Skip to main content
A service of Arizona State Library, Archives and Public Records, a division of the Secretary of State. Arizona Memory Project

Add or remove other collections to your search:



 

Narrow your search by:



Format

Coverage

Subject

Creator

You've searched:

All Collections
  • All fields: kilovolt
(21 results)



Display: 20

    • Palo Verde hub to TS-5 substation 500kV transmission project

    • Palo Verde hub to TS-5 substation 500kV transmission project
    • Environmental Planning Group.
    • Electric power transmission--Environmental aspects--Arizona; Electric utilities--Environmental aspects--Arizona; Electric lines--Environmental aspects--Arizona
    • 117 pages (PDF version). File size: 28271.697 KB. Environmental Assessment AZ-020-2004-0056. BLM Case File No. AZ A-32639; NEPA No. AZ-020-2004-0056. Includes bibliographic references. Note: this is an extremely large file and may take time to...
    • Renewable Arizona: restoration design energy project: final environmental impact statement

    • Renewable Arizona: restoration design energy project: final environmental impact statement
    • United States. Bureau of Land Management.
    • Solar energy--Arizona; Solar energy policy--Arizona; Energy development--Environmental aspects--Arizona; Public lands--Arizona--Management; Public lands--Environmental aspects--Arizona;
    • This title contains one or more volumes. BLM/AZ/PL-13/001. Col. ill. Maps. "The Restoration Design Energy Project (RDEP) is a BLM Arizona initiative to identify lands across the State that may be suitable for the development of renewable energy. ...
    • Yuma Expressway Study

    • Yuma Expressway Study
    • Parsons Brinckerhoff
    • Express highways--Location--Arizona--Yuma; Highway capacity--Arizona--Yuma; Transportation--Arizona--Yuma--Planning;
    • This title contains one or more publications
    • Annual report / Central Arizona Project

    • Annual report / Central Arizona Project
    • Central Arizona Project (U.S.).
    • Central Arizona Project (U.S.)--Periodicals; Water resources development--Arizona--Periodicals; Water supply--Arizona--Periodicals;
    • This title contains one or more publications. Published annually.
    • Environmental assessment: Yuma TS-8 to San Luis 69kV project

    • Environmental assessment: Yuma TS-8 to San Luis 69kV project
    • Environmental Planning Group
    • Electric power transmission--Environmental aspects--Arizona; Electric utilities--Environmental aspects--Arizona; Electric lines--Environmental aspects--Arizona
    • 58 pages (PDF version). File size: 1.81 MB. Col. ill. Maps. Includes references. The report analyzes the proposed power project which includes a 69kV transmission line and a 12/69kV substation, would cross federal lands withdrawn for and...
    • Final environmental impact statement for the Dos Pobres/San Juan Project

    • Final environmental impact statement for the Dos Pobres/San Juan Project
    • United States. Bureau of Land Management. Safford Field Office.
    • Strip mining--Environmental aspects--Arizona--Graham County; Copper mines and mining--Environmental aspects--Arizona--Graham County; Mining leases--Arizona--Graham County
    • This title contains one or more volumes. Col. ill. Maps. Includes bibliographical references. Glossary.
    • Arizona-Southern California outages on September 8, 2011: causes and recommendations

    • Arizona-Southern California outages on September 8, 2011: causes and recommendations
    • United States. Federal Energy Regulatory Commission
    • Electric power failures--California, Southern--Evaluation; Electric power failures--Arizona--Evaluation
    • 153 pages (PDF version). Col. ill. Maps. Appendices. The report discusses the events and issues that led to a significant power outage in Arizona and parts of California. stemming in part from the loss of a single transmission line.
    • U.S. 93 Hoover Dam bypass project: final environmental impact statement and section 4(f) evaluation

    • U.S. 93 Hoover Dam bypass project: final environmental impact statement and section 4(f) evaluation
    • United States. Federal Highway Administration.
    • Highway planning -- Environmental aspects -- Nevada; Highway planning -- Environmental aspects -- Arizona; Bridges -- Environmental aspects -- Colorado River (Colo.-Mexico); Highway relocation -- Environmental aspects;
    • 954 pages (PDF version). File size: 21392.267 KB. This document comprises both volumes of the impact statement. Volume 2 begins on Adobe page 655. Index follows end of volume 1 on page 650. Note: this is an extremely large file and may take...
    • Report to Congress: corridors and rights-of-way on federal lands

    • Report to Congress: corridors and rights-of-way on federal lands
    • United States. Dept. of Agriculture.
    • Right of way--United States; Electric lines--United States; Electric power transmission--United States; Land use--United States--Planning;
    • 56 pages (PDF version). File size: 240.238 KB. Includes statistics for Arizona and the ten other western states power tranmission facilities and related information. This report was prepared in response to Section 1221(b) in Title XII of the...
    • Arizona mineral resource

    • Arizona mineral resource
    • Arizona. Dept. of Mines and Mineral Resources.
    • Arizona. Dept. of Mines and Mineral Resources--Periodicals; Mines and mineral resources--Arizona--Periodicals;
    • This title contains one or more publications.

QuickView

Display a larger image and more item information when the pointer pauses over a thumbnail
on off
 

Layout options:

Thumbnail with title
Grid with smaller thumbnails and more detail
Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK
Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK