February 20, 2009
This report contains the construction projects from the new 5- Year Program. The report is sorted 7 different ways; 1) by project name,
3) by bid date, route and beginning milepost, 4) by TRACS number, 5) by route, beginning milepost and TRACS
6) by engineering district, route, beginning milepost and TRACS number and 7) by CPSID.
Several projects are on “ special” status as indicated by a bid date in the year 2050. The special categories are listed below.
STATUS
02/ 25/ 2050 IGA/ JPA PROJECTS WITHOUT SCHEDULE
05/ 25/ 2050 PROJECTS IN THE NEW 5- YEAR PROGRAM IN THE PROCESS OF BEING SCHEDULED.
06/ 25/ 2050 DESIGN PROJECTS IN THE 5- YEAR PROGRAM WITHOUT CORRESPONDING CONSTRUCTION PROJECT
08/ 25/ 2050 PROJECTS THAT ARE ON “ HOLD” STATUS UNTIL THE PROBLEMS ARE RESOLVED AND A DECISION IS
MADE ON RESCHEDULING. PROJECT DEVELOPMENT SHOULD CONTINUE IF POSSIBLE.
09/ 25/ 2050 PROJECTS THAT HAVE BEEN DELETED FROM THE CURRENT 5- YEAR CONSTRUCTION PROGRAM. WE
WILL MAINTAIN THESE PROJECTS ON THE PRIMAVERA SYSTEM FOR RECORD. PROJECT DEVELOPMENT
IS TERMINATED FOR THESE PROJECTS .
ARIZONA DEPARTMENT OF TRANSPORTATION
PROJECT CATEGORIES
PROJECT CATEGORY
5- YEAR BID DATE REPORT
PROGRAM & PROJECT MANAGEMENT SECTION
AMEC AMEC LSD Logan Simpson Design
AZTC Aztec Engineering MB Michael Baker Jr., Inc.
BN Burgess & Niple MBD1 Michael Baker/ Design One
BRW BRW MMLA MMLA, Inc.
BSA Bulduc, Smiley & Associates. Inc. OLSN Olsson & Associates
C& B Carter & Burgess PARS Parsons Transportation Group
CANN Cannon & Associates PBQD PBQD - Parsons Brinkerhoff Quade & Douglas
CDG Corral Dybas Group, Inc. PBSJ PBS& J
CH2M CH2M Hill PREM Premier Engineering Corporation
DIBL Dibble & Associates RBF RBF Consulting
DMJM DMJM+ Harris RPOW Ritoch Powell & Associates
EEC EEC SCON Stanley Consultants
ENTR Entranco STEC Stantec Consulting, Inc.
ERTH Earth Tech SVER Sverdrup
GANN Gannett Fleming TBA To Be Assigned
HDR HDR Engineering TCOR Transcore
HUIT Huitt - Zollars TTI Tetra Tech, Inc.
JLK JLK Eingeers TYLN T. Y. Lin International
INCA Inca Engineering, Inc. URS URS
DESIGN FIRM ABBREVIATIONS
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
1ST SORT: PROJECT NAME Page 1 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
UM1J 93 MO 124.0 H763501C K 1 MILE SOUTH OF TOWN OF WIKIEUP; WEST OF ROAD SYSTEM PRESERVATION - RESTORATION/ REHAB IGA FY 09
40511 TR1H 17 MA 215.0 E 101L- CAREFREE HIGHWAY DESIGN FMS DESIGN FY 11
RC1J 0000 MA PVY SS69801C CM - PVY- 0( 201) A E 12 VARIOUS LOCATIONS TRAFFIC - VIDEO DETECTION SYSTEM FY 09
WR1J 0000 MA ELM SS72301C CM - ELM- 0( 200) A E 125TH & 127TH AVENUE PAVE UNPAVED ROADS FY 11
WS1J 0000 MA ELM SS72401C CM - ELM- 0( 201) A E 129TH AVENUE PAVE UNPAVED ROADS FY 11
VY1H 0000 MA PHX SS62701C CM - PHX- 0( 202) A E 19TH AVENUE THUNDERBIRD RD WIDENING INTERSECTION IMPROVEMENTS FY 09
45309 FN1H 10 MA 96.2 H708301X Y 395TH AVE ( BELMONT RD) CONSTRUCT TI TBD FY 09
IN1J 10 MA 144.0 H725601C M 3RD AVENUE - 3RD STREET FIRE DETECTION SYSTEM RETROFIT FEB 09
41211 UB1H 202L MA 0.0 E 51ST AVE TO I- 10 WEST CONSTRUCT ROADWAY TBD FY 11 TBD
41210 UA1H 202L MA 0.0 E 51ST AVE TO I- 10 WEST CONSTRUCT ROADWAY TBD FY 10 TBD
40808 UK1H 202L MA 0.0 E 51ST AVE TO I- 10 WEST CONSTRUCT ROADWAY TBD FY 09 TBD
FP1H 0000 MA GLN SH43201C HES - GLN- 0( 030) A E 51ST AVENUE & CAMELBACK AVENUE INTERSECTION IMPROVMENTS FY 09
FR1H 0000 MA GLN SH43101C HES - GLN- 0( 030) A E 51ST AVENUE & NORTHERN AVENUE INTERSECTION IMPROVEMENTS FY 09
MA1H 0000 MA GLN SS59101C CM - GLN- 0( 033) A E 63RD AVE / LOOP 101 CONSTRUCT MULTI- USE PATH AND BRIDGE FY 09
XC1H 0000 MA PEO SS65701C CM - PEO- 0( 201) A E 84TH AVENUE STREETSCAPE FY 09
11507 DP1H 60 MA 148.9 H669001C NH - 060- B( 200) B E 99TH AVE - 83RD AVE ( INCLUDING NEW RIVER BRIDGE) WIDEN ROADWAY AND BRIDGE MAY 09
RB1J 0000 MA PHX SS70501C CM - PHX- 0( 218) A E ACDC AT 7TH AVE ( BIKE UNDERPASS) ACDC BIKE UNDERPASS FY 09
12405 IV1A 89A CN 399.0 H413401C 366- F AIRPORT ROAD TI ( JW POWELL BLVD) CONSTRUCT INTERSECTION IMPR TBD FY 11
GG1J 66 MO 57.3 K AIRWAY AVENUE & MOHAVE AIRPORT DRIVE INTERSE CONCRETE MEDIAN & ASPHALT PAVING MAR 09
10211 CW1J 60 LA 0.0 H739001C P ALAMO LAKE STATE PARK CONSTRUCT PARKING TBD FY 11 PBBF1
10312 LE1G 93 MO 101.8 K ANTELOPE WASH CONSTRUCT 4- LANE DIVIDED HIGHWAY TBD FY 12
RH1J 17 MA 229.0 H760401C E ANTHEM WAY - NEW RIVER ROAD PAVEMENT PRESERVATION NOV 08
40312 TS1H 17 MA 209.0 E ARIZONA CANAL - 101L CONSTRUCT FMS TBD FY 12
40112 CT1J 17 MA 209.0 E ARIZONA CANAL TO SR 101L CONSTRUCT GPL TBD FY 13
PB1F 40B YV 145.0 H621301C B40- C( 002) A K ASH FORK, 40B, 3RD ST TO 8TH ST SIDEWALK TBD FY 09 TBA
11510 AA1C 95 YU 32 063- 1 Y AVENUE 9E TO ABURDEEN ROAD RECONSTRUCT FORTUNA WASH BRIDGE & WID TBD FY 11
ZT1H 40 CN 224.5 F BABBITTS TANK WASH BRIDGE SYSTEM ENHANCEMENT - ENGINEERING DEC 09
ZK1F 191 GE 160.0 H643201C S BACK COUNTRY BYWAY ( NORTH INTER) SAFETY IMPROVEMENTS TBD FY 09
16006 QT1F 101L MA 53.5 E BALBOA DRIVE CONSTRUCT MULTI- USE PATH BRIDGE OVER TH IGA FY 12
40812 TU1H 101L MA 0.0 H707601C E BEARDSLEY RD / UNION HILLS DRIVE ( CITY ADVANCEM CONSTRUCT TI TBD FY 09
40611 CV1J 51 MA 13.6 E BELL ROAD - SR 101L DESIGN FMS DESIGN FY 11
43010 GK1H 17 MA 204.9 E BETHANY HOME RD TO NORTHERN AVE DESIGN/ CONSTRUCT PEDESTRIAN WALKWAY AL TBD FY 10
UO1H 95 LA 161.7 H711501C K BILL WILLIAMS RIVER BRIDGE # 1272 FIRE DAMAGE REPAIR TBD FY 09
AC1G 17 YV 245.2 H636801C HES - 017- B( 201) A P BLACK CANYON HILL - ( SB) MILL AND REPLACE AND SAFETY IMPROVEMENT TBD FY 09
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
1ST SORT: PROJECT NAME Page 2 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
WB1H 264 AP 474.5 H712101C H BLACK CREEK BRIDGE ( STR # 624) SCOUR RETROFIT TBD FY 10
RN1H 40 AP 347.0 H706601C BR - 040- E( 202) A H BLACK CREEK BRIDGES EB, WB SFR( STR # 1134,1642,9 BRIDGE SCOUR RETROFIT JAN 09
14407 PRSP 60 PN 220.0 H684501C 060- D- 508 G BOYCE THOMPSON STATE PARK CONSTRUCT ROAD FEB 09 AMJC1
TS1J 0000 MA PHX SB43401C CM - PHX- 0( 222) B E BRIDGE INSPECTION EQUIPMENT VARIOUS LOCATIONS FY 09
OV1J 999 SW 0.0 H755001C BRIDGES # 2190, # 1152, # 1219, # 745, # 517, # 821, # 93 COLLISION DAMAGE REPAIR TBD FY 09
TK1J 999 MA 0.0 H770201C E BRIDGES # S 1772, 779, 1823, 2800, 517, 1335 COLLISION DAMAGE REPAIR IGA FY 09
ZC1H 40 MO 14.9 H727201C K BUCK MOUNTIAN WASH EB # 378 DECK REHABILITATION TBD FY 09
11606 AJ1C 191 AP 417.5 H451801C STP - 191- E( 200) A H BURNSIDE JUNCTION - NORTH ROADWAY WIDENING TBD FY 09 TBA
WN1G 8 YU 6.0 Y BUSINESS 8 AND AVE 2 1/ 2 E DRAINAGE STUDY & IMPROVEMENT AUG 09
TA1H 40 CN 198.0 F BUTLER AVE TI SYSTEM ENHANCEMENT- ENGINEERING TBD FY 12 RBML1
10412 DA1J 89 CN 464.5 F CAMERON SECTION CONSTRUCT 4- LANE URBAN, SR 64 INTERSECTI TBD FY 12
EO1G 19 PM 34.0 T CANOA TI - CONTINENTAL TI CONST ROADWAY ( NB FRONTAGE RD) IGA FY 09
10413 TC1J 93 MO 116.0 K CARROW TO STEPHENS CONSTRUCT 4- LANE DIVIDED HIGHWAY TBD FY 13
10910 DJ1G 90 CH 323.5 S CENTRAL AVE TO MOSON RD, E OF SIERRA VISTA WIDEN TO 5 LANES TBD FY 11
XA1J 0000 MA CHN SS72601C CM - CHN- 0( 210) A E CHANDLER BLVD TRAFFIC SIGNAL INTERCONNECT FIBER OPTIC - DELAWARE ST TO GILBERT RD FY 11
KO1H 40 MO 11.0 K CHEMEHUEVI & BOULDER WASH BRIDGES SCOUR RETROFIT JAN 10
21008 GL1J 191 AP 448.0 H748601C H CHINLE - MANY FARMS ( PH I) REMOVE & REPLACE FENCING, CATTLE GUARDS TBD FY 09
12010 EB1E 191 AP 446 H543801C H CHINLE SOUTH ROADWAY WIDENING TBD FY 11
20206 3WSP 10 PM 288.4 H239001C 010- E T CIENEGA CREEK - MARSH STATION PH1 RAILROAD GRADE & DRAIN MAR 09
14607 HX1G 10 PM 288.4 T CIENEGA CREEK- MARSH STATION PHASE II NEW RAILROAD TRACKS TBD FY 09
13408 HY1G 10 PM 288.4 H747301C T CIENEGA CREEK- MARSH STATION PHASE III REMOVE RAIL & BRIDGE, CONST ML TBD FY 09
14610 DE1J 177 GI 0.0 G CLIMBING PARK DESIGN DESIGN FY 10
14002 FF1C 191 CH 62.0 H416501C S COCHISE UPRR OP # 2530 BRIDGE REPLACEMENT. TBD FY 10
TV1J 0000 MA CHN SS70601C CM - CHN- 0( 203) A E COMMONWEALTH AVE ROADWAY IMPROVEMENT HAMILTON ST - ITHICA PL ( PAVING) FY 09
SW1H 19 PM 39.0 H705001C T CONTINENTAL RD/ I- 19 BIKE & PED SYS ENHNCMENT- OTHR ENHANCEMNTS TBD FY 10 HDSR1
13603 GM1C 17 YV 263.0 H426901C 17- 2( ) P CORDES JCT TI RECONSTRUCT TI TBD FY 09 HDJC1
13410 BB1G 10 PM 246.5 T CORTARO ROAD TI CONSTRUCT NEW TI TBD FY 10 TBA
SF1J 0000 PM PPM SS69301C STP - PPM- 0( 209) A T COTARO FAMS ROAD / MAGEE ROAD ROAD WIDENING, REALIGNMENTS, IMPROVEMEN FY 09
11312 CQ1J 10 PM 264.0 T COUNTRY CLUB ROAD TI CONSTRUCT NEW TRAFFIC INTERCHANGE DESIGN FY 13
14810 KP1H 40 AP 316.0 H692401C H DEAD RIVER BRIDGE EB ( STR # 565) SCOUR RETROFIT FEB 09
28303 RO1F 80 CH 364.0 H624301C CBI - 080- A( 009) B S DGLS STGC WEIGHT & INSP STATION DSGN/ CST WEIGHT & INSP STATION MAR 09 MBFG1
11406 SK1E 191 GH 91.8 H503704C 191- B S DIAL WASH TO TEN RANCH ( SEG II) CONSTRUCT PARALLEL ROADWAY TBD FY 11 TBA
QT1J 999 AP 0.0 H747701X SB - AZ07-( 004) H DINE'TAH " AMONG THE PEOPLE" SCENIC ROADS DESIGN MARKETING PLAN IGA FY 09
41711 TW1H 202L MA 0.0 E DOBSON ROAD TO I- 10 CONSTRUCT HOV/ RAMP TBD FY 13
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
1ST SORT: PROJECT NAME Page 3 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
41611 TX1H 202L MA 0.0 E DOBSON ROAD TO I- 10 DESIGN FMS DESIGN FY 11
11902 RH1B 260 GI 269.0 H469801C 260- B P DOUBTFUL CANYON SECTION RECONSTRUCT ROADWAY & CONSTRUCTION W TBD FY 10 SVBW1
22706 GV1H 80 CH 364.0 S DOUGLAS STRTGC INSPECTION STATION INSTALL VOICE & DATA LINES IGA FY 10
VI1J 0000 MA 0.0 SS71701C CM - GDV- 0( 201) A E DYNAMIC MESSAGE SIGNS VARIOUS LOCATIONS FY 10
FA1H 10 CH 307.0 H682201C IM - 010- F( 201) A S E BENSON - JOHNSON RD ( EB) RR 5" TL, 3" PL & ARFC FEB 09
FH1G 80 CH 368.0 H658001C STP - 080- B( 200) A S EAST OF DOUGLAS 2 1/ 2" MILL, 3" AC REPLACE PLUS 1/ 2" AR- ACFC JAN 09
OS1G 0000 MA GIL SS54701C CM - GIL- 0( 012) A E EASTERN CANAL ( GUADALUPE- ELLIOT) CONSTRUCT MULTI- USE PATH FY 09
BV1G 0000 MA GIL SS54601C CM- GIL- 0( 014) A E EASTERN CANAL, BASELINE- GUADALUPE CONST MULTI USE PATH FY 09
XQ1F 15 MO 9.0 F FARM ROAD TI CONSTRUCT NEW UNDERPASS TBD FY 11
13506 OQ1D 88 MA 223.0 H692001C STP - 088- A( 001) G FISH CREEK HILL CONSTRUCT RETAINING WALLS TBD FY 09 TBA
XN1H 0000 MA FTH SS66001C CM - FTH- 0( 202) A E FOUNTAIN HILLS BOULEVARD SIDEWALK CONSTRUCTION FY 09
FD1H 8 MA 114.0 H682901C Y GILA BEND - 121.0 RR 2" PL/ 5" TL & ARFC JAN 10
10112 CL1J 10 PN 0.0 T GILA RIVER INDIAN TRIBAL BOUNDARY TO I- 8 WIDEN ROADWAY TBD FY 12
UZ1H 0000 MA GIL SS64401C CM - GIL- 0( 200) A E GILBERT HERITAGE DISTRICT PEDESTRIAN SIDEWALK, LANDSCAPE FY 09
CM1G 89 YV 313.0 H648401C 089- B- 305 P GRANITE CREEK BRIDGE # 2869 BRIDGE REPLACEMENT TBD FY 09
GY1J 0000 MA SUP SS67601C CM - SUR- 0( 204) X E GREENWAY ROAD FIBER OPTIC INTERCONNECTS FY 09
QF1G 191 GE 153.0 S GUTHRIE BRIDGE # 352 DEMOLITION PA FOR BRIDGE DEMOLITION TBD FY 10 HDKA1
PV1J 101L MA 36.0 H741401C E HAYDEN RD TO PRINCESS DR DRAINAGE IMPROVEMENTS TBD FY 09
12510 HI1H 260 NA 317.2 H770501C G HEBER - SHOW LOW EB & WB CONSTRUCT PASSING LANES TBD FY 11
BW1J 40 MO 47.0 H752901C K HOLY MOSES WASH - RATTLESNAKE WASH RR( 5" TL, 3" PL)& AR ACFC & RR AR ACFC APR 09
13209 A6SP 87 NA 346.0 H717901C H HOMOLOVI RUINS STATE PARK CONSTRUCT ROAD TBD FY 10 CBJO1
SH1J 0000 MA QCR SS70401C CM - QCR- 0( 203) A E HUNT HIGHWAY - POWER TO ELLSWORTH PAVE DIRT SHOULDERS FY 09
VT1J 0000 MA PEO SS72101C CM - PEO( 230) A E HYBRID FIBER- TO- WIRELESS COMMUNICATION SYSTE TRAFFIC SIGNAL NETWORK FY 10
14406 VB1E 10 PM 260.0 H640401C 010- E T I- 10 / I- 19 ( FMS, PHASE 2) EXTEND ITS SYSTEMS ALONG I- 10 & I- 19 TBD FY 09 TRMM1
SX1J 10 PN 210.1 T I- 10 / SR 87 TI CAPACITY ADDITIONS - ENGINEERING TBD FY 10 PBDL1
40809 UD1H 202L MA 0.0 E I- 10 EAST/ SANTAN TI TO 51ST AVE DESIGN AND R/ W DESIGN FY 09 TBD
40013 UF1H 202L MA 0.0 E I- 10 EAST/ SANTAN TI TO 51ST AVE CONSTRUCT ROADWAY TBD FY 13 TBD
41310 UE1H 202L MA 0.0 E I- 10 EAST/ SANTAN TI TO 51ST AVE DESIGN & R/ W DESIGN FY 10 TBD
13706 SI1E 101L MA 0.0 H726701C 101- A E I- 10 TO MC 85 ( 99TH AVE) WIDEN ROADWAY TBD FY 10 KHRC1
41612 UH1H 303L MA 0.0 E I- 10 TO US 60 ( GRAND AVE) CONSTRUCT NEW FREEWAY TBD FY 12 TBD
SY1H 10 PN 211.0 H710601C T I- 10 WIDENING SR87 TO PICACHO PEAK CAPACITY ADDITIONS- ENGINEERING TBD FY 10 PBDL1
43311 DJ1J 303L MA 0.0 E I- 10/ 303L TI, PHASE I ( I- 10 REALIGNMENT) CONSTRUCT TI TBD FY 11
40313 DD1J 101L MA 23.5 E I- 17 TO TATUM BLVD CONSTRUCT HOV LANE DESIGN FY 13
41011 TV1H 101L MA 0.0 E I- 17 TO SR 51 DESIGN FMS DESIGN FY 11
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
1ST SORT: PROJECT NAME Page 4 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
CG1J 19 PM 45.8 HX21301C T I- 19 AND SAHUARITA RD INSTALL NEW TRAFFIC SIGNAL IGA FY 09
FY1J 40 MO 52.0 H740601C TEA - 040- A( 201) K I- 40 STOCKTON HILL - HARRISON CONSTRUCT LANDSCAPING AND IRRIGATION SEP 08
TB1H 10 PN 199.0 H710401C T I- 8 TO SR 87 TI CAPACITY ADDITIONS - ENGINRING TBD FY 10 EECA1
TI1J 8 YU 66.0 H744601C Y I- 8, DATELAND TO GILA BEND REST AREA SIGN REHABILITATION IGA FY 09
NZ1E 0000 GI GGI SB40001C BR - GGI- 0( 005) A G ICE HOUSE CANYON WASH BR # 8193 BRIDGE REPLACEMENT FY 09
QL1J 10 PM 247.0 T INA RD TO RUTHRAUFF RD DCR / EA AND 30% DESIGN DESIGN FY 09
10208 PJ1F 10 PM 248.0 010- D T INA ROAD TI RECONSTRUCT TI & MAINLINE TBD FY 10 TBA
WQ1J 0000 MA SCT SS72201C CM - SCT- 0( 205) A E INDIAN BEND ROAD MCCORMICK STILLMAN RR PARK FY 11
VM1H 0000 MA SCT SS64801C CM - SCT- 0( 201) A E INDIAN BEND WASH; CHAP - JACK RDS MULTI- USE PATHWAY FY 09
KF1H 8 PN 177.0 H692601C 008- B( 003) A T INTERSTATE I- 8 EB, I- 10 WB RAMP IMPROVEMENT MAY 09
WX1J 0000 MA MES SS73101C CM - MES- 0( 206) X E ITS SIGNAL CONVERSIONS - PHASE 4A FIBER OPTIC LINK FY 11
WY1J 0000 MA MES SS73201C CM - MES- 0( 205) X E ITS SIGNAL CONVERSIONS - PHASE 4B FIBER OPTIC LINK FY 11
QG1J 0000 PM TUC SS69201C STP - TUC- 0( 223) A T ITS TRAFFIC SIGNAL EXPANSION - VARIOUS LOCATION EQUIPMENT PURCHASES FY 09
RA1J 0000 PM TUC STP - TUC- 0( 222) A T ITS TRAFFIC SIGNAL TIMING STUDY TIMING STUDY - VARIOUS LOCATIONS FY 09
LP1G 78 GE 169.0 H666901C S JAKE'S CORNER REALIGNMENT HIGHWAY REALIGNMENT MAR 09 AMJS1
FG1G 78 GE 154.0 H657901C S JCT 191 TO FOREST SERVICE BOUNDARY CHIP SEAL AND GUARDRAIL EXTENSION APR 09
22802 UX1C 160 CN 311.5 H527401C 160- A-( 001) F JCT 89 - VAN'S TRADING POST 2" ARAC & ARFC & TURNLANES TBD FY 09
10113 TE1J 89A YV 319.0 P JCT 89A TO CHINO VALLEY ( S. CHINO LIMITS) - PH II CONSTRUCT ROADWAY WIDENING TBD FY 13
10512 CZ1J 89 YV 317.5 P JCT 89A TO MP 324 WIDEN THE SR 89 CORRIDOR TBD FY 12
14510 CN1J 10 PN 199.1 T JCT I 8 TO PICACHO PEAK TI WIDEN ROADWAY TBD FY 10
EU1H 191 AP 375.0 H681901C H JCT I- 40 MP 385 3" AC & SC JAN 10
FO1G 160 NA 402.0 H658501C H JCT N 59 TO DENNEHOTSO 3" COLD RECYCLE & ARFC DEC 09
XT1H 180 AP 402.0 G JCT SR 260 / US 180 & RODEO GROUNDS INTERSECTIO REALIGN INTERSECTION TBD FY 10
11710 RJ1C 160 NA 375.2 H JCT SR 564 - TSEGI, PH I CONST DUAL PASSING LNS TBD FY 10
LP1J 83 SC 31.6 H747001C T JCT SR 82 ( MP 31.6) TO MP 43.5 HIP RECYCLE + CHIP SEAL COAT DEC 08
NW1J 89A YV 344.0 H733901C P JEROME RETAINING WALL REPLACE RETAINING WALL TBD FY 09
NY1E 0000 GI GGI SH27901C HES- GGI- 0( 006) A G JESSE HAYES ROAD ROADWAY IMPROVEMENTS FY 09
SL1J 40B NA 276.8 H767701C H JOSEPH CITY TRUCK STOP 3" MILL AND REPLACE MAR 09
AP1G 160 NA 389.5 H635601C 160- A( 200) A H KAYENTA - JCT IR 59 3" AC + ACFC DEC 08
QU1J 163 NA 0.0 H747801X SB - AZ07-( 007) H KAYENTA- MONUMENT VALLEY SCENIC ROADS DEVELOP INTERPRETIVE PLAN IGA FY 09
QV1J 163 NA 0.0 H747901X SB - AZ07-( 008) H KAYENTA- MONUMENT VALLEY SCENIC ROADS DESIGN MARKETING PLAN IGA FY 09
ZN1E 0000 PN PPN SB41001C BR - PPN- 0-( 169) G KELVIN BRIDGE - # 8441 BRIDGE REPLACEMENT FY 09
11212 CP1J 10 PM 262.5 T KINO TI DESIGN TRAFFIC INTERCHANGE DESIGN FY 12
13910 GY1H 86 PM 132.8 T KITT PK ROAD SEGMENT ROADWAY WIDENING TBD FY 10
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
1ST SORT: PROJECT NAME Page 5 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
15708 UI1H 95 MO 0.0 K LAKE HAVASU STATE PARK DESIGN ( LAUNCH RAMPS) DESIGN FY 10 TBD
OU1J 40 MO 9.8 H742001C K LAKE HAVASU TI UP # 1586 BRIDGE REHABILITATION TBD FY 09
VE1J 8 YU 19.0 H773901C Y LIGURTA TO DATELAND SIGN REHAB TBD FY 10
43208 ST1H 202L MA 0.0 E LINDSAY ROAD TO GILBERT ROAD DESIGN & CONST MULTI- USE PATH TBD FY 09
40711 TT1H 60 MA 0.0 E LINDSEY RD HALF INTERCHANGE DESIGN TI DESIGN FY 11
21301 LY1C 260 GI 258.0 P LION SPRINGS SECTION DESIGN ( ROADWAY) DESIGN FY 09
14601 RG1B 260 GI 263.1 H469901C P LITTLE GREEN VALLEY RECONSTRUCT ROADWAY TBD FY 09 AMRM1
TQ1J 0000 MA CHN CM - CHN- 0( 208) A E LOOP 101 @ GALVESTON ST MULTI- USE PATH & BRIDGE FY 09
TD1H 191 GE 170.0 H710001C S LWR CORONADO TRAIL DRAINAGE IMPRV SYST ENHANCEMENT - ENGINEERING MAR 09
11112 CO1J 10 PM 236.4 T MARANA ROAD TO INA ROAD RECONSTRUCT & WIDEN FRONTAGE ROADS TBD FY 12
11113 TL1J 10 PM 236.4 T MARANA ROAD TO INA ROAD ( FRONTAGE ROADS) RECONSTRUCT & WIDEN FRONTAGE ROADS TO TBD FY 13
MD1J 89 YV 269.0 P MARTINEZ RIVER BRIDGE ( STR # 1320) SCOUR RETROFIT TBD FY 10
VA1H 0000 MA AVN SS64501C CM - AVN- 0( 200) A E MCDOWELL RD PEDESTRIAN IMPROVEMENTS FY 09
OY1H 0000 MA PHX SH44101C HBS - PHX- 0( 200) A E MCDOWELL RD & 35TH AVENUE STREET LIGHTS CONSTRUCTION FY 09
WZ1J 0000 MA PHX SS72501C STP - PHX- 0( 228) A E MCDOWELL ROAD & 32ND STREET INTERRSECTION IMPROVEMENT FY 11
40612 CX1J 60 MA 194.0 E MERIDIAN ROAD CONSTRUCT TI TBD FY 13
13607 QG1F 85 MA 120.5 Y MP 120.54 - MP 122.99 CONSTRUCT ROADWAY TBD FY 09 TBA
OG1H 8 MA 121.0 H701601C 008- B Y MP 121.00 - BIG HORN SYSTEM PRES - ENGINEERING APR 09
CF1J 79 PN 124.2 H731001C T MP 124 TO MP 126 SYSTEM ENHANCEMENT - ENGINEERING TBD FY 09 HDRB1
QZ1J 177 PN 139.2 H760301C G MP 139.16 @ AAR/ DOT # 742- 390- N CONCRETE RR CROSSING SURFACE & LED FLAS IGA FY 09
QY1C 86 PM 141.1 H713701C T MP 141.1 TO RESERVATION BOUNDARY CONSTRUCT ROADWAY WIDENING TBD FY 09 TBA
16604 RV1E 86 PM 145.6 H543401C S - 086- A- 500 T MP 145.6 - BRAWLEY WASH EXTEND BOX CULVERTS TBD FY 09 TBA
OS1J 40 CN 177.0 H751401C F MP 177- 182 ( EB& WB) SHOULDERS PAVEMENT PRESERVATION TBD FY 09
VO1H 40 MO 21.0 H721201C 040- A( 200) K MP 21 - WALNUT CREEK RR 5" TL & 3" PL & 2" AC ARFC JAN 09
46208 XP1G 87 MA 211.8 P MP 211.8 TO MP 213.0 REPAIR CUT SLOPES FOR EROSION CONTROL TBD FY 10
EB1H 260 NA 356.0 H681201C G MP 356- 357.6 INSTALL NEW R/ W FENCE TBD FY 09
11308 EO1E 77 NA 364.0 H546001C 077- B H MP 364 TO 372 CONSTRUCT PASSING LANE TBD FY 10 TBA
QB1J 40 MO 39.0 H756801C K MP 39 - MP 121 MINOR PAVEMENT PRESERVATION FEB 09
UM1H 83 PM 44.0 H705701C 083- A( 200) A T MP 44.0 TO MP 45.5 SAFETY IMPRVMNTS / REALIGNMENT MAY 09
10306 RE1E 17 CN 322.0 017- B F MUNDS PARK TI DESIGN TRAFFIC INTERCHANGE JUN 14 KHRC1
12303 LV1C 191 AP 367.0 H436001C H NAHATA' DZIIL ROAD - SANDERS TI RECONSTRUCT 3 BRIDGES AND RDWY TBD FY 10 SVSG1
SV1J 40 CN 182.0 H768901C F NAVAJO ARMY DEPOT, WB 1/ 2" MILL & 1/ 2" ACFC ON SHOULDER TBD FY 09
YH1G 87 MA 204.3 E NEW FOUR PEAKS RD TO DOS S RANCH RD CLIMBING LANE AND SHOULDER WIDENING TBD FY 10
41410 SZ1J 888 MA 0.0 H752501C E NOISE MITIGATION ON THE MAG REGIONAL FREEWAY SYSTEM ENHANCEMENT - OTHER ENHANCEMEN TBD FY 10
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
1ST SORT: PROJECT NAME Page 6 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
10007 EX1F 60 PN 230.0 060- D G OAK FLAT - DEVIL'S CANYON CONSTRCT PASSING/ CLIMBING LANE TBD FY 09 TBA
PZ1G 0000 YU YYU SB41501C BR - YYU- 0( 031) A Y OLD US 80 @ RED TOP WASH BRIDGE REPLACEMENT FY 09
BC1J 0000 MA 0.0 SB42801C BR - MMA- 0( 202) A E OLD US 80 BRIDGE BRIDGE REHABILITATION FY 10
CH1G 70 GI 256.0 H645301C G OLD WINKELMAN HIGHWAY AND BIA ROUTE 6 INTERSECTION IMPROVEMENTS APR 09 HZJS1
XB1J 0000 MA PEO SS72801C CM - PEO- 0( 204) A E OLIVE AVENUE - UNDERPASS NEW RIVER TRAIL UNDERPASS CONSTRUCTION FY 11
10311 CY1J 77 PN 0.0 H739101C T ORACLE STATE PARK CONSTRUCT PARKING TBD FY 11
TDSP 89 CN 546.5 H475301C F PAGE REST AREA CONST REST AREA & VISITOR CNTR TBD FY 10
WV1J 0000 PM TUC SS73003D STP - TUC- 0( 226) A T PANTANO BOULEVARD DESIGN PAVEMENT RECONSTRUCTION FY 11
WU1J 0000 PM TUC SS73001C STP - TUC- 0( 226) A T PANTANO BOULEVARD PAVEMENT RECONSTRUCTION FY 11
10900 AR1B 10 PM 288.6 H239101C 10- 5-( 068) N S PANTANO RR UP/ CIENEGA CREEK SECTION CONSTRUCT STRUCTURE TBD FY 09
14410 DB1J 95 LA 128.9 H675701C Y PASSING LANES SOUTH OF BOUSE WASH CONSTRUCT PASSING LANES TBD FY 10
10411 AR1E 82 SC 0.0 H718201C T PATAGONIA LAKE STATE PARK CONSTRUCT ROAD TBD FY 11 HDSM1
VJ1J 0000 MA 0.0 SS71601C CM - PHX- 0( 224) A E PAVE DIRT ALLEYS VARIOUS LOCATIONS FY 10
XA1H 0000 MA 0.0 SS65301C OM - SUR- 0( 200) A E PAVE DIRT ROADS - SURPRISE PAVE DIRT ROADS FY 09
TU1J 0000 MA BKY SS70901C E PAVE DIRT SHOULDERS - VARIOUS LOCATIONS PAVE DIRT SHOULDERS FY 09
FG1H 40 MO 73.0 H682401C K PEACOCK WASH- SILVER SPRNGS ROAD TI- EB RR5" TL & 3" TL & 2" AC & ARFC FEB 09
NN1J 0000 MA BKY SS68501C CM - BKY- 0( 200) A E PEDESTRIAN IMPROVEMENTS - 7TH ST AND EASON AV PEDESTRIAN IMPROVEMENT PROJECT FY 09
FK1G 89 YV 283.0 H658301C STP - 089- A( 200) A P PEEPLES VALLEY YARD TO WILHOIT SPOT 3" RR & ARFC APR 09
PK1E 95 YU 63.0 H584101C Y PELIGRO - CLARKS PA ( 3" AC + FC) JUN 09
11407 PN1F 17 MA 208.9 017- A E PEORIA AVE TO GREENWAY RD DRAINAGE IMPROVEMENTS TBD FY 09 TBA
WT1J 0000 MA SUP SS72701C CM - SUP- 0( 207) X E PEORIA AVENUE FIBER OPTIC INTERCONNECTS FY 11
40913 CM1J 10 MA 122.0 H770901C E PERRYVILLE ROAD CONSTRUCT TI TBD FY 13
SM1J 180 NA 324.2 H767801C H PETRIFIED FOREST MINOR PAVEMENT PRESERVATION MAR 09
11209 EK1G 10 PM 232.4 T PINAL AIR PARK - MARANA, PH II CONST MAINLINE WIDENING 6 LN TBD FY 12
EY1H 87 GI 267.0 H683201C P PINE - RIM 3" RR & ARFC TBD FY 09
TR1J 0000 MA PHX SB43301C CM - PHX- 0( 221) B E PONTIS & VIRTIS BRIDGE MANAGEMENT SOFTWARE VARIOUS LOCATIONS FY 09
TZ1J 0000 MA CHN SS71101C CM - CHN- 0( 207) A E PRICE RD TO HAMILTON ST WESTERN CANAL- MULTI- USE PATH ( 1) FY 09
TY1J 0000 MA CHN SS71001C CM - CHN- 0( 206) A E PRICE ROAD TO HAMILTON STREET WESTERN CANAL - MULTI- USE PATH ( 2) FY 09
TX1J 0000 MA CHN SS70801C E PURCHASE TRAFFIC DETECTION CAMERAS VARIOUS LOCATIONS FY 09
10610 XG1G 70 GI 253.4 G RAILROAD OVERPASS TO JCT SR 77 CONSTRUCT NEW ROADWAY & RAILROAD STRU TBD FY 11
FQ1G 180 AP 347.0 H658701C G RANCH TO JCT 61 SYS PRES- RESTORE/ REHAB/ RESRFC APR 09
10213 EC1H 40 MO 56.5 K RATTLESNAKE WASH TI CONSTRUCT NEW TI TBD FY 13 TBA
NT1J 0000 MA MMA SS68701C CM - MMA- 0( 206) A E REACT IN GLENDALE, PEORIA, AND SCOTTSDALE INCIDENT MANAGEMENT PARTNERSHIP FY 09
FP1G 160 AP 452.0 H658601C H RED MESA TO TEEC NOS POS 3" AC & ARFC JAN 10
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
1ST SORT: PROJECT NAME Page 7 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
15208 NSSP 89A YV 0.0 F RED ROCK STATE PARK DESIGN DESIGN FY 09
FI1G 86 PM 145.0 H658101C T RESERVATION BOUNDRY TO BRAWLY WASH 3" AC & SC ( POLY) AUG 09
KQ1H 0000 MA QCR STP - QCR- 0( 001) A E RIGGS RD, ELLSWORTH TO MERIDIAN CONSTRUCT NEW RDWAY FY 09
QD1J 0000 MA 0.0 SS70101C CM - MMA-( 209) A E RIO VERDE DRIVE PAVE SHOULDERS FY 09
10212 CU1J 17 YV 232.0 P ROCK SPRINGS TO CORDES JUNCTION WIDEN ROADWAY TBD FY 12
UC1J 17 CN 316.5 F ROCKY PARK- MCCONNELL SYSTEM PRESERVATION - ENGINEERING TBD FY 09
41411 UG1H 202L MA 0.0 E RURAL RD TO SR 101L DESIGN GPL DESIGN FY 11 TBD
EM1G 10 PM 253.0 H624101C T RUTHRAUFF RD - PRINCE RD CONSTRUCT MAINLINE WIDENING TO 8 LANES TBD FY 11 ENBS2
FJ1G 87 PN 131.0 H658201C T S COOLIDGE CL TO JCT 287 RR 2.5" ARAC FEB 09
TT1J 0000 PM PPM SS71301C CM - PPM- 0( 210) A T SAFETY AND EDUCATION PROGRAM VARIOUS LOCATIONS FY 09
NH1G 0000 GH GGH SH27701C STP- GGH- 0( 006) A S SAFFORD- BRYCE RD & SAFFORD LANDFILL ROAD PETERSON WASH CULVERT EXTENSION FY 09
XM1H 0000 MA FTH SS65901C CM - FTH- 0( 201) A E SAGUARO BOULEVARD PAVE DIRT ALLEYS FY 09
XF1H 19 PM 47.0 H722201C STP - 019- A-( AUP) T SAHUARITA TI CONSTRUCT NEW TI TBD FY 09
HB1G 70 GH 271.0 H661401C 070- A- 308 G SAN CARLOS RIVER BRIDGE # 2910 BRIDGE REPLACEMENT TBD FY 10
CU1H 191 GE 163.0 S SAN FRANCISCO RIVER BR # 563 BRIDGE REPLACEMENT AUG 09
MF1J 82 CH 61.2 H749701C S SAN PEDRO RIVER BR ( STR # 403) SCOUR RETROFIT FEB 09
11609 ES1G 86 PM 137.1 T SAN PEDRO ROAD SEGMENT WIDEN ROADWAY TO 40' TBD FY 10
23701 ZY1D 40 AP 340.0 H552601C 040- E( 001) H SANDERS PORT OF ENTRY RECONSTRUCT POE TBD FY 11 TBA
PS1J 86 PM 171.0 H755601C T SANTA CRUZ RIVER BRIDGE # 528 DECK REPLACEMENT JAN 09
UW1J 86 PM 128.5 T SANTA ROSA RANCH SEGMENT DESIGN ROADWAY WIDENING DESIGN FY 10
43409 TO1H 10 MA 126.0 H729601C E SARIVAL AVE TO DYSART RD CONSTRUCT GPL ( CITY ADVANCEMENT) OUTSID MAR 09 TBD
43711 TF1J 10 MA 125.0 E SARIVAL AVENUE TO DYSART ROAD CONSTRUCT LANDSCAPE TBD FY 11
11410 HC1H 93 MO 104.1 H738901C K SB RANCH ROAD CONSTRUCT PARALLEL ROADWAY TBD FY 11 MBAP1
QH1J 19 SC 1.6 H732901C T SB- 19 AND SPRR OP BRIDGE # 980 BRIDGE REPAIR TBD FY 09
NV1H 0000 MA 0.0 SS57701C CM - SCT- 0( 015) X E SCOTTSDALE ROAD CONSTRUCT ITS PROJECT FY 10
VB1H 0000 MA FTH SS64601C STP - FTH- 0( 200) A E SHEA BLVD ROADWAY WIDENING FY 09
XB1H 0000 MA 0.0 SS45102C CM - FTH- 0( 000) A E SHEA BOULEVARD CONSTRUCT BIKE LANE FY 09
10612 QP1C 60 NA 342.0 G SHOW LOW TO LITTLE MORMON LAKE WIDEN ROADWAY TBD FY 12
12910 GS1H 60 PN 222.3 G SILVER KING SECTION RECONSTRUCT ROADWAY TBD FY 11
WD1H 0000 MA PEO SS64301C CM - PEO- 0( 200) A E SKUNK CREEK- 75TH AVE TO NEW RIVER CONSTRUCT MULTI- USE PATH FY 09
13509 TZ1H 89A CN ASP F SLIDE ROCK STATE PARK DESIGN ( ADD'L PRRKING ) DESIGN FY 09
20806 WW1G 85 MA 152 H595514C E SOUTHERN AVE TO I- 10 CONSTRUCT ROADWAY TBD FY 09
SN1H 0000 MA GLN SS62301C CM - GLN- 0( 035) A E SPORTS FACILITIES FIBER OPTIC FIBER OPTIC CABLE INSTALLATION FY 09
MU1H 101L MA 47.0 E SR 101 AT CHAPARRAL ROAD ADD LEFT LANES AT TI TBD FY 10
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
1ST SORT: PROJECT NAME Page 8 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
40310 GP1H 60 MA 148.9 E SR 101L ( AGUA FRIA) - MCDOWELL RD WIDEN ROADWAY TBD FY 10
40008 GH1H 10 MA 133.0 H715501C E SR 101L ( AGUA FRIA) TO I- 17 CONSTRUCT GENERAL PURPOSE LANES TBD FY 10
UU1J 101L MA 59.5 E SR 101L ( PRICE FREEWAY) @ GALVESTON SRP DRAINAGE INPROVEMENTS ASSOCIATED WI TBD FY 09
43509 SR1H 17 MA 215.0 E SR 101L TO CAREFREE HWY ( SR 74) CONSTRUCT LANDSCAPE TBD FY 10
41409 DI1J 202L MA 10.0 H749001C E SR 101L TO GILBERT ROAD CONSTRUCT FMS TBD FY 09
FC1J 143 MA 0.0 H752801C E SR 143 / SKY HARBOR BLVD TI TRAFFIC INTERCHANGE IMPROVEMENTS TBD FY 10
VD1J 143 MA 3.8 HX21001C E SR 143, 48TH STREET - MCDOWELL RD SIGN REPLACEMENT TBD FY 09
KD1H 177 PN 163.0 H692101C HES - 177- A( 003) A G SR 177, MP 163.80- 164.40 CURVE RE- ALIGNMENT NOV 09
12407 FX1C 10 MA 161.2 H505101C E SR 202L ( SANTAN) TO RIGGS ROAD CONST HOV & GEN PURPOSE LANE TBD FY 10 PALL1
CK1J 260 NA 353.1 HX21501C G SR 260 @ JCT WOODLAND LAKE ROAD TRAFFIC SIGNAL CONSTRUCTION TBD FY 09
ZL1H 260 AP 385.0 H726101C G SR 260 FROM GREER TO RODEO GROUNDS 3" RR & ARFC APR 09
OV1F 260 NA 350.0 H621401C TEA - 260- C( 003) A G SR 260 PORTER MTN RD - WOODLAND RD LANDSCAPING, IRRIGATION & PEDESTRIAN LIGH TBD FY 09 TBA
DG1J 273 AP 380.0 G SR 273, BETWEEN MPS 377.46 AND 381.46 SYSTEM ENHANCEMENT - ENGINEERING MAR 10
40309 GO1H 60 MA 138.0 H686601C 060- B( 201) E SR 303L TO 99TH AVE WIDEN ROADWAY AUG 09
EO1H 66 MO 61.0 H675201C K SR 66 @ MOHAVE AIRPORT INTERSECTION IMPROVEMENT TBD FY 09
14409 GE1J 69 YV 288.3 H741001C 069- 4 P SR 69 GLASSFORD HILL PRESCOTT EAST HIGHWAY ROADWAY WIDENING JAN 09
OJ1J 77 NA 374.0 H753201C H SR 77 @ MP 374.38 AND MP 383.50 SYSTEM ENHANCEMENT - ENGINEERING MAR 09
JD1H 79 PN 126.0 H690601C T SR 79 ORACLE JCT - FLORENCE HWY EXTEND RCB CULVERTS MAR 09 HDRB1
EE1F 82 SC 38.0 H598701C T SR 82, MP 38 - 39.5 SLOPE FLATTENING TBD FY 12 RSKP1
40710 MC1G 85 MA 122.0 E SR 85, HAZEN RD - BROADWAY RD ( MAIN LINE) RECONSTRUCT & WIDEN TBD FY 10
PY1H 86 PM 166.8 HX19601C T SR 86 AT CAMINO DE OESTE INSTALL TRAFFIC SIGNAL & MINOR INT IMPROVE TBD FY 09
IH1J 89A YV 373.1 F SR 89A JCT AIRPORT ROAD INTERSECTION IMPROVEMENT JUN 09
10106 CN1G 10 CH 300.2 H650401C NH - 010- E( 200) N S SR 90 TI RECONSTRUCT SR 90 TI AND ADD PASSING LAN TBD FY 10 URJR1
OX1H 90 CH 321.1 H740401C S SR 90 @ MP 321.11 TO MP 321.42 MINOR PAVEMENT PRESERVATION FEB 09
SR1J 90 CH 321.5 H769201C S SR 90 @ MP 321.58 TO MP 321.91 MINOR PAVEMENT PRESERVATION FEB 09
JJ1G 95 LA 156.6 H638001C Y SR 95, HOLIDAY HARBOUR DRAINAGE STUDY TBD FY 10 PBGS1
UD1J 17 YV 279.6 P SR169 - ROCKY PARK SYSTEM PRESERVATION - ENGINEERING TBD FY 10
13609 AM1J 101L MA 30.0 H769901C E SR51 TO PRINCESS DRIVE DESIGN AND CONSTRUCT FMS TBD FY 09
JL1G 72 LA 13.1 Y SR- 72 MP 13.1 - 17.0 SHOULDERS & SLOPES MAY 09
44209 XW1H 17 MA 224.0 H688101C E SR74- ANTHEM WAY CONSTRUCT GENERAL PURPOSE LANE ( STAN A OCT 08
QY1J 74 MA 24.1 HX22401C E SR74 TRAFFIC SIGNAL DESIGN TRAFFIC SIGNAL MAR 09 TRDC1
UP1F 86 PM 74.0 H630201C T SR- 86, MP 73.99 - 77.69 SYMMETRICAL WIDENING MAR 09
EE1E 89 YV 288 089- A- 201 P SR- 89 @ KIRKLAND JCT / WAGNER RD CST RT & LT TURN LNS, SHOULDER TBD FY 10 DVJB1
JK1G 95 LA 131.7 Y SR- 95 @ MP 131.7 - 142.7 SHOULDER IMPROVEMENTS MAY 09
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
1ST SORT: PROJECT NAME Page 9 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
ZY1B 89 YV 313.8 029- 1 P SUNDOG RD BRIDGE ( OLD BLK CYN HWY TURNBACK OWNERSHIP & MAINTENANCE ( IGA R IGA FY 10
CV1G 191 CH 48.3 H650901C S SUNSITES @ HIGH STREET WIDEN ROADWAY FOR TURN LANES DEC 08 HERW1
10313 TD1J 60 PN 212.0 G SUPERIOR STREETS RECONSTRUCT TO 4 LANE RDWY W/ CNT TURN L TBD FY 13
14110 AY1G 77 PM 82.0 077- A T TANGERINE ROAD - PINAL COUNTY LINE WIDENING TO 6 LANES TBD FY 12 TBA
QL1H 40 NA 278.0 H TANNER WASH BRIDGE WB # 459 BRIDGE REPLACEMENT DEC 09
LJ1J 160 AP 465.1 H730903C H TEEC NOS POS PORT OF ENTRY SYSTEM ENHANCEMENT - OTHER ENHANCEMEN FEB 09
ES1H 89 CN 495.0 H682701C F THE GAP - CEDAR RIDGE TP SHOULDER WIDENING JUL 09
FD1G 60 GI 278.0 H657401C G TIMBER MT TO SENECA RR 3" & ARFC FEB 09
13309 WS1H 80 CH 316.0 H718101C S TOMBSTONE COURTHOUSE STATE PARK CONSTRUCT PARKING TBD FY 10 HDSM1
KS1H 80 CH 318.0 S TOMBSTONE TO JUNCTION SR 90 EXTEND CULVERTS TBD FY 12 PSMR1
VK1J 0000 GI 0.0 SS71803D HPP - GGI- 0( 204) A G TONTO CREEK BRIDGE DESIGN BRIDGE APPROACHES FY 10
13409 TQ1H 87 GI 263.0 H718301C P TONTO NATURAL BRIDGE CONSTRUCT NEW ROAD TBD FY 10 CBJO1
ER1H 89 CN 420.0 H682601C F TOWNSEND - FERNWOOD RR 4" & ARFC DEC 09
OI1J 19 PM 0.0 H750101C T TUCSON TO INTERNATIONAL BORDER SIGN REHAB - REPLACE PANELS OR SIGNS IGA FY 09
JS1H 64 CN 235.0 H692701C F TUSAYAN STREETS WIDEN ROADWAY - SAFTEY IMPROVEMENTS TBD FY 10
DU1H 160 CN 320.0 H669501C 160- A( 003) A F US 160 @ SR 264 LIGHTING MAY 09
UL1H 160 CN 349.0 F US 160 TURN LANES AT NAVAJO ROUTE CONSTRUCT TURN LANES JUN 09 PLCH1
OI1H 163 NA 395.3 HX19101C H US 163 AT KAYENTA SCHOOL TRAFFIC SIGNAL INSTALLATION MAY 09
KA1G 191 AP 446.0 HX12001C H US 191 AT IR 102 CNST TRAFFIC SIGNAL TBD FY 10
41313 DK1J 303L MA 0.0 E US 60 ( GRAND AVE) TO I- 17 CONSTRUCT ROADWAY TBD FY 13
40610 GT1H 74 MA 13.0 P US 60 - 303L, MP 13 - MP 15 ( EB) CONSTRUCT PASSING LANE TBD FY 10
BL1J 60 PN 228.4 HX20701C 060- D( 202) A G US 60 @ MP 228, QUEEN CREEK TUNNEL SYSTEM ENHANCEMENT - SAFETY IMPROVEMEN TBD FY 09
NP1J 60 PN 204.3 HX22301C E US 60 AT PERALTA ROAD ( TRAFFIC SIGNAL) INSTALL TRAFFIC SIGNAL IGA FY 09
HB1J 60 LA 45.8 H733501C Y US 60 AT VICKSBURG ROAD INTERSECTION IMPROVEMENT JUL 09
40608 GU1H 74 MA 20.0 H691201C P US 60 TO SR 303L, MP 20 TO MP 22 ( EB & WB) CONSTRUCT PASSING LANES FEB 09
IG1J 60 GI 243.0 H743601C G US 60, MIAMI CITY LIMITS TO MCMILLAN WASH PAVEMENT PRESERVATION MAR 09
DX1H 70 GH 338.0 H680801C S US 70 & 8TH AVENUE INTERSECTION INTERSECTION IMPROVEMENTS TBD FY 09
XL1G 70 GH 331 070- A- 310 S US 70 PIMA TO THATCHER DESIGN SLOPE FLATTING TBD FY 10 EEJM1
GK1J 95 LA 82.0 H752601C Y US 95 @ 82 & 89 INTERSECTION IMROVEMENTS TBD FY 10
11207 QK1C 19 PM 58.7 H510501C T VALENCIA RD TO AJO WAY WIDEN ROADWAY TBD FY 13 TBA
11508 AZ1G 86 PM 159.5 H680601C STP - 086- A T VALENCIA ROAD - KINNEY ROAD CONSTRUCT ROADWAY WIDENING TO 4 LANES TBD FY 10 TBA
11512 CR1J 10 PM 267.1 T VALENCIA ROAD TI CONSTRUCT TRAFFIC INTERCHANGE DESIGN FY 12
NU1H 0000 MA GDY SS56001C GDY- 0- 417 E VAN BUREN @ BULLARD WASH BRIDGE APPROACHES FY 09
QA1J 0000 MA 0.0 SS68601C CM - CUK- 0( 200) A E VARIOUS LOCATIONS PAVE DIRT ROADS FY 09
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
1ST SORT: PROJECT NAME Page 10 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
HO1G 999 MA 0.0 H662101C 999- A( 023) E VARIOUS ROUTES, MARICOPA COUNTY BRKWY CABLE TERMINAL TBD FY 09
44109 XV1H 10 MA 119.0 H721101C E VERRADO WAY TO SARIVAL AVE CONSTRUCT GENERAL PURPOSE LANE ( STAN A OCT 08
10506 EM1E 40 CN 205.0 H545701C F WALNUT CANYON ( WB) RECONSTRUCT ROADWAY ( REPROFILE VERTICA TBD FY 11 KHRC1
DP1G 95 YU 38.0 095- B- 308 Y WELLTON MOHAWK CANAL BRIDGE # 343 BRIDGE REHAB TBD FY 10
VL1J 0000 MA 0.0 SS72001C CM - SUR- 0( 206) A E WEST OF 219TH AVENUE PAVE DIRT ROADS FY 10
MN1J 89 CN 371.0 F WEST SEDONA ( NB & SB) R & R 2.5" AC & FR JAN 11
TW1J 0000 MA CHN SS70701C CM - CHN- 0( 204) A E WESTERN CANAL @ ALMA SCHOOL & DOBSON PEDESTRIAN SIGNAL - TRANSPORTATION IMPRO FY 09
FF1G 73 NA 342.0 G WHITERIVER TO COAL MINE CANYON 2" AC & ARFC TBD FY 11
GI1F 191 AP 390.0 H602501C 191- E- 505 H WIDE RUINS WIDENING FOR PASSING/ CLIMBING LANES, SAFE TBD FY 10 WERS1
FJ1J 40 MO 85.9 H733001C K WILLOW CREEK BRIDGE, WB # 1769 DECK REHABILITATION TBD FY 09
11313 CS1J 10 PM 269.4 T WILMOT ROAD TI UPGRADE EXISTING TRAFFIC INTERCHANGE TBD FY 13
OQ1J 177 GI 136.3 H752301C G WINKELMAN 3" MILL AND REPLACE TBD FY 09
18606 MU1F 17 YV 299.0 H613601C F YAVAPAI COUNTY - JCT SR 179 ( SB) RR ( 4" TL, 3" PL) + RR ARFC FEB 09
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
2ND SORT: FEDERAL ID # Page 1 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
KA1G 191 AP 446.0 HX12001C H US 191 AT IR 102 CNST TRAFFIC SIGNAL TBD FY 10
LP1J 83 SC 31.6 H747001C T JCT SR 82 ( MP 31.6) TO MP 43.5 HIP RECYCLE + CHIP SEAL COAT DEC 08
IN1J 10 MA 144.0 H725601C M 3RD AVENUE - 3RD STREET FIRE DETECTION SYSTEM RETROFIT FEB 09
JD1H 79 PN 126.0 H690601C T SR 79 ORACLE JCT - FLORENCE HWY EXTEND RCB CULVERTS MAR 09 HDRB1
JJ1G 95 LA 156.6 H638001C Y SR 95, HOLIDAY HARBOUR DRAINAGE STUDY TBD FY 10 PBGS1
JK1G 95 LA 131.7 Y SR- 95 @ MP 131.7 - 142.7 SHOULDER IMPROVEMENTS MAY 09
IG1J 60 GI 243.0 H743601C G US 60, MIAMI CITY LIMITS TO MCMILLAN WASH PAVEMENT PRESERVATION MAR 09
JS1H 64 CN 235.0 H692701C F TUSAYAN STREETS WIDEN ROADWAY - SAFTEY IMPROVEMENTS TBD FY 10
13408 HY1G 10 PM 288.4 H747301C T CIENEGA CREEK- MARSH STATION PHASE III REMOVE RAIL & BRIDGE, CONST ML TBD FY 09
KO1H 40 MO 11.0 K CHEMEHUEVI & BOULDER WASH BRIDGES SCOUR RETROFIT JAN 10
14810 KP1H 40 AP 316.0 H692401C H DEAD RIVER BRIDGE EB ( STR # 565) SCOUR RETROFIT FEB 09
KS1H 80 CH 318.0 S TOMBSTONE TO JUNCTION SR 90 EXTEND CULVERTS TBD FY 12 PSMR1
10312 LE1G 93 MO 101.8 K ANTELOPE WASH CONSTRUCT 4- LANE DIVIDED HIGHWAY TBD FY 12
LJ1J 160 AP 465.1 H730903C H TEEC NOS POS PORT OF ENTRY SYSTEM ENHANCEMENT - OTHER ENHANCEMEN FEB 09
QY1C 86 PM 141.1 H713701C T MP 141.1 TO RESERVATION BOUNDARY CONSTRUCT ROADWAY WIDENING TBD FY 09 TBA
JL1G 72 LA 13.1 Y SR- 72 MP 13.1 - 17.0 SHOULDERS & SLOPES MAY 09
40608 GU1H 74 MA 20.0 H691201C P US 60 TO SR 303L, MP 20 TO MP 22 ( EB & WB) CONSTRUCT PASSING LANES FEB 09
40008 GH1H 10 MA 133.0 H715501C E SR 101L ( AGUA FRIA) TO I- 17 CONSTRUCT GENERAL PURPOSE LANES TBD FY 10
43010 GK1H 17 MA 204.9 E BETHANY HOME RD TO NORTHERN AVE DESIGN/ CONSTRUCT PEDESTRIAN WALKWAY AL TBD FY 10
GK1J 95 LA 82.0 H752601C Y US 95 @ 82 & 89 INTERSECTION IMROVEMENTS TBD FY 10
21008 GL1J 191 AP 448.0 H748601C H CHINLE - MANY FARMS ( PH I) REMOVE & REPLACE FENCING, CATTLE GUARDS TBD FY 09
40310 GP1H 60 MA 148.9 E SR 101L ( AGUA FRIA) - MCDOWELL RD WIDEN ROADWAY TBD FY 10
IH1J 89A YV 373.1 F SR 89A JCT AIRPORT ROAD INTERSECTION IMPROVEMENT JUN 09
40610 GT1H 74 MA 13.0 P US 60 - 303L, MP 13 - MP 15 ( EB) CONSTRUCT PASSING LANE TBD FY 10
12303 LV1C 191 AP 367.0 H436001C H NAHATA' DZIIL ROAD - SANDERS TI RECONSTRUCT 3 BRIDGES AND RDWY TBD FY 10 SVSG1
22706 GV1H 80 CH 364.0 S DOUGLAS STRTGC INSPECTION STATION INSTALL VOICE & DATA LINES IGA FY 10
13910 GY1H 86 PM 132.8 T KITT PK ROAD SEGMENT ROADWAY WIDENING TBD FY 10
HB1J 60 LA 45.8 H733501C Y US 60 AT VICKSBURG ROAD INTERSECTION IMPROVEMENT JUL 09
11410 HC1H 93 MO 104.1 H738901C K SB RANCH ROAD CONSTRUCT PARALLEL ROADWAY TBD FY 11 MBAP1
12510 HI1H 260 NA 317.2 H770501C G HEBER - SHOW LOW EB & WB CONSTRUCT PASSING LANES TBD FY 11
14607 HX1G 10 PM 288.4 T CIENEGA CREEK- MARSH STATION PHASE II NEW RAILROAD TRACKS TBD FY 09
12910 GS1H 60 PN 222.3 G SILVER KING SECTION RECONSTRUCT ROADWAY TBD FY 11
13607 QG1F 85 MA 120.5 Y MP 120.54 - MP 122.99 CONSTRUCT ROADWAY TBD FY 09 TBA
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
2ND SORT: FEDERAL ID # Page 2 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
LP1G 78 GE 169.0 H666901C S JAKE'S CORNER REALIGNMENT HIGHWAY REALIGNMENT MAR 09 AMJS1
PK1E 95 YU 63.0 H584101C Y PELIGRO - CLARKS PA ( 3" AC + FC) JUN 09
PS1J 86 PM 171.0 H755601C T SANTA CRUZ RIVER BRIDGE # 528 DECK REPLACEMENT JAN 09
PV1J 101L MA 36.0 H741401C E HAYDEN RD TO PRINCESS DR DRAINAGE IMPROVEMENTS TBD FY 09
PY1H 86 PM 166.8 HX19601C T SR 86 AT CAMINO DE OESTE INSTALL TRAFFIC SIGNAL & MINOR INT IMPROVE TBD FY 09
OV1J 999 SW 0.0 H755001C BRIDGES # 2190, # 1152, # 1219, # 745, # 517, # 821, # 93 COLLISION DAMAGE REPAIR TBD FY 09
QF1G 191 GE 153.0 S GUTHRIE BRIDGE # 352 DEMOLITION PA FOR BRIDGE DEMOLITION TBD FY 10 HDKA1
OS1J 40 CN 177.0 H751401C F MP 177- 182 ( EB& WB) SHOULDERS PAVEMENT PRESERVATION TBD FY 09
QH1J 19 SC 1.6 H732901C T SB- 19 AND SPRR OP BRIDGE # 980 BRIDGE REPAIR TBD FY 09
11207 QK1C 19 PM 58.7 H510501C T VALENCIA RD TO AJO WAY WIDEN ROADWAY TBD FY 13 TBA
QL1H 40 NA 278.0 H TANNER WASH BRIDGE WB # 459 BRIDGE REPLACEMENT DEC 09
QL1J 10 PM 247.0 T INA RD TO RUTHRAUFF RD DCR / EA AND 30% DESIGN DESIGN FY 09
10612 QP1C 60 NA 342.0 G SHOW LOW TO LITTLE MORMON LAKE WIDEN ROADWAY TBD FY 12
16006 QT1F 101L MA 53.5 E BALBOA DRIVE CONSTRUCT MULTI- USE PATH BRIDGE OVER TH IGA FY 12
QB1J 40 MO 39.0 H756801C K MP 39 - MP 121 MINOR PAVEMENT PRESERVATION FEB 09
NP1J 60 PN 204.3 HX22301C E US 60 AT PERALTA ROAD ( TRAFFIC SIGNAL) INSTALL TRAFFIC SIGNAL IGA FY 09
21301 LY1C 260 GI 258.0 P LION SPRINGS SECTION DESIGN ( ROADWAY) DESIGN FY 09
40710 MC1G 85 MA 122.0 E SR 85, HAZEN RD - BROADWAY RD ( MAIN LINE) RECONSTRUCT & WIDEN TBD FY 10
MD1J 89 YV 269.0 P MARTINEZ RIVER BRIDGE ( STR # 1320) SCOUR RETROFIT TBD FY 10
MF1J 82 CH 61.2 H749701C S SAN PEDRO RIVER BR ( STR # 403) SCOUR RETROFIT FEB 09
MN1J 89 CN 371.0 F WEST SEDONA ( NB & SB) R & R 2.5" AC & FR JAN 11
OX1H 90 CH 321.1 H740401C S SR 90 @ MP 321.11 TO MP 321.42 MINOR PAVEMENT PRESERVATION FEB 09
MU1H 101L MA 47.0 E SR 101 AT CHAPARRAL ROAD ADD LEFT LANES AT TI TBD FY 10
FP1G 160 AP 452.0 H658601C H RED MESA TO TEEC NOS POS 3" AC & ARFC JAN 10
15208 NSSP 89A YV 0.0 F RED ROCK STATE PARK DESIGN DESIGN FY 09
NW1J 89A YV 344.0 H733901C P JEROME RETAINING WALL REPLACE RETAINING WALL TBD FY 09
OI1H 163 NA 395.3 HX19101C H US 163 AT KAYENTA SCHOOL TRAFFIC SIGNAL INSTALLATION MAY 09
OI1J 19 PM 0.0 H750101C T TUCSON TO INTERNATIONAL BORDER SIGN REHAB - REPLACE PANELS OR SIGNS IGA FY 09
OJ1J 77 NA 374.0 H753201C H SR 77 @ MP 374.38 AND MP 383.50 SYSTEM ENHANCEMENT - ENGINEERING MAR 09
OQ1J 177 GI 136.3 H752301C G WINKELMAN 3" MILL AND REPLACE TBD FY 09
18606 MU1F 17 YV 299.0 H613601C F YAVAPAI COUNTY - JCT SR 179 ( SB) RR ( 4" TL, 3" PL) + RR ARFC FEB 09
40612 CX1J 60 MA 194.0 E MERIDIAN ROAD CONSTRUCT TI TBD FY 13
GG1J 66 MO 57.3 K AIRWAY AVENUE & MOHAVE AIRPORT DRIVE INTERSE CONCRETE MEDIAN & ASPHALT PAVING MAR 09
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
2ND SORT: FEDERAL ID # Page 3 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
40112 CT1J 17 MA 209.0 E ARIZONA CANAL TO SR 101L CONSTRUCT GPL TBD FY 13
CU1H 191 GE 163.0 S SAN FRANCISCO RIVER BR # 563 BRIDGE REPLACEMENT AUG 09
10212 CU1J 17 YV 232.0 P ROCK SPRINGS TO CORDES JUNCTION WIDEN ROADWAY TBD FY 12
CV1G 191 CH 48.3 H650901C S SUNSITES @ HIGH STREET WIDEN ROADWAY FOR TURN LANES DEC 08 HERW1
11512 CR1J 10 PM 267.1 T VALENCIA ROAD TI CONSTRUCT TRAFFIC INTERCHANGE DESIGN FY 12
10211 CW1J 60 LA 0.0 H739001C P ALAMO LAKE STATE PARK CONSTRUCT PARKING TBD FY 11 PBBF1
11312 CQ1J 10 PM 264.0 T COUNTRY CLUB ROAD TI CONSTRUCT NEW TRAFFIC INTERCHANGE DESIGN FY 13
10311 CY1J 77 PN 0.0 H739101C T ORACLE STATE PARK CONSTRUCT PARKING TBD FY 11
10512 CZ1J 89 YV 317.5 P JCT 89A TO MP 324 WIDEN THE SR 89 CORRIDOR TBD FY 12
10412 DA1J 89 CN 464.5 F CAMERON SECTION CONSTRUCT 4- LANE URBAN, SR 64 INTERSECTI TBD FY 12
14410 DB1J 95 LA 128.9 H675701C Y PASSING LANES SOUTH OF BOUSE WASH CONSTRUCT PASSING LANES TBD FY 10
40313 DD1J 101L MA 23.5 E I- 17 TO TATUM BLVD CONSTRUCT HOV LANE DESIGN FY 13
14610 DE1J 177 GI 0.0 G CLIMBING PARK DESIGN DESIGN FY 10
40611 CV1J 51 MA 13.6 E BELL ROAD - SR 101L DESIGN FMS DESIGN FY 11
CH1G 70 GI 256.0 H645301C G OLD WINKELMAN HIGHWAY AND BIA ROUTE 6 INTERSECTION IMPROVEMENTS APR 09 HZJS1
13209 A6SP 87 NA 346.0 H717901C H HOMOLOVI RUINS STATE PARK CONSTRUCT ROAD TBD FY 10 CBJO1
13609 AM1J 101L MA 30.0 H769901C E SR51 TO PRINCESS DRIVE DESIGN AND CONSTRUCT FMS TBD FY 09
10411 AR1E 82 SC 0.0 H718201C T PATAGONIA LAKE STATE PARK CONSTRUCT ROAD TBD FY 11 HDSM1
13410 BB1G 10 PM 246.5 T CORTARO ROAD TI CONSTRUCT NEW TI TBD FY 10 TBA
BW1J 40 MO 47.0 H752901C K HOLY MOSES WASH - RATTLESNAKE WASH RR( 5" TL, 3" PL)& AR ACFC & RR AR ACFC APR 09
11313 CS1J 10 PM 269.4 T WILMOT ROAD TI UPGRADE EXISTING TRAFFIC INTERCHANGE TBD FY 13
CG1J 19 PM 45.8 HX21301C T I- 19 AND SAHUARITA RD INSTALL NEW TRAFFIC SIGNAL IGA FY 09
10910 DJ1G 90 CH 323.5 S CENTRAL AVE TO MOSON RD, E OF SIERRA VISTA WIDEN TO 5 LANES TBD FY 11
CK1J 260 NA 353.1 HX21501C G SR 260 @ JCT WOODLAND LAKE ROAD TRAFFIC SIGNAL CONSTRUCTION TBD FY 09
10112 CL1J 10 PN 0.0 T GILA RIVER INDIAN TRIBAL BOUNDARY TO I- 8 WIDEN ROADWAY TBD FY 12
40913 CM1J 10 MA 122.0 H770901C E PERRYVILLE ROAD CONSTRUCT TI TBD FY 13
14510 CN1J 10 PN 199.1 T JCT I 8 TO PICACHO PEAK TI WIDEN ROADWAY TBD FY 10
11112 CO1J 10 PM 236.4 T MARANA ROAD TO INA ROAD RECONSTRUCT & WIDEN FRONTAGE ROADS TBD FY 12
11212 CP1J 10 PM 262.5 T KINO TI DESIGN TRAFFIC INTERCHANGE DESIGN FY 12
CF1J 79 PN 124.2 H731001C T MP 124 TO MP 126 SYSTEM ENHANCEMENT - ENGINEERING TBD FY 09 HDRB1
FG1H 40 MO 73.0 H682401C K PEACOCK WASH- SILVER SPRNGS ROAD TI- EB RR5" TL & 3" TL & 2" AC & ARFC FEB 09
EY1H 87 GI 267.0 H683201C P PINE - RIM 3" RR & ARFC TBD FY 09
FC1J 143 MA 0.0 H752801C E SR 143 / SKY HARBOR BLVD TI TRAFFIC INTERCHANGE IMPROVEMENTS TBD FY 10
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
2ND SORT: FEDERAL ID # Page 4 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
FD1G 60 GI 278.0 H657401C G TIMBER MT TO SENECA RR 3" & ARFC FEB 09
FD1H 8 MA 114.0 H682901C Y GILA BEND - 121.0 RR 2" PL/ 5" TL & ARFC JAN 10
14002 FF1C 191 CH 62.0 H416501C S COCHISE UPRR OP # 2530 BRIDGE REPLACEMENT. TBD FY 10
DG1J 273 AP 380.0 G SR 273, BETWEEN MPS 377.46 AND 381.46 SYSTEM ENHANCEMENT - ENGINEERING MAR 10
FG1G 78 GE 154.0 H657901C S JCT 191 TO FOREST SERVICE BOUNDARY CHIP SEAL AND GUARDRAIL EXTENSION APR 09
11609 ES1G 86 PM 137.1 T SAN PEDRO ROAD SEGMENT WIDEN ROADWAY TO 40' TBD FY 10
FI1G 86 PM 145.0 H658101C T RESERVATION BOUNDRY TO BRAWLY WASH 3" AC & SC ( POLY) AUG 09
FJ1G 87 PN 131.0 H658201C T S COOLIDGE CL TO JCT 287 RR 2.5" ARAC FEB 09
FJ1J 40 MO 85.9 H733001C K WILLOW CREEK BRIDGE, WB # 1769 DECK REHABILITATION TBD FY 09
45309 FN1H 10 MA 96.2 H708301X Y 395TH AVE ( BELMONT RD) CONSTRUCT TI TBD FY 09
FO1G 160 NA 402.0 H658501C H JCT N 59 TO DENNEHOTSO 3" COLD RECYCLE & ARFC DEC 09
OU1J 40 MO 9.8 H742001C K LAKE HAVASU TI UP # 1586 BRIDGE REHABILITATION TBD FY 09
FF1G 73 NA 342.0 G WHITERIVER TO COAL MINE CANYON 2" AC & ARFC TBD FY 11
11209 EK1G 10 PM 232.4 T PINAL AIR PARK - MARANA, PH II CONST MAINLINE WIDENING 6 LN TBD FY 12
FQ1G 180 AP 347.0 H658701C G RANCH TO JCT 61 SYS PRES- RESTORE/ REHAB/ RESRFC APR 09
43311 DJ1J 303L MA 0.0 E I- 10/ 303L TI, PHASE I ( I- 10 REALIGNMENT) CONSTRUCT TI TBD FY 11
41313 DK1J 303L MA 0.0 E US 60 ( GRAND AVE) TO I- 17 CONSTRUCT ROADWAY TBD FY 13
DX1H 70 GH 338.0 H680801C S US 70 & 8TH AVENUE INTERSECTION INTERSECTION IMPROVEMENTS TBD FY 09
12010 EB1E 191 AP 446 H543801C H CHINLE SOUTH ROADWAY WIDENING TBD FY 11
EB1H 260 NA 356.0 H681201C G MP 356- 357.6 INSTALL NEW R/ W FENCE TBD FY 09
EU1H 191 AP 375.0 H681901C H JCT I- 40 MP 385 3" AC & SC JAN 10
EE1F 82 SC 38.0 H598701C T SR 82, MP 38 - 39.5 SLOPE FLATTENING TBD FY 12 RSKP1
ES1H 89 CN 495.0 H682701C F THE GAP - CEDAR RIDGE TP SHOULDER WIDENING JUL 09
10506 EM1E 40 CN 205.0 H545701C F WALNUT CANYON ( WB) RECONSTRUCT ROADWAY ( REPROFILE VERTICA TBD FY 11 KHRC1
EM1G 10 PM 253.0 H624101C T RUTHRAUFF RD - PRINCE RD CONSTRUCT MAINLINE WIDENING TO 8 LANES TBD FY 11 ENBS2
EO1G 19 PM 34.0 T CANOA TI - CONTINENTAL TI CONST ROADWAY ( NB FRONTAGE RD) IGA FY 09
EO1H 66 MO 61.0 H675201C K SR 66 @ MOHAVE AIRPORT INTERSECTION IMPROVEMENT TBD FY 09
ER1H 89 CN 420.0 H682601C F TOWNSEND - FERNWOOD RR 4" & ARFC DEC 09
41409 DI1J 202L MA 10.0 H749001C E SR 101L TO GILBERT ROAD CONSTRUCT FMS TBD FY 09
10213 EC1H 40 MO 56.5 K RATTLESNAKE WASH TI CONSTRUCT NEW TI TBD FY 13 TBA
40711 TT1H 60 MA 0.0 E LINDSEY RD HALF INTERCHANGE DESIGN TI DESIGN FY 11
10413 TC1J 93 MO 116.0 K CARROW TO STEPHENS CONSTRUCT 4- LANE DIVIDED HIGHWAY TBD FY 13
UD1J 17 YV 279.6 P SR169 - ROCKY PARK SYSTEM PRESERVATION - ENGINEERING TBD FY 10
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
2ND SORT: FEDERAL ID # Page 5 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
40809 UD1H 202L MA 0.0 E I- 10 EAST/ SANTAN TI TO 51ST AVE DESIGN AND R/ W DESIGN FY 09 TBD
UC1J 17 CN 316.5 F ROCKY PARK- MCCONNELL SYSTEM PRESERVATION - ENGINEERING TBD FY 09
QY1J 74 MA 24.1 HX22401C E SR74 TRAFFIC SIGNAL DESIGN TRAFFIC SIGNAL MAR 09 TRDC1
41210 UA1H 202L MA 0.0 E 51ST AVE TO I- 10 WEST CONSTRUCT ROADWAY TBD FY 10 TBD
13509 TZ1H 89A CN ASP F SLIDE ROCK STATE PARK DESIGN ( ADD'L PRRKING ) DESIGN FY 09
TX1J 0000 MA CHN SS70801C E PURCHASE TRAFFIC DETECTION CAMERAS VARIOUS LOCATIONS FY 09
41611 TX1H 202L MA 0.0 E DOBSON ROAD TO I- 10 DESIGN FMS DESIGN FY 11
41711 TW1H 202L MA 0.0 E DOBSON ROAD TO I- 10 CONSTRUCT HOV/ RAMP TBD FY 13
41011 TV1H 101L MA 0.0 E I- 17 TO SR 51 DESIGN FMS DESIGN FY 11
40013 UF1H 202L MA 0.0 E I- 10 EAST/ SANTAN TI TO 51ST AVE CONSTRUCT ROADWAY TBD FY 13 TBD
40812 TU1H 101L MA 0.0 H707601C E BEARDSLEY RD / UNION HILLS DRIVE ( CITY ADVANCEM CONSTRUCT TI TBD FY 09
41411 UG1H 202L MA 0.0 E RURAL RD TO SR 101L DESIGN GPL DESIGN FY 11 TBD
40312 TS1H 17 MA 209.0 E ARIZONA CANAL - 101L CONSTRUCT FMS TBD FY 12
40511 TR1H 17 MA 215.0 E 101L- CAREFREE HIGHWAY DESIGN FMS DESIGN FY 11
13409 TQ1H 87 GI 263.0 H718301C P TONTO NATURAL BRIDGE CONSTRUCT NEW ROAD TBD FY 10 CBJO1
11113 TL1J 10 PM 236.4 T MARANA ROAD TO INA ROAD ( FRONTAGE ROADS) RECONSTRUCT & WIDEN FRONTAGE ROADS TO TBD FY 13
TK1J 999 MA 0.0 H770201C E BRIDGES # S 1772, 779, 1823, 2800, 517, 1335 COLLISION DAMAGE REPAIR IGA FY 09
TI1J 8 YU 66.0 H744601C Y I- 8, DATELAND TO GILA BEND REST AREA SIGN REHABILITATION IGA FY 09
43711 TF1J 10 MA 125.0 E SARIVAL AVENUE TO DYSART ROAD CONSTRUCT LANDSCAPE TBD FY 11
10113 TE1J 89A YV 319.0 P JCT 89A TO CHINO VALLEY ( S. CHINO LIMITS) - PH II CONSTRUCT ROADWAY WIDENING TBD FY 13
TDSP 89 CN 546.5 H475301C F PAGE REST AREA CONST REST AREA & VISITOR CNTR TBD FY 10
10313 TD1J 60 PN 212.0 G SUPERIOR STREETS RECONSTRUCT TO 4 LANE RDWY W/ CNT TURN L TBD FY 13
TD1H 191 GE 170.0 H710001C S LWR CORONADO TRAIL DRAINAGE IMPRV SYST ENHANCEMENT - ENGINEERING MAR 09
TU1J 0000 MA BKY SS70901C E PAVE DIRT SHOULDERS - VARIOUS LOCATIONS PAVE DIRT SHOULDERS FY 09
WB1H 264 AP 474.5 H712101C H BLACK CREEK BRIDGE ( STR # 624) SCOUR RETROFIT TBD FY 10
ZT1H 40 CN 224.5 F BABBITTS TANK WASH BRIDGE SYSTEM ENHANCEMENT - ENGINEERING DEC 09
ZL1H 260 AP 385.0 H726101C G SR 260 FROM GREER TO RODEO GROUNDS 3" RR & ARFC APR 09
ZK1F 191 GE 160.0 H643201C S BACK COUNTRY BYWAY ( NORTH INTER) SAFETY IMPROVEMENTS TBD FY 09
ZC1H 40 MO 14.9 H727201C K BUCK MOUNTIAN WASH EB # 378 DECK REHABILITATION TBD FY 09
YH1G 87 MA 204.3 E NEW FOUR PEAKS RD TO DOS S RANCH RD CLIMBING LANE AND SHOULDER WIDENING TBD FY 10
44209 XW1H 17 MA 224.0 H688101C E SR74- ANTHEM WAY CONSTRUCT GENERAL PURPOSE LANE ( STAN A OCT 08
44109 XV1H 10 MA 119.0 H721101C E VERRADO WAY TO SARIVAL AVE CONSTRUCT GENERAL PURPOSE LANE ( STAN A OCT 08
XT1H 180 AP 402.0 G JCT SR 260 / US 180 & RODEO GROUNDS INTERSECTIO REALIGN INTERSECTION TBD FY 10
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
2ND SORT: FEDERAL ID # Page 6 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
XQ1F 15 MO 9.0 F FARM ROAD TI CONSTRUCT NEW UNDERPASS TBD FY 11
10610 XG1G 70 GI 253.4 G RAILROAD OVERPASS TO JCT SR 77 CONSTRUCT NEW ROADWAY & RAILROAD STRU TBD FY 11
20806 WW1G 85 MA 152 H595514C E SOUTHERN AVE TO I- 10 CONSTRUCT ROADWAY TBD FY 09
41310 UE1H 202L MA 0.0 E I- 10 EAST/ SANTAN TI TO 51ST AVE DESIGN & R/ W DESIGN FY 10 TBD
WN1G 8 YU 6.0 Y BUSINESS 8 AND AVE 2 1/ 2 E DRAINAGE STUDY & IMPROVEMENT AUG 09
41211 UB1H 202L MA 0.0 E 51ST AVE TO I- 10 WEST CONSTRUCT ROADWAY TBD FY 11 TBD
VE1J 8 YU 19.0 H773901C Y LIGURTA TO DATELAND SIGN REHAB TBD FY 10
VD1J 143 MA 3.8 HX21001C E SR 143, 48TH STREET - MCDOWELL RD SIGN REPLACEMENT TBD FY 09
UW1J 86 PM 128.5 T SANTA ROSA RANCH SEGMENT DESIGN ROADWAY WIDENING DESIGN FY 10
UU1J 101L MA 59.5 E SR 101L ( PRICE FREEWAY) @ GALVESTON SRP DRAINAGE INPROVEMENTS ASSOCIATED WI TBD FY 09
UP1F 86 PM 74.0 H630201C T SR- 86, MP 73.99 - 77.69 SYMMETRICAL WIDENING MAR 09
UO1H 95 LA 161.7 H711501C K BILL WILLIAMS RIVER BRIDGE # 1272 FIRE DAMAGE REPAIR TBD FY 09
UM1J 93 MO 124.0 H763501C K 1 MILE SOUTH OF TOWN OF WIKIEUP; WEST OF ROAD SYSTEM PRESERVATION - RESTORATION/ REHAB IGA FY 09
UL1H 160 CN 349.0 F US 160 TURN LANES AT NAVAJO ROUTE CONSTRUCT TURN LANES JUN 09 PLCH1
40808 UK1H 202L MA 0.0 E 51ST AVE TO I- 10 WEST CONSTRUCT ROADWAY TBD FY 09 TBD
15708 UI1H 95 MO 0.0 K LAKE HAVASU STATE PARK DESIGN ( LAUNCH RAMPS) DESIGN FY 10 TBD
41612 UH1H 303L MA 0.0 E I- 10 TO US 60 ( GRAND AVE) CONSTRUCT NEW FREEWAY TBD FY 12 TBD
13309 WS1H 80 CH 316.0 H718101C S TOMBSTONE COURTHOUSE STATE PARK CONSTRUCT PARKING TBD FY 10 HDSM1
14601 RG1B 260 GI 263.1 H469901C P LITTLE GREEN VALLEY RECONSTRUCT ROADWAY TBD FY 09 AMRM1
11710 RJ1C 160 NA 375.2 H JCT SR 564 - TSEGI, PH I CONST DUAL PASSING LNS TBD FY 10
SL1J 40B NA 276.8 H767701C H JOSEPH CITY TRUCK STOP 3" MILL AND REPLACE MAR 09
RH1J 17 MA 229.0 H760401C E ANTHEM WAY - NEW RIVER ROAD PAVEMENT PRESERVATION NOV 08
SM1J 180 NA 324.2 H767801C H PETRIFIED FOREST MINOR PAVEMENT PRESERVATION MAR 09
43509 SR1H 17 MA 215.0 E SR 101L TO CAREFREE HWY ( SR 74) CONSTRUCT LANDSCAPE TBD FY 10
SR1J 90 CH 321.5 H769201C S SR 90 @ MP 321.58 TO MP 321.91 MINOR PAVEMENT PRESERVATION FEB 09
QZ1J 177 PN 139.2 H760301C G MP 139.16 @ AAR/ DOT # 742- 390- N CONCRETE RR CROSSING SURFACE & LED FLAS IGA FY 09
43208 ST1H 202L MA 0.0 E LINDSAY ROAD TO GILBERT ROAD DESIGN & CONST MULTI- USE PATH TBD FY 09
SV1J 40 CN 182.0 H768901C F NAVAJO ARMY DEPOT, WB 1/ 2" MILL & 1/ 2" ACFC ON SHOULDER TBD FY 09
SW1H 19 PM 39.0 H705001C T CONTINENTAL RD/ I- 19 BIKE & PED SYS ENHNCMENT- OTHR ENHANCEMNTS TBD FY 10 HDSR1
SY1H 10 PN 211.0 H710601C T I- 10 WIDENING SR87 TO PICACHO PEAK CAPACITY ADDITIONS- ENGINEERING TBD FY 10 PBDL1
41410 SZ1J 888 MA 0.0 H752501C E NOISE MITIGATION ON THE MAG REGIONAL FREEWAY SYSTEM ENHANCEMENT - OTHER ENHANCEMEN TBD FY 10
SX1J 10 PN 210.1 T I- 10 / SR 87 TI CAPACITY ADDITIONS - ENGINEERING TBD FY 10 PBDL1
TB1H 10 PN 199.0 H710401C T I- 8 TO SR 87 TI CAPACITY ADDITIONS - ENGINRING TBD FY 10 EECA1
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
2ND SORT: FEDERAL ID # Page 7 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
TA1H 40 CN 198.0 F BUTLER AVE TI SYSTEM ENHANCEMENT- ENGINEERING TBD FY 12 RBML1
43409 TO1H 10 MA 126.0 H729601C E SARIVAL AVE TO DYSART RD CONSTRUCT GPL ( CITY ADVANCEMENT) OUTSID MAR 09 TBD
12407 FX1C 10 MA 161.2 H505101C E SR 202L ( SANTAN) TO RIGGS ROAD CONST HOV & GEN PURPOSE LANE TBD FY 10 PALL1
46208 XP1G 87 MA 211.8 P MP 211.8 TO MP 213.0 REPAIR CUT SLOPES FOR EROSION CONTROL TBD FY 10
BV1G 0000 MA GIL SS54601C CM- GIL- 0( 014) A E EASTERN CANAL, BASELINE- GUADALUPE CONST MULTI USE PATH FY 09
23701 ZY1D 40 AP 340.0 H552601C 040- E( 001) H SANDERS PORT OF ENTRY RECONSTRUCT POE TBD FY 11 TBA
NY1E 0000 GI GGI SH27901C HES- GGI- 0( 006) A G JESSE HAYES ROAD ROADWAY IMPROVEMENTS FY 09
NH1G 0000 GH GGH SH27701C STP- GGH- 0( 006) A S SAFFORD- BRYCE RD & SAFFORD LANDFILL ROAD PETERSON WASH CULVERT EXTENSION FY 09
OG1H 8 MA 121.0 H701601C 008- B Y MP 121.00 - BIG HORN SYSTEM PRES - ENGINEERING APR 09
KF1H 8 PN 177.0 H692601C 008- B( 003) A T INTERSTATE I- 8 EB, I- 10 WB RAMP IMPROVEMENT MAY 09
10208 PJ1F 10 PM 248.0 010- D T INA ROAD TI RECONSTRUCT TI & MAINLINE TBD FY 10 TBA
14406 VB1E 10 PM 260.0 H640401C 010- E T I- 10 / I- 19 ( FMS, PHASE 2) EXTEND ITS SYSTEMS ALONG I- 10 & I- 19 TBD FY 09 TRMM1
20206 3WSP 10 PM 288.4 H239001C 010- E T CIENEGA CREEK - MARSH STATION PH1 RAILROAD GRADE & DRAIN MAR 09
11407 PN1F 17 MA 208.9 017- A E PEORIA AVE TO GREENWAY RD DRAINAGE IMPROVEMENTS TBD FY 09 TBA
10306 RE1E 17 CN 322.0 017- B F MUNDS PARK TI DESIGN TRAFFIC INTERCHANGE JUN 14 KHRC1
ZY1B 89 YV 313.8 029- 1 P SUNDOG RD BRIDGE ( OLD BLK CYN HWY TURNBACK OWNERSHIP & MAINTENANCE ( IGA R IGA FY 10
VO1H 40 MO 21.0 H721201C 040- A( 200) K MP 21 - WALNUT CREEK RR 5" TL & 3" PL & 2" AC ARFC JAN 09
40309 GO1H 60 MA 138.0 H686601C 060- B( 201) E SR 303L TO 99TH AVE WIDEN ROADWAY AUG 09
10007 EX1F 60 PN 230.0 060- D G OAK FLAT - DEVIL'S CANYON CONSTRCT PASSING/ CLIMBING LANE TBD FY 09 TBA
BL1J 60 PN 228.4 HX20701C 060- D( 202) A G US 60 @ MP 228, QUEEN CREEK TUNNEL SYSTEM ENHANCEMENT - SAFETY IMPROVEMEN TBD FY 09
14407 PRSP 60 PN 220.0 H684501C 060- D- 508 G BOYCE THOMPSON STATE PARK CONSTRUCT ROAD FEB 09 AMJC1
11510 AA1C 95 YU 32 063- 1 Y AVENUE 9E TO ABURDEEN ROAD RECONSTRUCT FORTUNA WASH BRIDGE & WID TBD FY 11
14409 GE1J 69 YV 288.3 H741001C 069- 4 P SR 69 GLASSFORD HILL PRESCOTT EAST HIGHWAY ROADWAY WIDENING JAN 09
HB1G 70 GH 271.0 H661401C 070- A- 308 G SAN CARLOS RIVER BRIDGE # 2910 BRIDGE REPLACEMENT TBD FY 10
XL1G 70 GH 331 070- A- 310 S US 70 PIMA TO THATCHER DESIGN SLOPE FLATTING TBD FY 10 EEJM1
14110 AY1G 77 PM 82.0 077- A T TANGERINE ROAD - PINAL COUNTY LINE WIDENING TO 6 LANES TBD FY 12 TBA
11308 EO1E 77 NA 364.0 H546001C 077- B H MP 364 TO 372 CONSTRUCT PASSING LANE TBD FY 10 TBA
UM1H 83 PM 44.0 H705701C 083- A( 200) A T MP 44.0 TO MP 45.5 SAFETY IMPRVMNTS / REALIGNMENT MAY 09
EE1E 89 YV 288 089- A- 201 P SR- 89 @ KIRKLAND JCT / WAGNER RD CST RT & LT TURN LNS, SHOULDER TBD FY 10 DVJB1
CM1G 89 YV 313.0 H648401C 089- B- 305 P GRANITE CREEK BRIDGE # 2869 BRIDGE REPLACEMENT TBD FY 09
DP1G 95 YU 38.0 095- B- 308 Y WELLTON MOHAWK CANAL BRIDGE # 343 BRIDGE REHAB TBD FY 10
13706 SI1E 101L MA 0.0 H726701C 101- A E I- 10 TO MC 85 ( 99TH AVE) WIDEN ROADWAY TBD FY 10 KHRC1
10900 AR1B 10 PM 288.6 H239101C 10- 5-( 068) N S PANTANO RR UP/ CIENEGA CREEK SECTION CONSTRUCT STRUCTURE TBD FY 09
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
2ND SORT: FEDERAL ID # Page 8 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
22802 UX1C 160 CN 311.5 H527401C 160- A-( 001) F JCT 89 - VAN'S TRADING POST 2" ARAC & ARFC & TURNLANES TBD FY 09
DU1H 160 CN 320.0 H669501C 160- A( 003) A F US 160 @ SR 264 LIGHTING MAY 09
AP1G 160 NA 389.5 H635601C 160- A( 200) A H KAYENTA - JCT IR 59 3" AC + ACFC DEC 08
13603 GM1C 17 YV 263.0 H426901C 17- 2( ) P CORDES JCT TI RECONSTRUCT TI TBD FY 09 HDJC1
11406 SK1E 191 GH 91.8 H503704C 191- B S DIAL WASH TO TEN RANCH ( SEG II) CONSTRUCT PARALLEL ROADWAY TBD FY 11 TBA
GI1F 191 AP 390.0 H602501C 191- E- 505 H WIDE RUINS WIDENING FOR PASSING/ CLIMBING LANES, SAFE TBD FY 10 WERS1
11902 RH1B 260 GI 269.0 H469801C 260- B P DOUBTFUL CANYON SECTION RECONSTRUCT ROADWAY & CONSTRUCTION W TBD FY 10 SVBW1
12405 IV1A 89A CN 399.0 H413401C 366- F AIRPORT ROAD TI ( JW POWELL BLVD) CONSTRUCT INTERSECTION IMPR TBD FY 11
HO1G 999 MA 0.0 H662101C 999- A( 023) E VARIOUS ROUTES, MARICOPA COUNTY BRKWY CABLE TERMINAL TBD FY 09
PB1F 40B YV 145.0 H621301C B40- C( 002) A K ASH FORK, 40B, 3RD ST TO 8TH ST SIDEWALK TBD FY 09 TBA
RN1H 40 AP 347.0 H706601C BR - 040- E( 202) A H BLACK CREEK BRIDGES EB, WB SFR( STR # 1134,1642,9 BRIDGE SCOUR RETROFIT JAN 09
NZ1E 0000 GI GGI SB40001C BR - GGI- 0( 005) A G ICE HOUSE CANYON WASH BR # 8193 BRIDGE REPLACEMENT FY 09
BC1J 0000 MA 0.0 SB42801C BR - MMA- 0( 202) A E OLD US 80 BRIDGE BRIDGE REHABILITATION FY 10
ZN1E 0000 PN PPN SB41001C BR - PPN- 0-( 169) G KELVIN BRIDGE - # 8441 BRIDGE REPLACEMENT FY 09
PZ1G 0000 YU YYU SB41501C BR - YYU- 0( 031) A Y OLD US 80 @ RED TOP WASH BRIDGE REPLACEMENT FY 09
28303 RO1F 80 CH 364.0 H624301C CBI - 080- A( 009) B S DGLS STGC WEIGHT & INSP STATION DSGN/ CST WEIGHT & INSP STATION MAR 09 MBFG1
VA1H 0000 MA AVN SS64501C CM - AVN- 0( 200) A E MCDOWELL RD PEDESTRIAN IMPROVEMENTS FY 09
NN1J 0000 MA BKY SS68501C CM - BKY- 0( 200) A E PEDESTRIAN IMPROVEMENTS - 7TH ST AND EASON AV PEDESTRIAN IMPROVEMENT PROJECT FY 09
TV1J 0000 MA CHN SS70601C CM - CHN- 0( 203) A E COMMONWEALTH AVE ROADWAY IMPROVEMENT HAMILTON ST - ITHICA PL ( PAVING) FY 09
TW1J 0000 MA CHN SS70701C CM - CHN- 0( 204) A E WESTERN CANAL @ ALMA SCHOOL & DOBSON PEDESTRIAN SIGNAL - TRANSPORTATION IMPRO FY 09
TY1J 0000 MA CHN SS71001C CM - CHN- 0( 206) A E PRICE ROAD TO HAMILTON STREET WESTERN CANAL - MULTI- USE PATH ( 2) FY 09
TZ1J 0000 MA CHN SS71101C CM - CHN- 0( 207) A E PRICE RD TO HAMILTON ST WESTERN CANAL- MULTI- USE PATH ( 1) FY 09
TQ1J 0000 MA CHN CM - CHN- 0( 208) A E LOOP 101 @ GALVESTON ST MULTI- USE PATH & BRIDGE FY 09
XA1J 0000 MA CHN SS72601C CM - CHN- 0( 210) A E CHANDLER BLVD TRAFFIC SIGNAL INTERCONNECT FIBER OPTIC - DELAWARE ST TO GILBERT RD FY 11
QA1J 0000 MA 0.0 SS68601C CM - CUK- 0( 200) A E VARIOUS LOCATIONS PAVE DIRT ROADS FY 09
WR1J 0000 MA ELM SS72301C CM - ELM- 0( 200) A E 125TH & 127TH AVENUE PAVE UNPAVED ROADS FY 11
WS1J 0000 MA ELM SS72401C CM - ELM- 0( 201) A E 129TH AVENUE PAVE UNPAVED ROADS FY 11
XB1H 0000 MA 0.0 SS45102C CM - FTH- 0( 000) A E SHEA BOULEVARD CONSTRUCT BIKE LANE FY 09
XM1H 0000 MA FTH SS65901C CM - FTH- 0( 201) A E SAGUARO BOULEVARD PAVE DIRT ALLEYS FY 09
XN1H 0000 MA FTH SS66001C CM - FTH- 0( 202) A E FOUNTAIN HILLS BOULEVARD SIDEWALK CONSTRUCTION FY 09
VI1J 0000 MA 0.0 SS71701C CM - GDV- 0( 201) A E DYNAMIC MESSAGE SIGNS VARIOUS LOCATIONS FY 10
OS1G 0000 MA GIL SS54701C CM - GIL- 0( 012) A E EASTERN CANAL ( GUADALUPE- ELLIOT) CONSTRUCT MULTI- USE PATH FY 09
UZ1H 0000 MA GIL SS64401C CM - GIL- 0( 200) A E GILBERT HERITAGE DISTRICT PEDESTRIAN SIDEWALK, LANDSCAPE FY 09
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
2ND SORT: FEDERAL ID # Page 9 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
MA1H 0000 MA GLN SS59101C CM - GLN- 0( 033) A E 63RD AVE / LOOP 101 CONSTRUCT MULTI- USE PATH AND BRIDGE FY 09
SN1H 0000 MA GLN SS62301C CM - GLN- 0( 035) A E SPORTS FACILITIES FIBER OPTIC FIBER OPTIC CABLE INSTALLATION FY 09
WY1J 0000 MA MES SS73201C CM - MES- 0( 205) X E ITS SIGNAL CONVERSIONS - PHASE 4B FIBER OPTIC LINK FY 11
WX1J 0000 MA MES SS73101C CM - MES- 0( 206) X E ITS SIGNAL CONVERSIONS - PHASE 4A FIBER OPTIC LINK FY 11
QD1J 0000 MA 0.0 SS70101C CM - MMA-( 209) A E RIO VERDE DRIVE PAVE SHOULDERS FY 09
NT1J 0000 MA MMA SS68701C CM - MMA- 0( 206) A E REACT IN GLENDALE, PEORIA, AND SCOTTSDALE INCIDENT MANAGEMENT PARTNERSHIP FY 09
VT1J 0000 MA PEO SS72101C CM - PEO( 230) A E HYBRID FIBER- TO- WIRELESS COMMUNICATION SYSTE TRAFFIC SIGNAL NETWORK FY 10
WD1H 0000 MA PEO SS64301C CM - PEO- 0( 200) A E SKUNK CREEK- 75TH AVE TO NEW RIVER CONSTRUCT MULTI- USE PATH FY 09
XC1H 0000 MA PEO SS65701C CM - PEO- 0( 201) A E 84TH AVENUE STREETSCAPE FY 09
XB1J 0000 MA PEO SS72801C CM - PEO- 0( 204) A E OLIVE AVENUE - UNDERPASS NEW RIVER TRAIL UNDERPASS CONSTRUCTION FY 11
VY1H 0000 MA PHX SS62701C CM - PHX- 0( 202) A E 19TH AVENUE THUNDERBIRD RD WIDENING INTERSECTION IMPROVEMENTS FY 09
RB1J 0000 MA PHX SS70501C CM - PHX- 0( 218) A E ACDC AT 7TH AVE ( BIKE UNDERPASS) ACDC BIKE UNDERPASS FY 09
TR1J 0000 MA PHX SB43301C CM - PHX- 0( 221) B E PONTIS & VIRTIS BRIDGE MANAGEMENT SOFTWARE VARIOUS LOCATIONS FY 09
TS1J 0000 MA PHX SB43401C CM - PHX- 0( 222) B E BRIDGE INSPECTION EQUIPMENT VARIOUS LOCATIONS FY 09
VJ1J 0000 MA 0.0 SS71601C CM - PHX- 0( 224) A E PAVE DIRT ALLEYS VARIOUS LOCATIONS FY 10
TT1J 0000 PM PPM SS71301C CM - PPM- 0( 210) A T SAFETY AND EDUCATION PROGRAM VARIOUS LOCATIONS FY 09
RC1J 0000 MA PVY SS69801C CM - PVY- 0( 201) A E 12 VARIOUS LOCATIONS TRAFFIC - VIDEO DETECTION SYSTEM FY 09
SH1J 0000 MA QCR SS70401C CM - QCR- 0( 203) A E HUNT HIGHWAY - POWER TO ELLSWORTH PAVE DIRT SHOULDERS FY 09
NV1H 0000 MA 0.0 SS57701C CM - SCT- 0( 015) X E SCOTTSDALE ROAD CONSTRUCT ITS PROJECT FY 10
VM1H 0000 MA SCT SS64801C CM - SCT- 0( 201) A E INDIAN BEND WASH; CHAP - JACK RDS MULTI- USE PATHWAY FY 09
WQ1J 0000 MA SCT SS72201C CM - SCT- 0( 205) A E INDIAN BEND ROAD MCCORMICK STILLMAN RR PARK FY 11
WT1J 0000 MA SUP SS72701C CM - SUP- 0( 207) X E PEORIA AVENUE FIBER OPTIC INTERCONNECTS FY 11
GY1J 0000 MA SUP SS67601C CM - SUR- 0( 204) X E GREENWAY ROAD FIBER OPTIC INTERCONNECTS FY 09
VL1J 0000 MA 0.0 SS72001C CM - SUR- 0( 206) A E WEST OF 219TH AVENUE PAVE DIRT ROADS FY 10
NU1H 0000 MA GDY SS56001C GDY- 0- 417 E VAN BUREN @ BULLARD WASH BRIDGE APPROACHES FY 09
OY1H 0000 MA PHX SH44101C HBS - PHX- 0( 200) A E MCDOWELL RD & 35TH AVENUE STREET LIGHTS CONSTRUCTION FY 09
AC1G 17 YV 245.2 H636801C HES - 017- B( 201) A P BLACK CANYON HILL - ( SB) MILL AND REPLACE AND SAFETY IMPROVEMENT TBD FY 09
KD1H 177 PN 163.0 H692101C HES - 177- A( 003) A G SR 177, MP 163.80- 164.40 CURVE RE- ALIGNMENT NOV 09
FP1H 0000 MA GLN SH43201C HES - GLN- 0( 030) A E 51ST AVENUE & CAMELBACK AVENUE INTERSECTION IMPROVMENTS FY 09
FR1H 0000 MA GLN SH43101C HES - GLN- 0( 030) A E 51ST AVENUE & NORTHERN AVENUE INTERSECTION IMPROVEMENTS FY 09
VK1J 0000 GI 0.0 SS71803D HPP - GGI- 0( 204) A G TONTO CREEK BRIDGE DESIGN BRIDGE APPROACHES FY 10
FA1H 10 CH 307.0 H682201C IM - 010- F( 201) A S E BENSON - JOHNSON RD ( EB) RR 5" TL, 3" PL & ARFC FEB 09
10106 CN1G 10 CH 300.2 H650401C NH - 010- E( 200) N S SR 90 TI RECONSTRUCT SR 90 TI AND ADD PASSING LAN TBD FY 10 URJR1
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
2ND SORT: FEDERAL ID # Page 10 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
11507 DP1H 60 MA 148.9 H669001C NH - 060- B( 200) B E 99TH AVE - 83RD AVE ( INCLUDING NEW RIVER BRIDGE) WIDEN ROADWAY AND BRIDGE MAY 09
XA1H 0000 MA 0.0 SS65301C OM - SUR- 0( 200) A E PAVE DIRT ROADS - SURPRISE PAVE DIRT ROADS FY 09
16604 RV1E 86 PM 145.6 H543401C S - 086- A- 500 T MP 145.6 - BRAWLEY WASH EXTEND BOX CULVERTS TBD FY 09 TBA
QT1J 999 AP 0.0 H747701X SB - AZ07-( 004) H DINE'TAH " AMONG THE PEOPLE" SCENIC ROADS DESIGN MARKETING PLAN IGA FY 09
QU1J 163 NA 0.0 H747801X SB - AZ07-( 007) H KAYENTA- MONUMENT VALLEY SCENIC ROADS DEVELOP INTERPRETIVE PLAN IGA FY 09
QV1J 163 NA 0.0 H747901X SB - AZ07-( 008) H KAYENTA- MONUMENT VALLEY SCENIC ROADS DESIGN MARKETING PLAN IGA FY 09
XF1H 19 PM 47.0 H722201C STP - 019- A-( AUP) T SAHUARITA TI CONSTRUCT NEW TI TBD FY 09
FH1G 80 CH 368.0 H658001C STP - 080- B( 200) A S EAST OF DOUGLAS 2 1/ 2" MILL, 3" AC REPLACE PLUS 1/ 2" AR- ACFC JAN 09
11508 AZ1G 86 PM 159.5 H680601C STP - 086- A T VALENCIA ROAD - KINNEY ROAD CONSTRUCT ROADWAY WIDENING TO 4 LANES TBD FY 10 TBA
13506 OQ1D 88 MA 223.0 H692001C STP - 088- A( 001) G FISH CREEK HILL CONSTRUCT RETAINING WALLS TBD FY 09 TBA
FK1G 89 YV 283.0 H658301C STP - 089- A( 200) A P PEEPLES VALLEY YARD TO WILHOIT SPOT 3" RR & ARFC APR 09
11606 AJ1C 191 AP 417.5 H451801C STP - 191- E( 200) A H BURNSIDE JUNCTION - NORTH ROADWAY WIDENING TBD FY 09 TBA
VB1H 0000 MA FTH SS64601C STP - FTH- 0( 200) A E SHEA BLVD ROADWAY WIDENING FY 09
WZ1J 0000 MA PHX SS72501C STP - PHX- 0( 228) A E MCDOWELL ROAD & 32ND STREET INTERRSECTION IMPROVEMENT FY 11
SF1J 0000 PM PPM SS69301C STP - PPM- 0( 209) A T COTARO FAMS ROAD / MAGEE ROAD ROAD WIDENING, REALIGNMENTS, IMPROVEMEN FY 09
KQ1H 0000 MA QCR STP - QCR- 0( 001) A E RIGGS RD, ELLSWORTH TO MERIDIAN CONSTRUCT NEW RDWAY FY 09
RA1J 0000 PM TUC STP - TUC- 0( 222) A T ITS TRAFFIC SIGNAL TIMING STUDY TIMING STUDY - VARIOUS LOCATIONS FY 09
QG1J 0000 PM TUC SS69201C STP - TUC- 0( 223) A T ITS TRAFFIC SIGNAL EXPANSION - VARIOUS LOCATION EQUIPMENT PURCHASES FY 09
WU1J 0000 PM TUC SS73001C STP - TUC- 0( 226) A T PANTANO BOULEVARD PAVEMENT RECONSTRUCTION FY 11
WV1J 0000 PM TUC SS73003D STP - TUC- 0( 226) A T PANTANO BOULEVARD DESIGN PAVEMENT RECONSTRUCTION FY 11
FY1J 40 MO 52.0 H740601C TEA - 040- A( 201) K I- 40 STOCKTON HILL - HARRISON CONSTRUCT LANDSCAPING AND IRRIGATION SEP 08
OV1F 260 NA 350.0 H621401C TEA - 260- C( 003) A G SR 260 PORTER MTN RD - WOODLAND RD LANDSCAPING, IRRIGATION & PEDESTRIAN LIGH TBD FY 09 TBA
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
3RD SORT: BID DATE, RTE, MP Page 1 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
VO1H 40 MO 21.0 H721201C 040- A( 200) K MP 21 - WALNUT CREEK RR 5" TL & 3" PL & 2" AC ARFC JAN 09
RN1H 40 AP 347.0 H706601C BR - 040- E( 202) A H BLACK CREEK BRIDGES EB, WB SFR( STR # 1134,1642,9 BRIDGE SCOUR RETROFIT JAN 09
14409 GE1J 69 YV 288.3 H741001C 069- 4 P SR 69 GLASSFORD HILL PRESCOTT EAST HIGHWAY ROADWAY WIDENING JAN 09
FH1G 80 CH 368.0 H658001C STP - 080- B( 200) A S EAST OF DOUGLAS 2 1/ 2" MILL, 3" AC REPLACE PLUS 1/ 2" AR- ACFC JAN 09
PS1J 86 PM 171.0 H755601C T SANTA CRUZ RIVER BRIDGE # 528 DECK REPLACEMENT JAN 09
TX1J 0000 MA CHN SS70801C E PURCHASE TRAFFIC DETECTION CAMERAS VARIOUS LOCATIONS FY 09
TI1J 8 YU 66.0 H744601C Y I- 8, DATELAND TO GILA BEND REST AREA SIGN REHABILITATION IGA FY 09
IN1J 10 MA 144.0 H725601C M 3RD AVENUE - 3RD STREET FIRE DETECTION SYSTEM RETROFIT FEB 09
FA1H 10 CH 307.0 H682201C IM - 010- F( 201) A S E BENSON - JOHNSON RD ( EB) RR 5" TL, 3" PL & ARFC FEB 09
18606 MU1F 17 YV 299.0 H613601C F YAVAPAI COUNTY - JCT SR 179 ( SB) RR ( 4" TL, 3" PL) + RR ARFC FEB 09
OI1J 19 PM 0.0 H750101C T TUCSON TO INTERNATIONAL BORDER SIGN REHAB - REPLACE PANELS OR SIGNS IGA FY 09
EO1G 19 PM 34.0 T CANOA TI - CONTINENTAL TI CONST ROADWAY ( NB FRONTAGE RD) IGA FY 09
CG1J 19 PM 45.8 HX21301C T I- 19 AND SAHUARITA RD INSTALL NEW TRAFFIC SIGNAL IGA FY 09
QB1J 40 MO 39.0 H756801C K MP 39 - MP 121 MINOR PAVEMENT PRESERVATION FEB 09
FG1H 40 MO 73.0 H682401C K PEACOCK WASH- SILVER SPRNGS ROAD TI- EB RR5" TL & 3" TL & 2" AC & ARFC FEB 09
14810 KP1H 40 AP 316.0 H692401C H DEAD RIVER BRIDGE EB ( STR # 565) SCOUR RETROFIT FEB 09
NP1J 60 PN 204.3 HX22301C E US 60 AT PERALTA ROAD ( TRAFFIC SIGNAL) INSTALL TRAFFIC SIGNAL IGA FY 09
14407 PRSP 60 PN 220.0 H684501C 060- D- 508 G BOYCE THOMPSON STATE PARK CONSTRUCT ROAD FEB 09 AMJC1
FD1G 60 GI 278.0 H657401C G TIMBER MT TO SENECA RR 3" & ARFC FEB 09
40608 GU1H 74 MA 20.0 H691201C P US 60 TO SR 303L, MP 20 TO MP 22 ( EB & WB) CONSTRUCT PASSING LANES FEB 09
MF1J 82 CH 61.2 H749701C S SAN PEDRO RIVER BR ( STR # 403) SCOUR RETROFIT FEB 09
FJ1G 87 PN 131.0 H658201C T S COOLIDGE CL TO JCT 287 RR 2.5" ARAC FEB 09
OX1H 90 CH 321.1 H740401C S SR 90 @ MP 321.11 TO MP 321.42 MINOR PAVEMENT PRESERVATION FEB 09
SR1J 90 CH 321.5 H769201C S SR 90 @ MP 321.58 TO MP 321.91 MINOR PAVEMENT PRESERVATION FEB 09
UM1J 93 MO 124.0 H763501C K 1 MILE SOUTH OF TOWN OF WIKIEUP; WEST OF ROAD SYSTEM PRESERVATION - RESTORATION/ REHAB IGA FY 09
LJ1J 160 AP 465.1 H730903C H TEEC NOS POS PORT OF ENTRY SYSTEM ENHANCEMENT - OTHER ENHANCEMEN FEB 09
QU1J 163 NA 0.0 H747801X SB - AZ07-( 007) H KAYENTA- MONUMENT VALLEY SCENIC ROADS DEVELOP INTERPRETIVE PLAN IGA FY 09
QV1J 163 NA 0.0 H747901X SB - AZ07-( 008) H KAYENTA- MONUMENT VALLEY SCENIC ROADS DESIGN MARKETING PLAN IGA FY 09
QZ1J 177 PN 139.2 H760301C G MP 139.16 @ AAR/ DOT # 742- 390- N CONCRETE RR CROSSING SURFACE & LED FLAS IGA FY 09
TK1J 999 MA 0.0 H770201C E BRIDGES # S 1772, 779, 1823, 2800, 517, 1335 COLLISION DAMAGE REPAIR IGA FY 09
QT1J 999 AP 0.0 H747701X SB - AZ07-( 004) H DINE'TAH " AMONG THE PEOPLE" SCENIC ROADS DESIGN MARKETING PLAN IGA FY 09
VA1H 0000 MA AVN SS64501C CM - AVN- 0( 200) A E MCDOWELL RD PEDESTRIAN IMPROVEMENTS FY 09
QG1J 0000 PM TUC SS69201C STP - TUC- 0( 223) A T ITS TRAFFIC SIGNAL EXPANSION - VARIOUS LOCATION EQUIPMENT PURCHASES FY 09
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
3RD SORT: BID DATE, RTE, MP Page 2 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
RA1J 0000 PM TUC STP - TUC- 0( 222) A T ITS TRAFFIC SIGNAL TIMING STUDY TIMING STUDY - VARIOUS LOCATIONS FY 09
PZ1G 0000 YU YYU SB41501C BR - YYU- 0( 031) A Y OLD US 80 @ RED TOP WASH BRIDGE REPLACEMENT FY 09
43409 TO1H 10 MA 126.0 H729601C E SARIVAL AVE TO DYSART RD CONSTRUCT GPL ( CITY ADVANCEMENT) OUTSID MAR 09 TBD
20206 3WSP 10 PM 288.4 H239001C 010- E T CIENEGA CREEK - MARSH STATION PH1 RAILROAD GRADE & DRAIN MAR 09
SL1J 40B NA 276.8 H767701C H JOSEPH CITY TRUCK STOP 3" MILL AND REPLACE MAR 09
IG1J 60 GI 243.0 H743601C G US 60, MIAMI CITY LIMITS TO MCMILLAN WASH PAVEMENT PRESERVATION MAR 09
GG1J 66 MO 57.3 K AIRWAY AVENUE & MOHAVE AIRPORT DRIVE INTERSE CONCRETE MEDIAN & ASPHALT PAVING MAR 09
QY1J 74 MA 24.1 HX22401C E SR74 TRAFFIC SIGNAL DESIGN TRAFFIC SIGNAL MAR 09 TRDC1
OJ1J 77 NA 374.0 H753201C H SR 77 @ MP 374.38 AND MP 383.50 SYSTEM ENHANCEMENT - ENGINEERING MAR 09
LP1G 78 GE 169.0 H666901C S JAKE'S CORNER REALIGNMENT HIGHWAY REALIGNMENT MAR 09 AMJS1
JD1H 79 PN 126.0 H690601C T SR 79 ORACLE JCT - FLORENCE HWY EXTEND RCB CULVERTS MAR 09 HDRB1
28303 RO1F 80 CH 364.0 H624301C CBI - 080- A( 009) B S DGLS STGC WEIGHT & INSP STATION DSGN/ CST WEIGHT & INSP STATION MAR 09 MBFG1
UP1F 86 PM 74.0 H630201C T SR- 86, MP 73.99 - 77.69 SYMMETRICAL WIDENING MAR 09
SM1J 180 NA 324.2 H767801C H PETRIFIED FOREST MINOR PAVEMENT PRESERVATION MAR 09
TD1H 191 GE 170.0 H710001C S LWR CORONADO TRAIL DRAINAGE IMPRV SYST ENHANCEMENT - ENGINEERING MAR 09
UZ1H 0000 MA GIL SS64401C CM - GIL- 0( 200) A E GILBERT HERITAGE DISTRICT PEDESTRIAN SIDEWALK, LANDSCAPE FY 09
WD1H 0000 MA PEO SS64301C CM - PEO- 0( 200) A E SKUNK CREEK- 75TH AVE TO NEW RIVER CONSTRUCT MULTI- USE PATH FY 09
ZN1E 0000 PN PPN SB41001C BR - PPN- 0-( 169) G KELVIN BRIDGE - # 8441 BRIDGE REPLACEMENT FY 09
RC1J 0000 MA PVY SS69801C CM - PVY- 0( 201) A E 12 VARIOUS LOCATIONS TRAFFIC - VIDEO DETECTION SYSTEM FY 09
OG1H 8 MA 121.0 H701601C 008- B Y MP 121.00 - BIG HORN SYSTEM PRES - ENGINEERING APR 09
BW1J 40 MO 47.0 H752901C K HOLY MOSES WASH - RATTLESNAKE WASH RR( 5" TL, 3" PL)& AR ACFC & RR AR ACFC APR 09
CH1G 70 GI 256.0 H645301C G OLD WINKELMAN HIGHWAY AND BIA ROUTE 6 INTERSECTION IMPROVEMENTS APR 09 HZJS1
FG1G 78 GE 154.0 H657901C S JCT 191 TO FOREST SERVICE BOUNDARY CHIP SEAL AND GUARDRAIL EXTENSION APR 09
FK1G 89 YV 283.0 H658301C STP - 089- A( 200) A P PEEPLES VALLEY YARD TO WILHOIT SPOT 3" RR & ARFC APR 09
FQ1G 180 AP 347.0 H658701C G RANCH TO JCT 61 SYS PRES- RESTORE/ REHAB/ RESRFC APR 09
ZL1H 260 AP 385.0 H726101C G SR 260 FROM GREER TO RODEO GROUNDS 3" RR & ARFC APR 09
XB1H 0000 MA 0.0 SS45102C CM - FTH- 0( 000) A E SHEA BOULEVARD CONSTRUCT BIKE LANE FY 09
VB1H 0000 MA FTH SS64601C STP - FTH- 0( 200) A E SHEA BLVD ROADWAY WIDENING FY 09
SN1H 0000 MA GLN SS62301C CM - GLN- 0( 035) A E SPORTS FACILITIES FIBER OPTIC FIBER OPTIC CABLE INSTALLATION FY 09
KF1H 8 PN 177.0 H692601C 008- B( 003) A T INTERSTATE I- 8 EB, I- 10 WB RAMP IMPROVEMENT MAY 09
45309 FN1H 10 MA 96.2 H708301X Y 395TH AVE ( BELMONT RD) CONSTRUCT TI TBD FY 09
14406 VB1E 10 PM 260.0 H640401C 010- E T I- 10 / I- 19 ( FMS, PHASE 2) EXTEND ITS SYSTEMS ALONG I- 10 & I- 19 TBD FY 09 TRMM1
13408 HY1G 10 PM 288.4 H747301C T CIENEGA CREEK- MARSH STATION PHASE III REMOVE RAIL & BRIDGE, CONST ML TBD FY 09
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
3RD SORT: BID DATE, RTE, MP Page 3 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
14607 HX1G 10 PM 288.4 T CIENEGA CREEK- MARSH STATION PHASE II NEW RAILROAD TRACKS TBD FY 09
10900 AR1B 10 PM 288.6 H239101C 10- 5-( 068) N S PANTANO RR UP/ CIENEGA CREEK SECTION CONSTRUCT STRUCTURE TBD FY 09
11407 PN1F 17 MA 208.9 017- A E PEORIA AVE TO GREENWAY RD DRAINAGE IMPROVEMENTS TBD FY 09 TBA
AC1G 17 YV 245.2 H636801C HES - 017- B( 201) A P BLACK CANYON HILL - ( SB) MILL AND REPLACE AND SAFETY IMPROVEMENT TBD FY 09
13603 GM1C 17 YV 263.0 H426901C 17- 2( ) P CORDES JCT TI RECONSTRUCT TI TBD FY 09 HDJC1
UC1J 17 CN 316.5 F ROCKY PARK- MCCONNELL SYSTEM PRESERVATION - ENGINEERING TBD FY 09
QH1J 19 SC 1.6 H732901C T SB- 19 AND SPRR OP BRIDGE # 980 BRIDGE REPAIR TBD FY 09
XF1H 19 PM 47.0 H722201C STP - 019- A-( AUP) T SAHUARITA TI CONSTRUCT NEW TI TBD FY 09
OU1J 40 MO 9.8 H742001C K LAKE HAVASU TI UP # 1586 BRIDGE REHABILITATION TBD FY 09
ZC1H 40 MO 14.9 H727201C K BUCK MOUNTIAN WASH EB # 378 DECK REHABILITATION TBD FY 09
FJ1J 40 MO 85.9 H733001C K WILLOW CREEK BRIDGE, WB # 1769 DECK REHABILITATION TBD FY 09
OS1J 40 CN 177.0 H751401C F MP 177- 182 ( EB& WB) SHOULDERS PAVEMENT PRESERVATION TBD FY 09
SV1J 40 CN 182.0 H768901C F NAVAJO ARMY DEPOT, WB 1/ 2" MILL & 1/ 2" ACFC ON SHOULDER TBD FY 09
PB1F 40B YV 145.0 H621301C B40- C( 002) A K ASH FORK, 40B, 3RD ST TO 8TH ST SIDEWALK TBD FY 09 TBA
11507 DP1H 60 MA 148.9 H669001C NH - 060- B( 200) B E 99TH AVE - 83RD AVE ( INCLUDING NEW RIVER BRIDGE) WIDEN ROADWAY AND BRIDGE MAY 09
BL1J 60 PN 228.4 HX20701C 060- D( 202) A G US 60 @ MP 228, QUEEN CREEK TUNNEL SYSTEM ENHANCEMENT - SAFETY IMPROVEMEN TBD FY 09
10007 EX1F 60 PN 230.0 060- D G OAK FLAT - DEVIL'S CANYON CONSTRCT PASSING/ CLIMBING LANE TBD FY 09 TBA
EO1H 66 MO 61.0 H675201C K SR 66 @ MOHAVE AIRPORT INTERSECTION IMPROVEMENT TBD FY 09
DX1H 70 GH 338.0 H680801C S US 70 & 8TH AVENUE INTERSECTION INTERSECTION IMPROVEMENTS TBD FY 09
JL1G 72 LA 13.1 Y SR- 72 MP 13.1 - 17.0 SHOULDERS & SLOPES MAY 09
CF1J 79 PN 124.2 H731001C T MP 124 TO MP 126 SYSTEM ENHANCEMENT - ENGINEERING TBD FY 09 HDRB1
UM1H 83 PM 44.0 H705701C 083- A( 200) A T MP 44.0 TO MP 45.5 SAFETY IMPRVMNTS / REALIGNMENT MAY 09
13607 QG1F 85 MA 120.5 Y MP 120.54 - MP 122.99 CONSTRUCT ROADWAY TBD FY 09 TBA
20806 WW1G 85 MA 152 H595514C E SOUTHERN AVE TO I- 10 CONSTRUCT ROADWAY TBD FY 09
QY1C 86 PM 141.1 H713701C T MP 141.1 TO RESERVATION BOUNDARY CONSTRUCT ROADWAY WIDENING TBD FY 09 TBA
16604 RV1E 86 PM 145.6 H543401C S - 086- A- 500 T MP 145.6 - BRAWLEY WASH EXTEND BOX CULVERTS TBD FY 09 TBA
PY1H 86 PM 166.8 HX19601C T SR 86 AT CAMINO DE OESTE INSTALL TRAFFIC SIGNAL & MINOR INT IMPROVE TBD FY 09
EY1H 87 GI 267.0 H683201C P PINE - RIM 3" RR & ARFC TBD FY 09
13506 OQ1D 88 MA 223.0 H692001C STP - 088- A( 001) G FISH CREEK HILL CONSTRUCT RETAINING WALLS TBD FY 09 TBA
CM1G 89 YV 313.0 H648401C 089- B- 305 P GRANITE CREEK BRIDGE # 2869 BRIDGE REPLACEMENT TBD FY 09
NW1J 89A YV 344.0 H733901C P JEROME RETAINING WALL REPLACE RETAINING WALL TBD FY 09
JK1G 95 LA 131.7 Y SR- 95 @ MP 131.7 - 142.7 SHOULDER IMPROVEMENTS MAY 09
UO1H 95 LA 161.7 H711501C K BILL WILLIAMS RIVER BRIDGE # 1272 FIRE DAMAGE REPAIR TBD FY 09
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
3RD SORT: BID DATE, RTE, MP Page 4 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
40812 TU1H 101L MA 0.0 H707601C E BEARDSLEY RD / UNION HILLS DRIVE ( CITY ADVANCEM CONSTRUCT TI TBD FY 09
13609 AM1J 101L MA 30.0 H769901C E SR51 TO PRINCESS DRIVE DESIGN AND CONSTRUCT FMS TBD FY 09
PV1J 101L MA 36.0 H741401C E HAYDEN RD TO PRINCESS DR DRAINAGE IMPROVEMENTS TBD FY 09
UU1J 101L MA 59.5 E SR 101L ( PRICE FREEWAY) @ GALVESTON SRP DRAINAGE INPROVEMENTS ASSOCIATED WI TBD FY 09
VD1J 143 MA 3.8 HX21001C E SR 143, 48TH STREET - MCDOWELL RD SIGN REPLACEMENT TBD FY 09
22802 UX1C 160 CN 311.5 H527401C 160- A-( 001) F JCT 89 - VAN'S TRADING POST 2" ARAC & ARFC & TURNLANES TBD FY 09
DU1H 160 CN 320.0 H669501C 160- A( 003) A F US 160 @ SR 264 LIGHTING MAY 09
OI1H 163 NA 395.3 HX19101C H US 163 AT KAYENTA SCHOOL TRAFFIC SIGNAL INSTALLATION MAY 09
OQ1J 177 GI 136.3 H752301C G WINKELMAN 3" MILL AND REPLACE TBD FY 09
ZK1F 191 GE 160.0 H643201C S BACK COUNTRY BYWAY ( NORTH INTER) SAFETY IMPROVEMENTS TBD FY 09
11606 AJ1C 191 AP 417.5 H451801C STP - 191- E( 200) A H BURNSIDE JUNCTION - NORTH ROADWAY WIDENING TBD FY 09 TBA
21008 GL1J 191 AP 448.0 H748601C H CHINLE - MANY FARMS ( PH I) REMOVE & REPLACE FENCING, CATTLE GUARDS TBD FY 09
40808 UK1H 202L MA 0.0 E 51ST AVE TO I- 10 WEST CONSTRUCT ROADWAY TBD FY 09 TBD
43208 ST1H 202L MA 0.0 E LINDSAY ROAD TO GILBERT ROAD DESIGN & CONST MULTI- USE PATH TBD FY 09
41409 DI1J 202L MA 10.0 H749001C E SR 101L TO GILBERT ROAD CONSTRUCT FMS TBD FY 09
14601 RG1B 260 GI 263.1 H469901C P LITTLE GREEN VALLEY RECONSTRUCT ROADWAY TBD FY 09 AMRM1
OV1F 260 NA 350.0 H621401C TEA - 260- C( 003) A G SR 260 PORTER MTN RD - WOODLAND RD LANDSCAPING, IRRIGATION & PEDESTRIAN LIGH TBD FY 09 TBA
CK1J 260 NA 353.1 HX21501C G SR 260 @ JCT WOODLAND LAKE ROAD TRAFFIC SIGNAL CONSTRUCTION TBD FY 09
EB1H 260 NA 356.0 H681201C G MP 356- 357.6 INSTALL NEW R/ W FENCE TBD FY 09
HO1G 999 MA 0.0 H662101C 999- A( 023) E VARIOUS ROUTES, MARICOPA COUNTY BRKWY CABLE TERMINAL TBD FY 09
OV1J 999 SW 0.0 H755001C BRIDGES # 2190, # 1152, # 1219, # 745, # 517, # 821, # 93 COLLISION DAMAGE REPAIR TBD FY 09
VY1H 0000 MA PHX SS62701C CM - PHX- 0( 202) A E 19TH AVENUE THUNDERBIRD RD WIDENING INTERSECTION IMPROVEMENTS FY 09
QL1J 10 PM 247.0 T INA RD TO RUTHRAUFF RD DCR / EA AND 30% DESIGN DESIGN FY 09
15208 NSSP 89A YV 0.0 F RED ROCK STATE PARK DESIGN DESIGN FY 09
IH1J 89A YV 373.1 F SR 89A JCT AIRPORT ROAD INTERSECTION IMPROVEMENT JUN 09
13509 TZ1H 89A CN ASP F SLIDE ROCK STATE PARK DESIGN ( ADD'L PRRKING ) DESIGN FY 09
PK1E 95 YU 63.0 H584101C Y PELIGRO - CLARKS PA ( 3" AC + FC) JUN 09
UL1H 160 CN 349.0 F US 160 TURN LANES AT NAVAJO ROUTE CONSTRUCT TURN LANES JUN 09 PLCH1
40809 UD1H 202L MA 0.0 E I- 10 EAST/ SANTAN TI TO 51ST AVE DESIGN AND R/ W DESIGN FY 09 TBD
21301 LY1C 260 GI 258.0 P LION SPRINGS SECTION DESIGN ( ROADWAY) DESIGN FY 09
QA1J 0000 MA 0.0 SS68601C CM - CUK- 0( 200) A E VARIOUS LOCATIONS PAVE DIRT ROADS FY 09
QD1J 0000 MA 0.0 SS70101C CM - MMA-( 209) A E RIO VERDE DRIVE PAVE SHOULDERS FY 09
NN1J 0000 MA BKY SS68501C CM - BKY- 0( 200) A E PEDESTRIAN IMPROVEMENTS - 7TH ST AND EASON AV PEDESTRIAN IMPROVEMENT PROJECT FY 09
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
3RD SORT: BID DATE, RTE, MP Page 5 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
TU1J 0000 MA BKY SS70901C E PAVE DIRT SHOULDERS - VARIOUS LOCATIONS PAVE DIRT SHOULDERS FY 09
TW1J 0000 MA CHN SS70701C CM - CHN- 0( 204) A E WESTERN CANAL @ ALMA SCHOOL & DOBSON PEDESTRIAN SIGNAL - TRANSPORTATION IMPRO FY 09
TQ1J 0000 MA CHN CM - CHN- 0( 208) A E LOOP 101 @ GALVESTON ST MULTI- USE PATH & BRIDGE FY 09
TV1J 0000 MA CHN SS70601C CM - CHN- 0( 203) A E COMMONWEALTH AVE ROADWAY IMPROVEMENT HAMILTON ST - ITHICA PL ( PAVING) FY 09
TY1J 0000 MA CHN SS71001C CM - CHN- 0( 206) A E PRICE ROAD TO HAMILTON STREET WESTERN CANAL - MULTI- USE PATH ( 2) FY 09
TZ1J 0000 MA CHN SS71101C CM - CHN- 0( 207) A E PRICE RD TO HAMILTON ST WESTERN CANAL- MULTI- USE PATH ( 1) FY 09
XN1H 0000 MA FTH SS66001C CM - FTH- 0( 202) A E FOUNTAIN HILLS BOULEVARD SIDEWALK CONSTRUCTION FY 09
NU1H 0000 MA GDY SS56001C GDY- 0- 417 E VAN BUREN @ BULLARD WASH BRIDGE APPROACHES FY 09
NH1G 0000 GH GGH SH27701C STP- GGH- 0( 006) A S SAFFORD- BRYCE RD & SAFFORD LANDFILL ROAD PETERSON WASH CULVERT EXTENSION FY 09
NY1E 0000 GI GGI SH27901C HES- GGI- 0( 006) A G JESSE HAYES ROAD ROADWAY IMPROVEMENTS FY 09
NZ1E 0000 GI GGI SB40001C BR - GGI- 0( 005) A G ICE HOUSE CANYON WASH BR # 8193 BRIDGE REPLACEMENT FY 09
BV1G 0000 MA GIL SS54601C CM- GIL- 0( 014) A E EASTERN CANAL, BASELINE- GUADALUPE CONST MULTI USE PATH FY 09
OS1G 0000 MA GIL SS54701C CM - GIL- 0( 012) A E EASTERN CANAL ( GUADALUPE- ELLIOT) CONSTRUCT MULTI- USE PATH FY 09
FP1H 0000 MA GLN SH43201C HES - GLN- 0( 030) A E 51ST AVENUE & CAMELBACK AVENUE INTERSECTION IMPROVMENTS FY 09
MA1H 0000 MA GLN SS59101C CM - GLN- 0( 033) A E 63RD AVE / LOOP 101 CONSTRUCT MULTI- USE PATH AND BRIDGE FY 09
FR1H 0000 MA GLN SH43101C HES - GLN- 0( 030) A E 51ST AVENUE & NORTHERN AVENUE INTERSECTION IMPROVEMENTS FY 09
NT1J 0000 MA MMA SS68701C CM - MMA- 0( 206) A E REACT IN GLENDALE, PEORIA, AND SCOTTSDALE INCIDENT MANAGEMENT PARTNERSHIP FY 09
TS1J 0000 MA PHX SB43401C CM - PHX- 0( 222) B E BRIDGE INSPECTION EQUIPMENT VARIOUS LOCATIONS FY 09
OY1H 0000 MA PHX SH44101C HBS - PHX- 0( 200) A E MCDOWELL RD & 35TH AVENUE STREET LIGHTS CONSTRUCTION FY 09
TR1J 0000 MA PHX SB43301C CM - PHX- 0( 221) B E PONTIS & VIRTIS BRIDGE MANAGEMENT SOFTWARE VARIOUS LOCATIONS FY 09
SF1J 0000 PM PPM SS69301C STP - PPM- 0( 209) A T COTARO FAMS ROAD / MAGEE ROAD ROAD WIDENING, REALIGNMENTS, IMPROVEMEN FY 09
TT1J 0000 PM PPM SS71301C CM - PPM- 0( 210) A T SAFETY AND EDUCATION PROGRAM VARIOUS LOCATIONS FY 09
KQ1H 0000 MA QCR STP - QCR- 0( 001) A E RIGGS RD, ELLSWORTH TO MERIDIAN CONSTRUCT NEW RDWAY FY 09
SH1J 0000 MA QCR SS70401C CM - QCR- 0( 203) A E HUNT HIGHWAY - POWER TO ELLSWORTH PAVE DIRT SHOULDERS FY 09
VM1H 0000 MA SCT SS64801C CM - SCT- 0( 201) A E INDIAN BEND WASH; CHAP - JACK RDS MULTI- USE PATHWAY FY 09
GY1J 0000 MA SUP SS67601C CM - SUR- 0( 204) X E GREENWAY ROAD FIBER OPTIC INTERCONNECTS FY 09
XA1H 0000 MA 0.0 SS65301C OM - SUR- 0( 200) A E PAVE DIRT ROADS - SURPRISE PAVE DIRT ROADS FY 09
XM1H 0000 MA FTH SS65901C CM - FTH- 0( 201) A E SAGUARO BOULEVARD PAVE DIRT ALLEYS FY 09
XC1H 0000 MA PEO SS65701C CM - PEO- 0( 201) A E 84TH AVENUE STREETSCAPE FY 09
FY1J 40 MO 52.0 H740601C TEA - 040- A( 201) K I- 40 STOCKTON HILL - HARRISON CONSTRUCT LANDSCAPING AND IRRIGATION SEP 08
RB1J 0000 MA PHX SS70501C CM - PHX- 0( 218) A E ACDC AT 7TH AVE ( BIKE UNDERPASS) ACDC BIKE UNDERPASS FY 09
44109 XV1H 10 MA 119.0 H721101C E VERRADO WAY TO SARIVAL AVE CONSTRUCT GENERAL PURPOSE LANE ( STAN A OCT 08
44209 XW1H 17 MA 224.0 H688101C E SR74- ANTHEM WAY CONSTRUCT GENERAL PURPOSE LANE ( STAN A OCT 08
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
3RD SORT: BID DATE, RTE, MP Page 6 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
RH1J 17 MA 229.0 H760401C E ANTHEM WAY - NEW RIVER ROAD PAVEMENT PRESERVATION NOV 08
LP1J 83 SC 31.6 H747001C T JCT SR 82 ( MP 31.6) TO MP 43.5 HIP RECYCLE + CHIP SEAL COAT DEC 08
AP1G 160 NA 389.5 H635601C 160- A( 200) A H KAYENTA - JCT IR 59 3" AC + ACFC DEC 08
CV1G 191 CH 48.3 H650901C S SUNSITES @ HIGH STREET WIDEN ROADWAY FOR TURN LANES DEC 08 HERW1
FD1H 8 MA 114.0 H682901C Y GILA BEND - 121.0 RR 2" PL/ 5" TL & ARFC JAN 10
KO1H 40 MO 11.0 K CHEMEHUEVI & BOULDER WASH BRIDGES SCOUR RETROFIT JAN 10
FP1G 160 AP 452.0 H658601C H RED MESA TO TEEC NOS POS 3" AC & ARFC JAN 10
EU1H 191 AP 375.0 H681901C H JCT I- 40 MP 385 3" AC & SC JAN 10
22706 GV1H 80 CH 364.0 S DOUGLAS STRTGC INSPECTION STATION INSTALL VOICE & DATA LINES IGA FY 10
ZY1B 89 YV 313.8 029- 1 P SUNDOG RD BRIDGE ( OLD BLK CYN HWY TURNBACK OWNERSHIP & MAINTENANCE ( IGA R IGA FY 10
DG1J 273 AP 380.0 G SR 273, BETWEEN MPS 377.46 AND 381.46 SYSTEM ENHANCEMENT - ENGINEERING MAR 10
VE1J 8 YU 19.0 H773901C Y LIGURTA TO DATELAND SIGN REHAB TBD FY 10
40008 GH1H 10 MA 133.0 H715501C E SR 101L ( AGUA FRIA) TO I- 17 CONSTRUCT GENERAL PURPOSE LANES TBD FY 10
12407 FX1C 10 MA 161.2 H505101C E SR 202L ( SANTAN) TO RIGGS ROAD CONST HOV & GEN PURPOSE LANE TBD FY 10 PALL1
TB1H 10 PN 199.0 H710401C T I- 8 TO SR 87 TI CAPACITY ADDITIONS - ENGINRING TBD FY 10 EECA1
14510 CN1J 10 PN 199.1 T JCT I 8 TO PICACHO PEAK TI WIDEN ROADWAY TBD FY 10
SX1J 10 PN 210.1 T I- 10 / SR 87 TI CAPACITY ADDITIONS - ENGINEERING TBD FY 10 PBDL1
SY1H 10 PN 211.0 H710601C T I- 10 WIDENING SR87 TO PICACHO PEAK CAPACITY ADDITIONS- ENGINEERING TBD FY 10 PBDL1
13410 BB1G 10 PM 246.5 T CORTARO ROAD TI CONSTRUCT NEW TI TBD FY 10 TBA
10208 PJ1F 10 PM 248.0 010- D T INA ROAD TI RECONSTRUCT TI & MAINLINE TBD FY 10 TBA
10106 CN1G 10 CH 300.2 H650401C NH - 010- E( 200) N S SR 90 TI RECONSTRUCT SR 90 TI AND ADD PASSING LAN TBD FY 10 URJR1
43010 GK1H 17 MA 204.9 E BETHANY HOME RD TO NORTHERN AVE DESIGN/ CONSTRUCT PEDESTRIAN WALKWAY AL TBD FY 10
43509 SR1H 17 MA 215.0 E SR 101L TO CAREFREE HWY ( SR 74) CONSTRUCT LANDSCAPE TBD FY 10
UD1J 17 YV 279.6 P SR169 - ROCKY PARK SYSTEM PRESERVATION - ENGINEERING TBD FY 10
SW1H 19 PM 39.0 H705001C T CONTINENTAL RD/ I- 19 BIKE & PED SYS ENHNCMENT- OTHR ENHANCEMNTS TBD FY 10 HDSR1
40310 GP1H 60 MA 148.9 E SR 101L ( AGUA FRIA) - MCDOWELL RD WIDEN ROADWAY TBD FY 10
JS1H 64 CN 235.0 H692701C F TUSAYAN STREETS WIDEN ROADWAY - SAFTEY IMPROVEMENTS TBD FY 10
HB1G 70 GH 271.0 H661401C 070- A- 308 G SAN CARLOS RIVER BRIDGE # 2910 BRIDGE REPLACEMENT TBD FY 10
XL1G 70 GH 331 070- A- 310 S US 70 PIMA TO THATCHER DESIGN SLOPE FLATTING TBD FY 10 EEJM1
40610 GT1H 74 MA 13.0 P US 60 - 303L, MP 13 - MP 15 ( EB) CONSTRUCT PASSING LANE TBD FY 10
11308 EO1E 77 NA 364.0 H546001C 077- B H MP 364 TO 372 CONSTRUCT PASSING LANE TBD FY 10 TBA
13309 WS1H 80 CH 316.0 H718101C S TOMBSTONE COURTHOUSE STATE PARK CONSTRUCT PARKING TBD FY 10 HDSM1
40710 MC1G 85 MA 122.0 E SR 85, HAZEN RD - BROADWAY RD ( MAIN LINE) RECONSTRUCT & WIDEN TBD FY 10
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
3RD SORT: BID DATE, RTE, MP Page 7 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
13910 GY1H 86 PM 132.8 T KITT PK ROAD SEGMENT ROADWAY WIDENING TBD FY 10
11609 ES1G 86 PM 137.1 T SAN PEDRO ROAD SEGMENT WIDEN ROADWAY TO 40' TBD FY 10
11508 AZ1G 86 PM 159.5 H680601C STP - 086- A T VALENCIA ROAD - KINNEY ROAD CONSTRUCT ROADWAY WIDENING TO 4 LANES TBD FY 10 TBA
YH1G 87 MA 204.3 E NEW FOUR PEAKS RD TO DOS S RANCH RD CLIMBING LANE AND SHOULDER WIDENING TBD FY 10
46208 XP1G 87 MA 211.8 P MP 211.8 TO MP 213.0 REPAIR CUT SLOPES FOR EROSION CONTROL TBD FY 10
13409 TQ1H 87 GI 263.0 H718301C P TONTO NATURAL BRIDGE CONSTRUCT NEW ROAD TBD FY 10 CBJO1
13209 A6SP 87 NA 346.0 H717901C H HOMOLOVI RUINS STATE PARK CONSTRUCT ROAD TBD FY 10 CBJO1
MD1J 89 YV 269.0 P MARTINEZ RIVER BRIDGE ( STR # 1320) SCOUR RETROFIT TBD FY 10
EE1E 89 YV 288 089- A- 201 P SR- 89 @ KIRKLAND JCT / WAGNER RD CST RT & LT TURN LNS, SHOULDER TBD FY 10 DVJB1
TDSP 89 CN 546.5 H475301C F PAGE REST AREA CONST REST AREA & VISITOR CNTR TBD FY 10
DP1G 95 YU 38.0 095- B- 308 Y WELLTON MOHAWK CANAL BRIDGE # 343 BRIDGE REHAB TBD FY 10
GK1J 95 LA 82.0 H752601C Y US 95 @ 82 & 89 INTERSECTION IMROVEMENTS TBD FY 10
14410 DB1J 95 LA 128.9 H675701C Y PASSING LANES SOUTH OF BOUSE WASH CONSTRUCT PASSING LANES TBD FY 10
JJ1G 95 LA 156.6 H638001C Y SR 95, HOLIDAY HARBOUR DRAINAGE STUDY TBD FY 10 PBGS1
13706 SI1E 101L MA 0.0 H726701C 101- A E I- 10 TO MC 85 ( 99TH AVE) WIDEN ROADWAY TBD FY 10 KHRC1
MU1H 101L MA 47.0 E SR 101 AT CHAPARRAL ROAD ADD LEFT LANES AT TI TBD FY 10
FC1J 143 MA 0.0 H752801C E SR 143 / SKY HARBOR BLVD TI TRAFFIC INTERCHANGE IMPROVEMENTS TBD FY 10
11710 RJ1C 160 NA 375.2 H JCT SR 564 - TSEGI, PH I CONST DUAL PASSING LNS TBD FY 10
XT1H 180 AP 402.0 G JCT SR 260 / US 180 & RODEO GROUNDS INTERSECTIO REALIGN INTERSECTION TBD FY 10
14002 FF1C 191 CH 62.0 H416501C S COCHISE UPRR OP # 2530 BRIDGE REPLACEMENT. TBD FY 10
QF1G 191 GE 153.0 S GUTHRIE BRIDGE # 352 DEMOLITION PA FOR BRIDGE DEMOLITION TBD FY 10 HDKA1
12303 LV1C 191 AP 367.0 H436001C H NAHATA' DZIIL ROAD - SANDERS TI RECONSTRUCT 3 BRIDGES AND RDWY TBD FY 10 SVSG1
GI1F 191 AP 390.0 H602501C 191- E- 505 H WIDE RUINS WIDENING FOR PASSING/ CLIMBING LANES, SAFE TBD FY 10 WERS1
KA1G 191 AP 446.0 HX12001C H US 191 AT IR 102 CNST TRAFFIC SIGNAL TBD FY 10
41210 UA1H 202L MA 0.0 E 51ST AVE TO I- 10 WEST CONSTRUCT ROADWAY TBD FY 10 TBD
11902 RH1B 260 GI 269.0 H469801C 260- B P DOUBTFUL CANYON SECTION RECONSTRUCT ROADWAY & CONSTRUCTION W TBD FY 10 SVBW1
WB1H 264 AP 474.5 H712101C H BLACK CREEK BRIDGE ( STR # 624) SCOUR RETROFIT TBD FY 10
41410 SZ1J 888 MA 0.0 H752501C E NOISE MITIGATION ON THE MAG REGIONAL FREEWAY SYSTEM ENHANCEMENT - OTHER ENHANCEMEN TBD FY 10
UW1J 86 PM 128.5 T SANTA ROSA RANCH SEGMENT DESIGN ROADWAY WIDENING DESIGN FY 10
15708 UI1H 95 MO 0.0 K LAKE HAVASU STATE PARK DESIGN ( LAUNCH RAMPS) DESIGN FY 10 TBD
14610 DE1J 177 GI 0.0 G CLIMBING PARK DESIGN DESIGN FY 10
41310 UE1H 202L MA 0.0 E I- 10 EAST/ SANTAN TI TO 51ST AVE DESIGN & R/ W DESIGN FY 10 TBD
VL1J 0000 MA 0.0 SS72001C CM - SUR- 0( 206) A E WEST OF 219TH AVENUE PAVE DIRT ROADS FY 10
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
3RD SORT: BID DATE, RTE, MP Page 8 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
VK1J 0000 GI 0.0 SS71803D HPP - GGI- 0( 204) A G TONTO CREEK BRIDGE DESIGN BRIDGE APPROACHES FY 10
VT1J 0000 MA PEO SS72101C CM - PEO( 230) A E HYBRID FIBER- TO- WIRELESS COMMUNICATION SYSTE TRAFFIC SIGNAL NETWORK FY 10
HB1J 60 LA 45.8 H733501C Y US 60 AT VICKSBURG ROAD INTERSECTION IMPROVEMENT JUL 09
ES1H 89 CN 495.0 H682701C F THE GAP - CEDAR RIDGE TP SHOULDER WIDENING JUL 09
VI1J 0000 MA 0.0 SS71701C CM - GDV- 0( 201) A E DYNAMIC MESSAGE SIGNS VARIOUS LOCATIONS FY 10
WN1G 8 YU 6.0 Y BUSINESS 8 AND AVE 2 1/ 2 E DRAINAGE STUDY & IMPROVEMENT AUG 09
40309 GO1H 60 MA 138.0 H686601C 060- B( 201) E SR 303L TO 99TH AVE WIDEN ROADWAY AUG 09
FI1G 86 PM 145.0 H658101C T RESERVATION BOUNDRY TO BRAWLY WASH 3" AC & SC ( POLY) AUG 09
CU1H 191 GE 163.0 S SAN FRANCISCO RIVER BR # 563 BRIDGE REPLACEMENT AUG 09
NV1H 0000 MA 0.0 SS57701C CM - SCT- 0( 015) X E SCOTTSDALE ROAD CONSTRUCT ITS PROJECT FY 10
KD1H 177 PN 163.0 H692101C HES - 177- A( 003) A G SR 177, MP 163.80- 164.40 CURVE RE- ALIGNMENT NOV 09
VJ1J 0000 MA 0.0 SS71601C CM - PHX- 0( 224) A E PAVE DIRT ALLEYS VARIOUS LOCATIONS FY 10
ZT1H 40 CN 224.5 F BABBITTS TANK WASH BRIDGE SYSTEM ENHANCEMENT - ENGINEERING DEC 09
QL1H 40 NA 278.0 H TANNER WASH BRIDGE WB # 459 BRIDGE REPLACEMENT DEC 09
ER1H 89 CN 420.0 H682601C F TOWNSEND - FERNWOOD RR 4" & ARFC DEC 09
FO1G 160 NA 402.0 H658501C H JCT N 59 TO DENNEHOTSO 3" COLD RECYCLE & ARFC DEC 09
BC1J 0000 MA 0.0 SB42801C BR - MMA- 0( 202) A E OLD US 80 BRIDGE BRIDGE REHABILITATION FY 10
MN1J 89 CN 371.0 F WEST SEDONA ( NB & SB) R & R 2.5" AC & FR JAN 11
43711 TF1J 10 MA 125.0 E SARIVAL AVENUE TO DYSART ROAD CONSTRUCT LANDSCAPE TBD FY 11
EM1G 10 PM 253.0 H624101C T RUTHRAUFF RD - PRINCE RD CONSTRUCT MAINLINE WIDENING TO 8 LANES TBD FY 11 ENBS2
XQ1F 15 MO 9.0 F FARM ROAD TI CONSTRUCT NEW UNDERPASS TBD FY 11
10506 EM1E 40 CN 205.0 H545701C F WALNUT CANYON ( WB) RECONSTRUCT ROADWAY ( REPROFILE VERTICA TBD FY 11 KHRC1
23701 ZY1D 40 AP 340.0 H552601C 040- E( 001) H SANDERS PORT OF ENTRY RECONSTRUCT POE TBD FY 11 TBA
10211 CW1J 60 LA 0.0 H739001C P ALAMO LAKE STATE PARK CONSTRUCT PARKING TBD FY 11 PBBF1
12910 GS1H 60 PN 222.3 G SILVER KING SECTION RECONSTRUCT ROADWAY TBD FY 11
10610 XG1G 70 GI 253.4 G RAILROAD OVERPASS TO JCT SR 77 CONSTRUCT NEW ROADWAY & RAILROAD STRU TBD FY 11
FF1G 73 NA 342.0 G WHITERIVER TO COAL MINE CANYON 2" AC & ARFC TBD FY 11
10311 CY1J 77 PN 0.0 H739101C T ORACLE STATE PARK CONSTRUCT PARKING TBD FY 11
10411 AR1E 82 SC 0.0 H718201C T PATAGONIA LAKE STATE PARK CONSTRUCT ROAD TBD FY 11 HDSM1
12405 IV1A 89A CN 399.0 H413401C 366- F AIRPORT ROAD TI ( JW POWELL BLVD) CONSTRUCT INTERSECTION IMPR TBD FY 11
10910 DJ1G 90 CH 323.5 S CENTRAL AVE TO MOSON RD, E OF SIERRA VISTA WIDEN TO 5 LANES TBD FY 11
11410 HC1H 93 MO 104.1 H738901C K SB RANCH ROAD CONSTRUCT PARALLEL ROADWAY TBD FY 11 MBAP1
11510 AA1C 95 YU 32 063- 1 Y AVENUE 9E TO ABURDEEN ROAD RECONSTRUCT FORTUNA WASH BRIDGE & WID TBD FY 11
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
3RD SORT: BID DATE, RTE, MP Page 9 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
11406 SK1E 191 GH 91.8 H503704C 191- B S DIAL WASH TO TEN RANCH ( SEG II) CONSTRUCT PARALLEL ROADWAY TBD FY 11 TBA
12010 EB1E 191 AP 446 H543801C H CHINLE SOUTH ROADWAY WIDENING TBD FY 11
41211 UB1H 202L MA 0.0 E 51ST AVE TO I- 10 WEST CONSTRUCT ROADWAY TBD FY 11 TBD
12510 HI1H 260 NA 317.2 H770501C G HEBER - SHOW LOW EB & WB CONSTRUCT PASSING LANES TBD FY 11
43311 DJ1J 303L MA 0.0 E I- 10/ 303L TI, PHASE I ( I- 10 REALIGNMENT) CONSTRUCT TI TBD FY 11
40511 TR1H 17 MA 215.0 E 101L- CAREFREE HIGHWAY DESIGN FMS DESIGN FY 11
40611 CV1J 51 MA 13.6 E BELL ROAD - SR 101L DESIGN FMS DESIGN FY 11
40711 TT1H 60 MA 0.0 E LINDSEY RD HALF INTERCHANGE DESIGN TI DESIGN FY 11
41011 TV1H 101L MA 0.0 E I- 17 TO SR 51 DESIGN FMS DESIGN FY 11
41611 TX1H 202L MA 0.0 E DOBSON ROAD TO I- 10 DESIGN FMS DESIGN FY 11
41411 UG1H 202L MA 0.0 E RURAL RD TO SR 101L DESIGN GPL DESIGN FY 11 TBD
XA1J 0000 MA CHN SS72601C CM - CHN- 0( 210) A E CHANDLER BLVD TRAFFIC SIGNAL INTERCONNECT FIBER OPTIC - DELAWARE ST TO GILBERT RD FY 11
WR1J 0000 MA ELM SS72301C CM - ELM- 0( 200) A E 125TH & 127TH AVENUE PAVE UNPAVED ROADS FY 11
WS1J 0000 MA ELM SS72401C CM - ELM- 0( 201) A E 129TH AVENUE PAVE UNPAVED ROADS FY 11
WX1J 0000 MA MES SS73101C CM - MES- 0( 206) X E ITS SIGNAL CONVERSIONS - PHASE 4A FIBER OPTIC LINK FY 11
WY1J 0000 MA MES SS73201C CM - MES- 0( 205) X E ITS SIGNAL CONVERSIONS - PHASE 4B FIBER OPTIC LINK FY 11
XB1J 0000 MA PEO SS72801C CM - PEO- 0( 204) A E OLIVE AVENUE - UNDERPASS NEW RIVER TRAIL UNDERPASS CONSTRUCTION FY 11
WZ1J 0000 MA PHX SS72501C STP - PHX- 0( 228) A E MCDOWELL ROAD & 32ND STREET INTERRSECTION IMPROVEMENT FY 11
WQ1J 0000 MA SCT SS72201C CM - SCT- 0( 205) A E INDIAN BEND ROAD MCCORMICK STILLMAN RR PARK FY 11
WT1J 0000 MA SUP SS72701C CM - SUP- 0( 207) X E PEORIA AVENUE FIBER OPTIC INTERCONNECTS FY 11
WU1J 0000 PM TUC SS73001C STP - TUC- 0( 226) A T PANTANO BOULEVARD PAVEMENT RECONSTRUCTION FY 11
WV1J 0000 PM TUC SS73003D STP - TUC- 0( 226) A T PANTANO BOULEVARD DESIGN PAVEMENT RECONSTRUCTION FY 11
16006 QT1F 101L MA 53.5 E BALBOA DRIVE CONSTRUCT MULTI- USE PATH BRIDGE OVER TH IGA FY 12
10112 CL1J 10 PN 0.0 T GILA RIVER INDIAN TRIBAL BOUNDARY TO I- 8 WIDEN ROADWAY TBD FY 12
11209 EK1G 10 PM 232.4 T PINAL AIR PARK - MARANA, PH II CONST MAINLINE WIDENING 6 LN TBD FY 12
11112 CO1J 10 PM 236.4 T MARANA ROAD TO INA ROAD RECONSTRUCT & WIDEN FRONTAGE ROADS TBD FY 12
40312 TS1H 17 MA 209.0 E ARIZONA CANAL - 101L CONSTRUCT FMS TBD FY 12
10212 CU1J 17 YV 232.0 P ROCK SPRINGS TO CORDES JUNCTION WIDEN ROADWAY TBD FY 12
TA1H 40 CN 198.0 F BUTLER AVE TI SYSTEM ENHANCEMENT- ENGINEERING TBD FY 12 RBML1
10612 QP1C 60 NA 342.0 G SHOW LOW TO LITTLE MORMON LAKE WIDEN ROADWAY TBD FY 12
14110 AY1G 77 PM 82.0 077- A T TANGERINE ROAD - PINAL COUNTY LINE WIDENING TO 6 LANES TBD FY 12 TBA
KS1H 80 CH 318.0 S TOMBSTONE TO JUNCTION SR 90 EXTEND CULVERTS TBD FY 12 PSMR1
EE1F 82 SC 38.0 H598701C T SR 82, MP 38 - 39.5 SLOPE FLATTENING TBD FY 12 RSKP1
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
3RD SORT: BID DATE, RTE, MP Page 10 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
10512 CZ1J 89 YV 317.5 P JCT 89A TO MP 324 WIDEN THE SR 89 CORRIDOR TBD FY 12
10412 DA1J 89 CN 464.5 F CAMERON SECTION CONSTRUCT 4- LANE URBAN, SR 64 INTERSECTI TBD FY 12
10312 LE1G 93 MO 101.8 K ANTELOPE WASH CONSTRUCT 4- LANE DIVIDED HIGHWAY TBD FY 12
41612 UH1H 303L MA 0.0 E I- 10 TO US 60 ( GRAND AVE) CONSTRUCT NEW FREEWAY TBD FY 12 TBD
11212 CP1J 10 PM 262.5 T KINO TI DESIGN TRAFFIC INTERCHANGE DESIGN FY 12
11512 CR1J 10 PM 267.1 T VALENCIA ROAD TI CONSTRUCT TRAFFIC INTERCHANGE DESIGN FY 12
40913 CM1J 10 MA 122.0 H770901C E PERRYVILLE ROAD CONSTRUCT TI TBD FY 13
11113 TL1J 10 PM 236.4 T MARANA ROAD TO INA ROAD ( FRONTAGE ROADS) RECONSTRUCT & WIDEN FRONTAGE ROADS TO TBD FY 13
11313 CS1J 10 PM 269.4 T WILMOT ROAD TI UPGRADE EXISTING TRAFFIC INTERCHANGE TBD FY 13
40112 CT1J 17 MA 209.0 E ARIZONA CANAL TO SR 101L CONSTRUCT GPL TBD FY 13
11207 QK1C 19 PM 58.7 H510501C T VALENCIA RD TO AJO WAY WIDEN ROADWAY TBD FY 13 TBA
10213 EC1H 40 MO 56.5 K RATTLESNAKE WASH TI CONSTRUCT NEW TI TBD FY 13 TBA
40612 CX1J 60 MA 194.0 E MERIDIAN ROAD CONSTRUCT TI TBD FY 13
10313 TD1J 60 PN 212.0 G SUPERIOR STREETS RECONSTRUCT TO 4 LANE RDWY W/ CNT TURN L TBD FY 13
10113 TE1J 89A YV 319.0 P JCT 89A TO CHINO VALLEY ( S. CHINO LIMITS) - PH II CONSTRUCT ROADWAY WIDENING TBD FY 13
10413 TC1J 93 MO 116.0 K CARROW TO STEPHENS CONSTRUCT 4- LANE DIVIDED HIGHWAY TBD FY 13
40013 UF1H 202L MA 0.0 E I- 10 EAST/ SANTAN TI TO 51ST AVE CONSTRUCT ROADWAY TBD FY 13 TBD
41711 TW1H 202L MA 0.0 E DOBSON ROAD TO I- 10 CONSTRUCT HOV/ RAMP TBD FY 13
41313 DK1J 303L MA 0.0 E US 60 ( GRAND AVE) TO I- 17 CONSTRUCT ROADWAY TBD FY 13
11312 CQ1J 10 PM 264.0 T COUNTRY CLUB ROAD TI CONSTRUCT NEW TRAFFIC INTERCHANGE DESIGN FY 13
40313 DD1J 101L MA 23.5 E I- 17 TO TATUM BLVD CONSTRUCT HOV LANE DESIGN FY 13
10306 RE1E 17 CN 322.0 017- B F MUNDS PARK TI DESIGN TRAFFIC INTERCHANGE JUN 14 KHRC1
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
4TH SORT: TRACS # Page 1 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
41210 UA1H 202L MA 0.0 E 51ST AVE TO I- 10 WEST CONSTRUCT ROADWAY TBD FY 10 TBD
40312 TS1H 17 MA 209.0 E ARIZONA CANAL - 101L CONSTRUCT FMS TBD FY 12
41313 DK1J 303L MA 0.0 E US 60 ( GRAND AVE) TO I- 17 CONSTRUCT ROADWAY TBD FY 13
40711 TT1H 60 MA 0.0 E LINDSEY RD HALF INTERCHANGE DESIGN TI DESIGN FY 11
43311 DJ1J 303L MA 0.0 E I- 10/ 303L TI, PHASE I ( I- 10 REALIGNMENT) CONSTRUCT TI TBD FY 11
10910 DJ1G 90 CH 323.5 S CENTRAL AVE TO MOSON RD, E OF SIERRA VISTA WIDEN TO 5 LANES TBD FY 11
41011 TV1H 101L MA 0.0 E I- 17 TO SR 51 DESIGN FMS DESIGN FY 11
41711 TW1H 202L MA 0.0 E DOBSON ROAD TO I- 10 CONSTRUCT HOV/ RAMP TBD FY 13
DG1J 273 AP 380.0 G SR 273, BETWEEN MPS 377.46 AND 381.46 SYSTEM ENHANCEMENT - ENGINEERING MAR 10
41611 TX1H 202L MA 0.0 E DOBSON ROAD TO I- 10 DESIGN FMS DESIGN FY 11
14610 DE1J 177 GI 0.0 G CLIMBING PARK DESIGN DESIGN FY 10
40313 DD1J 101L MA 23.5 E I- 17 TO TATUM BLVD CONSTRUCT HOV LANE DESIGN FY 13
10412 DA1J 89 CN 464.5 F CAMERON SECTION CONSTRUCT 4- LANE URBAN, SR 64 INTERSECTI TBD FY 12
FF1G 73 NA 342.0 G WHITERIVER TO COAL MINE CANYON 2" AC & ARFC TBD FY 11
TQ1J 0000 MA CHN CM - CHN- 0( 208) A E LOOP 101 @ GALVESTON ST MULTI- USE PATH & BRIDGE FY 09
41211 UB1H 202L MA 0.0 E 51ST AVE TO I- 10 WEST CONSTRUCT ROADWAY TBD FY 11 TBD
UC1J 17 CN 316.5 F ROCKY PARK- MCCONNELL SYSTEM PRESERVATION - ENGINEERING TBD FY 09
40809 UD1H 202L MA 0.0 E I- 10 EAST/ SANTAN TI TO 51ST AVE DESIGN AND R/ W DESIGN FY 09 TBD
UD1J 17 YV 279.6 P SR169 - ROCKY PARK SYSTEM PRESERVATION - ENGINEERING TBD FY 10
41310 UE1H 202L MA 0.0 E I- 10 EAST/ SANTAN TI TO 51ST AVE DESIGN & R/ W DESIGN FY 10 TBD
10306 RE1E 17 CN 322.0 017- B F MUNDS PARK TI DESIGN TRAFFIC INTERCHANGE JUN 14 KHRC1
41411 UG1H 202L MA 0.0 E RURAL RD TO SR 101L DESIGN GPL DESIGN FY 11 TBD
15708 UI1H 95 MO 0.0 K LAKE HAVASU STATE PARK DESIGN ( LAUNCH RAMPS) DESIGN FY 10 TBD
40808 UK1H 202L MA 0.0 E 51ST AVE TO I- 10 WEST CONSTRUCT ROADWAY TBD FY 09 TBD
UL1H 160 CN 349.0 F US 160 TURN LANES AT NAVAJO ROUTE CONSTRUCT TURN LANES JUN 09 PLCH1
15208 NSSP 89A YV 0.0 F RED ROCK STATE PARK DESIGN DESIGN FY 09
13509 TZ1H 89A CN ASP F SLIDE ROCK STATE PARK DESIGN ( ADD'L PRRKING ) DESIGN FY 09
13607 QG1F 85 MA 120.5 Y MP 120.54 - MP 122.99 CONSTRUCT ROADWAY TBD FY 09 TBA
11710 RJ1C 160 NA 375.2 H JCT SR 564 - TSEGI, PH I CONST DUAL PASSING LNS TBD FY 10
RA1J 0000 PM TUC STP - TUC- 0( 222) A T ITS TRAFFIC SIGNAL TIMING STUDY TIMING STUDY - VARIOUS LOCATIONS FY 09
11209 EK1G 10 PM 232.4 T PINAL AIR PARK - MARANA, PH II CONST MAINLINE WIDENING 6 LN TBD FY 12
EO1G 19 PM 34.0 T CANOA TI - CONTINENTAL TI CONST ROADWAY ( NB FRONTAGE RD) IGA FY 09
16006 QT1F 101L MA 53.5 E BALBOA DRIVE CONSTRUCT MULTI- USE PATH BRIDGE OVER TH IGA FY 12
10612 QP1C 60 NA 342.0 G SHOW LOW TO LITTLE MORMON LAKE WIDEN ROADWAY TBD FY 12
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
4TH SORT: TRACS # Page 2 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
EE1E 89 YV 288 089- A- 201 P SR- 89 @ KIRKLAND JCT / WAGNER RD CST RT & LT TURN LNS, SHOULDER TBD FY 10 DVJB1
10213 EC1H 40 MO 56.5 K RATTLESNAKE WASH TI CONSTRUCT NEW TI TBD FY 13 TBA
QL1J 10 PM 247.0 T INA RD TO RUTHRAUFF RD DCR / EA AND 30% DESIGN DESIGN FY 09
43509 SR1H 17 MA 215.0 E SR 101L TO CAREFREE HWY ( SR 74) CONSTRUCT LANDSCAPE TBD FY 10
43208 ST1H 202L MA 0.0 E LINDSAY ROAD TO GILBERT ROAD DESIGN & CONST MULTI- USE PATH TBD FY 09
DP1G 95 YU 38.0 095- B- 308 Y WELLTON MOHAWK CANAL BRIDGE # 343 BRIDGE REHAB TBD FY 10
SX1J 10 PN 210.1 T I- 10 / SR 87 TI CAPACITY ADDITIONS - ENGINEERING TBD FY 10 PBDL1
40511 TR1H 17 MA 215.0 E 101L- CAREFREE HIGHWAY DESIGN FMS DESIGN FY 11
QF1G 191 GE 153.0 S GUTHRIE BRIDGE # 352 DEMOLITION PA FOR BRIDGE DEMOLITION TBD FY 10 HDKA1
TA1H 40 CN 198.0 F BUTLER AVE TI SYSTEM ENHANCEMENT- ENGINEERING TBD FY 12 RBML1
11609 ES1G 86 PM 137.1 T SAN PEDRO ROAD SEGMENT WIDEN ROADWAY TO 40' TBD FY 10
10413 TC1J 93 MO 116.0 K CARROW TO STEPHENS CONSTRUCT 4- LANE DIVIDED HIGHWAY TBD FY 13
10007 EX1F 60 PN 230.0 060- D G OAK FLAT - DEVIL'S CANYON CONSTRCT PASSING/ CLIMBING LANE TBD FY 09 TBA
10313 TD1J 60 PN 212.0 G SUPERIOR STREETS RECONSTRUCT TO 4 LANE RDWY W/ CNT TURN L TBD FY 13
10113 TE1J 89A YV 319.0 P JCT 89A TO CHINO VALLEY ( S. CHINO LIMITS) - PH II CONSTRUCT ROADWAY WIDENING TBD FY 13
43711 TF1J 10 MA 125.0 E SARIVAL AVENUE TO DYSART ROAD CONSTRUCT LANDSCAPE TBD FY 11
11407 PN1F 17 MA 208.9 017- A E PEORIA AVE TO GREENWAY RD DRAINAGE IMPROVEMENTS TBD FY 09 TBA
11113 TL1J 10 PM 236.4 T MARANA ROAD TO INA ROAD ( FRONTAGE ROADS) RECONSTRUCT & WIDEN FRONTAGE ROADS TO TBD FY 13
10208 PJ1F 10 PM 248.0 010- D T INA ROAD TI RECONSTRUCT TI & MAINLINE TBD FY 10 TBA
41612 UH1H 303L MA 0.0 E I- 10 TO US 60 ( GRAND AVE) CONSTRUCT NEW FREEWAY TBD FY 12 TBD
QL1H 40 NA 278.0 H TANNER WASH BRIDGE WB # 459 BRIDGE REPLACEMENT DEC 09
11510 AA1C 95 YU 32 063- 1 Y AVENUE 9E TO ABURDEEN ROAD RECONSTRUCT FORTUNA WASH BRIDGE & WID TBD FY 11
KO1H 40 MO 11.0 K CHEMEHUEVI & BOULDER WASH BRIDGES SCOUR RETROFIT JAN 10
10112 CL1J 10 PN 0.0 T GILA RIVER INDIAN TRIBAL BOUNDARY TO I- 8 WIDEN ROADWAY TBD FY 12
JL1G 72 LA 13.1 Y SR- 72 MP 13.1 - 17.0 SHOULDERS & SLOPES MAY 09
MU1H 101L MA 47.0 E SR 101 AT CHAPARRAL ROAD ADD LEFT LANES AT TI TBD FY 10
13410 BB1G 10 PM 246.5 T CORTARO ROAD TI CONSTRUCT NEW TI TBD FY 10 TBA
40013 UF1H 202L MA 0.0 E I- 10 EAST/ SANTAN TI TO 51ST AVE CONSTRUCT ROADWAY TBD FY 13 TBD
14110 AY1G 77 PM 82.0 077- A T TANGERINE ROAD - PINAL COUNTY LINE WIDENING TO 6 LANES TBD FY 12 TBA
IH1J 89A YV 373.1 F SR 89A JCT AIRPORT ROAD INTERSECTION IMPROVEMENT JUN 09
14607 HX1G 10 PM 288.4 T CIENEGA CREEK- MARSH STATION PHASE II NEW RAILROAD TRACKS TBD FY 09
13910 GY1H 86 PM 132.8 T KITT PK ROAD SEGMENT ROADWAY WIDENING TBD FY 10
10610 XG1G 70 GI 253.4 G RAILROAD OVERPASS TO JCT SR 77 CONSTRUCT NEW ROADWAY & RAILROAD STRU TBD FY 11
KQ1H 0000 MA QCR STP - QCR- 0( 001) A E RIGGS RD, ELLSWORTH TO MERIDIAN CONSTRUCT NEW RDWAY FY 09
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
4TH SORT: TRACS # Page 3 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
22706 GV1H 80 CH 364.0 S DOUGLAS STRTGC INSPECTION STATION INSTALL VOICE & DATA LINES IGA FY 10
JK1G 95 LA 131.7 Y SR- 95 @ MP 131.7 - 142.7 SHOULDER IMPROVEMENTS MAY 09
46208 XP1G 87 MA 211.8 P MP 211.8 TO MP 213.0 REPAIR CUT SLOPES FOR EROSION CONTROL TBD FY 10
XQ1F 15 MO 9.0 F FARM ROAD TI CONSTRUCT NEW UNDERPASS TBD FY 11
XT1H 180 AP 402.0 G JCT SR 260 / US 180 & RODEO GROUNDS INTERSECTIO REALIGN INTERSECTION TBD FY 10
40610 GT1H 74 MA 13.0 P US 60 - 303L, MP 13 - MP 15 ( EB) CONSTRUCT PASSING LANE TBD FY 10
12910 GS1H 60 PN 222.3 G SILVER KING SECTION RECONSTRUCT ROADWAY TBD FY 11
YH1G 87 MA 204.3 E NEW FOUR PEAKS RD TO DOS S RANCH RD CLIMBING LANE AND SHOULDER WIDENING TBD FY 10
40310 GP1H 60 MA 148.9 E SR 101L ( AGUA FRIA) - MCDOWELL RD WIDEN ROADWAY TBD FY 10
GG1J 66 MO 57.3 K AIRWAY AVENUE & MOHAVE AIRPORT DRIVE INTERSE CONCRETE MEDIAN & ASPHALT PAVING MAR 09
43010 GK1H 17 MA 204.9 E BETHANY HOME RD TO NORTHERN AVE DESIGN/ CONSTRUCT PEDESTRIAN WALKWAY AL TBD FY 10
ZT1H 40 CN 224.5 F BABBITTS TANK WASH BRIDGE SYSTEM ENHANCEMENT - ENGINEERING DEC 09
ZY1B 89 YV 313.8 029- 1 P SUNDOG RD BRIDGE ( OLD BLK CYN HWY TURNBACK OWNERSHIP & MAINTENANCE ( IGA R IGA FY 10
XL1G 70 GH 331 070- A- 310 S US 70 PIMA TO THATCHER DESIGN SLOPE FLATTING TBD FY 10 EEJM1
40611 CV1J 51 MA 13.6 E BELL ROAD - SR 101L DESIGN FMS DESIGN FY 11
14510 CN1J 10 PN 199.1 T JCT I 8 TO PICACHO PEAK TI WIDEN ROADWAY TBD FY 10
CU1H 191 GE 163.0 S SAN FRANCISCO RIVER BR # 563 BRIDGE REPLACEMENT AUG 09
40112 CT1J 17 MA 209.0 E ARIZONA CANAL TO SR 101L CONSTRUCT GPL TBD FY 13
11313 CS1J 10 PM 269.4 T WILMOT ROAD TI UPGRADE EXISTING TRAFFIC INTERCHANGE TBD FY 13
10512 CZ1J 89 YV 317.5 P JCT 89A TO MP 324 WIDEN THE SR 89 CORRIDOR TBD FY 12
10312 LE1G 93 MO 101.8 K ANTELOPE WASH CONSTRUCT 4- LANE DIVIDED HIGHWAY TBD FY 12
40612 CX1J 60 MA 194.0 E MERIDIAN ROAD CONSTRUCT TI TBD FY 13
40710 MC1G 85 MA 122.0 E SR 85, HAZEN RD - BROADWAY RD ( MAIN LINE) RECONSTRUCT & WIDEN TBD FY 10
MD1J 89 YV 269.0 P MARTINEZ RIVER BRIDGE ( STR # 1320) SCOUR RETROFIT TBD FY 10
11312 CQ1J 10 PM 264.0 T COUNTRY CLUB ROAD TI CONSTRUCT NEW TRAFFIC INTERCHANGE DESIGN FY 13
11512 CR1J 10 PM 267.1 T VALENCIA ROAD TI CONSTRUCT TRAFFIC INTERCHANGE DESIGN FY 12
UW1J 86 PM 128.5 T SANTA ROSA RANCH SEGMENT DESIGN ROADWAY WIDENING DESIGN FY 10
KS1H 80 CH 318.0 S TOMBSTONE TO JUNCTION SR 90 EXTEND CULVERTS TBD FY 12 PSMR1
11212 CP1J 10 PM 262.5 T KINO TI DESIGN TRAFFIC INTERCHANGE DESIGN FY 12
UU1J 101L MA 59.5 E SR 101L ( PRICE FREEWAY) @ GALVESTON SRP DRAINAGE INPROVEMENTS ASSOCIATED WI TBD FY 09
WN1G 8 YU 6.0 Y BUSINESS 8 AND AVE 2 1/ 2 E DRAINAGE STUDY & IMPROVEMENT AUG 09
11112 CO1J 10 PM 236.4 T MARANA ROAD TO INA ROAD RECONSTRUCT & WIDEN FRONTAGE ROADS TBD FY 12
MN1J 89 CN 371.0 F WEST SEDONA ( NB & SB) R & R 2.5" AC & FR JAN 11
21301 LY1C 260 GI 258.0 P LION SPRINGS SECTION DESIGN ( ROADWAY) DESIGN FY 09
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
4TH SORT: TRACS # Page 4 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
10212 CU1J 17 YV 232.0 P ROCK SPRINGS TO CORDES JUNCTION WIDEN ROADWAY TBD FY 12
20206 3WSP 10 PM 288.4 H239001C 010- E T CIENEGA CREEK - MARSH STATION PH1 RAILROAD GRADE & DRAIN MAR 09
10900 AR1B 10 PM 288.6 H239101C 10- 5-( 068) N S PANTANO RR UP/ CIENEGA CREEK SECTION CONSTRUCT STRUCTURE TBD FY 09
12405 IV1A 89A CN 399.0 H413401C 366- F AIRPORT ROAD TI ( JW POWELL BLVD) CONSTRUCT INTERSECTION IMPR TBD FY 11
14002 FF1C 191 CH 62.0 H416501C S COCHISE UPRR OP # 2530 BRIDGE REPLACEMENT. TBD FY 10
13603 GM1C 17 YV 263.0 H426901C 17- 2( ) P CORDES JCT TI RECONSTRUCT TI TBD FY 09 HDJC1
12303 LV1C 191 AP 367.0 H436001C H NAHATA' DZIIL ROAD - SANDERS TI RECONSTRUCT 3 BRIDGES AND RDWY TBD FY 10 SVSG1
11606 AJ1C 191 AP 417.5 H451801C STP - 191- E( 200) A H BURNSIDE JUNCTION - NORTH ROADWAY WIDENING TBD FY 09 TBA
11902 RH1B 260 GI 269.0 H469801C 260- B P DOUBTFUL CANYON SECTION RECONSTRUCT ROADWAY & CONSTRUCTION W TBD FY 10 SVBW1
14601 RG1B 260 GI 263.1 H469901C P LITTLE GREEN VALLEY RECONSTRUCT ROADWAY TBD FY 09 AMRM1
TDSP 89 CN 546.5 H475301C F PAGE REST AREA CONST REST AREA & VISITOR CNTR TBD FY 10
11406 SK1E 191 GH 91.8 H503704C 191- B S DIAL WASH TO TEN RANCH ( SEG II) CONSTRUCT PARALLEL ROADWAY TBD FY 11 TBA
12407 FX1C 10 MA 161.2 H505101C E SR 202L ( SANTAN) TO RIGGS ROAD CONST HOV & GEN PURPOSE LANE TBD FY 10 PALL1
11207 QK1C 19 PM 58.7 H510501C T VALENCIA RD TO AJO WAY WIDEN ROADWAY TBD FY 13 TBA
22802 UX1C 160 CN 311.5 H527401C 160- A-( 001) F JCT 89 - VAN'S TRADING POST 2" ARAC & ARFC & TURNLANES TBD FY 09
16604 RV1E 86 PM 145.6 H543401C S - 086- A- 500 T MP 145.6 - BRAWLEY WASH EXTEND BOX CULVERTS TBD FY 09 TBA
12010 EB1E 191 AP 446 H543801C H CHINLE SOUTH ROADWAY WIDENING TBD FY 11
10506 EM1E 40 CN 205.0 H545701C F WALNUT CANYON ( WB) RECONSTRUCT ROADWAY ( REPROFILE VERTICA TBD FY 11 KHRC1
11308 EO1E 77 NA 364.0 H546001C 077- B H MP 364 TO 372 CONSTRUCT PASSING LANE TBD FY 10 TBA
23701 ZY1D 40 AP 340.0 H552601C 040- E( 001) H SANDERS PORT OF ENTRY RECONSTRUCT POE TBD FY 11 TBA
PK1E 95 YU 63.0 H584101C Y PELIGRO - CLARKS PA ( 3" AC + FC) JUN 09
20806 WW1G 85 MA 152 H595514C E SOUTHERN AVE TO I- 10 CONSTRUCT ROADWAY TBD FY 09
EE1F 82 SC 38.0 H598701C T SR 82, MP 38 - 39.5 SLOPE FLATTENING TBD FY 12 RSKP1
GI1F 191 AP 390.0 H602501C 191- E- 505 H WIDE RUINS WIDENING FOR PASSING/ CLIMBING LANES, SAFE TBD FY 10 WERS1
18606 MU1F 17 YV 299.0 H613601C F YAVAPAI COUNTY - JCT SR 179 ( SB) RR ( 4" TL, 3" PL) + RR ARFC FEB 09
PB1F 40B YV 145.0 H621301C B40- C( 002) A K ASH FORK, 40B, 3RD ST TO 8TH ST SIDEWALK TBD FY 09 TBA
OV1F 260 NA 350.0 H621401C TEA - 260- C( 003) A G SR 260 PORTER MTN RD - WOODLAND RD LANDSCAPING, IRRIGATION & PEDESTRIAN LIGH TBD FY 09 TBA
EM1G 10 PM 253.0 H624101C T RUTHRAUFF RD - PRINCE RD CONSTRUCT MAINLINE WIDENING TO 8 LANES TBD FY 11 ENBS2
28303 RO1F 80 CH 364.0 H624301C CBI - 080- A( 009) B S DGLS STGC WEIGHT & INSP STATION DSGN/ CST WEIGHT & INSP STATION MAR 09 MBFG1
UP1F 86 PM 74.0 H630201C T SR- 86, MP 73.99 - 77.69 SYMMETRICAL WIDENING MAR 09
AP1G 160 NA 389.5 H635601C 160- A( 200) A H KAYENTA - JCT IR 59 3" AC + ACFC DEC 08
AC1G 17 YV 245.2 H636801C HES - 017- B( 201) A P BLACK CANYON HILL - ( SB) MILL AND REPLACE AND SAFETY IMPROVEMENT TBD FY 09
JJ1G 95 LA 156.6 H638001C Y SR 95, HOLIDAY HARBOUR DRAINAGE STUDY TBD FY 10 PBGS1
14406 VB1E 10 PM 260.0 H640401C 010- E T I- 10 / I- 19 ( FMS, PHASE 2) EXTEND ITS SYSTEMS ALONG I- 10 & I- 19 TBD FY 09 TRMM1
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
4TH SORT: TRACS # Page 5 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
ZK1F 191 GE 160.0 H643201C S BACK COUNTRY BYWAY ( NORTH INTER) SAFETY IMPROVEMENTS TBD FY 09
CH1G 70 GI 256.0 H645301C G OLD WINKELMAN HIGHWAY AND BIA ROUTE 6 INTERSECTION IMPROVEMENTS APR 09 HZJS1
CM1G 89 YV 313.0 H648401C 089- B- 305 P GRANITE CREEK BRIDGE # 2869 BRIDGE REPLACEMENT TBD FY 09
10106 CN1G 10 CH 300.2 H650401C NH - 010- E( 200) N S SR 90 TI RECONSTRUCT SR 90 TI AND ADD PASSING LAN TBD FY 10 URJR1
CV1G 191 CH 48.3 H650901C S SUNSITES @ HIGH STREET WIDEN ROADWAY FOR TURN LANES DEC 08 HERW1
FD1G 60 GI 278.0 H657401C G TIMBER MT TO SENECA RR 3" & ARFC FEB 09
FG1G 78 GE 154.0 H657901C S JCT 191 TO FOREST SERVICE BOUNDARY CHIP SEAL AND GUARDRAIL EXTENSION APR 09
FH1G 80 CH 368.0 H658001C STP - 080- B( 200) A S EAST OF DOUGLAS 2 1/ 2" MILL, 3" AC REPLACE PLUS 1/ 2" AR- ACFC JAN 09
FI1G 86 PM 145.0 H658101C T RESERVATION BOUNDRY TO BRAWLY WASH 3" AC & SC ( POLY) AUG 09
FJ1G 87 PN 131.0 H658201C T S COOLIDGE CL TO JCT 287 RR 2.5" ARAC FEB 09
FK1G 89 YV 283.0 H658301C STP - 089- A( 200) A P PEEPLES VALLEY YARD TO WILHOIT SPOT 3" RR & ARFC APR 09
FO1G 160 NA 402.0 H658501C H JCT N 59 TO DENNEHOTSO 3" COLD RECYCLE & ARFC DEC 09
FP1G 160 AP 452.0 H658601C H RED MESA TO TEEC NOS POS 3" AC & ARFC JAN 10
FQ1G 180 AP 347.0 H658701C G RANCH TO JCT 61 SYS PRES- RESTORE/ REHAB/ RESRFC APR 09
HB1G 70 GH 271.0 H661401C 070- A- 308 G SAN CARLOS RIVER BRIDGE # 2910 BRIDGE REPLACEMENT TBD FY 10
HO1G 999 MA 0.0 H662101C 999- A( 023) E VARIOUS ROUTES, MARICOPA COUNTY BRKWY CABLE TERMINAL TBD FY 09
LP1G 78 GE 169.0 H666901C S JAKE'S CORNER REALIGNMENT HIGHWAY REALIGNMENT MAR 09 AMJS1
11507 DP1H 60 MA 148.9 H669001C NH - 060- B( 200) B E 99TH AVE - 83RD AVE ( INCLUDING NEW RIVER BRIDGE) WIDEN ROADWAY AND BRIDGE MAY 09
DU1H 160 CN 320.0 H669501C 160- A( 003) A F US 160 @ SR 264 LIGHTING MAY 09
EO1H 66 MO 61.0 H675201C K SR 66 @ MOHAVE AIRPORT INTERSECTION IMPROVEMENT TBD FY 09
14410 DB1J 95 LA 128.9 H675701C Y PASSING LANES SOUTH OF BOUSE WASH CONSTRUCT PASSING LANES TBD FY 10
11508 AZ1G 86 PM 159.5 H680601C STP - 086- A T VALENCIA ROAD - KINNEY ROAD CONSTRUCT ROADWAY WIDENING TO 4 LANES TBD FY 10 TBA
DX1H 70 GH 338.0 H680801C S US 70 & 8TH AVENUE INTERSECTION INTERSECTION IMPROVEMENTS TBD FY 09
EB1H 260 NA 356.0 H681201C G MP 356- 357.6 INSTALL NEW R/ W FENCE TBD FY 09
EU1H 191 AP 375.0 H681901C H JCT I- 40 MP 385 3" AC & SC JAN 10
FA1H 10 CH 307.0 H682201C IM - 010- F( 201) A S E BENSON - JOHNSON RD ( EB) RR 5" TL, 3" PL & ARFC FEB 09
FG1H 40 MO 73.0 H682401C K PEACOCK WASH- SILVER SPRNGS ROAD TI- EB RR5" TL & 3" TL & 2" AC & ARFC FEB 09
ER1H 89 CN 420.0 H682601C F TOWNSEND - FERNWOOD RR 4" & ARFC DEC 09
ES1H 89 CN 495.0 H682701C F THE GAP - CEDAR RIDGE TP SHOULDER WIDENING JUL 09
FD1H 8 MA 114.0 H682901C Y GILA BEND - 121.0 RR 2" PL/ 5" TL & ARFC JAN 10
EY1H 87 GI 267.0 H683201C P PINE - RIM 3" RR & ARFC TBD FY 09
14407 PRSP 60 PN 220.0 H684501C 060- D- 508 G BOYCE THOMPSON STATE PARK CONSTRUCT ROAD FEB 09 AMJC1
40309 GO1H 60 MA 138.0 H686601C 060- B( 201) E SR 303L TO 99TH AVE WIDEN ROADWAY AUG 09
44209 XW1H 17 MA 224.0 H688101C E SR74- ANTHEM WAY CONSTRUCT GENERAL PURPOSE LANE ( STAN A OCT 08
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
4TH SORT: TRACS # Page 6 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
JD1H 79 PN 126.0 H690601C T SR 79 ORACLE JCT - FLORENCE HWY EXTEND RCB CULVERTS MAR 09 HDRB1
40608 GU1H 74 MA 20.0 H691201C P US 60 TO SR 303L, MP 20 TO MP 22 ( EB & WB) CONSTRUCT PASSING LANES FEB 09
13506 OQ1D 88 MA 223.0 H692001C STP - 088- A( 001) G FISH CREEK HILL CONSTRUCT RETAINING WALLS TBD FY 09 TBA
KD1H 177 PN 163.0 H692101C HES - 177- A( 003) A G SR 177, MP 163.80- 164.40 CURVE RE- ALIGNMENT NOV 09
14810 KP1H 40 AP 316.0 H692401C H DEAD RIVER BRIDGE EB ( STR # 565) SCOUR RETROFIT FEB 09
KF1H 8 PN 177.0 H692601C 008- B( 003) A T INTERSTATE I- 8 EB, I- 10 WB RAMP IMPROVEMENT MAY 09
JS1H 64 CN 235.0 H692701C F TUSAYAN STREETS WIDEN ROADWAY - SAFTEY IMPROVEMENTS TBD FY 10
OG1H 8 MA 121.0 H701601C 008- B Y MP 121.00 - BIG HORN SYSTEM PRES - ENGINEERING APR 09
SW1H 19 PM 39.0 H705001C T CONTINENTAL RD/ I- 19 BIKE & PED SYS ENHNCMENT- OTHR ENHANCEMNTS TBD FY 10 HDSR1
UM1H 83 PM 44.0 H705701C 083- A( 200) A T MP 44.0 TO MP 45.5 SAFETY IMPRVMNTS / REALIGNMENT MAY 09
RN1H 40 AP 347.0 H706601C BR - 040- E( 202) A H BLACK CREEK BRIDGES EB, WB SFR( STR # 1134,1642,9 BRIDGE SCOUR RETROFIT JAN 09
40812 TU1H 101L MA 0.0 H707601C E BEARDSLEY RD / UNION HILLS DRIVE ( CITY ADVANCEM CONSTRUCT TI TBD FY 09
45309 FN1H 10 MA 96.2 H708301X Y 395TH AVE ( BELMONT RD) CONSTRUCT TI TBD FY 09
TD1H 191 GE 170.0 H710001C S LWR CORONADO TRAIL DRAINAGE IMPRV SYST ENHANCEMENT - ENGINEERING MAR 09
TB1H 10 PN 199.0 H710401C T I- 8 TO SR 87 TI CAPACITY ADDITIONS - ENGINRING TBD FY 10 EECA1
SY1H 10 PN 211.0 H710601C T I- 10 WIDENING SR87 TO PICACHO PEAK CAPACITY ADDITIONS- ENGINEERING TBD FY 10 PBDL1
UO1H 95 LA 161.7 H711501C K BILL WILLIAMS RIVER BRIDGE # 1272 FIRE DAMAGE REPAIR TBD FY 09
WB1H 264 AP 474.5 H712101C H BLACK CREEK BRIDGE ( STR # 624) SCOUR RETROFIT TBD FY 10
QY1C 86 PM 141.1 H713701C T MP 141.1 TO RESERVATION BOUNDARY CONSTRUCT ROADWAY WIDENING TBD FY 09 TBA
40008 GH1H 10 MA 133.0 H715501C E SR 101L ( AGUA FRIA) TO I- 17 CONSTRUCT GENERAL PURPOSE LANES TBD FY 10
13209 A6SP 87 NA 346.0 H717901C H HOMOLOVI RUINS STATE PARK CONSTRUCT ROAD TBD FY 10 CBJO1
13309 WS1H 80 CH 316.0 H718101C S TOMBSTONE COURTHOUSE STATE PARK CONSTRUCT PARKING TBD FY 10 HDSM1
10411 AR1E 82 SC 0.0 H718201C T PATAGONIA LAKE STATE PARK CONSTRUCT ROAD TBD FY 11 HDSM1
13409 TQ1H 87 GI 263.0 H718301C P TONTO NATURAL BRIDGE CONSTRUCT NEW ROAD TBD FY 10 CBJO1
44109 XV1H 10 MA 119.0 H721101C E VERRADO WAY TO SARIVAL AVE CONSTRUCT GENERAL PURPOSE LANE ( STAN A OCT 08
VO1H 40 MO 21.0 H721201C 040- A( 200) K MP 21 - WALNUT CREEK RR 5" TL & 3" PL & 2" AC ARFC JAN 09
XF1H 19 PM 47.0 H722201C STP - 019- A-( AUP) T SAHUARITA TI CONSTRUCT NEW TI TBD FY 09
IN1J 10 MA 144.0 H725601C M 3RD AVENUE - 3RD STREET FIRE DETECTION SYSTEM RETROFIT FEB 09
ZL1H 260 AP 385.0 H726101C G SR 260 FROM GREER TO RODEO GROUNDS 3" RR & ARFC APR 09
13706 SI1E 101L MA 0.0 H726701C 101- A E I- 10 TO MC 85 ( 99TH AVE) WIDEN ROADWAY TBD FY 10 KHRC1
ZC1H 40 MO 14.9 H727201C K BUCK MOUNTIAN WASH EB # 378 DECK REHABILITATION TBD FY 09
43409 TO1H 10 MA 126.0 H729601C E SARIVAL AVE TO DYSART RD CONSTRUCT GPL ( CITY ADVANCEMENT) OUTSID MAR 09 TBD
LJ1J 160 AP 465.1 H730903C H TEEC NOS POS PORT OF ENTRY SYSTEM ENHANCEMENT - OTHER ENHANCEMEN FEB 09
CF1J 79 PN 124.2 H731001C T MP 124 TO MP 126 SYSTEM ENHANCEMENT - ENGINEERING TBD FY 09 HDRB1
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
4TH SORT: TRACS # Page 7 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
QH1J 19 SC 1.6 H732901C T SB- 19 AND SPRR OP BRIDGE # 980 BRIDGE REPAIR TBD FY 09
FJ1J 40 MO 85.9 H733001C K WILLOW CREEK BRIDGE, WB # 1769 DECK REHABILITATION TBD FY 09
HB1J 60 LA 45.8 H733501C Y US 60 AT VICKSBURG ROAD INTERSECTION IMPROVEMENT JUL 09
NW1J 89A YV 344.0 H733901C P JEROME RETAINING WALL REPLACE RETAINING WALL TBD FY 09
11410 HC1H 93 MO 104.1 H738901C K SB RANCH ROAD CONSTRUCT PARALLEL ROADWAY TBD FY 11 MBAP1
10211 CW1J 60 LA 0.0 H739001C P ALAMO LAKE STATE PARK CONSTRUCT PARKING TBD FY 11 PBBF1
10311 CY1J 77 PN 0.0 H739101C T ORACLE STATE PARK CONSTRUCT PARKING TBD FY 11
OX1H 90 CH 321.1 H740401C S SR 90 @ MP 321.11 TO MP 321.42 MINOR PAVEMENT PRESERVATION FEB 09
FY1J 40 MO 52.0 H740601C TEA - 040- A( 201) K I- 40 STOCKTON HILL - HARRISON CONSTRUCT LANDSCAPING AND IRRIGATION SEP 08
14409 GE1J 69 YV 288.3 H741001C 069- 4 P SR 69 GLASSFORD HILL PRESCOTT EAST HIGHWAY ROADWAY WIDENING JAN 09
PV1J 101L MA 36.0 H741401C E HAYDEN RD TO PRINCESS DR DRAINAGE IMPROVEMENTS TBD FY 09
OU1J 40 MO 9.8 H742001C K LAKE HAVASU TI UP # 1586 BRIDGE REHABILITATION TBD FY 09
IG1J 60 GI 243.0 H743601C G US 60, MIAMI CITY LIMITS TO MCMILLAN WASH PAVEMENT PRESERVATION MAR 09
TI1J 8 YU 66.0 H744601C Y I- 8, DATELAND TO GILA BEND REST AREA SIGN REHABILITATION IGA FY 09
LP1J 83 SC 31.6 H747001C T JCT SR 82 ( MP 31.6) TO MP 43.5 HIP RECYCLE + CHIP SEAL COAT DEC 08
13408 HY1G 10 PM 288.4 H747301C T CIENEGA CREEK- MARSH STATION PHASE III REMOVE RAIL & BRIDGE, CONST ML TBD FY 09
QT1J 999 AP 0.0 H747701X SB - AZ07-( 004) H DINE'TAH " AMONG THE PEOPLE" SCENIC ROADS DESIGN MARKETING PLAN IGA FY 09
QU1J 163 NA 0.0 H747801X SB - AZ07-( 007) H KAYENTA- MONUMENT VALLEY SCENIC ROADS DEVELOP INTERPRETIVE PLAN IGA FY 09
QV1J 163 NA 0.0 H747901X SB - AZ07-( 008) H KAYENTA- MONUMENT VALLEY SCENIC ROADS DESIGN MARKETING PLAN IGA FY 09
21008 GL1J 191 AP 448.0 H748601C H CHINLE - MANY FARMS ( PH I) REMOVE & REPLACE FENCING, CATTLE GUARDS TBD FY 09
41409 DI1J 202L MA 10.0 H749001C E SR 101L TO GILBERT ROAD CONSTRUCT FMS TBD FY 09
MF1J 82 CH 61.2 H749701C S SAN PEDRO RIVER BR ( STR # 403) SCOUR RETROFIT FEB 09
OI1J 19 PM 0.0 H750101C T TUCSON TO INTERNATIONAL BORDER SIGN REHAB - REPLACE PANELS OR SIGNS IGA FY 09
OS1J 40 CN 177.0 H751401C F MP 177- 182 ( EB& WB) SHOULDERS PAVEMENT PRESERVATION TBD FY 09
OQ1J 177 GI 136.3 H752301C G WINKELMAN 3" MILL AND REPLACE TBD FY 09
41410 SZ1J 888 MA 0.0 H752501C E NOISE MITIGATION ON THE MAG REGIONAL FREEWAY SYSTEM ENHANCEMENT - OTHER ENHANCEMEN TBD FY 10
GK1J 95 LA 82.0 H752601C Y US 95 @ 82 & 89 INTERSECTION IMROVEMENTS TBD FY 10
FC1J 143 MA 0.0 H752801C E SR 143 / SKY HARBOR BLVD TI TRAFFIC INTERCHANGE IMPROVEMENTS TBD FY 10
BW1J 40 MO 47.0 H752901C K HOLY MOSES WASH - RATTLESNAKE WASH RR( 5" TL, 3" PL)& AR ACFC & RR AR ACFC APR 09
OJ1J 77 NA 374.0 H753201C H SR 77 @ MP 374.38 AND MP 383.50 SYSTEM ENHANCEMENT - ENGINEERING MAR 09
OV1J 999 SW 0.0 H755001C BRIDGES # 2190, # 1152, # 1219, # 745, # 517, # 821, # 93 COLLISION DAMAGE REPAIR TBD FY 09
PS1J 86 PM 171.0 H755601C T SANTA CRUZ RIVER BRIDGE # 528 DECK REPLACEMENT JAN 09
QB1J 40 MO 39.0 H756801C K MP 39 - MP 121 MINOR PAVEMENT PRESERVATION FEB 09
QZ1J 177 PN 139.2 H760301C G MP 139.16 @ AAR/ DOT # 742- 390- N CONCRETE RR CROSSING SURFACE & LED FLAS IGA FY 09
PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED.
ARIZONA DEPARTMENT OF TRANSPORTATION
5 YEAR BID DATE REPORT
4TH SORT: TRACS # Page 8 of 10
CPSI
D: RTE: CO: TRACS:
PROJECT
MP: NUMBER: PROJECT NAME: TYPE OF WORK:
ITEM
#:
BID
DATE:
DESIGN
DIST: FIRM:
RH1J 17 MA 229.0 H760401C E ANTHEM WAY - NEW RIVER ROAD PAVEMENT PRESERVATION NOV 08
UM1J 93 MO 124.0 H763501C K 1 MILE SOUTH OF TOWN OF WIKIEUP; WEST OF ROAD SYSTEM PRESERVATION - RESTORATION/ REHAB IGA FY 09
SL1J 40B NA 276.8 H767701C H JOSEPH CITY TRUCK STOP 3" MILL AND REPLACE MAR 09
SM1J 180 NA 324.2 H767801C H PETRIFIED FOREST MINOR PAVEMENT PRESERVATION MAR 09
SV1J 40 CN 182.0 H768901C F NAVAJO ARMY DEPOT, WB 1/ 2" MILL & 1/ 2" ACFC ON SHOULDER TBD FY 09
SR1J 90 CH 321.5 H769201C S SR 90 @ MP 321.58 TO MP 321.91 MINOR PAVEMENT PRESERVATION FEB 09
13609 AM1J 101L MA 30.0 H769901C E SR51 TO PRI
Object Description
| Rating | |
| TITLE | 5 year bid date report |
| CREATOR | Arizona. Dept. of Transportation, Intermodal Transportation Division. |
| SUBJECT | Transportation--Arizona; |
| Browse Topic |
Transportation |
| DESCRIPTION | This item contains one or more publications. |
| Language | English |
| Publisher | Arizona Dept. of Transportation, Intermodal Transportation Division. |
| Material Collection |
State Documents |
| Source Identifier | TRT 7.2:B 42 |
| Location | ocn439092231 |
| REPOSITORY | Arizona State Library. Archives and Public Records--Law and Research Library. |
Description
| TITLE | 5 year bid date report |
| DESCRIPTION | 74 pages (PDF version); 587.7 KB |
| TYPE | Text |
| RIGHTS MANAGEMENT | Copyright to this resource is held by the creating agency and is provided here for educational purposes only. I may not be downloaded, reproduced, or distributed in any format without written permission of the creating agency. Any attempt to circumvent the access controls placed on this file is a violation of United States and international copyright laws, and is subject to criminal prosecution |
| DATE ORIGINAL | 2009-02 |
| Time Period |
2000s (2000-2009) |
| ORIGINAL FORMAT | Born Digital |
| Source Identifier | TRT 7.2:B 42 |
| Location | ocn439092231 |
| DIGITAL IDENTIFIER | ps3whole.pdf |
| DIGITAL FORMAT |
PDF (Portable Document Format) |
| REPOSITORY | Arizona State Library, Archives and Public Records—Law and Research Library. |
| File Size | 587.684 KB |
| Full Text | February 20, 2009 This report contains the construction projects from the new 5- Year Program. The report is sorted 7 different ways; 1) by project name, 3) by bid date, route and beginning milepost, 4) by TRACS number, 5) by route, beginning milepost and TRACS 6) by engineering district, route, beginning milepost and TRACS number and 7) by CPSID. Several projects are on “ special” status as indicated by a bid date in the year 2050. The special categories are listed below. STATUS 02/ 25/ 2050 IGA/ JPA PROJECTS WITHOUT SCHEDULE 05/ 25/ 2050 PROJECTS IN THE NEW 5- YEAR PROGRAM IN THE PROCESS OF BEING SCHEDULED. 06/ 25/ 2050 DESIGN PROJECTS IN THE 5- YEAR PROGRAM WITHOUT CORRESPONDING CONSTRUCTION PROJECT 08/ 25/ 2050 PROJECTS THAT ARE ON “ HOLD” STATUS UNTIL THE PROBLEMS ARE RESOLVED AND A DECISION IS MADE ON RESCHEDULING. PROJECT DEVELOPMENT SHOULD CONTINUE IF POSSIBLE. 09/ 25/ 2050 PROJECTS THAT HAVE BEEN DELETED FROM THE CURRENT 5- YEAR CONSTRUCTION PROGRAM. WE WILL MAINTAIN THESE PROJECTS ON THE PRIMAVERA SYSTEM FOR RECORD. PROJECT DEVELOPMENT IS TERMINATED FOR THESE PROJECTS . ARIZONA DEPARTMENT OF TRANSPORTATION PROJECT CATEGORIES PROJECT CATEGORY 5- YEAR BID DATE REPORT PROGRAM & PROJECT MANAGEMENT SECTION AMEC AMEC LSD Logan Simpson Design AZTC Aztec Engineering MB Michael Baker Jr., Inc. BN Burgess & Niple MBD1 Michael Baker/ Design One BRW BRW MMLA MMLA, Inc. BSA Bulduc, Smiley & Associates. Inc. OLSN Olsson & Associates C& B Carter & Burgess PARS Parsons Transportation Group CANN Cannon & Associates PBQD PBQD - Parsons Brinkerhoff Quade & Douglas CDG Corral Dybas Group, Inc. PBSJ PBS& J CH2M CH2M Hill PREM Premier Engineering Corporation DIBL Dibble & Associates RBF RBF Consulting DMJM DMJM+ Harris RPOW Ritoch Powell & Associates EEC EEC SCON Stanley Consultants ENTR Entranco STEC Stantec Consulting, Inc. ERTH Earth Tech SVER Sverdrup GANN Gannett Fleming TBA To Be Assigned HDR HDR Engineering TCOR Transcore HUIT Huitt - Zollars TTI Tetra Tech, Inc. JLK JLK Eingeers TYLN T. Y. Lin International INCA Inca Engineering, Inc. URS URS DESIGN FIRM ABBREVIATIONS ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 1ST SORT: PROJECT NAME Page 1 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: UM1J 93 MO 124.0 H763501C K 1 MILE SOUTH OF TOWN OF WIKIEUP; WEST OF ROAD SYSTEM PRESERVATION - RESTORATION/ REHAB IGA FY 09 40511 TR1H 17 MA 215.0 E 101L- CAREFREE HIGHWAY DESIGN FMS DESIGN FY 11 RC1J 0000 MA PVY SS69801C CM - PVY- 0( 201) A E 12 VARIOUS LOCATIONS TRAFFIC - VIDEO DETECTION SYSTEM FY 09 WR1J 0000 MA ELM SS72301C CM - ELM- 0( 200) A E 125TH & 127TH AVENUE PAVE UNPAVED ROADS FY 11 WS1J 0000 MA ELM SS72401C CM - ELM- 0( 201) A E 129TH AVENUE PAVE UNPAVED ROADS FY 11 VY1H 0000 MA PHX SS62701C CM - PHX- 0( 202) A E 19TH AVENUE THUNDERBIRD RD WIDENING INTERSECTION IMPROVEMENTS FY 09 45309 FN1H 10 MA 96.2 H708301X Y 395TH AVE ( BELMONT RD) CONSTRUCT TI TBD FY 09 IN1J 10 MA 144.0 H725601C M 3RD AVENUE - 3RD STREET FIRE DETECTION SYSTEM RETROFIT FEB 09 41211 UB1H 202L MA 0.0 E 51ST AVE TO I- 10 WEST CONSTRUCT ROADWAY TBD FY 11 TBD 41210 UA1H 202L MA 0.0 E 51ST AVE TO I- 10 WEST CONSTRUCT ROADWAY TBD FY 10 TBD 40808 UK1H 202L MA 0.0 E 51ST AVE TO I- 10 WEST CONSTRUCT ROADWAY TBD FY 09 TBD FP1H 0000 MA GLN SH43201C HES - GLN- 0( 030) A E 51ST AVENUE & CAMELBACK AVENUE INTERSECTION IMPROVMENTS FY 09 FR1H 0000 MA GLN SH43101C HES - GLN- 0( 030) A E 51ST AVENUE & NORTHERN AVENUE INTERSECTION IMPROVEMENTS FY 09 MA1H 0000 MA GLN SS59101C CM - GLN- 0( 033) A E 63RD AVE / LOOP 101 CONSTRUCT MULTI- USE PATH AND BRIDGE FY 09 XC1H 0000 MA PEO SS65701C CM - PEO- 0( 201) A E 84TH AVENUE STREETSCAPE FY 09 11507 DP1H 60 MA 148.9 H669001C NH - 060- B( 200) B E 99TH AVE - 83RD AVE ( INCLUDING NEW RIVER BRIDGE) WIDEN ROADWAY AND BRIDGE MAY 09 RB1J 0000 MA PHX SS70501C CM - PHX- 0( 218) A E ACDC AT 7TH AVE ( BIKE UNDERPASS) ACDC BIKE UNDERPASS FY 09 12405 IV1A 89A CN 399.0 H413401C 366- F AIRPORT ROAD TI ( JW POWELL BLVD) CONSTRUCT INTERSECTION IMPR TBD FY 11 GG1J 66 MO 57.3 K AIRWAY AVENUE & MOHAVE AIRPORT DRIVE INTERSE CONCRETE MEDIAN & ASPHALT PAVING MAR 09 10211 CW1J 60 LA 0.0 H739001C P ALAMO LAKE STATE PARK CONSTRUCT PARKING TBD FY 11 PBBF1 10312 LE1G 93 MO 101.8 K ANTELOPE WASH CONSTRUCT 4- LANE DIVIDED HIGHWAY TBD FY 12 RH1J 17 MA 229.0 H760401C E ANTHEM WAY - NEW RIVER ROAD PAVEMENT PRESERVATION NOV 08 40312 TS1H 17 MA 209.0 E ARIZONA CANAL - 101L CONSTRUCT FMS TBD FY 12 40112 CT1J 17 MA 209.0 E ARIZONA CANAL TO SR 101L CONSTRUCT GPL TBD FY 13 PB1F 40B YV 145.0 H621301C B40- C( 002) A K ASH FORK, 40B, 3RD ST TO 8TH ST SIDEWALK TBD FY 09 TBA 11510 AA1C 95 YU 32 063- 1 Y AVENUE 9E TO ABURDEEN ROAD RECONSTRUCT FORTUNA WASH BRIDGE & WID TBD FY 11 ZT1H 40 CN 224.5 F BABBITTS TANK WASH BRIDGE SYSTEM ENHANCEMENT - ENGINEERING DEC 09 ZK1F 191 GE 160.0 H643201C S BACK COUNTRY BYWAY ( NORTH INTER) SAFETY IMPROVEMENTS TBD FY 09 16006 QT1F 101L MA 53.5 E BALBOA DRIVE CONSTRUCT MULTI- USE PATH BRIDGE OVER TH IGA FY 12 40812 TU1H 101L MA 0.0 H707601C E BEARDSLEY RD / UNION HILLS DRIVE ( CITY ADVANCEM CONSTRUCT TI TBD FY 09 40611 CV1J 51 MA 13.6 E BELL ROAD - SR 101L DESIGN FMS DESIGN FY 11 43010 GK1H 17 MA 204.9 E BETHANY HOME RD TO NORTHERN AVE DESIGN/ CONSTRUCT PEDESTRIAN WALKWAY AL TBD FY 10 UO1H 95 LA 161.7 H711501C K BILL WILLIAMS RIVER BRIDGE # 1272 FIRE DAMAGE REPAIR TBD FY 09 AC1G 17 YV 245.2 H636801C HES - 017- B( 201) A P BLACK CANYON HILL - ( SB) MILL AND REPLACE AND SAFETY IMPROVEMENT TBD FY 09 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 1ST SORT: PROJECT NAME Page 2 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: WB1H 264 AP 474.5 H712101C H BLACK CREEK BRIDGE ( STR # 624) SCOUR RETROFIT TBD FY 10 RN1H 40 AP 347.0 H706601C BR - 040- E( 202) A H BLACK CREEK BRIDGES EB, WB SFR( STR # 1134,1642,9 BRIDGE SCOUR RETROFIT JAN 09 14407 PRSP 60 PN 220.0 H684501C 060- D- 508 G BOYCE THOMPSON STATE PARK CONSTRUCT ROAD FEB 09 AMJC1 TS1J 0000 MA PHX SB43401C CM - PHX- 0( 222) B E BRIDGE INSPECTION EQUIPMENT VARIOUS LOCATIONS FY 09 OV1J 999 SW 0.0 H755001C BRIDGES # 2190, # 1152, # 1219, # 745, # 517, # 821, # 93 COLLISION DAMAGE REPAIR TBD FY 09 TK1J 999 MA 0.0 H770201C E BRIDGES # S 1772, 779, 1823, 2800, 517, 1335 COLLISION DAMAGE REPAIR IGA FY 09 ZC1H 40 MO 14.9 H727201C K BUCK MOUNTIAN WASH EB # 378 DECK REHABILITATION TBD FY 09 11606 AJ1C 191 AP 417.5 H451801C STP - 191- E( 200) A H BURNSIDE JUNCTION - NORTH ROADWAY WIDENING TBD FY 09 TBA WN1G 8 YU 6.0 Y BUSINESS 8 AND AVE 2 1/ 2 E DRAINAGE STUDY & IMPROVEMENT AUG 09 TA1H 40 CN 198.0 F BUTLER AVE TI SYSTEM ENHANCEMENT- ENGINEERING TBD FY 12 RBML1 10412 DA1J 89 CN 464.5 F CAMERON SECTION CONSTRUCT 4- LANE URBAN, SR 64 INTERSECTI TBD FY 12 EO1G 19 PM 34.0 T CANOA TI - CONTINENTAL TI CONST ROADWAY ( NB FRONTAGE RD) IGA FY 09 10413 TC1J 93 MO 116.0 K CARROW TO STEPHENS CONSTRUCT 4- LANE DIVIDED HIGHWAY TBD FY 13 10910 DJ1G 90 CH 323.5 S CENTRAL AVE TO MOSON RD, E OF SIERRA VISTA WIDEN TO 5 LANES TBD FY 11 XA1J 0000 MA CHN SS72601C CM - CHN- 0( 210) A E CHANDLER BLVD TRAFFIC SIGNAL INTERCONNECT FIBER OPTIC - DELAWARE ST TO GILBERT RD FY 11 KO1H 40 MO 11.0 K CHEMEHUEVI & BOULDER WASH BRIDGES SCOUR RETROFIT JAN 10 21008 GL1J 191 AP 448.0 H748601C H CHINLE - MANY FARMS ( PH I) REMOVE & REPLACE FENCING, CATTLE GUARDS TBD FY 09 12010 EB1E 191 AP 446 H543801C H CHINLE SOUTH ROADWAY WIDENING TBD FY 11 20206 3WSP 10 PM 288.4 H239001C 010- E T CIENEGA CREEK - MARSH STATION PH1 RAILROAD GRADE & DRAIN MAR 09 14607 HX1G 10 PM 288.4 T CIENEGA CREEK- MARSH STATION PHASE II NEW RAILROAD TRACKS TBD FY 09 13408 HY1G 10 PM 288.4 H747301C T CIENEGA CREEK- MARSH STATION PHASE III REMOVE RAIL & BRIDGE, CONST ML TBD FY 09 14610 DE1J 177 GI 0.0 G CLIMBING PARK DESIGN DESIGN FY 10 14002 FF1C 191 CH 62.0 H416501C S COCHISE UPRR OP # 2530 BRIDGE REPLACEMENT. TBD FY 10 TV1J 0000 MA CHN SS70601C CM - CHN- 0( 203) A E COMMONWEALTH AVE ROADWAY IMPROVEMENT HAMILTON ST - ITHICA PL ( PAVING) FY 09 SW1H 19 PM 39.0 H705001C T CONTINENTAL RD/ I- 19 BIKE & PED SYS ENHNCMENT- OTHR ENHANCEMNTS TBD FY 10 HDSR1 13603 GM1C 17 YV 263.0 H426901C 17- 2( ) P CORDES JCT TI RECONSTRUCT TI TBD FY 09 HDJC1 13410 BB1G 10 PM 246.5 T CORTARO ROAD TI CONSTRUCT NEW TI TBD FY 10 TBA SF1J 0000 PM PPM SS69301C STP - PPM- 0( 209) A T COTARO FAMS ROAD / MAGEE ROAD ROAD WIDENING, REALIGNMENTS, IMPROVEMEN FY 09 11312 CQ1J 10 PM 264.0 T COUNTRY CLUB ROAD TI CONSTRUCT NEW TRAFFIC INTERCHANGE DESIGN FY 13 14810 KP1H 40 AP 316.0 H692401C H DEAD RIVER BRIDGE EB ( STR # 565) SCOUR RETROFIT FEB 09 28303 RO1F 80 CH 364.0 H624301C CBI - 080- A( 009) B S DGLS STGC WEIGHT & INSP STATION DSGN/ CST WEIGHT & INSP STATION MAR 09 MBFG1 11406 SK1E 191 GH 91.8 H503704C 191- B S DIAL WASH TO TEN RANCH ( SEG II) CONSTRUCT PARALLEL ROADWAY TBD FY 11 TBA QT1J 999 AP 0.0 H747701X SB - AZ07-( 004) H DINE'TAH " AMONG THE PEOPLE" SCENIC ROADS DESIGN MARKETING PLAN IGA FY 09 41711 TW1H 202L MA 0.0 E DOBSON ROAD TO I- 10 CONSTRUCT HOV/ RAMP TBD FY 13 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 1ST SORT: PROJECT NAME Page 3 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: 41611 TX1H 202L MA 0.0 E DOBSON ROAD TO I- 10 DESIGN FMS DESIGN FY 11 11902 RH1B 260 GI 269.0 H469801C 260- B P DOUBTFUL CANYON SECTION RECONSTRUCT ROADWAY & CONSTRUCTION W TBD FY 10 SVBW1 22706 GV1H 80 CH 364.0 S DOUGLAS STRTGC INSPECTION STATION INSTALL VOICE & DATA LINES IGA FY 10 VI1J 0000 MA 0.0 SS71701C CM - GDV- 0( 201) A E DYNAMIC MESSAGE SIGNS VARIOUS LOCATIONS FY 10 FA1H 10 CH 307.0 H682201C IM - 010- F( 201) A S E BENSON - JOHNSON RD ( EB) RR 5" TL, 3" PL & ARFC FEB 09 FH1G 80 CH 368.0 H658001C STP - 080- B( 200) A S EAST OF DOUGLAS 2 1/ 2" MILL, 3" AC REPLACE PLUS 1/ 2" AR- ACFC JAN 09 OS1G 0000 MA GIL SS54701C CM - GIL- 0( 012) A E EASTERN CANAL ( GUADALUPE- ELLIOT) CONSTRUCT MULTI- USE PATH FY 09 BV1G 0000 MA GIL SS54601C CM- GIL- 0( 014) A E EASTERN CANAL, BASELINE- GUADALUPE CONST MULTI USE PATH FY 09 XQ1F 15 MO 9.0 F FARM ROAD TI CONSTRUCT NEW UNDERPASS TBD FY 11 13506 OQ1D 88 MA 223.0 H692001C STP - 088- A( 001) G FISH CREEK HILL CONSTRUCT RETAINING WALLS TBD FY 09 TBA XN1H 0000 MA FTH SS66001C CM - FTH- 0( 202) A E FOUNTAIN HILLS BOULEVARD SIDEWALK CONSTRUCTION FY 09 FD1H 8 MA 114.0 H682901C Y GILA BEND - 121.0 RR 2" PL/ 5" TL & ARFC JAN 10 10112 CL1J 10 PN 0.0 T GILA RIVER INDIAN TRIBAL BOUNDARY TO I- 8 WIDEN ROADWAY TBD FY 12 UZ1H 0000 MA GIL SS64401C CM - GIL- 0( 200) A E GILBERT HERITAGE DISTRICT PEDESTRIAN SIDEWALK, LANDSCAPE FY 09 CM1G 89 YV 313.0 H648401C 089- B- 305 P GRANITE CREEK BRIDGE # 2869 BRIDGE REPLACEMENT TBD FY 09 GY1J 0000 MA SUP SS67601C CM - SUR- 0( 204) X E GREENWAY ROAD FIBER OPTIC INTERCONNECTS FY 09 QF1G 191 GE 153.0 S GUTHRIE BRIDGE # 352 DEMOLITION PA FOR BRIDGE DEMOLITION TBD FY 10 HDKA1 PV1J 101L MA 36.0 H741401C E HAYDEN RD TO PRINCESS DR DRAINAGE IMPROVEMENTS TBD FY 09 12510 HI1H 260 NA 317.2 H770501C G HEBER - SHOW LOW EB & WB CONSTRUCT PASSING LANES TBD FY 11 BW1J 40 MO 47.0 H752901C K HOLY MOSES WASH - RATTLESNAKE WASH RR( 5" TL, 3" PL)& AR ACFC & RR AR ACFC APR 09 13209 A6SP 87 NA 346.0 H717901C H HOMOLOVI RUINS STATE PARK CONSTRUCT ROAD TBD FY 10 CBJO1 SH1J 0000 MA QCR SS70401C CM - QCR- 0( 203) A E HUNT HIGHWAY - POWER TO ELLSWORTH PAVE DIRT SHOULDERS FY 09 VT1J 0000 MA PEO SS72101C CM - PEO( 230) A E HYBRID FIBER- TO- WIRELESS COMMUNICATION SYSTE TRAFFIC SIGNAL NETWORK FY 10 14406 VB1E 10 PM 260.0 H640401C 010- E T I- 10 / I- 19 ( FMS, PHASE 2) EXTEND ITS SYSTEMS ALONG I- 10 & I- 19 TBD FY 09 TRMM1 SX1J 10 PN 210.1 T I- 10 / SR 87 TI CAPACITY ADDITIONS - ENGINEERING TBD FY 10 PBDL1 40809 UD1H 202L MA 0.0 E I- 10 EAST/ SANTAN TI TO 51ST AVE DESIGN AND R/ W DESIGN FY 09 TBD 40013 UF1H 202L MA 0.0 E I- 10 EAST/ SANTAN TI TO 51ST AVE CONSTRUCT ROADWAY TBD FY 13 TBD 41310 UE1H 202L MA 0.0 E I- 10 EAST/ SANTAN TI TO 51ST AVE DESIGN & R/ W DESIGN FY 10 TBD 13706 SI1E 101L MA 0.0 H726701C 101- A E I- 10 TO MC 85 ( 99TH AVE) WIDEN ROADWAY TBD FY 10 KHRC1 41612 UH1H 303L MA 0.0 E I- 10 TO US 60 ( GRAND AVE) CONSTRUCT NEW FREEWAY TBD FY 12 TBD SY1H 10 PN 211.0 H710601C T I- 10 WIDENING SR87 TO PICACHO PEAK CAPACITY ADDITIONS- ENGINEERING TBD FY 10 PBDL1 43311 DJ1J 303L MA 0.0 E I- 10/ 303L TI, PHASE I ( I- 10 REALIGNMENT) CONSTRUCT TI TBD FY 11 40313 DD1J 101L MA 23.5 E I- 17 TO TATUM BLVD CONSTRUCT HOV LANE DESIGN FY 13 41011 TV1H 101L MA 0.0 E I- 17 TO SR 51 DESIGN FMS DESIGN FY 11 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 1ST SORT: PROJECT NAME Page 4 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: CG1J 19 PM 45.8 HX21301C T I- 19 AND SAHUARITA RD INSTALL NEW TRAFFIC SIGNAL IGA FY 09 FY1J 40 MO 52.0 H740601C TEA - 040- A( 201) K I- 40 STOCKTON HILL - HARRISON CONSTRUCT LANDSCAPING AND IRRIGATION SEP 08 TB1H 10 PN 199.0 H710401C T I- 8 TO SR 87 TI CAPACITY ADDITIONS - ENGINRING TBD FY 10 EECA1 TI1J 8 YU 66.0 H744601C Y I- 8, DATELAND TO GILA BEND REST AREA SIGN REHABILITATION IGA FY 09 NZ1E 0000 GI GGI SB40001C BR - GGI- 0( 005) A G ICE HOUSE CANYON WASH BR # 8193 BRIDGE REPLACEMENT FY 09 QL1J 10 PM 247.0 T INA RD TO RUTHRAUFF RD DCR / EA AND 30% DESIGN DESIGN FY 09 10208 PJ1F 10 PM 248.0 010- D T INA ROAD TI RECONSTRUCT TI & MAINLINE TBD FY 10 TBA WQ1J 0000 MA SCT SS72201C CM - SCT- 0( 205) A E INDIAN BEND ROAD MCCORMICK STILLMAN RR PARK FY 11 VM1H 0000 MA SCT SS64801C CM - SCT- 0( 201) A E INDIAN BEND WASH; CHAP - JACK RDS MULTI- USE PATHWAY FY 09 KF1H 8 PN 177.0 H692601C 008- B( 003) A T INTERSTATE I- 8 EB, I- 10 WB RAMP IMPROVEMENT MAY 09 WX1J 0000 MA MES SS73101C CM - MES- 0( 206) X E ITS SIGNAL CONVERSIONS - PHASE 4A FIBER OPTIC LINK FY 11 WY1J 0000 MA MES SS73201C CM - MES- 0( 205) X E ITS SIGNAL CONVERSIONS - PHASE 4B FIBER OPTIC LINK FY 11 QG1J 0000 PM TUC SS69201C STP - TUC- 0( 223) A T ITS TRAFFIC SIGNAL EXPANSION - VARIOUS LOCATION EQUIPMENT PURCHASES FY 09 RA1J 0000 PM TUC STP - TUC- 0( 222) A T ITS TRAFFIC SIGNAL TIMING STUDY TIMING STUDY - VARIOUS LOCATIONS FY 09 LP1G 78 GE 169.0 H666901C S JAKE'S CORNER REALIGNMENT HIGHWAY REALIGNMENT MAR 09 AMJS1 FG1G 78 GE 154.0 H657901C S JCT 191 TO FOREST SERVICE BOUNDARY CHIP SEAL AND GUARDRAIL EXTENSION APR 09 22802 UX1C 160 CN 311.5 H527401C 160- A-( 001) F JCT 89 - VAN'S TRADING POST 2" ARAC & ARFC & TURNLANES TBD FY 09 10113 TE1J 89A YV 319.0 P JCT 89A TO CHINO VALLEY ( S. CHINO LIMITS) - PH II CONSTRUCT ROADWAY WIDENING TBD FY 13 10512 CZ1J 89 YV 317.5 P JCT 89A TO MP 324 WIDEN THE SR 89 CORRIDOR TBD FY 12 14510 CN1J 10 PN 199.1 T JCT I 8 TO PICACHO PEAK TI WIDEN ROADWAY TBD FY 10 EU1H 191 AP 375.0 H681901C H JCT I- 40 MP 385 3" AC & SC JAN 10 FO1G 160 NA 402.0 H658501C H JCT N 59 TO DENNEHOTSO 3" COLD RECYCLE & ARFC DEC 09 XT1H 180 AP 402.0 G JCT SR 260 / US 180 & RODEO GROUNDS INTERSECTIO REALIGN INTERSECTION TBD FY 10 11710 RJ1C 160 NA 375.2 H JCT SR 564 - TSEGI, PH I CONST DUAL PASSING LNS TBD FY 10 LP1J 83 SC 31.6 H747001C T JCT SR 82 ( MP 31.6) TO MP 43.5 HIP RECYCLE + CHIP SEAL COAT DEC 08 NW1J 89A YV 344.0 H733901C P JEROME RETAINING WALL REPLACE RETAINING WALL TBD FY 09 NY1E 0000 GI GGI SH27901C HES- GGI- 0( 006) A G JESSE HAYES ROAD ROADWAY IMPROVEMENTS FY 09 SL1J 40B NA 276.8 H767701C H JOSEPH CITY TRUCK STOP 3" MILL AND REPLACE MAR 09 AP1G 160 NA 389.5 H635601C 160- A( 200) A H KAYENTA - JCT IR 59 3" AC + ACFC DEC 08 QU1J 163 NA 0.0 H747801X SB - AZ07-( 007) H KAYENTA- MONUMENT VALLEY SCENIC ROADS DEVELOP INTERPRETIVE PLAN IGA FY 09 QV1J 163 NA 0.0 H747901X SB - AZ07-( 008) H KAYENTA- MONUMENT VALLEY SCENIC ROADS DESIGN MARKETING PLAN IGA FY 09 ZN1E 0000 PN PPN SB41001C BR - PPN- 0-( 169) G KELVIN BRIDGE - # 8441 BRIDGE REPLACEMENT FY 09 11212 CP1J 10 PM 262.5 T KINO TI DESIGN TRAFFIC INTERCHANGE DESIGN FY 12 13910 GY1H 86 PM 132.8 T KITT PK ROAD SEGMENT ROADWAY WIDENING TBD FY 10 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 1ST SORT: PROJECT NAME Page 5 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: 15708 UI1H 95 MO 0.0 K LAKE HAVASU STATE PARK DESIGN ( LAUNCH RAMPS) DESIGN FY 10 TBD OU1J 40 MO 9.8 H742001C K LAKE HAVASU TI UP # 1586 BRIDGE REHABILITATION TBD FY 09 VE1J 8 YU 19.0 H773901C Y LIGURTA TO DATELAND SIGN REHAB TBD FY 10 43208 ST1H 202L MA 0.0 E LINDSAY ROAD TO GILBERT ROAD DESIGN & CONST MULTI- USE PATH TBD FY 09 40711 TT1H 60 MA 0.0 E LINDSEY RD HALF INTERCHANGE DESIGN TI DESIGN FY 11 21301 LY1C 260 GI 258.0 P LION SPRINGS SECTION DESIGN ( ROADWAY) DESIGN FY 09 14601 RG1B 260 GI 263.1 H469901C P LITTLE GREEN VALLEY RECONSTRUCT ROADWAY TBD FY 09 AMRM1 TQ1J 0000 MA CHN CM - CHN- 0( 208) A E LOOP 101 @ GALVESTON ST MULTI- USE PATH & BRIDGE FY 09 TD1H 191 GE 170.0 H710001C S LWR CORONADO TRAIL DRAINAGE IMPRV SYST ENHANCEMENT - ENGINEERING MAR 09 11112 CO1J 10 PM 236.4 T MARANA ROAD TO INA ROAD RECONSTRUCT & WIDEN FRONTAGE ROADS TBD FY 12 11113 TL1J 10 PM 236.4 T MARANA ROAD TO INA ROAD ( FRONTAGE ROADS) RECONSTRUCT & WIDEN FRONTAGE ROADS TO TBD FY 13 MD1J 89 YV 269.0 P MARTINEZ RIVER BRIDGE ( STR # 1320) SCOUR RETROFIT TBD FY 10 VA1H 0000 MA AVN SS64501C CM - AVN- 0( 200) A E MCDOWELL RD PEDESTRIAN IMPROVEMENTS FY 09 OY1H 0000 MA PHX SH44101C HBS - PHX- 0( 200) A E MCDOWELL RD & 35TH AVENUE STREET LIGHTS CONSTRUCTION FY 09 WZ1J 0000 MA PHX SS72501C STP - PHX- 0( 228) A E MCDOWELL ROAD & 32ND STREET INTERRSECTION IMPROVEMENT FY 11 40612 CX1J 60 MA 194.0 E MERIDIAN ROAD CONSTRUCT TI TBD FY 13 13607 QG1F 85 MA 120.5 Y MP 120.54 - MP 122.99 CONSTRUCT ROADWAY TBD FY 09 TBA OG1H 8 MA 121.0 H701601C 008- B Y MP 121.00 - BIG HORN SYSTEM PRES - ENGINEERING APR 09 CF1J 79 PN 124.2 H731001C T MP 124 TO MP 126 SYSTEM ENHANCEMENT - ENGINEERING TBD FY 09 HDRB1 QZ1J 177 PN 139.2 H760301C G MP 139.16 @ AAR/ DOT # 742- 390- N CONCRETE RR CROSSING SURFACE & LED FLAS IGA FY 09 QY1C 86 PM 141.1 H713701C T MP 141.1 TO RESERVATION BOUNDARY CONSTRUCT ROADWAY WIDENING TBD FY 09 TBA 16604 RV1E 86 PM 145.6 H543401C S - 086- A- 500 T MP 145.6 - BRAWLEY WASH EXTEND BOX CULVERTS TBD FY 09 TBA OS1J 40 CN 177.0 H751401C F MP 177- 182 ( EB& WB) SHOULDERS PAVEMENT PRESERVATION TBD FY 09 VO1H 40 MO 21.0 H721201C 040- A( 200) K MP 21 - WALNUT CREEK RR 5" TL & 3" PL & 2" AC ARFC JAN 09 46208 XP1G 87 MA 211.8 P MP 211.8 TO MP 213.0 REPAIR CUT SLOPES FOR EROSION CONTROL TBD FY 10 EB1H 260 NA 356.0 H681201C G MP 356- 357.6 INSTALL NEW R/ W FENCE TBD FY 09 11308 EO1E 77 NA 364.0 H546001C 077- B H MP 364 TO 372 CONSTRUCT PASSING LANE TBD FY 10 TBA QB1J 40 MO 39.0 H756801C K MP 39 - MP 121 MINOR PAVEMENT PRESERVATION FEB 09 UM1H 83 PM 44.0 H705701C 083- A( 200) A T MP 44.0 TO MP 45.5 SAFETY IMPRVMNTS / REALIGNMENT MAY 09 10306 RE1E 17 CN 322.0 017- B F MUNDS PARK TI DESIGN TRAFFIC INTERCHANGE JUN 14 KHRC1 12303 LV1C 191 AP 367.0 H436001C H NAHATA' DZIIL ROAD - SANDERS TI RECONSTRUCT 3 BRIDGES AND RDWY TBD FY 10 SVSG1 SV1J 40 CN 182.0 H768901C F NAVAJO ARMY DEPOT, WB 1/ 2" MILL & 1/ 2" ACFC ON SHOULDER TBD FY 09 YH1G 87 MA 204.3 E NEW FOUR PEAKS RD TO DOS S RANCH RD CLIMBING LANE AND SHOULDER WIDENING TBD FY 10 41410 SZ1J 888 MA 0.0 H752501C E NOISE MITIGATION ON THE MAG REGIONAL FREEWAY SYSTEM ENHANCEMENT - OTHER ENHANCEMEN TBD FY 10 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 1ST SORT: PROJECT NAME Page 6 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: 10007 EX1F 60 PN 230.0 060- D G OAK FLAT - DEVIL'S CANYON CONSTRCT PASSING/ CLIMBING LANE TBD FY 09 TBA PZ1G 0000 YU YYU SB41501C BR - YYU- 0( 031) A Y OLD US 80 @ RED TOP WASH BRIDGE REPLACEMENT FY 09 BC1J 0000 MA 0.0 SB42801C BR - MMA- 0( 202) A E OLD US 80 BRIDGE BRIDGE REHABILITATION FY 10 CH1G 70 GI 256.0 H645301C G OLD WINKELMAN HIGHWAY AND BIA ROUTE 6 INTERSECTION IMPROVEMENTS APR 09 HZJS1 XB1J 0000 MA PEO SS72801C CM - PEO- 0( 204) A E OLIVE AVENUE - UNDERPASS NEW RIVER TRAIL UNDERPASS CONSTRUCTION FY 11 10311 CY1J 77 PN 0.0 H739101C T ORACLE STATE PARK CONSTRUCT PARKING TBD FY 11 TDSP 89 CN 546.5 H475301C F PAGE REST AREA CONST REST AREA & VISITOR CNTR TBD FY 10 WV1J 0000 PM TUC SS73003D STP - TUC- 0( 226) A T PANTANO BOULEVARD DESIGN PAVEMENT RECONSTRUCTION FY 11 WU1J 0000 PM TUC SS73001C STP - TUC- 0( 226) A T PANTANO BOULEVARD PAVEMENT RECONSTRUCTION FY 11 10900 AR1B 10 PM 288.6 H239101C 10- 5-( 068) N S PANTANO RR UP/ CIENEGA CREEK SECTION CONSTRUCT STRUCTURE TBD FY 09 14410 DB1J 95 LA 128.9 H675701C Y PASSING LANES SOUTH OF BOUSE WASH CONSTRUCT PASSING LANES TBD FY 10 10411 AR1E 82 SC 0.0 H718201C T PATAGONIA LAKE STATE PARK CONSTRUCT ROAD TBD FY 11 HDSM1 VJ1J 0000 MA 0.0 SS71601C CM - PHX- 0( 224) A E PAVE DIRT ALLEYS VARIOUS LOCATIONS FY 10 XA1H 0000 MA 0.0 SS65301C OM - SUR- 0( 200) A E PAVE DIRT ROADS - SURPRISE PAVE DIRT ROADS FY 09 TU1J 0000 MA BKY SS70901C E PAVE DIRT SHOULDERS - VARIOUS LOCATIONS PAVE DIRT SHOULDERS FY 09 FG1H 40 MO 73.0 H682401C K PEACOCK WASH- SILVER SPRNGS ROAD TI- EB RR5" TL & 3" TL & 2" AC & ARFC FEB 09 NN1J 0000 MA BKY SS68501C CM - BKY- 0( 200) A E PEDESTRIAN IMPROVEMENTS - 7TH ST AND EASON AV PEDESTRIAN IMPROVEMENT PROJECT FY 09 FK1G 89 YV 283.0 H658301C STP - 089- A( 200) A P PEEPLES VALLEY YARD TO WILHOIT SPOT 3" RR & ARFC APR 09 PK1E 95 YU 63.0 H584101C Y PELIGRO - CLARKS PA ( 3" AC + FC) JUN 09 11407 PN1F 17 MA 208.9 017- A E PEORIA AVE TO GREENWAY RD DRAINAGE IMPROVEMENTS TBD FY 09 TBA WT1J 0000 MA SUP SS72701C CM - SUP- 0( 207) X E PEORIA AVENUE FIBER OPTIC INTERCONNECTS FY 11 40913 CM1J 10 MA 122.0 H770901C E PERRYVILLE ROAD CONSTRUCT TI TBD FY 13 SM1J 180 NA 324.2 H767801C H PETRIFIED FOREST MINOR PAVEMENT PRESERVATION MAR 09 11209 EK1G 10 PM 232.4 T PINAL AIR PARK - MARANA, PH II CONST MAINLINE WIDENING 6 LN TBD FY 12 EY1H 87 GI 267.0 H683201C P PINE - RIM 3" RR & ARFC TBD FY 09 TR1J 0000 MA PHX SB43301C CM - PHX- 0( 221) B E PONTIS & VIRTIS BRIDGE MANAGEMENT SOFTWARE VARIOUS LOCATIONS FY 09 TZ1J 0000 MA CHN SS71101C CM - CHN- 0( 207) A E PRICE RD TO HAMILTON ST WESTERN CANAL- MULTI- USE PATH ( 1) FY 09 TY1J 0000 MA CHN SS71001C CM - CHN- 0( 206) A E PRICE ROAD TO HAMILTON STREET WESTERN CANAL - MULTI- USE PATH ( 2) FY 09 TX1J 0000 MA CHN SS70801C E PURCHASE TRAFFIC DETECTION CAMERAS VARIOUS LOCATIONS FY 09 10610 XG1G 70 GI 253.4 G RAILROAD OVERPASS TO JCT SR 77 CONSTRUCT NEW ROADWAY & RAILROAD STRU TBD FY 11 FQ1G 180 AP 347.0 H658701C G RANCH TO JCT 61 SYS PRES- RESTORE/ REHAB/ RESRFC APR 09 10213 EC1H 40 MO 56.5 K RATTLESNAKE WASH TI CONSTRUCT NEW TI TBD FY 13 TBA NT1J 0000 MA MMA SS68701C CM - MMA- 0( 206) A E REACT IN GLENDALE, PEORIA, AND SCOTTSDALE INCIDENT MANAGEMENT PARTNERSHIP FY 09 FP1G 160 AP 452.0 H658601C H RED MESA TO TEEC NOS POS 3" AC & ARFC JAN 10 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 1ST SORT: PROJECT NAME Page 7 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: 15208 NSSP 89A YV 0.0 F RED ROCK STATE PARK DESIGN DESIGN FY 09 FI1G 86 PM 145.0 H658101C T RESERVATION BOUNDRY TO BRAWLY WASH 3" AC & SC ( POLY) AUG 09 KQ1H 0000 MA QCR STP - QCR- 0( 001) A E RIGGS RD, ELLSWORTH TO MERIDIAN CONSTRUCT NEW RDWAY FY 09 QD1J 0000 MA 0.0 SS70101C CM - MMA-( 209) A E RIO VERDE DRIVE PAVE SHOULDERS FY 09 10212 CU1J 17 YV 232.0 P ROCK SPRINGS TO CORDES JUNCTION WIDEN ROADWAY TBD FY 12 UC1J 17 CN 316.5 F ROCKY PARK- MCCONNELL SYSTEM PRESERVATION - ENGINEERING TBD FY 09 41411 UG1H 202L MA 0.0 E RURAL RD TO SR 101L DESIGN GPL DESIGN FY 11 TBD EM1G 10 PM 253.0 H624101C T RUTHRAUFF RD - PRINCE RD CONSTRUCT MAINLINE WIDENING TO 8 LANES TBD FY 11 ENBS2 FJ1G 87 PN 131.0 H658201C T S COOLIDGE CL TO JCT 287 RR 2.5" ARAC FEB 09 TT1J 0000 PM PPM SS71301C CM - PPM- 0( 210) A T SAFETY AND EDUCATION PROGRAM VARIOUS LOCATIONS FY 09 NH1G 0000 GH GGH SH27701C STP- GGH- 0( 006) A S SAFFORD- BRYCE RD & SAFFORD LANDFILL ROAD PETERSON WASH CULVERT EXTENSION FY 09 XM1H 0000 MA FTH SS65901C CM - FTH- 0( 201) A E SAGUARO BOULEVARD PAVE DIRT ALLEYS FY 09 XF1H 19 PM 47.0 H722201C STP - 019- A-( AUP) T SAHUARITA TI CONSTRUCT NEW TI TBD FY 09 HB1G 70 GH 271.0 H661401C 070- A- 308 G SAN CARLOS RIVER BRIDGE # 2910 BRIDGE REPLACEMENT TBD FY 10 CU1H 191 GE 163.0 S SAN FRANCISCO RIVER BR # 563 BRIDGE REPLACEMENT AUG 09 MF1J 82 CH 61.2 H749701C S SAN PEDRO RIVER BR ( STR # 403) SCOUR RETROFIT FEB 09 11609 ES1G 86 PM 137.1 T SAN PEDRO ROAD SEGMENT WIDEN ROADWAY TO 40' TBD FY 10 23701 ZY1D 40 AP 340.0 H552601C 040- E( 001) H SANDERS PORT OF ENTRY RECONSTRUCT POE TBD FY 11 TBA PS1J 86 PM 171.0 H755601C T SANTA CRUZ RIVER BRIDGE # 528 DECK REPLACEMENT JAN 09 UW1J 86 PM 128.5 T SANTA ROSA RANCH SEGMENT DESIGN ROADWAY WIDENING DESIGN FY 10 43409 TO1H 10 MA 126.0 H729601C E SARIVAL AVE TO DYSART RD CONSTRUCT GPL ( CITY ADVANCEMENT) OUTSID MAR 09 TBD 43711 TF1J 10 MA 125.0 E SARIVAL AVENUE TO DYSART ROAD CONSTRUCT LANDSCAPE TBD FY 11 11410 HC1H 93 MO 104.1 H738901C K SB RANCH ROAD CONSTRUCT PARALLEL ROADWAY TBD FY 11 MBAP1 QH1J 19 SC 1.6 H732901C T SB- 19 AND SPRR OP BRIDGE # 980 BRIDGE REPAIR TBD FY 09 NV1H 0000 MA 0.0 SS57701C CM - SCT- 0( 015) X E SCOTTSDALE ROAD CONSTRUCT ITS PROJECT FY 10 VB1H 0000 MA FTH SS64601C STP - FTH- 0( 200) A E SHEA BLVD ROADWAY WIDENING FY 09 XB1H 0000 MA 0.0 SS45102C CM - FTH- 0( 000) A E SHEA BOULEVARD CONSTRUCT BIKE LANE FY 09 10612 QP1C 60 NA 342.0 G SHOW LOW TO LITTLE MORMON LAKE WIDEN ROADWAY TBD FY 12 12910 GS1H 60 PN 222.3 G SILVER KING SECTION RECONSTRUCT ROADWAY TBD FY 11 WD1H 0000 MA PEO SS64301C CM - PEO- 0( 200) A E SKUNK CREEK- 75TH AVE TO NEW RIVER CONSTRUCT MULTI- USE PATH FY 09 13509 TZ1H 89A CN ASP F SLIDE ROCK STATE PARK DESIGN ( ADD'L PRRKING ) DESIGN FY 09 20806 WW1G 85 MA 152 H595514C E SOUTHERN AVE TO I- 10 CONSTRUCT ROADWAY TBD FY 09 SN1H 0000 MA GLN SS62301C CM - GLN- 0( 035) A E SPORTS FACILITIES FIBER OPTIC FIBER OPTIC CABLE INSTALLATION FY 09 MU1H 101L MA 47.0 E SR 101 AT CHAPARRAL ROAD ADD LEFT LANES AT TI TBD FY 10 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 1ST SORT: PROJECT NAME Page 8 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: 40310 GP1H 60 MA 148.9 E SR 101L ( AGUA FRIA) - MCDOWELL RD WIDEN ROADWAY TBD FY 10 40008 GH1H 10 MA 133.0 H715501C E SR 101L ( AGUA FRIA) TO I- 17 CONSTRUCT GENERAL PURPOSE LANES TBD FY 10 UU1J 101L MA 59.5 E SR 101L ( PRICE FREEWAY) @ GALVESTON SRP DRAINAGE INPROVEMENTS ASSOCIATED WI TBD FY 09 43509 SR1H 17 MA 215.0 E SR 101L TO CAREFREE HWY ( SR 74) CONSTRUCT LANDSCAPE TBD FY 10 41409 DI1J 202L MA 10.0 H749001C E SR 101L TO GILBERT ROAD CONSTRUCT FMS TBD FY 09 FC1J 143 MA 0.0 H752801C E SR 143 / SKY HARBOR BLVD TI TRAFFIC INTERCHANGE IMPROVEMENTS TBD FY 10 VD1J 143 MA 3.8 HX21001C E SR 143, 48TH STREET - MCDOWELL RD SIGN REPLACEMENT TBD FY 09 KD1H 177 PN 163.0 H692101C HES - 177- A( 003) A G SR 177, MP 163.80- 164.40 CURVE RE- ALIGNMENT NOV 09 12407 FX1C 10 MA 161.2 H505101C E SR 202L ( SANTAN) TO RIGGS ROAD CONST HOV & GEN PURPOSE LANE TBD FY 10 PALL1 CK1J 260 NA 353.1 HX21501C G SR 260 @ JCT WOODLAND LAKE ROAD TRAFFIC SIGNAL CONSTRUCTION TBD FY 09 ZL1H 260 AP 385.0 H726101C G SR 260 FROM GREER TO RODEO GROUNDS 3" RR & ARFC APR 09 OV1F 260 NA 350.0 H621401C TEA - 260- C( 003) A G SR 260 PORTER MTN RD - WOODLAND RD LANDSCAPING, IRRIGATION & PEDESTRIAN LIGH TBD FY 09 TBA DG1J 273 AP 380.0 G SR 273, BETWEEN MPS 377.46 AND 381.46 SYSTEM ENHANCEMENT - ENGINEERING MAR 10 40309 GO1H 60 MA 138.0 H686601C 060- B( 201) E SR 303L TO 99TH AVE WIDEN ROADWAY AUG 09 EO1H 66 MO 61.0 H675201C K SR 66 @ MOHAVE AIRPORT INTERSECTION IMPROVEMENT TBD FY 09 14409 GE1J 69 YV 288.3 H741001C 069- 4 P SR 69 GLASSFORD HILL PRESCOTT EAST HIGHWAY ROADWAY WIDENING JAN 09 OJ1J 77 NA 374.0 H753201C H SR 77 @ MP 374.38 AND MP 383.50 SYSTEM ENHANCEMENT - ENGINEERING MAR 09 JD1H 79 PN 126.0 H690601C T SR 79 ORACLE JCT - FLORENCE HWY EXTEND RCB CULVERTS MAR 09 HDRB1 EE1F 82 SC 38.0 H598701C T SR 82, MP 38 - 39.5 SLOPE FLATTENING TBD FY 12 RSKP1 40710 MC1G 85 MA 122.0 E SR 85, HAZEN RD - BROADWAY RD ( MAIN LINE) RECONSTRUCT & WIDEN TBD FY 10 PY1H 86 PM 166.8 HX19601C T SR 86 AT CAMINO DE OESTE INSTALL TRAFFIC SIGNAL & MINOR INT IMPROVE TBD FY 09 IH1J 89A YV 373.1 F SR 89A JCT AIRPORT ROAD INTERSECTION IMPROVEMENT JUN 09 10106 CN1G 10 CH 300.2 H650401C NH - 010- E( 200) N S SR 90 TI RECONSTRUCT SR 90 TI AND ADD PASSING LAN TBD FY 10 URJR1 OX1H 90 CH 321.1 H740401C S SR 90 @ MP 321.11 TO MP 321.42 MINOR PAVEMENT PRESERVATION FEB 09 SR1J 90 CH 321.5 H769201C S SR 90 @ MP 321.58 TO MP 321.91 MINOR PAVEMENT PRESERVATION FEB 09 JJ1G 95 LA 156.6 H638001C Y SR 95, HOLIDAY HARBOUR DRAINAGE STUDY TBD FY 10 PBGS1 UD1J 17 YV 279.6 P SR169 - ROCKY PARK SYSTEM PRESERVATION - ENGINEERING TBD FY 10 13609 AM1J 101L MA 30.0 H769901C E SR51 TO PRINCESS DRIVE DESIGN AND CONSTRUCT FMS TBD FY 09 JL1G 72 LA 13.1 Y SR- 72 MP 13.1 - 17.0 SHOULDERS & SLOPES MAY 09 44209 XW1H 17 MA 224.0 H688101C E SR74- ANTHEM WAY CONSTRUCT GENERAL PURPOSE LANE ( STAN A OCT 08 QY1J 74 MA 24.1 HX22401C E SR74 TRAFFIC SIGNAL DESIGN TRAFFIC SIGNAL MAR 09 TRDC1 UP1F 86 PM 74.0 H630201C T SR- 86, MP 73.99 - 77.69 SYMMETRICAL WIDENING MAR 09 EE1E 89 YV 288 089- A- 201 P SR- 89 @ KIRKLAND JCT / WAGNER RD CST RT & LT TURN LNS, SHOULDER TBD FY 10 DVJB1 JK1G 95 LA 131.7 Y SR- 95 @ MP 131.7 - 142.7 SHOULDER IMPROVEMENTS MAY 09 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 1ST SORT: PROJECT NAME Page 9 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: ZY1B 89 YV 313.8 029- 1 P SUNDOG RD BRIDGE ( OLD BLK CYN HWY TURNBACK OWNERSHIP & MAINTENANCE ( IGA R IGA FY 10 CV1G 191 CH 48.3 H650901C S SUNSITES @ HIGH STREET WIDEN ROADWAY FOR TURN LANES DEC 08 HERW1 10313 TD1J 60 PN 212.0 G SUPERIOR STREETS RECONSTRUCT TO 4 LANE RDWY W/ CNT TURN L TBD FY 13 14110 AY1G 77 PM 82.0 077- A T TANGERINE ROAD - PINAL COUNTY LINE WIDENING TO 6 LANES TBD FY 12 TBA QL1H 40 NA 278.0 H TANNER WASH BRIDGE WB # 459 BRIDGE REPLACEMENT DEC 09 LJ1J 160 AP 465.1 H730903C H TEEC NOS POS PORT OF ENTRY SYSTEM ENHANCEMENT - OTHER ENHANCEMEN FEB 09 ES1H 89 CN 495.0 H682701C F THE GAP - CEDAR RIDGE TP SHOULDER WIDENING JUL 09 FD1G 60 GI 278.0 H657401C G TIMBER MT TO SENECA RR 3" & ARFC FEB 09 13309 WS1H 80 CH 316.0 H718101C S TOMBSTONE COURTHOUSE STATE PARK CONSTRUCT PARKING TBD FY 10 HDSM1 KS1H 80 CH 318.0 S TOMBSTONE TO JUNCTION SR 90 EXTEND CULVERTS TBD FY 12 PSMR1 VK1J 0000 GI 0.0 SS71803D HPP - GGI- 0( 204) A G TONTO CREEK BRIDGE DESIGN BRIDGE APPROACHES FY 10 13409 TQ1H 87 GI 263.0 H718301C P TONTO NATURAL BRIDGE CONSTRUCT NEW ROAD TBD FY 10 CBJO1 ER1H 89 CN 420.0 H682601C F TOWNSEND - FERNWOOD RR 4" & ARFC DEC 09 OI1J 19 PM 0.0 H750101C T TUCSON TO INTERNATIONAL BORDER SIGN REHAB - REPLACE PANELS OR SIGNS IGA FY 09 JS1H 64 CN 235.0 H692701C F TUSAYAN STREETS WIDEN ROADWAY - SAFTEY IMPROVEMENTS TBD FY 10 DU1H 160 CN 320.0 H669501C 160- A( 003) A F US 160 @ SR 264 LIGHTING MAY 09 UL1H 160 CN 349.0 F US 160 TURN LANES AT NAVAJO ROUTE CONSTRUCT TURN LANES JUN 09 PLCH1 OI1H 163 NA 395.3 HX19101C H US 163 AT KAYENTA SCHOOL TRAFFIC SIGNAL INSTALLATION MAY 09 KA1G 191 AP 446.0 HX12001C H US 191 AT IR 102 CNST TRAFFIC SIGNAL TBD FY 10 41313 DK1J 303L MA 0.0 E US 60 ( GRAND AVE) TO I- 17 CONSTRUCT ROADWAY TBD FY 13 40610 GT1H 74 MA 13.0 P US 60 - 303L, MP 13 - MP 15 ( EB) CONSTRUCT PASSING LANE TBD FY 10 BL1J 60 PN 228.4 HX20701C 060- D( 202) A G US 60 @ MP 228, QUEEN CREEK TUNNEL SYSTEM ENHANCEMENT - SAFETY IMPROVEMEN TBD FY 09 NP1J 60 PN 204.3 HX22301C E US 60 AT PERALTA ROAD ( TRAFFIC SIGNAL) INSTALL TRAFFIC SIGNAL IGA FY 09 HB1J 60 LA 45.8 H733501C Y US 60 AT VICKSBURG ROAD INTERSECTION IMPROVEMENT JUL 09 40608 GU1H 74 MA 20.0 H691201C P US 60 TO SR 303L, MP 20 TO MP 22 ( EB & WB) CONSTRUCT PASSING LANES FEB 09 IG1J 60 GI 243.0 H743601C G US 60, MIAMI CITY LIMITS TO MCMILLAN WASH PAVEMENT PRESERVATION MAR 09 DX1H 70 GH 338.0 H680801C S US 70 & 8TH AVENUE INTERSECTION INTERSECTION IMPROVEMENTS TBD FY 09 XL1G 70 GH 331 070- A- 310 S US 70 PIMA TO THATCHER DESIGN SLOPE FLATTING TBD FY 10 EEJM1 GK1J 95 LA 82.0 H752601C Y US 95 @ 82 & 89 INTERSECTION IMROVEMENTS TBD FY 10 11207 QK1C 19 PM 58.7 H510501C T VALENCIA RD TO AJO WAY WIDEN ROADWAY TBD FY 13 TBA 11508 AZ1G 86 PM 159.5 H680601C STP - 086- A T VALENCIA ROAD - KINNEY ROAD CONSTRUCT ROADWAY WIDENING TO 4 LANES TBD FY 10 TBA 11512 CR1J 10 PM 267.1 T VALENCIA ROAD TI CONSTRUCT TRAFFIC INTERCHANGE DESIGN FY 12 NU1H 0000 MA GDY SS56001C GDY- 0- 417 E VAN BUREN @ BULLARD WASH BRIDGE APPROACHES FY 09 QA1J 0000 MA 0.0 SS68601C CM - CUK- 0( 200) A E VARIOUS LOCATIONS PAVE DIRT ROADS FY 09 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 1ST SORT: PROJECT NAME Page 10 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: HO1G 999 MA 0.0 H662101C 999- A( 023) E VARIOUS ROUTES, MARICOPA COUNTY BRKWY CABLE TERMINAL TBD FY 09 44109 XV1H 10 MA 119.0 H721101C E VERRADO WAY TO SARIVAL AVE CONSTRUCT GENERAL PURPOSE LANE ( STAN A OCT 08 10506 EM1E 40 CN 205.0 H545701C F WALNUT CANYON ( WB) RECONSTRUCT ROADWAY ( REPROFILE VERTICA TBD FY 11 KHRC1 DP1G 95 YU 38.0 095- B- 308 Y WELLTON MOHAWK CANAL BRIDGE # 343 BRIDGE REHAB TBD FY 10 VL1J 0000 MA 0.0 SS72001C CM - SUR- 0( 206) A E WEST OF 219TH AVENUE PAVE DIRT ROADS FY 10 MN1J 89 CN 371.0 F WEST SEDONA ( NB & SB) R & R 2.5" AC & FR JAN 11 TW1J 0000 MA CHN SS70701C CM - CHN- 0( 204) A E WESTERN CANAL @ ALMA SCHOOL & DOBSON PEDESTRIAN SIGNAL - TRANSPORTATION IMPRO FY 09 FF1G 73 NA 342.0 G WHITERIVER TO COAL MINE CANYON 2" AC & ARFC TBD FY 11 GI1F 191 AP 390.0 H602501C 191- E- 505 H WIDE RUINS WIDENING FOR PASSING/ CLIMBING LANES, SAFE TBD FY 10 WERS1 FJ1J 40 MO 85.9 H733001C K WILLOW CREEK BRIDGE, WB # 1769 DECK REHABILITATION TBD FY 09 11313 CS1J 10 PM 269.4 T WILMOT ROAD TI UPGRADE EXISTING TRAFFIC INTERCHANGE TBD FY 13 OQ1J 177 GI 136.3 H752301C G WINKELMAN 3" MILL AND REPLACE TBD FY 09 18606 MU1F 17 YV 299.0 H613601C F YAVAPAI COUNTY - JCT SR 179 ( SB) RR ( 4" TL, 3" PL) + RR ARFC FEB 09 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 2ND SORT: FEDERAL ID # Page 1 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: KA1G 191 AP 446.0 HX12001C H US 191 AT IR 102 CNST TRAFFIC SIGNAL TBD FY 10 LP1J 83 SC 31.6 H747001C T JCT SR 82 ( MP 31.6) TO MP 43.5 HIP RECYCLE + CHIP SEAL COAT DEC 08 IN1J 10 MA 144.0 H725601C M 3RD AVENUE - 3RD STREET FIRE DETECTION SYSTEM RETROFIT FEB 09 JD1H 79 PN 126.0 H690601C T SR 79 ORACLE JCT - FLORENCE HWY EXTEND RCB CULVERTS MAR 09 HDRB1 JJ1G 95 LA 156.6 H638001C Y SR 95, HOLIDAY HARBOUR DRAINAGE STUDY TBD FY 10 PBGS1 JK1G 95 LA 131.7 Y SR- 95 @ MP 131.7 - 142.7 SHOULDER IMPROVEMENTS MAY 09 IG1J 60 GI 243.0 H743601C G US 60, MIAMI CITY LIMITS TO MCMILLAN WASH PAVEMENT PRESERVATION MAR 09 JS1H 64 CN 235.0 H692701C F TUSAYAN STREETS WIDEN ROADWAY - SAFTEY IMPROVEMENTS TBD FY 10 13408 HY1G 10 PM 288.4 H747301C T CIENEGA CREEK- MARSH STATION PHASE III REMOVE RAIL & BRIDGE, CONST ML TBD FY 09 KO1H 40 MO 11.0 K CHEMEHUEVI & BOULDER WASH BRIDGES SCOUR RETROFIT JAN 10 14810 KP1H 40 AP 316.0 H692401C H DEAD RIVER BRIDGE EB ( STR # 565) SCOUR RETROFIT FEB 09 KS1H 80 CH 318.0 S TOMBSTONE TO JUNCTION SR 90 EXTEND CULVERTS TBD FY 12 PSMR1 10312 LE1G 93 MO 101.8 K ANTELOPE WASH CONSTRUCT 4- LANE DIVIDED HIGHWAY TBD FY 12 LJ1J 160 AP 465.1 H730903C H TEEC NOS POS PORT OF ENTRY SYSTEM ENHANCEMENT - OTHER ENHANCEMEN FEB 09 QY1C 86 PM 141.1 H713701C T MP 141.1 TO RESERVATION BOUNDARY CONSTRUCT ROADWAY WIDENING TBD FY 09 TBA JL1G 72 LA 13.1 Y SR- 72 MP 13.1 - 17.0 SHOULDERS & SLOPES MAY 09 40608 GU1H 74 MA 20.0 H691201C P US 60 TO SR 303L, MP 20 TO MP 22 ( EB & WB) CONSTRUCT PASSING LANES FEB 09 40008 GH1H 10 MA 133.0 H715501C E SR 101L ( AGUA FRIA) TO I- 17 CONSTRUCT GENERAL PURPOSE LANES TBD FY 10 43010 GK1H 17 MA 204.9 E BETHANY HOME RD TO NORTHERN AVE DESIGN/ CONSTRUCT PEDESTRIAN WALKWAY AL TBD FY 10 GK1J 95 LA 82.0 H752601C Y US 95 @ 82 & 89 INTERSECTION IMROVEMENTS TBD FY 10 21008 GL1J 191 AP 448.0 H748601C H CHINLE - MANY FARMS ( PH I) REMOVE & REPLACE FENCING, CATTLE GUARDS TBD FY 09 40310 GP1H 60 MA 148.9 E SR 101L ( AGUA FRIA) - MCDOWELL RD WIDEN ROADWAY TBD FY 10 IH1J 89A YV 373.1 F SR 89A JCT AIRPORT ROAD INTERSECTION IMPROVEMENT JUN 09 40610 GT1H 74 MA 13.0 P US 60 - 303L, MP 13 - MP 15 ( EB) CONSTRUCT PASSING LANE TBD FY 10 12303 LV1C 191 AP 367.0 H436001C H NAHATA' DZIIL ROAD - SANDERS TI RECONSTRUCT 3 BRIDGES AND RDWY TBD FY 10 SVSG1 22706 GV1H 80 CH 364.0 S DOUGLAS STRTGC INSPECTION STATION INSTALL VOICE & DATA LINES IGA FY 10 13910 GY1H 86 PM 132.8 T KITT PK ROAD SEGMENT ROADWAY WIDENING TBD FY 10 HB1J 60 LA 45.8 H733501C Y US 60 AT VICKSBURG ROAD INTERSECTION IMPROVEMENT JUL 09 11410 HC1H 93 MO 104.1 H738901C K SB RANCH ROAD CONSTRUCT PARALLEL ROADWAY TBD FY 11 MBAP1 12510 HI1H 260 NA 317.2 H770501C G HEBER - SHOW LOW EB & WB CONSTRUCT PASSING LANES TBD FY 11 14607 HX1G 10 PM 288.4 T CIENEGA CREEK- MARSH STATION PHASE II NEW RAILROAD TRACKS TBD FY 09 12910 GS1H 60 PN 222.3 G SILVER KING SECTION RECONSTRUCT ROADWAY TBD FY 11 13607 QG1F 85 MA 120.5 Y MP 120.54 - MP 122.99 CONSTRUCT ROADWAY TBD FY 09 TBA PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 2ND SORT: FEDERAL ID # Page 2 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: LP1G 78 GE 169.0 H666901C S JAKE'S CORNER REALIGNMENT HIGHWAY REALIGNMENT MAR 09 AMJS1 PK1E 95 YU 63.0 H584101C Y PELIGRO - CLARKS PA ( 3" AC + FC) JUN 09 PS1J 86 PM 171.0 H755601C T SANTA CRUZ RIVER BRIDGE # 528 DECK REPLACEMENT JAN 09 PV1J 101L MA 36.0 H741401C E HAYDEN RD TO PRINCESS DR DRAINAGE IMPROVEMENTS TBD FY 09 PY1H 86 PM 166.8 HX19601C T SR 86 AT CAMINO DE OESTE INSTALL TRAFFIC SIGNAL & MINOR INT IMPROVE TBD FY 09 OV1J 999 SW 0.0 H755001C BRIDGES # 2190, # 1152, # 1219, # 745, # 517, # 821, # 93 COLLISION DAMAGE REPAIR TBD FY 09 QF1G 191 GE 153.0 S GUTHRIE BRIDGE # 352 DEMOLITION PA FOR BRIDGE DEMOLITION TBD FY 10 HDKA1 OS1J 40 CN 177.0 H751401C F MP 177- 182 ( EB& WB) SHOULDERS PAVEMENT PRESERVATION TBD FY 09 QH1J 19 SC 1.6 H732901C T SB- 19 AND SPRR OP BRIDGE # 980 BRIDGE REPAIR TBD FY 09 11207 QK1C 19 PM 58.7 H510501C T VALENCIA RD TO AJO WAY WIDEN ROADWAY TBD FY 13 TBA QL1H 40 NA 278.0 H TANNER WASH BRIDGE WB # 459 BRIDGE REPLACEMENT DEC 09 QL1J 10 PM 247.0 T INA RD TO RUTHRAUFF RD DCR / EA AND 30% DESIGN DESIGN FY 09 10612 QP1C 60 NA 342.0 G SHOW LOW TO LITTLE MORMON LAKE WIDEN ROADWAY TBD FY 12 16006 QT1F 101L MA 53.5 E BALBOA DRIVE CONSTRUCT MULTI- USE PATH BRIDGE OVER TH IGA FY 12 QB1J 40 MO 39.0 H756801C K MP 39 - MP 121 MINOR PAVEMENT PRESERVATION FEB 09 NP1J 60 PN 204.3 HX22301C E US 60 AT PERALTA ROAD ( TRAFFIC SIGNAL) INSTALL TRAFFIC SIGNAL IGA FY 09 21301 LY1C 260 GI 258.0 P LION SPRINGS SECTION DESIGN ( ROADWAY) DESIGN FY 09 40710 MC1G 85 MA 122.0 E SR 85, HAZEN RD - BROADWAY RD ( MAIN LINE) RECONSTRUCT & WIDEN TBD FY 10 MD1J 89 YV 269.0 P MARTINEZ RIVER BRIDGE ( STR # 1320) SCOUR RETROFIT TBD FY 10 MF1J 82 CH 61.2 H749701C S SAN PEDRO RIVER BR ( STR # 403) SCOUR RETROFIT FEB 09 MN1J 89 CN 371.0 F WEST SEDONA ( NB & SB) R & R 2.5" AC & FR JAN 11 OX1H 90 CH 321.1 H740401C S SR 90 @ MP 321.11 TO MP 321.42 MINOR PAVEMENT PRESERVATION FEB 09 MU1H 101L MA 47.0 E SR 101 AT CHAPARRAL ROAD ADD LEFT LANES AT TI TBD FY 10 FP1G 160 AP 452.0 H658601C H RED MESA TO TEEC NOS POS 3" AC & ARFC JAN 10 15208 NSSP 89A YV 0.0 F RED ROCK STATE PARK DESIGN DESIGN FY 09 NW1J 89A YV 344.0 H733901C P JEROME RETAINING WALL REPLACE RETAINING WALL TBD FY 09 OI1H 163 NA 395.3 HX19101C H US 163 AT KAYENTA SCHOOL TRAFFIC SIGNAL INSTALLATION MAY 09 OI1J 19 PM 0.0 H750101C T TUCSON TO INTERNATIONAL BORDER SIGN REHAB - REPLACE PANELS OR SIGNS IGA FY 09 OJ1J 77 NA 374.0 H753201C H SR 77 @ MP 374.38 AND MP 383.50 SYSTEM ENHANCEMENT - ENGINEERING MAR 09 OQ1J 177 GI 136.3 H752301C G WINKELMAN 3" MILL AND REPLACE TBD FY 09 18606 MU1F 17 YV 299.0 H613601C F YAVAPAI COUNTY - JCT SR 179 ( SB) RR ( 4" TL, 3" PL) + RR ARFC FEB 09 40612 CX1J 60 MA 194.0 E MERIDIAN ROAD CONSTRUCT TI TBD FY 13 GG1J 66 MO 57.3 K AIRWAY AVENUE & MOHAVE AIRPORT DRIVE INTERSE CONCRETE MEDIAN & ASPHALT PAVING MAR 09 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 2ND SORT: FEDERAL ID # Page 3 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: 40112 CT1J 17 MA 209.0 E ARIZONA CANAL TO SR 101L CONSTRUCT GPL TBD FY 13 CU1H 191 GE 163.0 S SAN FRANCISCO RIVER BR # 563 BRIDGE REPLACEMENT AUG 09 10212 CU1J 17 YV 232.0 P ROCK SPRINGS TO CORDES JUNCTION WIDEN ROADWAY TBD FY 12 CV1G 191 CH 48.3 H650901C S SUNSITES @ HIGH STREET WIDEN ROADWAY FOR TURN LANES DEC 08 HERW1 11512 CR1J 10 PM 267.1 T VALENCIA ROAD TI CONSTRUCT TRAFFIC INTERCHANGE DESIGN FY 12 10211 CW1J 60 LA 0.0 H739001C P ALAMO LAKE STATE PARK CONSTRUCT PARKING TBD FY 11 PBBF1 11312 CQ1J 10 PM 264.0 T COUNTRY CLUB ROAD TI CONSTRUCT NEW TRAFFIC INTERCHANGE DESIGN FY 13 10311 CY1J 77 PN 0.0 H739101C T ORACLE STATE PARK CONSTRUCT PARKING TBD FY 11 10512 CZ1J 89 YV 317.5 P JCT 89A TO MP 324 WIDEN THE SR 89 CORRIDOR TBD FY 12 10412 DA1J 89 CN 464.5 F CAMERON SECTION CONSTRUCT 4- LANE URBAN, SR 64 INTERSECTI TBD FY 12 14410 DB1J 95 LA 128.9 H675701C Y PASSING LANES SOUTH OF BOUSE WASH CONSTRUCT PASSING LANES TBD FY 10 40313 DD1J 101L MA 23.5 E I- 17 TO TATUM BLVD CONSTRUCT HOV LANE DESIGN FY 13 14610 DE1J 177 GI 0.0 G CLIMBING PARK DESIGN DESIGN FY 10 40611 CV1J 51 MA 13.6 E BELL ROAD - SR 101L DESIGN FMS DESIGN FY 11 CH1G 70 GI 256.0 H645301C G OLD WINKELMAN HIGHWAY AND BIA ROUTE 6 INTERSECTION IMPROVEMENTS APR 09 HZJS1 13209 A6SP 87 NA 346.0 H717901C H HOMOLOVI RUINS STATE PARK CONSTRUCT ROAD TBD FY 10 CBJO1 13609 AM1J 101L MA 30.0 H769901C E SR51 TO PRINCESS DRIVE DESIGN AND CONSTRUCT FMS TBD FY 09 10411 AR1E 82 SC 0.0 H718201C T PATAGONIA LAKE STATE PARK CONSTRUCT ROAD TBD FY 11 HDSM1 13410 BB1G 10 PM 246.5 T CORTARO ROAD TI CONSTRUCT NEW TI TBD FY 10 TBA BW1J 40 MO 47.0 H752901C K HOLY MOSES WASH - RATTLESNAKE WASH RR( 5" TL, 3" PL)& AR ACFC & RR AR ACFC APR 09 11313 CS1J 10 PM 269.4 T WILMOT ROAD TI UPGRADE EXISTING TRAFFIC INTERCHANGE TBD FY 13 CG1J 19 PM 45.8 HX21301C T I- 19 AND SAHUARITA RD INSTALL NEW TRAFFIC SIGNAL IGA FY 09 10910 DJ1G 90 CH 323.5 S CENTRAL AVE TO MOSON RD, E OF SIERRA VISTA WIDEN TO 5 LANES TBD FY 11 CK1J 260 NA 353.1 HX21501C G SR 260 @ JCT WOODLAND LAKE ROAD TRAFFIC SIGNAL CONSTRUCTION TBD FY 09 10112 CL1J 10 PN 0.0 T GILA RIVER INDIAN TRIBAL BOUNDARY TO I- 8 WIDEN ROADWAY TBD FY 12 40913 CM1J 10 MA 122.0 H770901C E PERRYVILLE ROAD CONSTRUCT TI TBD FY 13 14510 CN1J 10 PN 199.1 T JCT I 8 TO PICACHO PEAK TI WIDEN ROADWAY TBD FY 10 11112 CO1J 10 PM 236.4 T MARANA ROAD TO INA ROAD RECONSTRUCT & WIDEN FRONTAGE ROADS TBD FY 12 11212 CP1J 10 PM 262.5 T KINO TI DESIGN TRAFFIC INTERCHANGE DESIGN FY 12 CF1J 79 PN 124.2 H731001C T MP 124 TO MP 126 SYSTEM ENHANCEMENT - ENGINEERING TBD FY 09 HDRB1 FG1H 40 MO 73.0 H682401C K PEACOCK WASH- SILVER SPRNGS ROAD TI- EB RR5" TL & 3" TL & 2" AC & ARFC FEB 09 EY1H 87 GI 267.0 H683201C P PINE - RIM 3" RR & ARFC TBD FY 09 FC1J 143 MA 0.0 H752801C E SR 143 / SKY HARBOR BLVD TI TRAFFIC INTERCHANGE IMPROVEMENTS TBD FY 10 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 2ND SORT: FEDERAL ID # Page 4 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: FD1G 60 GI 278.0 H657401C G TIMBER MT TO SENECA RR 3" & ARFC FEB 09 FD1H 8 MA 114.0 H682901C Y GILA BEND - 121.0 RR 2" PL/ 5" TL & ARFC JAN 10 14002 FF1C 191 CH 62.0 H416501C S COCHISE UPRR OP # 2530 BRIDGE REPLACEMENT. TBD FY 10 DG1J 273 AP 380.0 G SR 273, BETWEEN MPS 377.46 AND 381.46 SYSTEM ENHANCEMENT - ENGINEERING MAR 10 FG1G 78 GE 154.0 H657901C S JCT 191 TO FOREST SERVICE BOUNDARY CHIP SEAL AND GUARDRAIL EXTENSION APR 09 11609 ES1G 86 PM 137.1 T SAN PEDRO ROAD SEGMENT WIDEN ROADWAY TO 40' TBD FY 10 FI1G 86 PM 145.0 H658101C T RESERVATION BOUNDRY TO BRAWLY WASH 3" AC & SC ( POLY) AUG 09 FJ1G 87 PN 131.0 H658201C T S COOLIDGE CL TO JCT 287 RR 2.5" ARAC FEB 09 FJ1J 40 MO 85.9 H733001C K WILLOW CREEK BRIDGE, WB # 1769 DECK REHABILITATION TBD FY 09 45309 FN1H 10 MA 96.2 H708301X Y 395TH AVE ( BELMONT RD) CONSTRUCT TI TBD FY 09 FO1G 160 NA 402.0 H658501C H JCT N 59 TO DENNEHOTSO 3" COLD RECYCLE & ARFC DEC 09 OU1J 40 MO 9.8 H742001C K LAKE HAVASU TI UP # 1586 BRIDGE REHABILITATION TBD FY 09 FF1G 73 NA 342.0 G WHITERIVER TO COAL MINE CANYON 2" AC & ARFC TBD FY 11 11209 EK1G 10 PM 232.4 T PINAL AIR PARK - MARANA, PH II CONST MAINLINE WIDENING 6 LN TBD FY 12 FQ1G 180 AP 347.0 H658701C G RANCH TO JCT 61 SYS PRES- RESTORE/ REHAB/ RESRFC APR 09 43311 DJ1J 303L MA 0.0 E I- 10/ 303L TI, PHASE I ( I- 10 REALIGNMENT) CONSTRUCT TI TBD FY 11 41313 DK1J 303L MA 0.0 E US 60 ( GRAND AVE) TO I- 17 CONSTRUCT ROADWAY TBD FY 13 DX1H 70 GH 338.0 H680801C S US 70 & 8TH AVENUE INTERSECTION INTERSECTION IMPROVEMENTS TBD FY 09 12010 EB1E 191 AP 446 H543801C H CHINLE SOUTH ROADWAY WIDENING TBD FY 11 EB1H 260 NA 356.0 H681201C G MP 356- 357.6 INSTALL NEW R/ W FENCE TBD FY 09 EU1H 191 AP 375.0 H681901C H JCT I- 40 MP 385 3" AC & SC JAN 10 EE1F 82 SC 38.0 H598701C T SR 82, MP 38 - 39.5 SLOPE FLATTENING TBD FY 12 RSKP1 ES1H 89 CN 495.0 H682701C F THE GAP - CEDAR RIDGE TP SHOULDER WIDENING JUL 09 10506 EM1E 40 CN 205.0 H545701C F WALNUT CANYON ( WB) RECONSTRUCT ROADWAY ( REPROFILE VERTICA TBD FY 11 KHRC1 EM1G 10 PM 253.0 H624101C T RUTHRAUFF RD - PRINCE RD CONSTRUCT MAINLINE WIDENING TO 8 LANES TBD FY 11 ENBS2 EO1G 19 PM 34.0 T CANOA TI - CONTINENTAL TI CONST ROADWAY ( NB FRONTAGE RD) IGA FY 09 EO1H 66 MO 61.0 H675201C K SR 66 @ MOHAVE AIRPORT INTERSECTION IMPROVEMENT TBD FY 09 ER1H 89 CN 420.0 H682601C F TOWNSEND - FERNWOOD RR 4" & ARFC DEC 09 41409 DI1J 202L MA 10.0 H749001C E SR 101L TO GILBERT ROAD CONSTRUCT FMS TBD FY 09 10213 EC1H 40 MO 56.5 K RATTLESNAKE WASH TI CONSTRUCT NEW TI TBD FY 13 TBA 40711 TT1H 60 MA 0.0 E LINDSEY RD HALF INTERCHANGE DESIGN TI DESIGN FY 11 10413 TC1J 93 MO 116.0 K CARROW TO STEPHENS CONSTRUCT 4- LANE DIVIDED HIGHWAY TBD FY 13 UD1J 17 YV 279.6 P SR169 - ROCKY PARK SYSTEM PRESERVATION - ENGINEERING TBD FY 10 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 2ND SORT: FEDERAL ID # Page 5 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: 40809 UD1H 202L MA 0.0 E I- 10 EAST/ SANTAN TI TO 51ST AVE DESIGN AND R/ W DESIGN FY 09 TBD UC1J 17 CN 316.5 F ROCKY PARK- MCCONNELL SYSTEM PRESERVATION - ENGINEERING TBD FY 09 QY1J 74 MA 24.1 HX22401C E SR74 TRAFFIC SIGNAL DESIGN TRAFFIC SIGNAL MAR 09 TRDC1 41210 UA1H 202L MA 0.0 E 51ST AVE TO I- 10 WEST CONSTRUCT ROADWAY TBD FY 10 TBD 13509 TZ1H 89A CN ASP F SLIDE ROCK STATE PARK DESIGN ( ADD'L PRRKING ) DESIGN FY 09 TX1J 0000 MA CHN SS70801C E PURCHASE TRAFFIC DETECTION CAMERAS VARIOUS LOCATIONS FY 09 41611 TX1H 202L MA 0.0 E DOBSON ROAD TO I- 10 DESIGN FMS DESIGN FY 11 41711 TW1H 202L MA 0.0 E DOBSON ROAD TO I- 10 CONSTRUCT HOV/ RAMP TBD FY 13 41011 TV1H 101L MA 0.0 E I- 17 TO SR 51 DESIGN FMS DESIGN FY 11 40013 UF1H 202L MA 0.0 E I- 10 EAST/ SANTAN TI TO 51ST AVE CONSTRUCT ROADWAY TBD FY 13 TBD 40812 TU1H 101L MA 0.0 H707601C E BEARDSLEY RD / UNION HILLS DRIVE ( CITY ADVANCEM CONSTRUCT TI TBD FY 09 41411 UG1H 202L MA 0.0 E RURAL RD TO SR 101L DESIGN GPL DESIGN FY 11 TBD 40312 TS1H 17 MA 209.0 E ARIZONA CANAL - 101L CONSTRUCT FMS TBD FY 12 40511 TR1H 17 MA 215.0 E 101L- CAREFREE HIGHWAY DESIGN FMS DESIGN FY 11 13409 TQ1H 87 GI 263.0 H718301C P TONTO NATURAL BRIDGE CONSTRUCT NEW ROAD TBD FY 10 CBJO1 11113 TL1J 10 PM 236.4 T MARANA ROAD TO INA ROAD ( FRONTAGE ROADS) RECONSTRUCT & WIDEN FRONTAGE ROADS TO TBD FY 13 TK1J 999 MA 0.0 H770201C E BRIDGES # S 1772, 779, 1823, 2800, 517, 1335 COLLISION DAMAGE REPAIR IGA FY 09 TI1J 8 YU 66.0 H744601C Y I- 8, DATELAND TO GILA BEND REST AREA SIGN REHABILITATION IGA FY 09 43711 TF1J 10 MA 125.0 E SARIVAL AVENUE TO DYSART ROAD CONSTRUCT LANDSCAPE TBD FY 11 10113 TE1J 89A YV 319.0 P JCT 89A TO CHINO VALLEY ( S. CHINO LIMITS) - PH II CONSTRUCT ROADWAY WIDENING TBD FY 13 TDSP 89 CN 546.5 H475301C F PAGE REST AREA CONST REST AREA & VISITOR CNTR TBD FY 10 10313 TD1J 60 PN 212.0 G SUPERIOR STREETS RECONSTRUCT TO 4 LANE RDWY W/ CNT TURN L TBD FY 13 TD1H 191 GE 170.0 H710001C S LWR CORONADO TRAIL DRAINAGE IMPRV SYST ENHANCEMENT - ENGINEERING MAR 09 TU1J 0000 MA BKY SS70901C E PAVE DIRT SHOULDERS - VARIOUS LOCATIONS PAVE DIRT SHOULDERS FY 09 WB1H 264 AP 474.5 H712101C H BLACK CREEK BRIDGE ( STR # 624) SCOUR RETROFIT TBD FY 10 ZT1H 40 CN 224.5 F BABBITTS TANK WASH BRIDGE SYSTEM ENHANCEMENT - ENGINEERING DEC 09 ZL1H 260 AP 385.0 H726101C G SR 260 FROM GREER TO RODEO GROUNDS 3" RR & ARFC APR 09 ZK1F 191 GE 160.0 H643201C S BACK COUNTRY BYWAY ( NORTH INTER) SAFETY IMPROVEMENTS TBD FY 09 ZC1H 40 MO 14.9 H727201C K BUCK MOUNTIAN WASH EB # 378 DECK REHABILITATION TBD FY 09 YH1G 87 MA 204.3 E NEW FOUR PEAKS RD TO DOS S RANCH RD CLIMBING LANE AND SHOULDER WIDENING TBD FY 10 44209 XW1H 17 MA 224.0 H688101C E SR74- ANTHEM WAY CONSTRUCT GENERAL PURPOSE LANE ( STAN A OCT 08 44109 XV1H 10 MA 119.0 H721101C E VERRADO WAY TO SARIVAL AVE CONSTRUCT GENERAL PURPOSE LANE ( STAN A OCT 08 XT1H 180 AP 402.0 G JCT SR 260 / US 180 & RODEO GROUNDS INTERSECTIO REALIGN INTERSECTION TBD FY 10 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 2ND SORT: FEDERAL ID # Page 6 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: XQ1F 15 MO 9.0 F FARM ROAD TI CONSTRUCT NEW UNDERPASS TBD FY 11 10610 XG1G 70 GI 253.4 G RAILROAD OVERPASS TO JCT SR 77 CONSTRUCT NEW ROADWAY & RAILROAD STRU TBD FY 11 20806 WW1G 85 MA 152 H595514C E SOUTHERN AVE TO I- 10 CONSTRUCT ROADWAY TBD FY 09 41310 UE1H 202L MA 0.0 E I- 10 EAST/ SANTAN TI TO 51ST AVE DESIGN & R/ W DESIGN FY 10 TBD WN1G 8 YU 6.0 Y BUSINESS 8 AND AVE 2 1/ 2 E DRAINAGE STUDY & IMPROVEMENT AUG 09 41211 UB1H 202L MA 0.0 E 51ST AVE TO I- 10 WEST CONSTRUCT ROADWAY TBD FY 11 TBD VE1J 8 YU 19.0 H773901C Y LIGURTA TO DATELAND SIGN REHAB TBD FY 10 VD1J 143 MA 3.8 HX21001C E SR 143, 48TH STREET - MCDOWELL RD SIGN REPLACEMENT TBD FY 09 UW1J 86 PM 128.5 T SANTA ROSA RANCH SEGMENT DESIGN ROADWAY WIDENING DESIGN FY 10 UU1J 101L MA 59.5 E SR 101L ( PRICE FREEWAY) @ GALVESTON SRP DRAINAGE INPROVEMENTS ASSOCIATED WI TBD FY 09 UP1F 86 PM 74.0 H630201C T SR- 86, MP 73.99 - 77.69 SYMMETRICAL WIDENING MAR 09 UO1H 95 LA 161.7 H711501C K BILL WILLIAMS RIVER BRIDGE # 1272 FIRE DAMAGE REPAIR TBD FY 09 UM1J 93 MO 124.0 H763501C K 1 MILE SOUTH OF TOWN OF WIKIEUP; WEST OF ROAD SYSTEM PRESERVATION - RESTORATION/ REHAB IGA FY 09 UL1H 160 CN 349.0 F US 160 TURN LANES AT NAVAJO ROUTE CONSTRUCT TURN LANES JUN 09 PLCH1 40808 UK1H 202L MA 0.0 E 51ST AVE TO I- 10 WEST CONSTRUCT ROADWAY TBD FY 09 TBD 15708 UI1H 95 MO 0.0 K LAKE HAVASU STATE PARK DESIGN ( LAUNCH RAMPS) DESIGN FY 10 TBD 41612 UH1H 303L MA 0.0 E I- 10 TO US 60 ( GRAND AVE) CONSTRUCT NEW FREEWAY TBD FY 12 TBD 13309 WS1H 80 CH 316.0 H718101C S TOMBSTONE COURTHOUSE STATE PARK CONSTRUCT PARKING TBD FY 10 HDSM1 14601 RG1B 260 GI 263.1 H469901C P LITTLE GREEN VALLEY RECONSTRUCT ROADWAY TBD FY 09 AMRM1 11710 RJ1C 160 NA 375.2 H JCT SR 564 - TSEGI, PH I CONST DUAL PASSING LNS TBD FY 10 SL1J 40B NA 276.8 H767701C H JOSEPH CITY TRUCK STOP 3" MILL AND REPLACE MAR 09 RH1J 17 MA 229.0 H760401C E ANTHEM WAY - NEW RIVER ROAD PAVEMENT PRESERVATION NOV 08 SM1J 180 NA 324.2 H767801C H PETRIFIED FOREST MINOR PAVEMENT PRESERVATION MAR 09 43509 SR1H 17 MA 215.0 E SR 101L TO CAREFREE HWY ( SR 74) CONSTRUCT LANDSCAPE TBD FY 10 SR1J 90 CH 321.5 H769201C S SR 90 @ MP 321.58 TO MP 321.91 MINOR PAVEMENT PRESERVATION FEB 09 QZ1J 177 PN 139.2 H760301C G MP 139.16 @ AAR/ DOT # 742- 390- N CONCRETE RR CROSSING SURFACE & LED FLAS IGA FY 09 43208 ST1H 202L MA 0.0 E LINDSAY ROAD TO GILBERT ROAD DESIGN & CONST MULTI- USE PATH TBD FY 09 SV1J 40 CN 182.0 H768901C F NAVAJO ARMY DEPOT, WB 1/ 2" MILL & 1/ 2" ACFC ON SHOULDER TBD FY 09 SW1H 19 PM 39.0 H705001C T CONTINENTAL RD/ I- 19 BIKE & PED SYS ENHNCMENT- OTHR ENHANCEMNTS TBD FY 10 HDSR1 SY1H 10 PN 211.0 H710601C T I- 10 WIDENING SR87 TO PICACHO PEAK CAPACITY ADDITIONS- ENGINEERING TBD FY 10 PBDL1 41410 SZ1J 888 MA 0.0 H752501C E NOISE MITIGATION ON THE MAG REGIONAL FREEWAY SYSTEM ENHANCEMENT - OTHER ENHANCEMEN TBD FY 10 SX1J 10 PN 210.1 T I- 10 / SR 87 TI CAPACITY ADDITIONS - ENGINEERING TBD FY 10 PBDL1 TB1H 10 PN 199.0 H710401C T I- 8 TO SR 87 TI CAPACITY ADDITIONS - ENGINRING TBD FY 10 EECA1 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 2ND SORT: FEDERAL ID # Page 7 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: TA1H 40 CN 198.0 F BUTLER AVE TI SYSTEM ENHANCEMENT- ENGINEERING TBD FY 12 RBML1 43409 TO1H 10 MA 126.0 H729601C E SARIVAL AVE TO DYSART RD CONSTRUCT GPL ( CITY ADVANCEMENT) OUTSID MAR 09 TBD 12407 FX1C 10 MA 161.2 H505101C E SR 202L ( SANTAN) TO RIGGS ROAD CONST HOV & GEN PURPOSE LANE TBD FY 10 PALL1 46208 XP1G 87 MA 211.8 P MP 211.8 TO MP 213.0 REPAIR CUT SLOPES FOR EROSION CONTROL TBD FY 10 BV1G 0000 MA GIL SS54601C CM- GIL- 0( 014) A E EASTERN CANAL, BASELINE- GUADALUPE CONST MULTI USE PATH FY 09 23701 ZY1D 40 AP 340.0 H552601C 040- E( 001) H SANDERS PORT OF ENTRY RECONSTRUCT POE TBD FY 11 TBA NY1E 0000 GI GGI SH27901C HES- GGI- 0( 006) A G JESSE HAYES ROAD ROADWAY IMPROVEMENTS FY 09 NH1G 0000 GH GGH SH27701C STP- GGH- 0( 006) A S SAFFORD- BRYCE RD & SAFFORD LANDFILL ROAD PETERSON WASH CULVERT EXTENSION FY 09 OG1H 8 MA 121.0 H701601C 008- B Y MP 121.00 - BIG HORN SYSTEM PRES - ENGINEERING APR 09 KF1H 8 PN 177.0 H692601C 008- B( 003) A T INTERSTATE I- 8 EB, I- 10 WB RAMP IMPROVEMENT MAY 09 10208 PJ1F 10 PM 248.0 010- D T INA ROAD TI RECONSTRUCT TI & MAINLINE TBD FY 10 TBA 14406 VB1E 10 PM 260.0 H640401C 010- E T I- 10 / I- 19 ( FMS, PHASE 2) EXTEND ITS SYSTEMS ALONG I- 10 & I- 19 TBD FY 09 TRMM1 20206 3WSP 10 PM 288.4 H239001C 010- E T CIENEGA CREEK - MARSH STATION PH1 RAILROAD GRADE & DRAIN MAR 09 11407 PN1F 17 MA 208.9 017- A E PEORIA AVE TO GREENWAY RD DRAINAGE IMPROVEMENTS TBD FY 09 TBA 10306 RE1E 17 CN 322.0 017- B F MUNDS PARK TI DESIGN TRAFFIC INTERCHANGE JUN 14 KHRC1 ZY1B 89 YV 313.8 029- 1 P SUNDOG RD BRIDGE ( OLD BLK CYN HWY TURNBACK OWNERSHIP & MAINTENANCE ( IGA R IGA FY 10 VO1H 40 MO 21.0 H721201C 040- A( 200) K MP 21 - WALNUT CREEK RR 5" TL & 3" PL & 2" AC ARFC JAN 09 40309 GO1H 60 MA 138.0 H686601C 060- B( 201) E SR 303L TO 99TH AVE WIDEN ROADWAY AUG 09 10007 EX1F 60 PN 230.0 060- D G OAK FLAT - DEVIL'S CANYON CONSTRCT PASSING/ CLIMBING LANE TBD FY 09 TBA BL1J 60 PN 228.4 HX20701C 060- D( 202) A G US 60 @ MP 228, QUEEN CREEK TUNNEL SYSTEM ENHANCEMENT - SAFETY IMPROVEMEN TBD FY 09 14407 PRSP 60 PN 220.0 H684501C 060- D- 508 G BOYCE THOMPSON STATE PARK CONSTRUCT ROAD FEB 09 AMJC1 11510 AA1C 95 YU 32 063- 1 Y AVENUE 9E TO ABURDEEN ROAD RECONSTRUCT FORTUNA WASH BRIDGE & WID TBD FY 11 14409 GE1J 69 YV 288.3 H741001C 069- 4 P SR 69 GLASSFORD HILL PRESCOTT EAST HIGHWAY ROADWAY WIDENING JAN 09 HB1G 70 GH 271.0 H661401C 070- A- 308 G SAN CARLOS RIVER BRIDGE # 2910 BRIDGE REPLACEMENT TBD FY 10 XL1G 70 GH 331 070- A- 310 S US 70 PIMA TO THATCHER DESIGN SLOPE FLATTING TBD FY 10 EEJM1 14110 AY1G 77 PM 82.0 077- A T TANGERINE ROAD - PINAL COUNTY LINE WIDENING TO 6 LANES TBD FY 12 TBA 11308 EO1E 77 NA 364.0 H546001C 077- B H MP 364 TO 372 CONSTRUCT PASSING LANE TBD FY 10 TBA UM1H 83 PM 44.0 H705701C 083- A( 200) A T MP 44.0 TO MP 45.5 SAFETY IMPRVMNTS / REALIGNMENT MAY 09 EE1E 89 YV 288 089- A- 201 P SR- 89 @ KIRKLAND JCT / WAGNER RD CST RT & LT TURN LNS, SHOULDER TBD FY 10 DVJB1 CM1G 89 YV 313.0 H648401C 089- B- 305 P GRANITE CREEK BRIDGE # 2869 BRIDGE REPLACEMENT TBD FY 09 DP1G 95 YU 38.0 095- B- 308 Y WELLTON MOHAWK CANAL BRIDGE # 343 BRIDGE REHAB TBD FY 10 13706 SI1E 101L MA 0.0 H726701C 101- A E I- 10 TO MC 85 ( 99TH AVE) WIDEN ROADWAY TBD FY 10 KHRC1 10900 AR1B 10 PM 288.6 H239101C 10- 5-( 068) N S PANTANO RR UP/ CIENEGA CREEK SECTION CONSTRUCT STRUCTURE TBD FY 09 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 2ND SORT: FEDERAL ID # Page 8 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: 22802 UX1C 160 CN 311.5 H527401C 160- A-( 001) F JCT 89 - VAN'S TRADING POST 2" ARAC & ARFC & TURNLANES TBD FY 09 DU1H 160 CN 320.0 H669501C 160- A( 003) A F US 160 @ SR 264 LIGHTING MAY 09 AP1G 160 NA 389.5 H635601C 160- A( 200) A H KAYENTA - JCT IR 59 3" AC + ACFC DEC 08 13603 GM1C 17 YV 263.0 H426901C 17- 2( ) P CORDES JCT TI RECONSTRUCT TI TBD FY 09 HDJC1 11406 SK1E 191 GH 91.8 H503704C 191- B S DIAL WASH TO TEN RANCH ( SEG II) CONSTRUCT PARALLEL ROADWAY TBD FY 11 TBA GI1F 191 AP 390.0 H602501C 191- E- 505 H WIDE RUINS WIDENING FOR PASSING/ CLIMBING LANES, SAFE TBD FY 10 WERS1 11902 RH1B 260 GI 269.0 H469801C 260- B P DOUBTFUL CANYON SECTION RECONSTRUCT ROADWAY & CONSTRUCTION W TBD FY 10 SVBW1 12405 IV1A 89A CN 399.0 H413401C 366- F AIRPORT ROAD TI ( JW POWELL BLVD) CONSTRUCT INTERSECTION IMPR TBD FY 11 HO1G 999 MA 0.0 H662101C 999- A( 023) E VARIOUS ROUTES, MARICOPA COUNTY BRKWY CABLE TERMINAL TBD FY 09 PB1F 40B YV 145.0 H621301C B40- C( 002) A K ASH FORK, 40B, 3RD ST TO 8TH ST SIDEWALK TBD FY 09 TBA RN1H 40 AP 347.0 H706601C BR - 040- E( 202) A H BLACK CREEK BRIDGES EB, WB SFR( STR # 1134,1642,9 BRIDGE SCOUR RETROFIT JAN 09 NZ1E 0000 GI GGI SB40001C BR - GGI- 0( 005) A G ICE HOUSE CANYON WASH BR # 8193 BRIDGE REPLACEMENT FY 09 BC1J 0000 MA 0.0 SB42801C BR - MMA- 0( 202) A E OLD US 80 BRIDGE BRIDGE REHABILITATION FY 10 ZN1E 0000 PN PPN SB41001C BR - PPN- 0-( 169) G KELVIN BRIDGE - # 8441 BRIDGE REPLACEMENT FY 09 PZ1G 0000 YU YYU SB41501C BR - YYU- 0( 031) A Y OLD US 80 @ RED TOP WASH BRIDGE REPLACEMENT FY 09 28303 RO1F 80 CH 364.0 H624301C CBI - 080- A( 009) B S DGLS STGC WEIGHT & INSP STATION DSGN/ CST WEIGHT & INSP STATION MAR 09 MBFG1 VA1H 0000 MA AVN SS64501C CM - AVN- 0( 200) A E MCDOWELL RD PEDESTRIAN IMPROVEMENTS FY 09 NN1J 0000 MA BKY SS68501C CM - BKY- 0( 200) A E PEDESTRIAN IMPROVEMENTS - 7TH ST AND EASON AV PEDESTRIAN IMPROVEMENT PROJECT FY 09 TV1J 0000 MA CHN SS70601C CM - CHN- 0( 203) A E COMMONWEALTH AVE ROADWAY IMPROVEMENT HAMILTON ST - ITHICA PL ( PAVING) FY 09 TW1J 0000 MA CHN SS70701C CM - CHN- 0( 204) A E WESTERN CANAL @ ALMA SCHOOL & DOBSON PEDESTRIAN SIGNAL - TRANSPORTATION IMPRO FY 09 TY1J 0000 MA CHN SS71001C CM - CHN- 0( 206) A E PRICE ROAD TO HAMILTON STREET WESTERN CANAL - MULTI- USE PATH ( 2) FY 09 TZ1J 0000 MA CHN SS71101C CM - CHN- 0( 207) A E PRICE RD TO HAMILTON ST WESTERN CANAL- MULTI- USE PATH ( 1) FY 09 TQ1J 0000 MA CHN CM - CHN- 0( 208) A E LOOP 101 @ GALVESTON ST MULTI- USE PATH & BRIDGE FY 09 XA1J 0000 MA CHN SS72601C CM - CHN- 0( 210) A E CHANDLER BLVD TRAFFIC SIGNAL INTERCONNECT FIBER OPTIC - DELAWARE ST TO GILBERT RD FY 11 QA1J 0000 MA 0.0 SS68601C CM - CUK- 0( 200) A E VARIOUS LOCATIONS PAVE DIRT ROADS FY 09 WR1J 0000 MA ELM SS72301C CM - ELM- 0( 200) A E 125TH & 127TH AVENUE PAVE UNPAVED ROADS FY 11 WS1J 0000 MA ELM SS72401C CM - ELM- 0( 201) A E 129TH AVENUE PAVE UNPAVED ROADS FY 11 XB1H 0000 MA 0.0 SS45102C CM - FTH- 0( 000) A E SHEA BOULEVARD CONSTRUCT BIKE LANE FY 09 XM1H 0000 MA FTH SS65901C CM - FTH- 0( 201) A E SAGUARO BOULEVARD PAVE DIRT ALLEYS FY 09 XN1H 0000 MA FTH SS66001C CM - FTH- 0( 202) A E FOUNTAIN HILLS BOULEVARD SIDEWALK CONSTRUCTION FY 09 VI1J 0000 MA 0.0 SS71701C CM - GDV- 0( 201) A E DYNAMIC MESSAGE SIGNS VARIOUS LOCATIONS FY 10 OS1G 0000 MA GIL SS54701C CM - GIL- 0( 012) A E EASTERN CANAL ( GUADALUPE- ELLIOT) CONSTRUCT MULTI- USE PATH FY 09 UZ1H 0000 MA GIL SS64401C CM - GIL- 0( 200) A E GILBERT HERITAGE DISTRICT PEDESTRIAN SIDEWALK, LANDSCAPE FY 09 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 2ND SORT: FEDERAL ID # Page 9 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: MA1H 0000 MA GLN SS59101C CM - GLN- 0( 033) A E 63RD AVE / LOOP 101 CONSTRUCT MULTI- USE PATH AND BRIDGE FY 09 SN1H 0000 MA GLN SS62301C CM - GLN- 0( 035) A E SPORTS FACILITIES FIBER OPTIC FIBER OPTIC CABLE INSTALLATION FY 09 WY1J 0000 MA MES SS73201C CM - MES- 0( 205) X E ITS SIGNAL CONVERSIONS - PHASE 4B FIBER OPTIC LINK FY 11 WX1J 0000 MA MES SS73101C CM - MES- 0( 206) X E ITS SIGNAL CONVERSIONS - PHASE 4A FIBER OPTIC LINK FY 11 QD1J 0000 MA 0.0 SS70101C CM - MMA-( 209) A E RIO VERDE DRIVE PAVE SHOULDERS FY 09 NT1J 0000 MA MMA SS68701C CM - MMA- 0( 206) A E REACT IN GLENDALE, PEORIA, AND SCOTTSDALE INCIDENT MANAGEMENT PARTNERSHIP FY 09 VT1J 0000 MA PEO SS72101C CM - PEO( 230) A E HYBRID FIBER- TO- WIRELESS COMMUNICATION SYSTE TRAFFIC SIGNAL NETWORK FY 10 WD1H 0000 MA PEO SS64301C CM - PEO- 0( 200) A E SKUNK CREEK- 75TH AVE TO NEW RIVER CONSTRUCT MULTI- USE PATH FY 09 XC1H 0000 MA PEO SS65701C CM - PEO- 0( 201) A E 84TH AVENUE STREETSCAPE FY 09 XB1J 0000 MA PEO SS72801C CM - PEO- 0( 204) A E OLIVE AVENUE - UNDERPASS NEW RIVER TRAIL UNDERPASS CONSTRUCTION FY 11 VY1H 0000 MA PHX SS62701C CM - PHX- 0( 202) A E 19TH AVENUE THUNDERBIRD RD WIDENING INTERSECTION IMPROVEMENTS FY 09 RB1J 0000 MA PHX SS70501C CM - PHX- 0( 218) A E ACDC AT 7TH AVE ( BIKE UNDERPASS) ACDC BIKE UNDERPASS FY 09 TR1J 0000 MA PHX SB43301C CM - PHX- 0( 221) B E PONTIS & VIRTIS BRIDGE MANAGEMENT SOFTWARE VARIOUS LOCATIONS FY 09 TS1J 0000 MA PHX SB43401C CM - PHX- 0( 222) B E BRIDGE INSPECTION EQUIPMENT VARIOUS LOCATIONS FY 09 VJ1J 0000 MA 0.0 SS71601C CM - PHX- 0( 224) A E PAVE DIRT ALLEYS VARIOUS LOCATIONS FY 10 TT1J 0000 PM PPM SS71301C CM - PPM- 0( 210) A T SAFETY AND EDUCATION PROGRAM VARIOUS LOCATIONS FY 09 RC1J 0000 MA PVY SS69801C CM - PVY- 0( 201) A E 12 VARIOUS LOCATIONS TRAFFIC - VIDEO DETECTION SYSTEM FY 09 SH1J 0000 MA QCR SS70401C CM - QCR- 0( 203) A E HUNT HIGHWAY - POWER TO ELLSWORTH PAVE DIRT SHOULDERS FY 09 NV1H 0000 MA 0.0 SS57701C CM - SCT- 0( 015) X E SCOTTSDALE ROAD CONSTRUCT ITS PROJECT FY 10 VM1H 0000 MA SCT SS64801C CM - SCT- 0( 201) A E INDIAN BEND WASH; CHAP - JACK RDS MULTI- USE PATHWAY FY 09 WQ1J 0000 MA SCT SS72201C CM - SCT- 0( 205) A E INDIAN BEND ROAD MCCORMICK STILLMAN RR PARK FY 11 WT1J 0000 MA SUP SS72701C CM - SUP- 0( 207) X E PEORIA AVENUE FIBER OPTIC INTERCONNECTS FY 11 GY1J 0000 MA SUP SS67601C CM - SUR- 0( 204) X E GREENWAY ROAD FIBER OPTIC INTERCONNECTS FY 09 VL1J 0000 MA 0.0 SS72001C CM - SUR- 0( 206) A E WEST OF 219TH AVENUE PAVE DIRT ROADS FY 10 NU1H 0000 MA GDY SS56001C GDY- 0- 417 E VAN BUREN @ BULLARD WASH BRIDGE APPROACHES FY 09 OY1H 0000 MA PHX SH44101C HBS - PHX- 0( 200) A E MCDOWELL RD & 35TH AVENUE STREET LIGHTS CONSTRUCTION FY 09 AC1G 17 YV 245.2 H636801C HES - 017- B( 201) A P BLACK CANYON HILL - ( SB) MILL AND REPLACE AND SAFETY IMPROVEMENT TBD FY 09 KD1H 177 PN 163.0 H692101C HES - 177- A( 003) A G SR 177, MP 163.80- 164.40 CURVE RE- ALIGNMENT NOV 09 FP1H 0000 MA GLN SH43201C HES - GLN- 0( 030) A E 51ST AVENUE & CAMELBACK AVENUE INTERSECTION IMPROVMENTS FY 09 FR1H 0000 MA GLN SH43101C HES - GLN- 0( 030) A E 51ST AVENUE & NORTHERN AVENUE INTERSECTION IMPROVEMENTS FY 09 VK1J 0000 GI 0.0 SS71803D HPP - GGI- 0( 204) A G TONTO CREEK BRIDGE DESIGN BRIDGE APPROACHES FY 10 FA1H 10 CH 307.0 H682201C IM - 010- F( 201) A S E BENSON - JOHNSON RD ( EB) RR 5" TL, 3" PL & ARFC FEB 09 10106 CN1G 10 CH 300.2 H650401C NH - 010- E( 200) N S SR 90 TI RECONSTRUCT SR 90 TI AND ADD PASSING LAN TBD FY 10 URJR1 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 2ND SORT: FEDERAL ID # Page 10 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: 11507 DP1H 60 MA 148.9 H669001C NH - 060- B( 200) B E 99TH AVE - 83RD AVE ( INCLUDING NEW RIVER BRIDGE) WIDEN ROADWAY AND BRIDGE MAY 09 XA1H 0000 MA 0.0 SS65301C OM - SUR- 0( 200) A E PAVE DIRT ROADS - SURPRISE PAVE DIRT ROADS FY 09 16604 RV1E 86 PM 145.6 H543401C S - 086- A- 500 T MP 145.6 - BRAWLEY WASH EXTEND BOX CULVERTS TBD FY 09 TBA QT1J 999 AP 0.0 H747701X SB - AZ07-( 004) H DINE'TAH " AMONG THE PEOPLE" SCENIC ROADS DESIGN MARKETING PLAN IGA FY 09 QU1J 163 NA 0.0 H747801X SB - AZ07-( 007) H KAYENTA- MONUMENT VALLEY SCENIC ROADS DEVELOP INTERPRETIVE PLAN IGA FY 09 QV1J 163 NA 0.0 H747901X SB - AZ07-( 008) H KAYENTA- MONUMENT VALLEY SCENIC ROADS DESIGN MARKETING PLAN IGA FY 09 XF1H 19 PM 47.0 H722201C STP - 019- A-( AUP) T SAHUARITA TI CONSTRUCT NEW TI TBD FY 09 FH1G 80 CH 368.0 H658001C STP - 080- B( 200) A S EAST OF DOUGLAS 2 1/ 2" MILL, 3" AC REPLACE PLUS 1/ 2" AR- ACFC JAN 09 11508 AZ1G 86 PM 159.5 H680601C STP - 086- A T VALENCIA ROAD - KINNEY ROAD CONSTRUCT ROADWAY WIDENING TO 4 LANES TBD FY 10 TBA 13506 OQ1D 88 MA 223.0 H692001C STP - 088- A( 001) G FISH CREEK HILL CONSTRUCT RETAINING WALLS TBD FY 09 TBA FK1G 89 YV 283.0 H658301C STP - 089- A( 200) A P PEEPLES VALLEY YARD TO WILHOIT SPOT 3" RR & ARFC APR 09 11606 AJ1C 191 AP 417.5 H451801C STP - 191- E( 200) A H BURNSIDE JUNCTION - NORTH ROADWAY WIDENING TBD FY 09 TBA VB1H 0000 MA FTH SS64601C STP - FTH- 0( 200) A E SHEA BLVD ROADWAY WIDENING FY 09 WZ1J 0000 MA PHX SS72501C STP - PHX- 0( 228) A E MCDOWELL ROAD & 32ND STREET INTERRSECTION IMPROVEMENT FY 11 SF1J 0000 PM PPM SS69301C STP - PPM- 0( 209) A T COTARO FAMS ROAD / MAGEE ROAD ROAD WIDENING, REALIGNMENTS, IMPROVEMEN FY 09 KQ1H 0000 MA QCR STP - QCR- 0( 001) A E RIGGS RD, ELLSWORTH TO MERIDIAN CONSTRUCT NEW RDWAY FY 09 RA1J 0000 PM TUC STP - TUC- 0( 222) A T ITS TRAFFIC SIGNAL TIMING STUDY TIMING STUDY - VARIOUS LOCATIONS FY 09 QG1J 0000 PM TUC SS69201C STP - TUC- 0( 223) A T ITS TRAFFIC SIGNAL EXPANSION - VARIOUS LOCATION EQUIPMENT PURCHASES FY 09 WU1J 0000 PM TUC SS73001C STP - TUC- 0( 226) A T PANTANO BOULEVARD PAVEMENT RECONSTRUCTION FY 11 WV1J 0000 PM TUC SS73003D STP - TUC- 0( 226) A T PANTANO BOULEVARD DESIGN PAVEMENT RECONSTRUCTION FY 11 FY1J 40 MO 52.0 H740601C TEA - 040- A( 201) K I- 40 STOCKTON HILL - HARRISON CONSTRUCT LANDSCAPING AND IRRIGATION SEP 08 OV1F 260 NA 350.0 H621401C TEA - 260- C( 003) A G SR 260 PORTER MTN RD - WOODLAND RD LANDSCAPING, IRRIGATION & PEDESTRIAN LIGH TBD FY 09 TBA PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 3RD SORT: BID DATE, RTE, MP Page 1 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: VO1H 40 MO 21.0 H721201C 040- A( 200) K MP 21 - WALNUT CREEK RR 5" TL & 3" PL & 2" AC ARFC JAN 09 RN1H 40 AP 347.0 H706601C BR - 040- E( 202) A H BLACK CREEK BRIDGES EB, WB SFR( STR # 1134,1642,9 BRIDGE SCOUR RETROFIT JAN 09 14409 GE1J 69 YV 288.3 H741001C 069- 4 P SR 69 GLASSFORD HILL PRESCOTT EAST HIGHWAY ROADWAY WIDENING JAN 09 FH1G 80 CH 368.0 H658001C STP - 080- B( 200) A S EAST OF DOUGLAS 2 1/ 2" MILL, 3" AC REPLACE PLUS 1/ 2" AR- ACFC JAN 09 PS1J 86 PM 171.0 H755601C T SANTA CRUZ RIVER BRIDGE # 528 DECK REPLACEMENT JAN 09 TX1J 0000 MA CHN SS70801C E PURCHASE TRAFFIC DETECTION CAMERAS VARIOUS LOCATIONS FY 09 TI1J 8 YU 66.0 H744601C Y I- 8, DATELAND TO GILA BEND REST AREA SIGN REHABILITATION IGA FY 09 IN1J 10 MA 144.0 H725601C M 3RD AVENUE - 3RD STREET FIRE DETECTION SYSTEM RETROFIT FEB 09 FA1H 10 CH 307.0 H682201C IM - 010- F( 201) A S E BENSON - JOHNSON RD ( EB) RR 5" TL, 3" PL & ARFC FEB 09 18606 MU1F 17 YV 299.0 H613601C F YAVAPAI COUNTY - JCT SR 179 ( SB) RR ( 4" TL, 3" PL) + RR ARFC FEB 09 OI1J 19 PM 0.0 H750101C T TUCSON TO INTERNATIONAL BORDER SIGN REHAB - REPLACE PANELS OR SIGNS IGA FY 09 EO1G 19 PM 34.0 T CANOA TI - CONTINENTAL TI CONST ROADWAY ( NB FRONTAGE RD) IGA FY 09 CG1J 19 PM 45.8 HX21301C T I- 19 AND SAHUARITA RD INSTALL NEW TRAFFIC SIGNAL IGA FY 09 QB1J 40 MO 39.0 H756801C K MP 39 - MP 121 MINOR PAVEMENT PRESERVATION FEB 09 FG1H 40 MO 73.0 H682401C K PEACOCK WASH- SILVER SPRNGS ROAD TI- EB RR5" TL & 3" TL & 2" AC & ARFC FEB 09 14810 KP1H 40 AP 316.0 H692401C H DEAD RIVER BRIDGE EB ( STR # 565) SCOUR RETROFIT FEB 09 NP1J 60 PN 204.3 HX22301C E US 60 AT PERALTA ROAD ( TRAFFIC SIGNAL) INSTALL TRAFFIC SIGNAL IGA FY 09 14407 PRSP 60 PN 220.0 H684501C 060- D- 508 G BOYCE THOMPSON STATE PARK CONSTRUCT ROAD FEB 09 AMJC1 FD1G 60 GI 278.0 H657401C G TIMBER MT TO SENECA RR 3" & ARFC FEB 09 40608 GU1H 74 MA 20.0 H691201C P US 60 TO SR 303L, MP 20 TO MP 22 ( EB & WB) CONSTRUCT PASSING LANES FEB 09 MF1J 82 CH 61.2 H749701C S SAN PEDRO RIVER BR ( STR # 403) SCOUR RETROFIT FEB 09 FJ1G 87 PN 131.0 H658201C T S COOLIDGE CL TO JCT 287 RR 2.5" ARAC FEB 09 OX1H 90 CH 321.1 H740401C S SR 90 @ MP 321.11 TO MP 321.42 MINOR PAVEMENT PRESERVATION FEB 09 SR1J 90 CH 321.5 H769201C S SR 90 @ MP 321.58 TO MP 321.91 MINOR PAVEMENT PRESERVATION FEB 09 UM1J 93 MO 124.0 H763501C K 1 MILE SOUTH OF TOWN OF WIKIEUP; WEST OF ROAD SYSTEM PRESERVATION - RESTORATION/ REHAB IGA FY 09 LJ1J 160 AP 465.1 H730903C H TEEC NOS POS PORT OF ENTRY SYSTEM ENHANCEMENT - OTHER ENHANCEMEN FEB 09 QU1J 163 NA 0.0 H747801X SB - AZ07-( 007) H KAYENTA- MONUMENT VALLEY SCENIC ROADS DEVELOP INTERPRETIVE PLAN IGA FY 09 QV1J 163 NA 0.0 H747901X SB - AZ07-( 008) H KAYENTA- MONUMENT VALLEY SCENIC ROADS DESIGN MARKETING PLAN IGA FY 09 QZ1J 177 PN 139.2 H760301C G MP 139.16 @ AAR/ DOT # 742- 390- N CONCRETE RR CROSSING SURFACE & LED FLAS IGA FY 09 TK1J 999 MA 0.0 H770201C E BRIDGES # S 1772, 779, 1823, 2800, 517, 1335 COLLISION DAMAGE REPAIR IGA FY 09 QT1J 999 AP 0.0 H747701X SB - AZ07-( 004) H DINE'TAH " AMONG THE PEOPLE" SCENIC ROADS DESIGN MARKETING PLAN IGA FY 09 VA1H 0000 MA AVN SS64501C CM - AVN- 0( 200) A E MCDOWELL RD PEDESTRIAN IMPROVEMENTS FY 09 QG1J 0000 PM TUC SS69201C STP - TUC- 0( 223) A T ITS TRAFFIC SIGNAL EXPANSION - VARIOUS LOCATION EQUIPMENT PURCHASES FY 09 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 3RD SORT: BID DATE, RTE, MP Page 2 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: RA1J 0000 PM TUC STP - TUC- 0( 222) A T ITS TRAFFIC SIGNAL TIMING STUDY TIMING STUDY - VARIOUS LOCATIONS FY 09 PZ1G 0000 YU YYU SB41501C BR - YYU- 0( 031) A Y OLD US 80 @ RED TOP WASH BRIDGE REPLACEMENT FY 09 43409 TO1H 10 MA 126.0 H729601C E SARIVAL AVE TO DYSART RD CONSTRUCT GPL ( CITY ADVANCEMENT) OUTSID MAR 09 TBD 20206 3WSP 10 PM 288.4 H239001C 010- E T CIENEGA CREEK - MARSH STATION PH1 RAILROAD GRADE & DRAIN MAR 09 SL1J 40B NA 276.8 H767701C H JOSEPH CITY TRUCK STOP 3" MILL AND REPLACE MAR 09 IG1J 60 GI 243.0 H743601C G US 60, MIAMI CITY LIMITS TO MCMILLAN WASH PAVEMENT PRESERVATION MAR 09 GG1J 66 MO 57.3 K AIRWAY AVENUE & MOHAVE AIRPORT DRIVE INTERSE CONCRETE MEDIAN & ASPHALT PAVING MAR 09 QY1J 74 MA 24.1 HX22401C E SR74 TRAFFIC SIGNAL DESIGN TRAFFIC SIGNAL MAR 09 TRDC1 OJ1J 77 NA 374.0 H753201C H SR 77 @ MP 374.38 AND MP 383.50 SYSTEM ENHANCEMENT - ENGINEERING MAR 09 LP1G 78 GE 169.0 H666901C S JAKE'S CORNER REALIGNMENT HIGHWAY REALIGNMENT MAR 09 AMJS1 JD1H 79 PN 126.0 H690601C T SR 79 ORACLE JCT - FLORENCE HWY EXTEND RCB CULVERTS MAR 09 HDRB1 28303 RO1F 80 CH 364.0 H624301C CBI - 080- A( 009) B S DGLS STGC WEIGHT & INSP STATION DSGN/ CST WEIGHT & INSP STATION MAR 09 MBFG1 UP1F 86 PM 74.0 H630201C T SR- 86, MP 73.99 - 77.69 SYMMETRICAL WIDENING MAR 09 SM1J 180 NA 324.2 H767801C H PETRIFIED FOREST MINOR PAVEMENT PRESERVATION MAR 09 TD1H 191 GE 170.0 H710001C S LWR CORONADO TRAIL DRAINAGE IMPRV SYST ENHANCEMENT - ENGINEERING MAR 09 UZ1H 0000 MA GIL SS64401C CM - GIL- 0( 200) A E GILBERT HERITAGE DISTRICT PEDESTRIAN SIDEWALK, LANDSCAPE FY 09 WD1H 0000 MA PEO SS64301C CM - PEO- 0( 200) A E SKUNK CREEK- 75TH AVE TO NEW RIVER CONSTRUCT MULTI- USE PATH FY 09 ZN1E 0000 PN PPN SB41001C BR - PPN- 0-( 169) G KELVIN BRIDGE - # 8441 BRIDGE REPLACEMENT FY 09 RC1J 0000 MA PVY SS69801C CM - PVY- 0( 201) A E 12 VARIOUS LOCATIONS TRAFFIC - VIDEO DETECTION SYSTEM FY 09 OG1H 8 MA 121.0 H701601C 008- B Y MP 121.00 - BIG HORN SYSTEM PRES - ENGINEERING APR 09 BW1J 40 MO 47.0 H752901C K HOLY MOSES WASH - RATTLESNAKE WASH RR( 5" TL, 3" PL)& AR ACFC & RR AR ACFC APR 09 CH1G 70 GI 256.0 H645301C G OLD WINKELMAN HIGHWAY AND BIA ROUTE 6 INTERSECTION IMPROVEMENTS APR 09 HZJS1 FG1G 78 GE 154.0 H657901C S JCT 191 TO FOREST SERVICE BOUNDARY CHIP SEAL AND GUARDRAIL EXTENSION APR 09 FK1G 89 YV 283.0 H658301C STP - 089- A( 200) A P PEEPLES VALLEY YARD TO WILHOIT SPOT 3" RR & ARFC APR 09 FQ1G 180 AP 347.0 H658701C G RANCH TO JCT 61 SYS PRES- RESTORE/ REHAB/ RESRFC APR 09 ZL1H 260 AP 385.0 H726101C G SR 260 FROM GREER TO RODEO GROUNDS 3" RR & ARFC APR 09 XB1H 0000 MA 0.0 SS45102C CM - FTH- 0( 000) A E SHEA BOULEVARD CONSTRUCT BIKE LANE FY 09 VB1H 0000 MA FTH SS64601C STP - FTH- 0( 200) A E SHEA BLVD ROADWAY WIDENING FY 09 SN1H 0000 MA GLN SS62301C CM - GLN- 0( 035) A E SPORTS FACILITIES FIBER OPTIC FIBER OPTIC CABLE INSTALLATION FY 09 KF1H 8 PN 177.0 H692601C 008- B( 003) A T INTERSTATE I- 8 EB, I- 10 WB RAMP IMPROVEMENT MAY 09 45309 FN1H 10 MA 96.2 H708301X Y 395TH AVE ( BELMONT RD) CONSTRUCT TI TBD FY 09 14406 VB1E 10 PM 260.0 H640401C 010- E T I- 10 / I- 19 ( FMS, PHASE 2) EXTEND ITS SYSTEMS ALONG I- 10 & I- 19 TBD FY 09 TRMM1 13408 HY1G 10 PM 288.4 H747301C T CIENEGA CREEK- MARSH STATION PHASE III REMOVE RAIL & BRIDGE, CONST ML TBD FY 09 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 3RD SORT: BID DATE, RTE, MP Page 3 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: 14607 HX1G 10 PM 288.4 T CIENEGA CREEK- MARSH STATION PHASE II NEW RAILROAD TRACKS TBD FY 09 10900 AR1B 10 PM 288.6 H239101C 10- 5-( 068) N S PANTANO RR UP/ CIENEGA CREEK SECTION CONSTRUCT STRUCTURE TBD FY 09 11407 PN1F 17 MA 208.9 017- A E PEORIA AVE TO GREENWAY RD DRAINAGE IMPROVEMENTS TBD FY 09 TBA AC1G 17 YV 245.2 H636801C HES - 017- B( 201) A P BLACK CANYON HILL - ( SB) MILL AND REPLACE AND SAFETY IMPROVEMENT TBD FY 09 13603 GM1C 17 YV 263.0 H426901C 17- 2( ) P CORDES JCT TI RECONSTRUCT TI TBD FY 09 HDJC1 UC1J 17 CN 316.5 F ROCKY PARK- MCCONNELL SYSTEM PRESERVATION - ENGINEERING TBD FY 09 QH1J 19 SC 1.6 H732901C T SB- 19 AND SPRR OP BRIDGE # 980 BRIDGE REPAIR TBD FY 09 XF1H 19 PM 47.0 H722201C STP - 019- A-( AUP) T SAHUARITA TI CONSTRUCT NEW TI TBD FY 09 OU1J 40 MO 9.8 H742001C K LAKE HAVASU TI UP # 1586 BRIDGE REHABILITATION TBD FY 09 ZC1H 40 MO 14.9 H727201C K BUCK MOUNTIAN WASH EB # 378 DECK REHABILITATION TBD FY 09 FJ1J 40 MO 85.9 H733001C K WILLOW CREEK BRIDGE, WB # 1769 DECK REHABILITATION TBD FY 09 OS1J 40 CN 177.0 H751401C F MP 177- 182 ( EB& WB) SHOULDERS PAVEMENT PRESERVATION TBD FY 09 SV1J 40 CN 182.0 H768901C F NAVAJO ARMY DEPOT, WB 1/ 2" MILL & 1/ 2" ACFC ON SHOULDER TBD FY 09 PB1F 40B YV 145.0 H621301C B40- C( 002) A K ASH FORK, 40B, 3RD ST TO 8TH ST SIDEWALK TBD FY 09 TBA 11507 DP1H 60 MA 148.9 H669001C NH - 060- B( 200) B E 99TH AVE - 83RD AVE ( INCLUDING NEW RIVER BRIDGE) WIDEN ROADWAY AND BRIDGE MAY 09 BL1J 60 PN 228.4 HX20701C 060- D( 202) A G US 60 @ MP 228, QUEEN CREEK TUNNEL SYSTEM ENHANCEMENT - SAFETY IMPROVEMEN TBD FY 09 10007 EX1F 60 PN 230.0 060- D G OAK FLAT - DEVIL'S CANYON CONSTRCT PASSING/ CLIMBING LANE TBD FY 09 TBA EO1H 66 MO 61.0 H675201C K SR 66 @ MOHAVE AIRPORT INTERSECTION IMPROVEMENT TBD FY 09 DX1H 70 GH 338.0 H680801C S US 70 & 8TH AVENUE INTERSECTION INTERSECTION IMPROVEMENTS TBD FY 09 JL1G 72 LA 13.1 Y SR- 72 MP 13.1 - 17.0 SHOULDERS & SLOPES MAY 09 CF1J 79 PN 124.2 H731001C T MP 124 TO MP 126 SYSTEM ENHANCEMENT - ENGINEERING TBD FY 09 HDRB1 UM1H 83 PM 44.0 H705701C 083- A( 200) A T MP 44.0 TO MP 45.5 SAFETY IMPRVMNTS / REALIGNMENT MAY 09 13607 QG1F 85 MA 120.5 Y MP 120.54 - MP 122.99 CONSTRUCT ROADWAY TBD FY 09 TBA 20806 WW1G 85 MA 152 H595514C E SOUTHERN AVE TO I- 10 CONSTRUCT ROADWAY TBD FY 09 QY1C 86 PM 141.1 H713701C T MP 141.1 TO RESERVATION BOUNDARY CONSTRUCT ROADWAY WIDENING TBD FY 09 TBA 16604 RV1E 86 PM 145.6 H543401C S - 086- A- 500 T MP 145.6 - BRAWLEY WASH EXTEND BOX CULVERTS TBD FY 09 TBA PY1H 86 PM 166.8 HX19601C T SR 86 AT CAMINO DE OESTE INSTALL TRAFFIC SIGNAL & MINOR INT IMPROVE TBD FY 09 EY1H 87 GI 267.0 H683201C P PINE - RIM 3" RR & ARFC TBD FY 09 13506 OQ1D 88 MA 223.0 H692001C STP - 088- A( 001) G FISH CREEK HILL CONSTRUCT RETAINING WALLS TBD FY 09 TBA CM1G 89 YV 313.0 H648401C 089- B- 305 P GRANITE CREEK BRIDGE # 2869 BRIDGE REPLACEMENT TBD FY 09 NW1J 89A YV 344.0 H733901C P JEROME RETAINING WALL REPLACE RETAINING WALL TBD FY 09 JK1G 95 LA 131.7 Y SR- 95 @ MP 131.7 - 142.7 SHOULDER IMPROVEMENTS MAY 09 UO1H 95 LA 161.7 H711501C K BILL WILLIAMS RIVER BRIDGE # 1272 FIRE DAMAGE REPAIR TBD FY 09 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 3RD SORT: BID DATE, RTE, MP Page 4 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: 40812 TU1H 101L MA 0.0 H707601C E BEARDSLEY RD / UNION HILLS DRIVE ( CITY ADVANCEM CONSTRUCT TI TBD FY 09 13609 AM1J 101L MA 30.0 H769901C E SR51 TO PRINCESS DRIVE DESIGN AND CONSTRUCT FMS TBD FY 09 PV1J 101L MA 36.0 H741401C E HAYDEN RD TO PRINCESS DR DRAINAGE IMPROVEMENTS TBD FY 09 UU1J 101L MA 59.5 E SR 101L ( PRICE FREEWAY) @ GALVESTON SRP DRAINAGE INPROVEMENTS ASSOCIATED WI TBD FY 09 VD1J 143 MA 3.8 HX21001C E SR 143, 48TH STREET - MCDOWELL RD SIGN REPLACEMENT TBD FY 09 22802 UX1C 160 CN 311.5 H527401C 160- A-( 001) F JCT 89 - VAN'S TRADING POST 2" ARAC & ARFC & TURNLANES TBD FY 09 DU1H 160 CN 320.0 H669501C 160- A( 003) A F US 160 @ SR 264 LIGHTING MAY 09 OI1H 163 NA 395.3 HX19101C H US 163 AT KAYENTA SCHOOL TRAFFIC SIGNAL INSTALLATION MAY 09 OQ1J 177 GI 136.3 H752301C G WINKELMAN 3" MILL AND REPLACE TBD FY 09 ZK1F 191 GE 160.0 H643201C S BACK COUNTRY BYWAY ( NORTH INTER) SAFETY IMPROVEMENTS TBD FY 09 11606 AJ1C 191 AP 417.5 H451801C STP - 191- E( 200) A H BURNSIDE JUNCTION - NORTH ROADWAY WIDENING TBD FY 09 TBA 21008 GL1J 191 AP 448.0 H748601C H CHINLE - MANY FARMS ( PH I) REMOVE & REPLACE FENCING, CATTLE GUARDS TBD FY 09 40808 UK1H 202L MA 0.0 E 51ST AVE TO I- 10 WEST CONSTRUCT ROADWAY TBD FY 09 TBD 43208 ST1H 202L MA 0.0 E LINDSAY ROAD TO GILBERT ROAD DESIGN & CONST MULTI- USE PATH TBD FY 09 41409 DI1J 202L MA 10.0 H749001C E SR 101L TO GILBERT ROAD CONSTRUCT FMS TBD FY 09 14601 RG1B 260 GI 263.1 H469901C P LITTLE GREEN VALLEY RECONSTRUCT ROADWAY TBD FY 09 AMRM1 OV1F 260 NA 350.0 H621401C TEA - 260- C( 003) A G SR 260 PORTER MTN RD - WOODLAND RD LANDSCAPING, IRRIGATION & PEDESTRIAN LIGH TBD FY 09 TBA CK1J 260 NA 353.1 HX21501C G SR 260 @ JCT WOODLAND LAKE ROAD TRAFFIC SIGNAL CONSTRUCTION TBD FY 09 EB1H 260 NA 356.0 H681201C G MP 356- 357.6 INSTALL NEW R/ W FENCE TBD FY 09 HO1G 999 MA 0.0 H662101C 999- A( 023) E VARIOUS ROUTES, MARICOPA COUNTY BRKWY CABLE TERMINAL TBD FY 09 OV1J 999 SW 0.0 H755001C BRIDGES # 2190, # 1152, # 1219, # 745, # 517, # 821, # 93 COLLISION DAMAGE REPAIR TBD FY 09 VY1H 0000 MA PHX SS62701C CM - PHX- 0( 202) A E 19TH AVENUE THUNDERBIRD RD WIDENING INTERSECTION IMPROVEMENTS FY 09 QL1J 10 PM 247.0 T INA RD TO RUTHRAUFF RD DCR / EA AND 30% DESIGN DESIGN FY 09 15208 NSSP 89A YV 0.0 F RED ROCK STATE PARK DESIGN DESIGN FY 09 IH1J 89A YV 373.1 F SR 89A JCT AIRPORT ROAD INTERSECTION IMPROVEMENT JUN 09 13509 TZ1H 89A CN ASP F SLIDE ROCK STATE PARK DESIGN ( ADD'L PRRKING ) DESIGN FY 09 PK1E 95 YU 63.0 H584101C Y PELIGRO - CLARKS PA ( 3" AC + FC) JUN 09 UL1H 160 CN 349.0 F US 160 TURN LANES AT NAVAJO ROUTE CONSTRUCT TURN LANES JUN 09 PLCH1 40809 UD1H 202L MA 0.0 E I- 10 EAST/ SANTAN TI TO 51ST AVE DESIGN AND R/ W DESIGN FY 09 TBD 21301 LY1C 260 GI 258.0 P LION SPRINGS SECTION DESIGN ( ROADWAY) DESIGN FY 09 QA1J 0000 MA 0.0 SS68601C CM - CUK- 0( 200) A E VARIOUS LOCATIONS PAVE DIRT ROADS FY 09 QD1J 0000 MA 0.0 SS70101C CM - MMA-( 209) A E RIO VERDE DRIVE PAVE SHOULDERS FY 09 NN1J 0000 MA BKY SS68501C CM - BKY- 0( 200) A E PEDESTRIAN IMPROVEMENTS - 7TH ST AND EASON AV PEDESTRIAN IMPROVEMENT PROJECT FY 09 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 3RD SORT: BID DATE, RTE, MP Page 5 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: TU1J 0000 MA BKY SS70901C E PAVE DIRT SHOULDERS - VARIOUS LOCATIONS PAVE DIRT SHOULDERS FY 09 TW1J 0000 MA CHN SS70701C CM - CHN- 0( 204) A E WESTERN CANAL @ ALMA SCHOOL & DOBSON PEDESTRIAN SIGNAL - TRANSPORTATION IMPRO FY 09 TQ1J 0000 MA CHN CM - CHN- 0( 208) A E LOOP 101 @ GALVESTON ST MULTI- USE PATH & BRIDGE FY 09 TV1J 0000 MA CHN SS70601C CM - CHN- 0( 203) A E COMMONWEALTH AVE ROADWAY IMPROVEMENT HAMILTON ST - ITHICA PL ( PAVING) FY 09 TY1J 0000 MA CHN SS71001C CM - CHN- 0( 206) A E PRICE ROAD TO HAMILTON STREET WESTERN CANAL - MULTI- USE PATH ( 2) FY 09 TZ1J 0000 MA CHN SS71101C CM - CHN- 0( 207) A E PRICE RD TO HAMILTON ST WESTERN CANAL- MULTI- USE PATH ( 1) FY 09 XN1H 0000 MA FTH SS66001C CM - FTH- 0( 202) A E FOUNTAIN HILLS BOULEVARD SIDEWALK CONSTRUCTION FY 09 NU1H 0000 MA GDY SS56001C GDY- 0- 417 E VAN BUREN @ BULLARD WASH BRIDGE APPROACHES FY 09 NH1G 0000 GH GGH SH27701C STP- GGH- 0( 006) A S SAFFORD- BRYCE RD & SAFFORD LANDFILL ROAD PETERSON WASH CULVERT EXTENSION FY 09 NY1E 0000 GI GGI SH27901C HES- GGI- 0( 006) A G JESSE HAYES ROAD ROADWAY IMPROVEMENTS FY 09 NZ1E 0000 GI GGI SB40001C BR - GGI- 0( 005) A G ICE HOUSE CANYON WASH BR # 8193 BRIDGE REPLACEMENT FY 09 BV1G 0000 MA GIL SS54601C CM- GIL- 0( 014) A E EASTERN CANAL, BASELINE- GUADALUPE CONST MULTI USE PATH FY 09 OS1G 0000 MA GIL SS54701C CM - GIL- 0( 012) A E EASTERN CANAL ( GUADALUPE- ELLIOT) CONSTRUCT MULTI- USE PATH FY 09 FP1H 0000 MA GLN SH43201C HES - GLN- 0( 030) A E 51ST AVENUE & CAMELBACK AVENUE INTERSECTION IMPROVMENTS FY 09 MA1H 0000 MA GLN SS59101C CM - GLN- 0( 033) A E 63RD AVE / LOOP 101 CONSTRUCT MULTI- USE PATH AND BRIDGE FY 09 FR1H 0000 MA GLN SH43101C HES - GLN- 0( 030) A E 51ST AVENUE & NORTHERN AVENUE INTERSECTION IMPROVEMENTS FY 09 NT1J 0000 MA MMA SS68701C CM - MMA- 0( 206) A E REACT IN GLENDALE, PEORIA, AND SCOTTSDALE INCIDENT MANAGEMENT PARTNERSHIP FY 09 TS1J 0000 MA PHX SB43401C CM - PHX- 0( 222) B E BRIDGE INSPECTION EQUIPMENT VARIOUS LOCATIONS FY 09 OY1H 0000 MA PHX SH44101C HBS - PHX- 0( 200) A E MCDOWELL RD & 35TH AVENUE STREET LIGHTS CONSTRUCTION FY 09 TR1J 0000 MA PHX SB43301C CM - PHX- 0( 221) B E PONTIS & VIRTIS BRIDGE MANAGEMENT SOFTWARE VARIOUS LOCATIONS FY 09 SF1J 0000 PM PPM SS69301C STP - PPM- 0( 209) A T COTARO FAMS ROAD / MAGEE ROAD ROAD WIDENING, REALIGNMENTS, IMPROVEMEN FY 09 TT1J 0000 PM PPM SS71301C CM - PPM- 0( 210) A T SAFETY AND EDUCATION PROGRAM VARIOUS LOCATIONS FY 09 KQ1H 0000 MA QCR STP - QCR- 0( 001) A E RIGGS RD, ELLSWORTH TO MERIDIAN CONSTRUCT NEW RDWAY FY 09 SH1J 0000 MA QCR SS70401C CM - QCR- 0( 203) A E HUNT HIGHWAY - POWER TO ELLSWORTH PAVE DIRT SHOULDERS FY 09 VM1H 0000 MA SCT SS64801C CM - SCT- 0( 201) A E INDIAN BEND WASH; CHAP - JACK RDS MULTI- USE PATHWAY FY 09 GY1J 0000 MA SUP SS67601C CM - SUR- 0( 204) X E GREENWAY ROAD FIBER OPTIC INTERCONNECTS FY 09 XA1H 0000 MA 0.0 SS65301C OM - SUR- 0( 200) A E PAVE DIRT ROADS - SURPRISE PAVE DIRT ROADS FY 09 XM1H 0000 MA FTH SS65901C CM - FTH- 0( 201) A E SAGUARO BOULEVARD PAVE DIRT ALLEYS FY 09 XC1H 0000 MA PEO SS65701C CM - PEO- 0( 201) A E 84TH AVENUE STREETSCAPE FY 09 FY1J 40 MO 52.0 H740601C TEA - 040- A( 201) K I- 40 STOCKTON HILL - HARRISON CONSTRUCT LANDSCAPING AND IRRIGATION SEP 08 RB1J 0000 MA PHX SS70501C CM - PHX- 0( 218) A E ACDC AT 7TH AVE ( BIKE UNDERPASS) ACDC BIKE UNDERPASS FY 09 44109 XV1H 10 MA 119.0 H721101C E VERRADO WAY TO SARIVAL AVE CONSTRUCT GENERAL PURPOSE LANE ( STAN A OCT 08 44209 XW1H 17 MA 224.0 H688101C E SR74- ANTHEM WAY CONSTRUCT GENERAL PURPOSE LANE ( STAN A OCT 08 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 3RD SORT: BID DATE, RTE, MP Page 6 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: RH1J 17 MA 229.0 H760401C E ANTHEM WAY - NEW RIVER ROAD PAVEMENT PRESERVATION NOV 08 LP1J 83 SC 31.6 H747001C T JCT SR 82 ( MP 31.6) TO MP 43.5 HIP RECYCLE + CHIP SEAL COAT DEC 08 AP1G 160 NA 389.5 H635601C 160- A( 200) A H KAYENTA - JCT IR 59 3" AC + ACFC DEC 08 CV1G 191 CH 48.3 H650901C S SUNSITES @ HIGH STREET WIDEN ROADWAY FOR TURN LANES DEC 08 HERW1 FD1H 8 MA 114.0 H682901C Y GILA BEND - 121.0 RR 2" PL/ 5" TL & ARFC JAN 10 KO1H 40 MO 11.0 K CHEMEHUEVI & BOULDER WASH BRIDGES SCOUR RETROFIT JAN 10 FP1G 160 AP 452.0 H658601C H RED MESA TO TEEC NOS POS 3" AC & ARFC JAN 10 EU1H 191 AP 375.0 H681901C H JCT I- 40 MP 385 3" AC & SC JAN 10 22706 GV1H 80 CH 364.0 S DOUGLAS STRTGC INSPECTION STATION INSTALL VOICE & DATA LINES IGA FY 10 ZY1B 89 YV 313.8 029- 1 P SUNDOG RD BRIDGE ( OLD BLK CYN HWY TURNBACK OWNERSHIP & MAINTENANCE ( IGA R IGA FY 10 DG1J 273 AP 380.0 G SR 273, BETWEEN MPS 377.46 AND 381.46 SYSTEM ENHANCEMENT - ENGINEERING MAR 10 VE1J 8 YU 19.0 H773901C Y LIGURTA TO DATELAND SIGN REHAB TBD FY 10 40008 GH1H 10 MA 133.0 H715501C E SR 101L ( AGUA FRIA) TO I- 17 CONSTRUCT GENERAL PURPOSE LANES TBD FY 10 12407 FX1C 10 MA 161.2 H505101C E SR 202L ( SANTAN) TO RIGGS ROAD CONST HOV & GEN PURPOSE LANE TBD FY 10 PALL1 TB1H 10 PN 199.0 H710401C T I- 8 TO SR 87 TI CAPACITY ADDITIONS - ENGINRING TBD FY 10 EECA1 14510 CN1J 10 PN 199.1 T JCT I 8 TO PICACHO PEAK TI WIDEN ROADWAY TBD FY 10 SX1J 10 PN 210.1 T I- 10 / SR 87 TI CAPACITY ADDITIONS - ENGINEERING TBD FY 10 PBDL1 SY1H 10 PN 211.0 H710601C T I- 10 WIDENING SR87 TO PICACHO PEAK CAPACITY ADDITIONS- ENGINEERING TBD FY 10 PBDL1 13410 BB1G 10 PM 246.5 T CORTARO ROAD TI CONSTRUCT NEW TI TBD FY 10 TBA 10208 PJ1F 10 PM 248.0 010- D T INA ROAD TI RECONSTRUCT TI & MAINLINE TBD FY 10 TBA 10106 CN1G 10 CH 300.2 H650401C NH - 010- E( 200) N S SR 90 TI RECONSTRUCT SR 90 TI AND ADD PASSING LAN TBD FY 10 URJR1 43010 GK1H 17 MA 204.9 E BETHANY HOME RD TO NORTHERN AVE DESIGN/ CONSTRUCT PEDESTRIAN WALKWAY AL TBD FY 10 43509 SR1H 17 MA 215.0 E SR 101L TO CAREFREE HWY ( SR 74) CONSTRUCT LANDSCAPE TBD FY 10 UD1J 17 YV 279.6 P SR169 - ROCKY PARK SYSTEM PRESERVATION - ENGINEERING TBD FY 10 SW1H 19 PM 39.0 H705001C T CONTINENTAL RD/ I- 19 BIKE & PED SYS ENHNCMENT- OTHR ENHANCEMNTS TBD FY 10 HDSR1 40310 GP1H 60 MA 148.9 E SR 101L ( AGUA FRIA) - MCDOWELL RD WIDEN ROADWAY TBD FY 10 JS1H 64 CN 235.0 H692701C F TUSAYAN STREETS WIDEN ROADWAY - SAFTEY IMPROVEMENTS TBD FY 10 HB1G 70 GH 271.0 H661401C 070- A- 308 G SAN CARLOS RIVER BRIDGE # 2910 BRIDGE REPLACEMENT TBD FY 10 XL1G 70 GH 331 070- A- 310 S US 70 PIMA TO THATCHER DESIGN SLOPE FLATTING TBD FY 10 EEJM1 40610 GT1H 74 MA 13.0 P US 60 - 303L, MP 13 - MP 15 ( EB) CONSTRUCT PASSING LANE TBD FY 10 11308 EO1E 77 NA 364.0 H546001C 077- B H MP 364 TO 372 CONSTRUCT PASSING LANE TBD FY 10 TBA 13309 WS1H 80 CH 316.0 H718101C S TOMBSTONE COURTHOUSE STATE PARK CONSTRUCT PARKING TBD FY 10 HDSM1 40710 MC1G 85 MA 122.0 E SR 85, HAZEN RD - BROADWAY RD ( MAIN LINE) RECONSTRUCT & WIDEN TBD FY 10 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 3RD SORT: BID DATE, RTE, MP Page 7 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: 13910 GY1H 86 PM 132.8 T KITT PK ROAD SEGMENT ROADWAY WIDENING TBD FY 10 11609 ES1G 86 PM 137.1 T SAN PEDRO ROAD SEGMENT WIDEN ROADWAY TO 40' TBD FY 10 11508 AZ1G 86 PM 159.5 H680601C STP - 086- A T VALENCIA ROAD - KINNEY ROAD CONSTRUCT ROADWAY WIDENING TO 4 LANES TBD FY 10 TBA YH1G 87 MA 204.3 E NEW FOUR PEAKS RD TO DOS S RANCH RD CLIMBING LANE AND SHOULDER WIDENING TBD FY 10 46208 XP1G 87 MA 211.8 P MP 211.8 TO MP 213.0 REPAIR CUT SLOPES FOR EROSION CONTROL TBD FY 10 13409 TQ1H 87 GI 263.0 H718301C P TONTO NATURAL BRIDGE CONSTRUCT NEW ROAD TBD FY 10 CBJO1 13209 A6SP 87 NA 346.0 H717901C H HOMOLOVI RUINS STATE PARK CONSTRUCT ROAD TBD FY 10 CBJO1 MD1J 89 YV 269.0 P MARTINEZ RIVER BRIDGE ( STR # 1320) SCOUR RETROFIT TBD FY 10 EE1E 89 YV 288 089- A- 201 P SR- 89 @ KIRKLAND JCT / WAGNER RD CST RT & LT TURN LNS, SHOULDER TBD FY 10 DVJB1 TDSP 89 CN 546.5 H475301C F PAGE REST AREA CONST REST AREA & VISITOR CNTR TBD FY 10 DP1G 95 YU 38.0 095- B- 308 Y WELLTON MOHAWK CANAL BRIDGE # 343 BRIDGE REHAB TBD FY 10 GK1J 95 LA 82.0 H752601C Y US 95 @ 82 & 89 INTERSECTION IMROVEMENTS TBD FY 10 14410 DB1J 95 LA 128.9 H675701C Y PASSING LANES SOUTH OF BOUSE WASH CONSTRUCT PASSING LANES TBD FY 10 JJ1G 95 LA 156.6 H638001C Y SR 95, HOLIDAY HARBOUR DRAINAGE STUDY TBD FY 10 PBGS1 13706 SI1E 101L MA 0.0 H726701C 101- A E I- 10 TO MC 85 ( 99TH AVE) WIDEN ROADWAY TBD FY 10 KHRC1 MU1H 101L MA 47.0 E SR 101 AT CHAPARRAL ROAD ADD LEFT LANES AT TI TBD FY 10 FC1J 143 MA 0.0 H752801C E SR 143 / SKY HARBOR BLVD TI TRAFFIC INTERCHANGE IMPROVEMENTS TBD FY 10 11710 RJ1C 160 NA 375.2 H JCT SR 564 - TSEGI, PH I CONST DUAL PASSING LNS TBD FY 10 XT1H 180 AP 402.0 G JCT SR 260 / US 180 & RODEO GROUNDS INTERSECTIO REALIGN INTERSECTION TBD FY 10 14002 FF1C 191 CH 62.0 H416501C S COCHISE UPRR OP # 2530 BRIDGE REPLACEMENT. TBD FY 10 QF1G 191 GE 153.0 S GUTHRIE BRIDGE # 352 DEMOLITION PA FOR BRIDGE DEMOLITION TBD FY 10 HDKA1 12303 LV1C 191 AP 367.0 H436001C H NAHATA' DZIIL ROAD - SANDERS TI RECONSTRUCT 3 BRIDGES AND RDWY TBD FY 10 SVSG1 GI1F 191 AP 390.0 H602501C 191- E- 505 H WIDE RUINS WIDENING FOR PASSING/ CLIMBING LANES, SAFE TBD FY 10 WERS1 KA1G 191 AP 446.0 HX12001C H US 191 AT IR 102 CNST TRAFFIC SIGNAL TBD FY 10 41210 UA1H 202L MA 0.0 E 51ST AVE TO I- 10 WEST CONSTRUCT ROADWAY TBD FY 10 TBD 11902 RH1B 260 GI 269.0 H469801C 260- B P DOUBTFUL CANYON SECTION RECONSTRUCT ROADWAY & CONSTRUCTION W TBD FY 10 SVBW1 WB1H 264 AP 474.5 H712101C H BLACK CREEK BRIDGE ( STR # 624) SCOUR RETROFIT TBD FY 10 41410 SZ1J 888 MA 0.0 H752501C E NOISE MITIGATION ON THE MAG REGIONAL FREEWAY SYSTEM ENHANCEMENT - OTHER ENHANCEMEN TBD FY 10 UW1J 86 PM 128.5 T SANTA ROSA RANCH SEGMENT DESIGN ROADWAY WIDENING DESIGN FY 10 15708 UI1H 95 MO 0.0 K LAKE HAVASU STATE PARK DESIGN ( LAUNCH RAMPS) DESIGN FY 10 TBD 14610 DE1J 177 GI 0.0 G CLIMBING PARK DESIGN DESIGN FY 10 41310 UE1H 202L MA 0.0 E I- 10 EAST/ SANTAN TI TO 51ST AVE DESIGN & R/ W DESIGN FY 10 TBD VL1J 0000 MA 0.0 SS72001C CM - SUR- 0( 206) A E WEST OF 219TH AVENUE PAVE DIRT ROADS FY 10 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 3RD SORT: BID DATE, RTE, MP Page 8 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: VK1J 0000 GI 0.0 SS71803D HPP - GGI- 0( 204) A G TONTO CREEK BRIDGE DESIGN BRIDGE APPROACHES FY 10 VT1J 0000 MA PEO SS72101C CM - PEO( 230) A E HYBRID FIBER- TO- WIRELESS COMMUNICATION SYSTE TRAFFIC SIGNAL NETWORK FY 10 HB1J 60 LA 45.8 H733501C Y US 60 AT VICKSBURG ROAD INTERSECTION IMPROVEMENT JUL 09 ES1H 89 CN 495.0 H682701C F THE GAP - CEDAR RIDGE TP SHOULDER WIDENING JUL 09 VI1J 0000 MA 0.0 SS71701C CM - GDV- 0( 201) A E DYNAMIC MESSAGE SIGNS VARIOUS LOCATIONS FY 10 WN1G 8 YU 6.0 Y BUSINESS 8 AND AVE 2 1/ 2 E DRAINAGE STUDY & IMPROVEMENT AUG 09 40309 GO1H 60 MA 138.0 H686601C 060- B( 201) E SR 303L TO 99TH AVE WIDEN ROADWAY AUG 09 FI1G 86 PM 145.0 H658101C T RESERVATION BOUNDRY TO BRAWLY WASH 3" AC & SC ( POLY) AUG 09 CU1H 191 GE 163.0 S SAN FRANCISCO RIVER BR # 563 BRIDGE REPLACEMENT AUG 09 NV1H 0000 MA 0.0 SS57701C CM - SCT- 0( 015) X E SCOTTSDALE ROAD CONSTRUCT ITS PROJECT FY 10 KD1H 177 PN 163.0 H692101C HES - 177- A( 003) A G SR 177, MP 163.80- 164.40 CURVE RE- ALIGNMENT NOV 09 VJ1J 0000 MA 0.0 SS71601C CM - PHX- 0( 224) A E PAVE DIRT ALLEYS VARIOUS LOCATIONS FY 10 ZT1H 40 CN 224.5 F BABBITTS TANK WASH BRIDGE SYSTEM ENHANCEMENT - ENGINEERING DEC 09 QL1H 40 NA 278.0 H TANNER WASH BRIDGE WB # 459 BRIDGE REPLACEMENT DEC 09 ER1H 89 CN 420.0 H682601C F TOWNSEND - FERNWOOD RR 4" & ARFC DEC 09 FO1G 160 NA 402.0 H658501C H JCT N 59 TO DENNEHOTSO 3" COLD RECYCLE & ARFC DEC 09 BC1J 0000 MA 0.0 SB42801C BR - MMA- 0( 202) A E OLD US 80 BRIDGE BRIDGE REHABILITATION FY 10 MN1J 89 CN 371.0 F WEST SEDONA ( NB & SB) R & R 2.5" AC & FR JAN 11 43711 TF1J 10 MA 125.0 E SARIVAL AVENUE TO DYSART ROAD CONSTRUCT LANDSCAPE TBD FY 11 EM1G 10 PM 253.0 H624101C T RUTHRAUFF RD - PRINCE RD CONSTRUCT MAINLINE WIDENING TO 8 LANES TBD FY 11 ENBS2 XQ1F 15 MO 9.0 F FARM ROAD TI CONSTRUCT NEW UNDERPASS TBD FY 11 10506 EM1E 40 CN 205.0 H545701C F WALNUT CANYON ( WB) RECONSTRUCT ROADWAY ( REPROFILE VERTICA TBD FY 11 KHRC1 23701 ZY1D 40 AP 340.0 H552601C 040- E( 001) H SANDERS PORT OF ENTRY RECONSTRUCT POE TBD FY 11 TBA 10211 CW1J 60 LA 0.0 H739001C P ALAMO LAKE STATE PARK CONSTRUCT PARKING TBD FY 11 PBBF1 12910 GS1H 60 PN 222.3 G SILVER KING SECTION RECONSTRUCT ROADWAY TBD FY 11 10610 XG1G 70 GI 253.4 G RAILROAD OVERPASS TO JCT SR 77 CONSTRUCT NEW ROADWAY & RAILROAD STRU TBD FY 11 FF1G 73 NA 342.0 G WHITERIVER TO COAL MINE CANYON 2" AC & ARFC TBD FY 11 10311 CY1J 77 PN 0.0 H739101C T ORACLE STATE PARK CONSTRUCT PARKING TBD FY 11 10411 AR1E 82 SC 0.0 H718201C T PATAGONIA LAKE STATE PARK CONSTRUCT ROAD TBD FY 11 HDSM1 12405 IV1A 89A CN 399.0 H413401C 366- F AIRPORT ROAD TI ( JW POWELL BLVD) CONSTRUCT INTERSECTION IMPR TBD FY 11 10910 DJ1G 90 CH 323.5 S CENTRAL AVE TO MOSON RD, E OF SIERRA VISTA WIDEN TO 5 LANES TBD FY 11 11410 HC1H 93 MO 104.1 H738901C K SB RANCH ROAD CONSTRUCT PARALLEL ROADWAY TBD FY 11 MBAP1 11510 AA1C 95 YU 32 063- 1 Y AVENUE 9E TO ABURDEEN ROAD RECONSTRUCT FORTUNA WASH BRIDGE & WID TBD FY 11 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 3RD SORT: BID DATE, RTE, MP Page 9 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: 11406 SK1E 191 GH 91.8 H503704C 191- B S DIAL WASH TO TEN RANCH ( SEG II) CONSTRUCT PARALLEL ROADWAY TBD FY 11 TBA 12010 EB1E 191 AP 446 H543801C H CHINLE SOUTH ROADWAY WIDENING TBD FY 11 41211 UB1H 202L MA 0.0 E 51ST AVE TO I- 10 WEST CONSTRUCT ROADWAY TBD FY 11 TBD 12510 HI1H 260 NA 317.2 H770501C G HEBER - SHOW LOW EB & WB CONSTRUCT PASSING LANES TBD FY 11 43311 DJ1J 303L MA 0.0 E I- 10/ 303L TI, PHASE I ( I- 10 REALIGNMENT) CONSTRUCT TI TBD FY 11 40511 TR1H 17 MA 215.0 E 101L- CAREFREE HIGHWAY DESIGN FMS DESIGN FY 11 40611 CV1J 51 MA 13.6 E BELL ROAD - SR 101L DESIGN FMS DESIGN FY 11 40711 TT1H 60 MA 0.0 E LINDSEY RD HALF INTERCHANGE DESIGN TI DESIGN FY 11 41011 TV1H 101L MA 0.0 E I- 17 TO SR 51 DESIGN FMS DESIGN FY 11 41611 TX1H 202L MA 0.0 E DOBSON ROAD TO I- 10 DESIGN FMS DESIGN FY 11 41411 UG1H 202L MA 0.0 E RURAL RD TO SR 101L DESIGN GPL DESIGN FY 11 TBD XA1J 0000 MA CHN SS72601C CM - CHN- 0( 210) A E CHANDLER BLVD TRAFFIC SIGNAL INTERCONNECT FIBER OPTIC - DELAWARE ST TO GILBERT RD FY 11 WR1J 0000 MA ELM SS72301C CM - ELM- 0( 200) A E 125TH & 127TH AVENUE PAVE UNPAVED ROADS FY 11 WS1J 0000 MA ELM SS72401C CM - ELM- 0( 201) A E 129TH AVENUE PAVE UNPAVED ROADS FY 11 WX1J 0000 MA MES SS73101C CM - MES- 0( 206) X E ITS SIGNAL CONVERSIONS - PHASE 4A FIBER OPTIC LINK FY 11 WY1J 0000 MA MES SS73201C CM - MES- 0( 205) X E ITS SIGNAL CONVERSIONS - PHASE 4B FIBER OPTIC LINK FY 11 XB1J 0000 MA PEO SS72801C CM - PEO- 0( 204) A E OLIVE AVENUE - UNDERPASS NEW RIVER TRAIL UNDERPASS CONSTRUCTION FY 11 WZ1J 0000 MA PHX SS72501C STP - PHX- 0( 228) A E MCDOWELL ROAD & 32ND STREET INTERRSECTION IMPROVEMENT FY 11 WQ1J 0000 MA SCT SS72201C CM - SCT- 0( 205) A E INDIAN BEND ROAD MCCORMICK STILLMAN RR PARK FY 11 WT1J 0000 MA SUP SS72701C CM - SUP- 0( 207) X E PEORIA AVENUE FIBER OPTIC INTERCONNECTS FY 11 WU1J 0000 PM TUC SS73001C STP - TUC- 0( 226) A T PANTANO BOULEVARD PAVEMENT RECONSTRUCTION FY 11 WV1J 0000 PM TUC SS73003D STP - TUC- 0( 226) A T PANTANO BOULEVARD DESIGN PAVEMENT RECONSTRUCTION FY 11 16006 QT1F 101L MA 53.5 E BALBOA DRIVE CONSTRUCT MULTI- USE PATH BRIDGE OVER TH IGA FY 12 10112 CL1J 10 PN 0.0 T GILA RIVER INDIAN TRIBAL BOUNDARY TO I- 8 WIDEN ROADWAY TBD FY 12 11209 EK1G 10 PM 232.4 T PINAL AIR PARK - MARANA, PH II CONST MAINLINE WIDENING 6 LN TBD FY 12 11112 CO1J 10 PM 236.4 T MARANA ROAD TO INA ROAD RECONSTRUCT & WIDEN FRONTAGE ROADS TBD FY 12 40312 TS1H 17 MA 209.0 E ARIZONA CANAL - 101L CONSTRUCT FMS TBD FY 12 10212 CU1J 17 YV 232.0 P ROCK SPRINGS TO CORDES JUNCTION WIDEN ROADWAY TBD FY 12 TA1H 40 CN 198.0 F BUTLER AVE TI SYSTEM ENHANCEMENT- ENGINEERING TBD FY 12 RBML1 10612 QP1C 60 NA 342.0 G SHOW LOW TO LITTLE MORMON LAKE WIDEN ROADWAY TBD FY 12 14110 AY1G 77 PM 82.0 077- A T TANGERINE ROAD - PINAL COUNTY LINE WIDENING TO 6 LANES TBD FY 12 TBA KS1H 80 CH 318.0 S TOMBSTONE TO JUNCTION SR 90 EXTEND CULVERTS TBD FY 12 PSMR1 EE1F 82 SC 38.0 H598701C T SR 82, MP 38 - 39.5 SLOPE FLATTENING TBD FY 12 RSKP1 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 3RD SORT: BID DATE, RTE, MP Page 10 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: 10512 CZ1J 89 YV 317.5 P JCT 89A TO MP 324 WIDEN THE SR 89 CORRIDOR TBD FY 12 10412 DA1J 89 CN 464.5 F CAMERON SECTION CONSTRUCT 4- LANE URBAN, SR 64 INTERSECTI TBD FY 12 10312 LE1G 93 MO 101.8 K ANTELOPE WASH CONSTRUCT 4- LANE DIVIDED HIGHWAY TBD FY 12 41612 UH1H 303L MA 0.0 E I- 10 TO US 60 ( GRAND AVE) CONSTRUCT NEW FREEWAY TBD FY 12 TBD 11212 CP1J 10 PM 262.5 T KINO TI DESIGN TRAFFIC INTERCHANGE DESIGN FY 12 11512 CR1J 10 PM 267.1 T VALENCIA ROAD TI CONSTRUCT TRAFFIC INTERCHANGE DESIGN FY 12 40913 CM1J 10 MA 122.0 H770901C E PERRYVILLE ROAD CONSTRUCT TI TBD FY 13 11113 TL1J 10 PM 236.4 T MARANA ROAD TO INA ROAD ( FRONTAGE ROADS) RECONSTRUCT & WIDEN FRONTAGE ROADS TO TBD FY 13 11313 CS1J 10 PM 269.4 T WILMOT ROAD TI UPGRADE EXISTING TRAFFIC INTERCHANGE TBD FY 13 40112 CT1J 17 MA 209.0 E ARIZONA CANAL TO SR 101L CONSTRUCT GPL TBD FY 13 11207 QK1C 19 PM 58.7 H510501C T VALENCIA RD TO AJO WAY WIDEN ROADWAY TBD FY 13 TBA 10213 EC1H 40 MO 56.5 K RATTLESNAKE WASH TI CONSTRUCT NEW TI TBD FY 13 TBA 40612 CX1J 60 MA 194.0 E MERIDIAN ROAD CONSTRUCT TI TBD FY 13 10313 TD1J 60 PN 212.0 G SUPERIOR STREETS RECONSTRUCT TO 4 LANE RDWY W/ CNT TURN L TBD FY 13 10113 TE1J 89A YV 319.0 P JCT 89A TO CHINO VALLEY ( S. CHINO LIMITS) - PH II CONSTRUCT ROADWAY WIDENING TBD FY 13 10413 TC1J 93 MO 116.0 K CARROW TO STEPHENS CONSTRUCT 4- LANE DIVIDED HIGHWAY TBD FY 13 40013 UF1H 202L MA 0.0 E I- 10 EAST/ SANTAN TI TO 51ST AVE CONSTRUCT ROADWAY TBD FY 13 TBD 41711 TW1H 202L MA 0.0 E DOBSON ROAD TO I- 10 CONSTRUCT HOV/ RAMP TBD FY 13 41313 DK1J 303L MA 0.0 E US 60 ( GRAND AVE) TO I- 17 CONSTRUCT ROADWAY TBD FY 13 11312 CQ1J 10 PM 264.0 T COUNTRY CLUB ROAD TI CONSTRUCT NEW TRAFFIC INTERCHANGE DESIGN FY 13 40313 DD1J 101L MA 23.5 E I- 17 TO TATUM BLVD CONSTRUCT HOV LANE DESIGN FY 13 10306 RE1E 17 CN 322.0 017- B F MUNDS PARK TI DESIGN TRAFFIC INTERCHANGE JUN 14 KHRC1 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 4TH SORT: TRACS # Page 1 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: 41210 UA1H 202L MA 0.0 E 51ST AVE TO I- 10 WEST CONSTRUCT ROADWAY TBD FY 10 TBD 40312 TS1H 17 MA 209.0 E ARIZONA CANAL - 101L CONSTRUCT FMS TBD FY 12 41313 DK1J 303L MA 0.0 E US 60 ( GRAND AVE) TO I- 17 CONSTRUCT ROADWAY TBD FY 13 40711 TT1H 60 MA 0.0 E LINDSEY RD HALF INTERCHANGE DESIGN TI DESIGN FY 11 43311 DJ1J 303L MA 0.0 E I- 10/ 303L TI, PHASE I ( I- 10 REALIGNMENT) CONSTRUCT TI TBD FY 11 10910 DJ1G 90 CH 323.5 S CENTRAL AVE TO MOSON RD, E OF SIERRA VISTA WIDEN TO 5 LANES TBD FY 11 41011 TV1H 101L MA 0.0 E I- 17 TO SR 51 DESIGN FMS DESIGN FY 11 41711 TW1H 202L MA 0.0 E DOBSON ROAD TO I- 10 CONSTRUCT HOV/ RAMP TBD FY 13 DG1J 273 AP 380.0 G SR 273, BETWEEN MPS 377.46 AND 381.46 SYSTEM ENHANCEMENT - ENGINEERING MAR 10 41611 TX1H 202L MA 0.0 E DOBSON ROAD TO I- 10 DESIGN FMS DESIGN FY 11 14610 DE1J 177 GI 0.0 G CLIMBING PARK DESIGN DESIGN FY 10 40313 DD1J 101L MA 23.5 E I- 17 TO TATUM BLVD CONSTRUCT HOV LANE DESIGN FY 13 10412 DA1J 89 CN 464.5 F CAMERON SECTION CONSTRUCT 4- LANE URBAN, SR 64 INTERSECTI TBD FY 12 FF1G 73 NA 342.0 G WHITERIVER TO COAL MINE CANYON 2" AC & ARFC TBD FY 11 TQ1J 0000 MA CHN CM - CHN- 0( 208) A E LOOP 101 @ GALVESTON ST MULTI- USE PATH & BRIDGE FY 09 41211 UB1H 202L MA 0.0 E 51ST AVE TO I- 10 WEST CONSTRUCT ROADWAY TBD FY 11 TBD UC1J 17 CN 316.5 F ROCKY PARK- MCCONNELL SYSTEM PRESERVATION - ENGINEERING TBD FY 09 40809 UD1H 202L MA 0.0 E I- 10 EAST/ SANTAN TI TO 51ST AVE DESIGN AND R/ W DESIGN FY 09 TBD UD1J 17 YV 279.6 P SR169 - ROCKY PARK SYSTEM PRESERVATION - ENGINEERING TBD FY 10 41310 UE1H 202L MA 0.0 E I- 10 EAST/ SANTAN TI TO 51ST AVE DESIGN & R/ W DESIGN FY 10 TBD 10306 RE1E 17 CN 322.0 017- B F MUNDS PARK TI DESIGN TRAFFIC INTERCHANGE JUN 14 KHRC1 41411 UG1H 202L MA 0.0 E RURAL RD TO SR 101L DESIGN GPL DESIGN FY 11 TBD 15708 UI1H 95 MO 0.0 K LAKE HAVASU STATE PARK DESIGN ( LAUNCH RAMPS) DESIGN FY 10 TBD 40808 UK1H 202L MA 0.0 E 51ST AVE TO I- 10 WEST CONSTRUCT ROADWAY TBD FY 09 TBD UL1H 160 CN 349.0 F US 160 TURN LANES AT NAVAJO ROUTE CONSTRUCT TURN LANES JUN 09 PLCH1 15208 NSSP 89A YV 0.0 F RED ROCK STATE PARK DESIGN DESIGN FY 09 13509 TZ1H 89A CN ASP F SLIDE ROCK STATE PARK DESIGN ( ADD'L PRRKING ) DESIGN FY 09 13607 QG1F 85 MA 120.5 Y MP 120.54 - MP 122.99 CONSTRUCT ROADWAY TBD FY 09 TBA 11710 RJ1C 160 NA 375.2 H JCT SR 564 - TSEGI, PH I CONST DUAL PASSING LNS TBD FY 10 RA1J 0000 PM TUC STP - TUC- 0( 222) A T ITS TRAFFIC SIGNAL TIMING STUDY TIMING STUDY - VARIOUS LOCATIONS FY 09 11209 EK1G 10 PM 232.4 T PINAL AIR PARK - MARANA, PH II CONST MAINLINE WIDENING 6 LN TBD FY 12 EO1G 19 PM 34.0 T CANOA TI - CONTINENTAL TI CONST ROADWAY ( NB FRONTAGE RD) IGA FY 09 16006 QT1F 101L MA 53.5 E BALBOA DRIVE CONSTRUCT MULTI- USE PATH BRIDGE OVER TH IGA FY 12 10612 QP1C 60 NA 342.0 G SHOW LOW TO LITTLE MORMON LAKE WIDEN ROADWAY TBD FY 12 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 4TH SORT: TRACS # Page 2 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: EE1E 89 YV 288 089- A- 201 P SR- 89 @ KIRKLAND JCT / WAGNER RD CST RT & LT TURN LNS, SHOULDER TBD FY 10 DVJB1 10213 EC1H 40 MO 56.5 K RATTLESNAKE WASH TI CONSTRUCT NEW TI TBD FY 13 TBA QL1J 10 PM 247.0 T INA RD TO RUTHRAUFF RD DCR / EA AND 30% DESIGN DESIGN FY 09 43509 SR1H 17 MA 215.0 E SR 101L TO CAREFREE HWY ( SR 74) CONSTRUCT LANDSCAPE TBD FY 10 43208 ST1H 202L MA 0.0 E LINDSAY ROAD TO GILBERT ROAD DESIGN & CONST MULTI- USE PATH TBD FY 09 DP1G 95 YU 38.0 095- B- 308 Y WELLTON MOHAWK CANAL BRIDGE # 343 BRIDGE REHAB TBD FY 10 SX1J 10 PN 210.1 T I- 10 / SR 87 TI CAPACITY ADDITIONS - ENGINEERING TBD FY 10 PBDL1 40511 TR1H 17 MA 215.0 E 101L- CAREFREE HIGHWAY DESIGN FMS DESIGN FY 11 QF1G 191 GE 153.0 S GUTHRIE BRIDGE # 352 DEMOLITION PA FOR BRIDGE DEMOLITION TBD FY 10 HDKA1 TA1H 40 CN 198.0 F BUTLER AVE TI SYSTEM ENHANCEMENT- ENGINEERING TBD FY 12 RBML1 11609 ES1G 86 PM 137.1 T SAN PEDRO ROAD SEGMENT WIDEN ROADWAY TO 40' TBD FY 10 10413 TC1J 93 MO 116.0 K CARROW TO STEPHENS CONSTRUCT 4- LANE DIVIDED HIGHWAY TBD FY 13 10007 EX1F 60 PN 230.0 060- D G OAK FLAT - DEVIL'S CANYON CONSTRCT PASSING/ CLIMBING LANE TBD FY 09 TBA 10313 TD1J 60 PN 212.0 G SUPERIOR STREETS RECONSTRUCT TO 4 LANE RDWY W/ CNT TURN L TBD FY 13 10113 TE1J 89A YV 319.0 P JCT 89A TO CHINO VALLEY ( S. CHINO LIMITS) - PH II CONSTRUCT ROADWAY WIDENING TBD FY 13 43711 TF1J 10 MA 125.0 E SARIVAL AVENUE TO DYSART ROAD CONSTRUCT LANDSCAPE TBD FY 11 11407 PN1F 17 MA 208.9 017- A E PEORIA AVE TO GREENWAY RD DRAINAGE IMPROVEMENTS TBD FY 09 TBA 11113 TL1J 10 PM 236.4 T MARANA ROAD TO INA ROAD ( FRONTAGE ROADS) RECONSTRUCT & WIDEN FRONTAGE ROADS TO TBD FY 13 10208 PJ1F 10 PM 248.0 010- D T INA ROAD TI RECONSTRUCT TI & MAINLINE TBD FY 10 TBA 41612 UH1H 303L MA 0.0 E I- 10 TO US 60 ( GRAND AVE) CONSTRUCT NEW FREEWAY TBD FY 12 TBD QL1H 40 NA 278.0 H TANNER WASH BRIDGE WB # 459 BRIDGE REPLACEMENT DEC 09 11510 AA1C 95 YU 32 063- 1 Y AVENUE 9E TO ABURDEEN ROAD RECONSTRUCT FORTUNA WASH BRIDGE & WID TBD FY 11 KO1H 40 MO 11.0 K CHEMEHUEVI & BOULDER WASH BRIDGES SCOUR RETROFIT JAN 10 10112 CL1J 10 PN 0.0 T GILA RIVER INDIAN TRIBAL BOUNDARY TO I- 8 WIDEN ROADWAY TBD FY 12 JL1G 72 LA 13.1 Y SR- 72 MP 13.1 - 17.0 SHOULDERS & SLOPES MAY 09 MU1H 101L MA 47.0 E SR 101 AT CHAPARRAL ROAD ADD LEFT LANES AT TI TBD FY 10 13410 BB1G 10 PM 246.5 T CORTARO ROAD TI CONSTRUCT NEW TI TBD FY 10 TBA 40013 UF1H 202L MA 0.0 E I- 10 EAST/ SANTAN TI TO 51ST AVE CONSTRUCT ROADWAY TBD FY 13 TBD 14110 AY1G 77 PM 82.0 077- A T TANGERINE ROAD - PINAL COUNTY LINE WIDENING TO 6 LANES TBD FY 12 TBA IH1J 89A YV 373.1 F SR 89A JCT AIRPORT ROAD INTERSECTION IMPROVEMENT JUN 09 14607 HX1G 10 PM 288.4 T CIENEGA CREEK- MARSH STATION PHASE II NEW RAILROAD TRACKS TBD FY 09 13910 GY1H 86 PM 132.8 T KITT PK ROAD SEGMENT ROADWAY WIDENING TBD FY 10 10610 XG1G 70 GI 253.4 G RAILROAD OVERPASS TO JCT SR 77 CONSTRUCT NEW ROADWAY & RAILROAD STRU TBD FY 11 KQ1H 0000 MA QCR STP - QCR- 0( 001) A E RIGGS RD, ELLSWORTH TO MERIDIAN CONSTRUCT NEW RDWAY FY 09 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 4TH SORT: TRACS # Page 3 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: 22706 GV1H 80 CH 364.0 S DOUGLAS STRTGC INSPECTION STATION INSTALL VOICE & DATA LINES IGA FY 10 JK1G 95 LA 131.7 Y SR- 95 @ MP 131.7 - 142.7 SHOULDER IMPROVEMENTS MAY 09 46208 XP1G 87 MA 211.8 P MP 211.8 TO MP 213.0 REPAIR CUT SLOPES FOR EROSION CONTROL TBD FY 10 XQ1F 15 MO 9.0 F FARM ROAD TI CONSTRUCT NEW UNDERPASS TBD FY 11 XT1H 180 AP 402.0 G JCT SR 260 / US 180 & RODEO GROUNDS INTERSECTIO REALIGN INTERSECTION TBD FY 10 40610 GT1H 74 MA 13.0 P US 60 - 303L, MP 13 - MP 15 ( EB) CONSTRUCT PASSING LANE TBD FY 10 12910 GS1H 60 PN 222.3 G SILVER KING SECTION RECONSTRUCT ROADWAY TBD FY 11 YH1G 87 MA 204.3 E NEW FOUR PEAKS RD TO DOS S RANCH RD CLIMBING LANE AND SHOULDER WIDENING TBD FY 10 40310 GP1H 60 MA 148.9 E SR 101L ( AGUA FRIA) - MCDOWELL RD WIDEN ROADWAY TBD FY 10 GG1J 66 MO 57.3 K AIRWAY AVENUE & MOHAVE AIRPORT DRIVE INTERSE CONCRETE MEDIAN & ASPHALT PAVING MAR 09 43010 GK1H 17 MA 204.9 E BETHANY HOME RD TO NORTHERN AVE DESIGN/ CONSTRUCT PEDESTRIAN WALKWAY AL TBD FY 10 ZT1H 40 CN 224.5 F BABBITTS TANK WASH BRIDGE SYSTEM ENHANCEMENT - ENGINEERING DEC 09 ZY1B 89 YV 313.8 029- 1 P SUNDOG RD BRIDGE ( OLD BLK CYN HWY TURNBACK OWNERSHIP & MAINTENANCE ( IGA R IGA FY 10 XL1G 70 GH 331 070- A- 310 S US 70 PIMA TO THATCHER DESIGN SLOPE FLATTING TBD FY 10 EEJM1 40611 CV1J 51 MA 13.6 E BELL ROAD - SR 101L DESIGN FMS DESIGN FY 11 14510 CN1J 10 PN 199.1 T JCT I 8 TO PICACHO PEAK TI WIDEN ROADWAY TBD FY 10 CU1H 191 GE 163.0 S SAN FRANCISCO RIVER BR # 563 BRIDGE REPLACEMENT AUG 09 40112 CT1J 17 MA 209.0 E ARIZONA CANAL TO SR 101L CONSTRUCT GPL TBD FY 13 11313 CS1J 10 PM 269.4 T WILMOT ROAD TI UPGRADE EXISTING TRAFFIC INTERCHANGE TBD FY 13 10512 CZ1J 89 YV 317.5 P JCT 89A TO MP 324 WIDEN THE SR 89 CORRIDOR TBD FY 12 10312 LE1G 93 MO 101.8 K ANTELOPE WASH CONSTRUCT 4- LANE DIVIDED HIGHWAY TBD FY 12 40612 CX1J 60 MA 194.0 E MERIDIAN ROAD CONSTRUCT TI TBD FY 13 40710 MC1G 85 MA 122.0 E SR 85, HAZEN RD - BROADWAY RD ( MAIN LINE) RECONSTRUCT & WIDEN TBD FY 10 MD1J 89 YV 269.0 P MARTINEZ RIVER BRIDGE ( STR # 1320) SCOUR RETROFIT TBD FY 10 11312 CQ1J 10 PM 264.0 T COUNTRY CLUB ROAD TI CONSTRUCT NEW TRAFFIC INTERCHANGE DESIGN FY 13 11512 CR1J 10 PM 267.1 T VALENCIA ROAD TI CONSTRUCT TRAFFIC INTERCHANGE DESIGN FY 12 UW1J 86 PM 128.5 T SANTA ROSA RANCH SEGMENT DESIGN ROADWAY WIDENING DESIGN FY 10 KS1H 80 CH 318.0 S TOMBSTONE TO JUNCTION SR 90 EXTEND CULVERTS TBD FY 12 PSMR1 11212 CP1J 10 PM 262.5 T KINO TI DESIGN TRAFFIC INTERCHANGE DESIGN FY 12 UU1J 101L MA 59.5 E SR 101L ( PRICE FREEWAY) @ GALVESTON SRP DRAINAGE INPROVEMENTS ASSOCIATED WI TBD FY 09 WN1G 8 YU 6.0 Y BUSINESS 8 AND AVE 2 1/ 2 E DRAINAGE STUDY & IMPROVEMENT AUG 09 11112 CO1J 10 PM 236.4 T MARANA ROAD TO INA ROAD RECONSTRUCT & WIDEN FRONTAGE ROADS TBD FY 12 MN1J 89 CN 371.0 F WEST SEDONA ( NB & SB) R & R 2.5" AC & FR JAN 11 21301 LY1C 260 GI 258.0 P LION SPRINGS SECTION DESIGN ( ROADWAY) DESIGN FY 09 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 4TH SORT: TRACS # Page 4 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: 10212 CU1J 17 YV 232.0 P ROCK SPRINGS TO CORDES JUNCTION WIDEN ROADWAY TBD FY 12 20206 3WSP 10 PM 288.4 H239001C 010- E T CIENEGA CREEK - MARSH STATION PH1 RAILROAD GRADE & DRAIN MAR 09 10900 AR1B 10 PM 288.6 H239101C 10- 5-( 068) N S PANTANO RR UP/ CIENEGA CREEK SECTION CONSTRUCT STRUCTURE TBD FY 09 12405 IV1A 89A CN 399.0 H413401C 366- F AIRPORT ROAD TI ( JW POWELL BLVD) CONSTRUCT INTERSECTION IMPR TBD FY 11 14002 FF1C 191 CH 62.0 H416501C S COCHISE UPRR OP # 2530 BRIDGE REPLACEMENT. TBD FY 10 13603 GM1C 17 YV 263.0 H426901C 17- 2( ) P CORDES JCT TI RECONSTRUCT TI TBD FY 09 HDJC1 12303 LV1C 191 AP 367.0 H436001C H NAHATA' DZIIL ROAD - SANDERS TI RECONSTRUCT 3 BRIDGES AND RDWY TBD FY 10 SVSG1 11606 AJ1C 191 AP 417.5 H451801C STP - 191- E( 200) A H BURNSIDE JUNCTION - NORTH ROADWAY WIDENING TBD FY 09 TBA 11902 RH1B 260 GI 269.0 H469801C 260- B P DOUBTFUL CANYON SECTION RECONSTRUCT ROADWAY & CONSTRUCTION W TBD FY 10 SVBW1 14601 RG1B 260 GI 263.1 H469901C P LITTLE GREEN VALLEY RECONSTRUCT ROADWAY TBD FY 09 AMRM1 TDSP 89 CN 546.5 H475301C F PAGE REST AREA CONST REST AREA & VISITOR CNTR TBD FY 10 11406 SK1E 191 GH 91.8 H503704C 191- B S DIAL WASH TO TEN RANCH ( SEG II) CONSTRUCT PARALLEL ROADWAY TBD FY 11 TBA 12407 FX1C 10 MA 161.2 H505101C E SR 202L ( SANTAN) TO RIGGS ROAD CONST HOV & GEN PURPOSE LANE TBD FY 10 PALL1 11207 QK1C 19 PM 58.7 H510501C T VALENCIA RD TO AJO WAY WIDEN ROADWAY TBD FY 13 TBA 22802 UX1C 160 CN 311.5 H527401C 160- A-( 001) F JCT 89 - VAN'S TRADING POST 2" ARAC & ARFC & TURNLANES TBD FY 09 16604 RV1E 86 PM 145.6 H543401C S - 086- A- 500 T MP 145.6 - BRAWLEY WASH EXTEND BOX CULVERTS TBD FY 09 TBA 12010 EB1E 191 AP 446 H543801C H CHINLE SOUTH ROADWAY WIDENING TBD FY 11 10506 EM1E 40 CN 205.0 H545701C F WALNUT CANYON ( WB) RECONSTRUCT ROADWAY ( REPROFILE VERTICA TBD FY 11 KHRC1 11308 EO1E 77 NA 364.0 H546001C 077- B H MP 364 TO 372 CONSTRUCT PASSING LANE TBD FY 10 TBA 23701 ZY1D 40 AP 340.0 H552601C 040- E( 001) H SANDERS PORT OF ENTRY RECONSTRUCT POE TBD FY 11 TBA PK1E 95 YU 63.0 H584101C Y PELIGRO - CLARKS PA ( 3" AC + FC) JUN 09 20806 WW1G 85 MA 152 H595514C E SOUTHERN AVE TO I- 10 CONSTRUCT ROADWAY TBD FY 09 EE1F 82 SC 38.0 H598701C T SR 82, MP 38 - 39.5 SLOPE FLATTENING TBD FY 12 RSKP1 GI1F 191 AP 390.0 H602501C 191- E- 505 H WIDE RUINS WIDENING FOR PASSING/ CLIMBING LANES, SAFE TBD FY 10 WERS1 18606 MU1F 17 YV 299.0 H613601C F YAVAPAI COUNTY - JCT SR 179 ( SB) RR ( 4" TL, 3" PL) + RR ARFC FEB 09 PB1F 40B YV 145.0 H621301C B40- C( 002) A K ASH FORK, 40B, 3RD ST TO 8TH ST SIDEWALK TBD FY 09 TBA OV1F 260 NA 350.0 H621401C TEA - 260- C( 003) A G SR 260 PORTER MTN RD - WOODLAND RD LANDSCAPING, IRRIGATION & PEDESTRIAN LIGH TBD FY 09 TBA EM1G 10 PM 253.0 H624101C T RUTHRAUFF RD - PRINCE RD CONSTRUCT MAINLINE WIDENING TO 8 LANES TBD FY 11 ENBS2 28303 RO1F 80 CH 364.0 H624301C CBI - 080- A( 009) B S DGLS STGC WEIGHT & INSP STATION DSGN/ CST WEIGHT & INSP STATION MAR 09 MBFG1 UP1F 86 PM 74.0 H630201C T SR- 86, MP 73.99 - 77.69 SYMMETRICAL WIDENING MAR 09 AP1G 160 NA 389.5 H635601C 160- A( 200) A H KAYENTA - JCT IR 59 3" AC + ACFC DEC 08 AC1G 17 YV 245.2 H636801C HES - 017- B( 201) A P BLACK CANYON HILL - ( SB) MILL AND REPLACE AND SAFETY IMPROVEMENT TBD FY 09 JJ1G 95 LA 156.6 H638001C Y SR 95, HOLIDAY HARBOUR DRAINAGE STUDY TBD FY 10 PBGS1 14406 VB1E 10 PM 260.0 H640401C 010- E T I- 10 / I- 19 ( FMS, PHASE 2) EXTEND ITS SYSTEMS ALONG I- 10 & I- 19 TBD FY 09 TRMM1 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 4TH SORT: TRACS # Page 5 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: ZK1F 191 GE 160.0 H643201C S BACK COUNTRY BYWAY ( NORTH INTER) SAFETY IMPROVEMENTS TBD FY 09 CH1G 70 GI 256.0 H645301C G OLD WINKELMAN HIGHWAY AND BIA ROUTE 6 INTERSECTION IMPROVEMENTS APR 09 HZJS1 CM1G 89 YV 313.0 H648401C 089- B- 305 P GRANITE CREEK BRIDGE # 2869 BRIDGE REPLACEMENT TBD FY 09 10106 CN1G 10 CH 300.2 H650401C NH - 010- E( 200) N S SR 90 TI RECONSTRUCT SR 90 TI AND ADD PASSING LAN TBD FY 10 URJR1 CV1G 191 CH 48.3 H650901C S SUNSITES @ HIGH STREET WIDEN ROADWAY FOR TURN LANES DEC 08 HERW1 FD1G 60 GI 278.0 H657401C G TIMBER MT TO SENECA RR 3" & ARFC FEB 09 FG1G 78 GE 154.0 H657901C S JCT 191 TO FOREST SERVICE BOUNDARY CHIP SEAL AND GUARDRAIL EXTENSION APR 09 FH1G 80 CH 368.0 H658001C STP - 080- B( 200) A S EAST OF DOUGLAS 2 1/ 2" MILL, 3" AC REPLACE PLUS 1/ 2" AR- ACFC JAN 09 FI1G 86 PM 145.0 H658101C T RESERVATION BOUNDRY TO BRAWLY WASH 3" AC & SC ( POLY) AUG 09 FJ1G 87 PN 131.0 H658201C T S COOLIDGE CL TO JCT 287 RR 2.5" ARAC FEB 09 FK1G 89 YV 283.0 H658301C STP - 089- A( 200) A P PEEPLES VALLEY YARD TO WILHOIT SPOT 3" RR & ARFC APR 09 FO1G 160 NA 402.0 H658501C H JCT N 59 TO DENNEHOTSO 3" COLD RECYCLE & ARFC DEC 09 FP1G 160 AP 452.0 H658601C H RED MESA TO TEEC NOS POS 3" AC & ARFC JAN 10 FQ1G 180 AP 347.0 H658701C G RANCH TO JCT 61 SYS PRES- RESTORE/ REHAB/ RESRFC APR 09 HB1G 70 GH 271.0 H661401C 070- A- 308 G SAN CARLOS RIVER BRIDGE # 2910 BRIDGE REPLACEMENT TBD FY 10 HO1G 999 MA 0.0 H662101C 999- A( 023) E VARIOUS ROUTES, MARICOPA COUNTY BRKWY CABLE TERMINAL TBD FY 09 LP1G 78 GE 169.0 H666901C S JAKE'S CORNER REALIGNMENT HIGHWAY REALIGNMENT MAR 09 AMJS1 11507 DP1H 60 MA 148.9 H669001C NH - 060- B( 200) B E 99TH AVE - 83RD AVE ( INCLUDING NEW RIVER BRIDGE) WIDEN ROADWAY AND BRIDGE MAY 09 DU1H 160 CN 320.0 H669501C 160- A( 003) A F US 160 @ SR 264 LIGHTING MAY 09 EO1H 66 MO 61.0 H675201C K SR 66 @ MOHAVE AIRPORT INTERSECTION IMPROVEMENT TBD FY 09 14410 DB1J 95 LA 128.9 H675701C Y PASSING LANES SOUTH OF BOUSE WASH CONSTRUCT PASSING LANES TBD FY 10 11508 AZ1G 86 PM 159.5 H680601C STP - 086- A T VALENCIA ROAD - KINNEY ROAD CONSTRUCT ROADWAY WIDENING TO 4 LANES TBD FY 10 TBA DX1H 70 GH 338.0 H680801C S US 70 & 8TH AVENUE INTERSECTION INTERSECTION IMPROVEMENTS TBD FY 09 EB1H 260 NA 356.0 H681201C G MP 356- 357.6 INSTALL NEW R/ W FENCE TBD FY 09 EU1H 191 AP 375.0 H681901C H JCT I- 40 MP 385 3" AC & SC JAN 10 FA1H 10 CH 307.0 H682201C IM - 010- F( 201) A S E BENSON - JOHNSON RD ( EB) RR 5" TL, 3" PL & ARFC FEB 09 FG1H 40 MO 73.0 H682401C K PEACOCK WASH- SILVER SPRNGS ROAD TI- EB RR5" TL & 3" TL & 2" AC & ARFC FEB 09 ER1H 89 CN 420.0 H682601C F TOWNSEND - FERNWOOD RR 4" & ARFC DEC 09 ES1H 89 CN 495.0 H682701C F THE GAP - CEDAR RIDGE TP SHOULDER WIDENING JUL 09 FD1H 8 MA 114.0 H682901C Y GILA BEND - 121.0 RR 2" PL/ 5" TL & ARFC JAN 10 EY1H 87 GI 267.0 H683201C P PINE - RIM 3" RR & ARFC TBD FY 09 14407 PRSP 60 PN 220.0 H684501C 060- D- 508 G BOYCE THOMPSON STATE PARK CONSTRUCT ROAD FEB 09 AMJC1 40309 GO1H 60 MA 138.0 H686601C 060- B( 201) E SR 303L TO 99TH AVE WIDEN ROADWAY AUG 09 44209 XW1H 17 MA 224.0 H688101C E SR74- ANTHEM WAY CONSTRUCT GENERAL PURPOSE LANE ( STAN A OCT 08 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 4TH SORT: TRACS # Page 6 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: JD1H 79 PN 126.0 H690601C T SR 79 ORACLE JCT - FLORENCE HWY EXTEND RCB CULVERTS MAR 09 HDRB1 40608 GU1H 74 MA 20.0 H691201C P US 60 TO SR 303L, MP 20 TO MP 22 ( EB & WB) CONSTRUCT PASSING LANES FEB 09 13506 OQ1D 88 MA 223.0 H692001C STP - 088- A( 001) G FISH CREEK HILL CONSTRUCT RETAINING WALLS TBD FY 09 TBA KD1H 177 PN 163.0 H692101C HES - 177- A( 003) A G SR 177, MP 163.80- 164.40 CURVE RE- ALIGNMENT NOV 09 14810 KP1H 40 AP 316.0 H692401C H DEAD RIVER BRIDGE EB ( STR # 565) SCOUR RETROFIT FEB 09 KF1H 8 PN 177.0 H692601C 008- B( 003) A T INTERSTATE I- 8 EB, I- 10 WB RAMP IMPROVEMENT MAY 09 JS1H 64 CN 235.0 H692701C F TUSAYAN STREETS WIDEN ROADWAY - SAFTEY IMPROVEMENTS TBD FY 10 OG1H 8 MA 121.0 H701601C 008- B Y MP 121.00 - BIG HORN SYSTEM PRES - ENGINEERING APR 09 SW1H 19 PM 39.0 H705001C T CONTINENTAL RD/ I- 19 BIKE & PED SYS ENHNCMENT- OTHR ENHANCEMNTS TBD FY 10 HDSR1 UM1H 83 PM 44.0 H705701C 083- A( 200) A T MP 44.0 TO MP 45.5 SAFETY IMPRVMNTS / REALIGNMENT MAY 09 RN1H 40 AP 347.0 H706601C BR - 040- E( 202) A H BLACK CREEK BRIDGES EB, WB SFR( STR # 1134,1642,9 BRIDGE SCOUR RETROFIT JAN 09 40812 TU1H 101L MA 0.0 H707601C E BEARDSLEY RD / UNION HILLS DRIVE ( CITY ADVANCEM CONSTRUCT TI TBD FY 09 45309 FN1H 10 MA 96.2 H708301X Y 395TH AVE ( BELMONT RD) CONSTRUCT TI TBD FY 09 TD1H 191 GE 170.0 H710001C S LWR CORONADO TRAIL DRAINAGE IMPRV SYST ENHANCEMENT - ENGINEERING MAR 09 TB1H 10 PN 199.0 H710401C T I- 8 TO SR 87 TI CAPACITY ADDITIONS - ENGINRING TBD FY 10 EECA1 SY1H 10 PN 211.0 H710601C T I- 10 WIDENING SR87 TO PICACHO PEAK CAPACITY ADDITIONS- ENGINEERING TBD FY 10 PBDL1 UO1H 95 LA 161.7 H711501C K BILL WILLIAMS RIVER BRIDGE # 1272 FIRE DAMAGE REPAIR TBD FY 09 WB1H 264 AP 474.5 H712101C H BLACK CREEK BRIDGE ( STR # 624) SCOUR RETROFIT TBD FY 10 QY1C 86 PM 141.1 H713701C T MP 141.1 TO RESERVATION BOUNDARY CONSTRUCT ROADWAY WIDENING TBD FY 09 TBA 40008 GH1H 10 MA 133.0 H715501C E SR 101L ( AGUA FRIA) TO I- 17 CONSTRUCT GENERAL PURPOSE LANES TBD FY 10 13209 A6SP 87 NA 346.0 H717901C H HOMOLOVI RUINS STATE PARK CONSTRUCT ROAD TBD FY 10 CBJO1 13309 WS1H 80 CH 316.0 H718101C S TOMBSTONE COURTHOUSE STATE PARK CONSTRUCT PARKING TBD FY 10 HDSM1 10411 AR1E 82 SC 0.0 H718201C T PATAGONIA LAKE STATE PARK CONSTRUCT ROAD TBD FY 11 HDSM1 13409 TQ1H 87 GI 263.0 H718301C P TONTO NATURAL BRIDGE CONSTRUCT NEW ROAD TBD FY 10 CBJO1 44109 XV1H 10 MA 119.0 H721101C E VERRADO WAY TO SARIVAL AVE CONSTRUCT GENERAL PURPOSE LANE ( STAN A OCT 08 VO1H 40 MO 21.0 H721201C 040- A( 200) K MP 21 - WALNUT CREEK RR 5" TL & 3" PL & 2" AC ARFC JAN 09 XF1H 19 PM 47.0 H722201C STP - 019- A-( AUP) T SAHUARITA TI CONSTRUCT NEW TI TBD FY 09 IN1J 10 MA 144.0 H725601C M 3RD AVENUE - 3RD STREET FIRE DETECTION SYSTEM RETROFIT FEB 09 ZL1H 260 AP 385.0 H726101C G SR 260 FROM GREER TO RODEO GROUNDS 3" RR & ARFC APR 09 13706 SI1E 101L MA 0.0 H726701C 101- A E I- 10 TO MC 85 ( 99TH AVE) WIDEN ROADWAY TBD FY 10 KHRC1 ZC1H 40 MO 14.9 H727201C K BUCK MOUNTIAN WASH EB # 378 DECK REHABILITATION TBD FY 09 43409 TO1H 10 MA 126.0 H729601C E SARIVAL AVE TO DYSART RD CONSTRUCT GPL ( CITY ADVANCEMENT) OUTSID MAR 09 TBD LJ1J 160 AP 465.1 H730903C H TEEC NOS POS PORT OF ENTRY SYSTEM ENHANCEMENT - OTHER ENHANCEMEN FEB 09 CF1J 79 PN 124.2 H731001C T MP 124 TO MP 126 SYSTEM ENHANCEMENT - ENGINEERING TBD FY 09 HDRB1 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 4TH SORT: TRACS # Page 7 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: QH1J 19 SC 1.6 H732901C T SB- 19 AND SPRR OP BRIDGE # 980 BRIDGE REPAIR TBD FY 09 FJ1J 40 MO 85.9 H733001C K WILLOW CREEK BRIDGE, WB # 1769 DECK REHABILITATION TBD FY 09 HB1J 60 LA 45.8 H733501C Y US 60 AT VICKSBURG ROAD INTERSECTION IMPROVEMENT JUL 09 NW1J 89A YV 344.0 H733901C P JEROME RETAINING WALL REPLACE RETAINING WALL TBD FY 09 11410 HC1H 93 MO 104.1 H738901C K SB RANCH ROAD CONSTRUCT PARALLEL ROADWAY TBD FY 11 MBAP1 10211 CW1J 60 LA 0.0 H739001C P ALAMO LAKE STATE PARK CONSTRUCT PARKING TBD FY 11 PBBF1 10311 CY1J 77 PN 0.0 H739101C T ORACLE STATE PARK CONSTRUCT PARKING TBD FY 11 OX1H 90 CH 321.1 H740401C S SR 90 @ MP 321.11 TO MP 321.42 MINOR PAVEMENT PRESERVATION FEB 09 FY1J 40 MO 52.0 H740601C TEA - 040- A( 201) K I- 40 STOCKTON HILL - HARRISON CONSTRUCT LANDSCAPING AND IRRIGATION SEP 08 14409 GE1J 69 YV 288.3 H741001C 069- 4 P SR 69 GLASSFORD HILL PRESCOTT EAST HIGHWAY ROADWAY WIDENING JAN 09 PV1J 101L MA 36.0 H741401C E HAYDEN RD TO PRINCESS DR DRAINAGE IMPROVEMENTS TBD FY 09 OU1J 40 MO 9.8 H742001C K LAKE HAVASU TI UP # 1586 BRIDGE REHABILITATION TBD FY 09 IG1J 60 GI 243.0 H743601C G US 60, MIAMI CITY LIMITS TO MCMILLAN WASH PAVEMENT PRESERVATION MAR 09 TI1J 8 YU 66.0 H744601C Y I- 8, DATELAND TO GILA BEND REST AREA SIGN REHABILITATION IGA FY 09 LP1J 83 SC 31.6 H747001C T JCT SR 82 ( MP 31.6) TO MP 43.5 HIP RECYCLE + CHIP SEAL COAT DEC 08 13408 HY1G 10 PM 288.4 H747301C T CIENEGA CREEK- MARSH STATION PHASE III REMOVE RAIL & BRIDGE, CONST ML TBD FY 09 QT1J 999 AP 0.0 H747701X SB - AZ07-( 004) H DINE'TAH " AMONG THE PEOPLE" SCENIC ROADS DESIGN MARKETING PLAN IGA FY 09 QU1J 163 NA 0.0 H747801X SB - AZ07-( 007) H KAYENTA- MONUMENT VALLEY SCENIC ROADS DEVELOP INTERPRETIVE PLAN IGA FY 09 QV1J 163 NA 0.0 H747901X SB - AZ07-( 008) H KAYENTA- MONUMENT VALLEY SCENIC ROADS DESIGN MARKETING PLAN IGA FY 09 21008 GL1J 191 AP 448.0 H748601C H CHINLE - MANY FARMS ( PH I) REMOVE & REPLACE FENCING, CATTLE GUARDS TBD FY 09 41409 DI1J 202L MA 10.0 H749001C E SR 101L TO GILBERT ROAD CONSTRUCT FMS TBD FY 09 MF1J 82 CH 61.2 H749701C S SAN PEDRO RIVER BR ( STR # 403) SCOUR RETROFIT FEB 09 OI1J 19 PM 0.0 H750101C T TUCSON TO INTERNATIONAL BORDER SIGN REHAB - REPLACE PANELS OR SIGNS IGA FY 09 OS1J 40 CN 177.0 H751401C F MP 177- 182 ( EB& WB) SHOULDERS PAVEMENT PRESERVATION TBD FY 09 OQ1J 177 GI 136.3 H752301C G WINKELMAN 3" MILL AND REPLACE TBD FY 09 41410 SZ1J 888 MA 0.0 H752501C E NOISE MITIGATION ON THE MAG REGIONAL FREEWAY SYSTEM ENHANCEMENT - OTHER ENHANCEMEN TBD FY 10 GK1J 95 LA 82.0 H752601C Y US 95 @ 82 & 89 INTERSECTION IMROVEMENTS TBD FY 10 FC1J 143 MA 0.0 H752801C E SR 143 / SKY HARBOR BLVD TI TRAFFIC INTERCHANGE IMPROVEMENTS TBD FY 10 BW1J 40 MO 47.0 H752901C K HOLY MOSES WASH - RATTLESNAKE WASH RR( 5" TL, 3" PL)& AR ACFC & RR AR ACFC APR 09 OJ1J 77 NA 374.0 H753201C H SR 77 @ MP 374.38 AND MP 383.50 SYSTEM ENHANCEMENT - ENGINEERING MAR 09 OV1J 999 SW 0.0 H755001C BRIDGES # 2190, # 1152, # 1219, # 745, # 517, # 821, # 93 COLLISION DAMAGE REPAIR TBD FY 09 PS1J 86 PM 171.0 H755601C T SANTA CRUZ RIVER BRIDGE # 528 DECK REPLACEMENT JAN 09 QB1J 40 MO 39.0 H756801C K MP 39 - MP 121 MINOR PAVEMENT PRESERVATION FEB 09 QZ1J 177 PN 139.2 H760301C G MP 139.16 @ AAR/ DOT # 742- 390- N CONCRETE RR CROSSING SURFACE & LED FLAS IGA FY 09 PROJECT NAME AND TYPE OF WORK MAY BE TRUNCATED. ARIZONA DEPARTMENT OF TRANSPORTATION 5 YEAR BID DATE REPORT 4TH SORT: TRACS # Page 8 of 10 CPSI D: RTE: CO: TRACS: PROJECT MP: NUMBER: PROJECT NAME: TYPE OF WORK: ITEM #: BID DATE: DESIGN DIST: FIRM: RH1J 17 MA 229.0 H760401C E ANTHEM WAY - NEW RIVER ROAD PAVEMENT PRESERVATION NOV 08 UM1J 93 MO 124.0 H763501C K 1 MILE SOUTH OF TOWN OF WIKIEUP; WEST OF ROAD SYSTEM PRESERVATION - RESTORATION/ REHAB IGA FY 09 SL1J 40B NA 276.8 H767701C H JOSEPH CITY TRUCK STOP 3" MILL AND REPLACE MAR 09 SM1J 180 NA 324.2 H767801C H PETRIFIED FOREST MINOR PAVEMENT PRESERVATION MAR 09 SV1J 40 CN 182.0 H768901C F NAVAJO ARMY DEPOT, WB 1/ 2" MILL & 1/ 2" ACFC ON SHOULDER TBD FY 09 SR1J 90 CH 321.5 H769201C S SR 90 @ MP 321.58 TO MP 321.91 MINOR PAVEMENT PRESERVATION FEB 09 13609 AM1J 101L MA 30.0 H769901C E SR51 TO PRI |