND WASH; CHAP - JACK RDS MULTI- USE PATHWAY JUN 09 2009 UD1F SSC SC SL43501C TEA- SSC- 0( 007) A TUBAC - ANZA PLAZA PEDESTRIAN PATHWAY HOLD 2004 GY1J SUP MA SS67601C CM - SUR- 0( 204) X GREENWAY ROAD FIBER OPTIC INTERCONNECTS JUN 09 2009 WT1J SUP MA SS72701C CM - SUP- 0( 207) X PEORIA AVENUE FIBER OPTIC INTERCONNECTS JUL 10 2011 WU1J TUC PM SS73001C STP - TUC- 0( 226) A PANTANO BOULEVARD PAVEMENT RECONSTRUCTION JUL 10 2011 WV1J TUC PM SS73003D STP - TUC- 0( 226) A PANTANO BOULEVARD DESIGN PAVEMENT RECONSTRUCTION JUL 10 2011 QG1J TUC PM SS69201C STP - TUC- 0( 223) A ITS TRAFFIC SIGNAL EXPANSION - VARIOUS LOCATIONS EQUIPMENT PURCHASES FEB 09 2009 RA1J TUC PM STP - TUC- 0( 222) A ITS TRAFFIC SIGNAL TIMING STUDY TIMING STUDY - VARIOUS LOCATIONS FEB 09 2009 PZ1G YYU YU SB41501C BR - YYU- 0( 031) A OLD US 80 @ RED TOP WASH BRIDGE REPLACEMENT FEB 09 2009 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. http:// www. azdo t . g. ov/ Highways/ ppms/ |