WESTERN ARIZONA REGIONAL TRANSPORTATION COORDINATION PLAN
Prepared for the Western Arizona Council of Governments (WACOG)
Final Report
April 2007
WESTERN ARIZONA REGIONAL TRANSPORTATION COORDINATION PLAN
Final Report
RAE Consultants, Inc. 1029 East 8th Avenue Denver, CO 80218 303 860-9088
with Ostrander Consulting, Inc.
This report was funded through a grant to the Arizona Department of Transportation (ADOT) from the Federal Transit Administration (FTA) for the United We Ride program.
TABLE OF CONTENTS
I. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 3 5 7 7 8 10 12 12 13 16 18 19 19 25 26 26 27 30 32 32 33 38 38 39 39 43 46 56 58
II. WACOG REGION OVERVIEW The WACOG Region . . . Existing Transportation Providers . Unmet Needs . . . The Regional Plan Process . . Program Priorities and Evaluation Criteria III. BULLHEAD CITY SUB-REGION Existing Transportation Providers . Assessment of Needs . . . Coordination Strategies to Address Needs Sub-region Program of Projects Summary IV. KINGMAN SUB-REGION Existing Transportation Providers . Assessment of Needs . . . Coordination Strategies to Address Needs Sub-region Program of Projects Summary V. LAKE HAVASU SUB-REGION Existing Transportation Providers . Assessment of Needs . . . Coordination Strategies to Address Needs Sub-region Program of Projects Summary VI. MOHAVE COUNTY SUB-REGION Existing Transportation Providers . Assessment of Needs . . . Coordination Strategies to Address Needs Sub-region Program of Projects Summary VII. LA PAZ COUNTY SUB-REGION Existing Transportation Providers . Assessment of Needs . . . Coordination Strategies to Address Needs Sub-region Program of Projects Summary
VIII. REGIONAL PROGRAM OF PROJECTS SUMMARIES Regional Coordination Strategies . . . .
APPENDICES A. Regional Transportation Coordination Plan Meeting (12/07/06) . B. Regional Transportation Coordination Plan Meeting (02/22/07) . C. Mohave County Senior Program Vehicle Inventory . .
Western Arizona Regional Transportation Coordination Plan
I. INTRODUCTION
The purpose of this document is to address the planning requirement for a Coordinated Public Transit-Human Services Transportation Plan. These "Transportation Coordination Plans" are specifically mandated in SAFETEA-LU legislation, as well as in subsequent guidance from the Federal Transit Administration (FTA). Beginning in 2007, in order to receive funding under FTA's Section 5310, Section 5316 and Section 5317 programs, locally derived Transportation Coordination Plans must be developed. The FTA also expects Section 5311 and 5307 projects to be included in these Plans. A summary of these FTA programs is provided below.
Section 5310 � Elderly Individuals and Individuals with Disabilities Provides capital funding for transportation projects that serve the elderly and individuals with disabilities. Section 5316 � Job Access and Reverse Commute (JARC) Provides operating, administrative and capital funding for transportation projects that serve low income individuals who need transportation to work or to work-related activities. Section 5317 � New Freedom For new programs which provide transportation services which are above the requirements of the Americans with Disabilities Act (ADA). Section 5311 � Rural Public Transit Provides operating, administrative and capital funding for public transit projects in Non-Urbanized Areas. Section 5307 � Urban Formula Program Provides operating, administrative and capital funding for public transit projects in Urbanized Areas.
In Arizona, the 5310, 5316, 5317 and 5311 programs are managed by the Arizona Department of Transportation (ADOT). Section 5307 programs in small Urbanized Areas (UZAs) also have some, though much less, state involvement. In order to assist local areas in developing the required Transportation Coordination Plans, ADOT has taken a regional approach. Organizations interested in applying for FTA funding were informed that, in order to receive funding, they would need to be included in the Regional Transportation Coordination Plan which was being developed in their area. The rural Councils of Governments (COG) and the small Metropolitan Planning Organizations (MPOs) were asked to serve as facilitators in the development of the Regional Transportation Coordination Plans. ADOT hired a consultant team to develop the initial Regional Coordination Plans for the regions in 2006 and 2007.
Final Report
1
April 2007
Western Arizona Regional Transportation Coordination Plan
In the Western Arizona region, five sub-regions were identified based primarily on transportation service areas. The sub-regions are: Bullhead City, Kingman, Lake Havasu, Mohave County (including Colorado City), and La Paz County. Bullhead City, Kingman and Lake Havasu all have active general public transit agencies providing service locally. In addition to local coordination within these service areas, there are additional coordination opportunities within the US Highway 68/95 corridor that connects these communities. Individual elements of the WACOG Regional Transportation Coordination Plan were developed for each sub-region. This Western Arizona Regional Transportation Coordination Plan includes identified transportation needs for the Western Arizona Council of Governments (WACOG) planning region. It includes eight chapters. Chapter 1 provides a context for the plans and the planning process. Chapter 2 presents a summary of the WACOG region as a whole, as well as transportation providers in the area. Chapters 3-7 present individual plan elements for the five identified sub-regions; Bullhead City, Kingman, Lake Havasu, Mohave County, and La Paz County. Chapter 8 presents strategies for regional coordination and a summary of projects. The sub-regional plan elements present more detailed information, including the transit service area, information on existing providers, service gaps, coordination strategies, and a program of projects for anticipated funding requests.
Final Report
2
April 2007
Western Arizona Regional Transportation Coordination Plan
II. WACOG REGION OVERVIEW
The WACOG Region The Western Arizona Council of Governments (WACOG) is responsible for planning and delivery of various services from the Arizona State line in Northwest Arizona, to the Mexican border in Southwestern Arizona. WACOG is responsible for transportation planning for La Paz and Mohave Counties. Transportation planning for Yuma County is the responsibility of the YMPO and coordination strategies will be included in a separate plan. The three counties share the Colorado River as the western border for the planning region. Figure 1 is a map of the WACOG area. Mohave and Yuma Counties are growing at one of the fastest rates in Arizona, while La Paz County is much smaller with a total population of approximately 21,000, with both Mohave and Yuma Counties having populations closer to 200,000. However, the La Paz County population increases enormously during the winter months when the "snowbirds" arrive. The demographics of the region consist of an elderly population of nearly 25%, with a large portion of the elderly being transportation dependant. Western Arizona Council of Governments is a voluntary association of local governments established in 1971 by concurrent resolution of its member governments. The boundaries of Western Arizona Council of Governments comprise the county limits of Mohave, La Paz and Yuma Counties. The WACOG service area is referred to as Region IV. There are numerous multi-jurisdictional challenges and opportunities confronting Western Arizona Council of Governments. Chief among these is the need to develop effective means of planning, cooperation and coordination of local governmental activities within a regional framework. A number of functional responsibilities have been assigned to Western Arizona Council of Governments. WACOG is the designated Regional A-95 Clearinghouse, the Community Action Agency, and the Area Agency on Aging. Planning activities and program delivery functions are conducted for Aging Services, Head Start, Transportation, Social Services, Community Services, Emergency Services and Community Development. In addition, issues of concern to entities within the area are undertaken by WACOG. Three public transit systems serve the three largest cities, with numerous special needs transit providers providing transit services to their clients. Large geographical distances between population centers leads to high cost in delivery of transit services. Demands for transit services are expected to increase in future years as the population ages and growth continues.
Final Report
3
April 2007
Western Arizona Regional Transportation Coordination Plan
Final Report
4
April 2007
Western Arizona Regional Transportation Coordination Plan
Existing Transportation Providers Rural Public Transit The Federal Transit Administration (FTA) Section 5311 Rural Public Transportation Program provides funds for capital, operating and administrative assistance to local public bodies, nonprofit organizations, and operation of public transportation service in Non-Urbanized Areas. In addition to financial support, technical assistance is provided to transit agencies throughout the state to enhance the access to people in rural areas to healthcare, shopping, education, employment, public services, and recreation. Currently there are three rural public transit agencies operating in the WACOG Region. Data from July 2005 to June 2006 has been summarized to provide a comparison of these programs. Updated and expanded information about these programs is included in the respective chapters for each sub-region, chapters III through VII.
Agency Service Type # of Vehicles # of ADA Equipped Total Expenses Total Revenue Farebox Contract Federal State Local Capital Expenses Federal State Local Performance Vehicle Miles Vehicle Hours Passenger Trips $/Mile $/Hour $/Trip
Bullhead Dev/DR 10 8 $ 796,811 $ 826,189 $ 159,546 $ $ 301,131 $ 33,910 $ 331,602 $ 575 $ $ $ 460 115
Kingman Dev/Subs. 6 6 $ 506,493 $ 538,080 $ 68,710 $ $ 198,733 $ 22,349 $ 248,288 $ 152,407 $ 130,599 $ 21,808
Lake Havasu DR 19 19 $ 1,678,830 $ 1,681,433 $ 343,945 $ 2,055 $ 533,256 $ 47,429 $ 754,748 $ 57,219 $ $ 53,214 4,005 571,279 44,827 136,817 2.94 37.45 12.27
Total 35 33 2,982,134 3,045,702 572,201 2,055 1,033,120 103,688 1,334,638 210,201 184,273 25,928 998,667 71,036 317,004 2.99 41.98 9.41
$ $ $ $ $ $ $ $ $ $ $
273,343 16,037 113,993 $ 2.92 $ 49.69 $ 6.99
154,045 10,172 66,194 $ 3.29 $ 49.79 $ 7.65
$ $ $
$ $ $
Source: National Transit Database, Rural Data Reporting, July 2005 to June 2006
Final Report
5
April 2007
Western Arizona Regional Transportation Coordination Plan
Bullhead City: BATS Bullhead Area Transit System (BATS) provides deviated fixed route and dial-a-ride service within the city limits and connects with the Laughlin Connection, an intercity service to Laughlin, Nevada. BATS operates Monday through Saturday and provides 114,000 annual passenger trips with a fleet of ten vehicles. Kingman: KART KART is a two route, deviated fixed route system which provides service Monday through Saturday in the City of Kingman. The service provided over 66,000 passenger trips per year with a fleet of seven vehicles. The addition of a third route to reduce travel times and to access un-served transit dependent populations is under consideration. Lake Havasu: HAT Lake Havasu City provides demand response service within the Lake Havasu City limits and S.A.R.A. Park. Using a fleet of 18 vehicles which run seven days per week, Lake Havasu provides just under 140,000 passenger trips annually. Starting in October 2006, the service will change to a flexible fixed route system that will deviate to serve ADA and special needs passenger. Elderly and Disabled Transportation Programs For over twenty years, the Section 5310 Program has been providing private non-profit agencies and public agencies with capital assistance to purchase vehicles and related communication equipment. Statewide over 150 provider-agencies are assisted with funds from the Section 5310 program. Because of the significant range of number, age and use of vehicles, it is difficult to prepare a detailed inventory. Based on information of grants awarded in the past three grant years, a snapshot of vehicles in service in the WACOG region includes:
Recipient Bullhead City Hualapai Tribal Nation Kingman Regional Medical Center La Paz County Health Dept. Mohave County Senior Program Mohave Mental Health Mohave Senior Program New Horizon Silver Ridge West Care # of Service Sites Operated 2 1 1 2 2 2 2 1 1 3 Vehicles in Service 2 1 1 3 2 2 2 2 1 3 County Mohave Mohave Mohave La Paz Mohave Mohave Mohave Mohave Mohave Mohave
Source: Section 5310 Grant Awards for 2004, 2005, 2006
Final Report
6
April 2007
Western Arizona Regional Transportation Coordination Plan
This inventory is limited to vehicles awarded in 2004 (Grant Year 29), 2005 (Grant Year 30) and 2006 (Grant Year 31) and may not reflect changes made to accommodate the needs of the local agencies. Unmet Needs There are many unmet transportation needs in the region. Based on stakeholder input received at workshops in December, 2006 and February 2007, these include: increasing need to serve diverse origins and destinations, more funding and better use of existing funding, long distance medical transportation and regional connector services. The Regional Plan Process This plan was developed through a collaborative process. Two region-wide workshops were held in Kingman, one in December 2006 and one in February 2007. All existing providers and other stakeholders were invited to participate. At the December workshop, participants were asked: to summarize existing transportation services and existing coordination efforts; to identify unmet needs (service gaps); and to explore further coordination options. Information was presented by the project consultant on: coordination options; new federal programs and changes to existing federal programs; and strategies for involving others and developing additional coordination projects for 2007 and beyond. Between the December and February workshops, participants were asked to meet on their own to identify additional potential partners and to further explore coordination opportunities. Based on those discussions, they were asked to submit a draft coordination planning worksheet to the consultant team by mid-January 2007. Based on those submittals, the consultant team prepared a draft Regional Transportation Coordination Plan and sent that out to the region for comment. In February 2007, a second regional workshop was held. The draft Regional Transportation Coordination Plan was presented and comments were solicited. Participants were asked to help fill any gaps in terms of providers included in the plan and to finalize their anticipated funding requests from the FTA 5307, 5310, 5311, 5316 and 5317 programs for the years 2007 through 2009. This final Regional Transportation Coordination Plan was developed based on comments received on the draft plan.
Final Report
7
April 2007
Western Arizona Regional Transportation Coordination Plan
Program Priorities and Evaluation Criteria Service Priorities The following preliminary priorities were established for funding the FTA 5310, 5311, 5316 and 5317 programs. These will be refined in future years.
1. Need: projects which address a demonstrated need 2. Effective use of funds: projects which provide (or facilitate) a high volume of trips given the resources expended 3. Collaborative process: projects developed through a collaborative planning (project development) process 4. On-street coordination: projects which demonstrate sharing of resources. For example, projects showing multiple client use of vehicles will have a higher priority than singleagency services 5. Operational capability � projects which are operationally feasible and demonstrate accessibility, safety/training and effective maintenance 6. Management capability � grantee agencies which demonstrate strong management capability
Evaluation Criteria Regional evaluation teams assembled by COGs and MPOs will provide initial review of applications for FTA projects (excluding 5307). This review process was initially established to assess and rank FTA 5310 applications each year (5311 projects are evaluated though a separate process). After the regional review, the COGs and MPOs forward their prioritized award recommendations to ADOT for its review of overall program compliance and budget impact, prior to the Department's statewide grant submittal to the FTA. Beginning in 2007, this same process will also be used for the 5316 and 5317 programs in all regions except Maricopa and Pima counties, which have their own 5316 and 5317 review schedules. ADOT's evaluation criteria, for COGs and MPOs to use in evaluating projects, are included in each grant application packet. Given changes included in SAFETEA-LU legislation and subsequent FTA guidance, a new "mobility management" function is now included as an allowable expense under the 5307, 5310, 5311 and 5316 programs. As a result, the rural Councils of Governments (COGs) and the Metropolitan Planning Organizations (MPOs) in Urbanized Areas, which host the regional review teams, may be applying for mobility management funds themselves. To avoid conflict of interest with other applications for mobility management applications, ADOT will make a determination relative to these COG or MPO mobility management applications outside of the "regular" project review process, based on its evaluation of how effectively such a function will support the state's coordination goals and objectives.
Final Report
8
April 2007
Western Arizona Regional Transportation Coordination Plan
The chapters that follow present individual sub-region elements of this Regional Transportation Coordination Plan:
� � � � � Chapter III � Bullhead City Sub-Region Chapter IV � Kingman Sub-Region Chapter V � Lake Havasu Sub-Region Chapter VI � Mohave County Sub-Region Chapter VII � La Paz County Sub-Region
A summary of the strategies for regional coordination and a summary of projects are presented in Chapter VIII.
Final Report
9
April 2007
Western Arizona Regional Transportation Coordination Plan
III. BULLHEAD CITY SUB-REGION
Existing Transportation Providers The Bullhead City Sub-region includes Bullhead City and the service area of Bullhead Area Transit System (BATS). Bullhead Area Transit System (BATS) The Bullhead Area Transit System (BATS) provides transit services that are suited to community characteristics and ridership levels. BATS has been providing general public transportation since December 1, 2000. The service boundaries are the city limits of Bullhead City along with a coordinated connection to Silver Rider, Laughlin's public transit system, linking the communities of Bullhead City, Arizona and Laughlin, Nevada. The BATS Red Line Route operates from 6:30 am until 8:30 pm, Monday through Friday and operates from 8:30 am until 8:30 pm on Saturdays. The Red Line Route consists of two buses operating north and south along Highway 95 providing hourly deviated service and connections to the Blue Line. The BATS Blue Line Route operates from 5:30 am until 8:30 pm, Monday through Friday and operates from 8:30 am until 8:30 pm on Saturdays. The Blue Line operates hourly and offers deviated service traveling east and west with connections to the Red Line service. BATS also offers a demand responsive service for those passengers that prefer curb-tocurb service, passengers needing assistance, or passengers traveling with a mobility device. BATS operates this demand responsive service from 6:00 am until 7:00 pm, Monday through Friday and from 6:00 am until 5:00 pm on Saturdays. The ten vehicle fleet, all lift equipped with two tie-downs, includes: Make
Ford Dodge Dodge Dodge Bluebird Freightliner Chevy Chevy Final Report
Year
2000 2002 2003 2005 2006 2004 2005 2005
Mileage (000)
208,400 149,300 147,700 163,200 87,700 69,500 78,600 66,900
# of Seats
15 15 15 11 24 30 15 15
Condition
Poor Adequate Adequate Adequate Adequate Good Excellent Excellent April 2007
10
Western Arizona Regional Transportation Coordination Plan
Chevy Chevy
2005 2006
65,800 23,500
15 15
Excellent Excellent
Two new vehicles are on order to be delivered; a 30 passenger larger bus and a 15passenger cutaway style vehicle. Annual Service Data for the ADOT FY 05/06 reports: � Total Operating and Administrative Budget: $927,570 � Annual Vehicle Miles: 274,643 � Annual Vehicle Hours: 16,292 � Annual Passenger Trips: 116,981 BATS currently works with public and private entities such as the DES, CPS, Mohave Mental Health and the Senior Center to assist in their transportation needs. Silver Ridge Village Silver Ridge Village is a skilled nursing facility serving the elderly and disabled populations of Bullhead City, the Mohave Valley and surrounding areas. Two 5310 vans serve the public in transporting low and fixed income elderly and disabled residents to doctor's office visits, dialysis, x-rays, transportation between the (3) local hospitals, and for recreational activities for the nursing facility residents Silver Ridge Village has agreements to ensure that the needs of other related service organiations in the area can use these transportation services as their needs increase, including the River Gardens Rehab & Care Center, Rustler's Outpost Learning Center, the Lingenfelter Center and The Lily Pad Day Care Center. Under this service plan, 90% of the van usage will be to service the primary medical transport necessities of the elderly/disabled population. The remainaing 10% will encompass recreational activities or intergenerational activities with Rustler's Outpost and The Lily Pad Day Care Center. Vehicle Inventory: Vehicle Vehicle Make Model Ford Eldorado # of Seats 0-10 # W/C Tie-Downs
Year 2003
Condition Fair
Annual Service Data: (for 2005) � Total Op. and Admin. Budget: No separate budget information is available � Annual Vehicle Miles 13,000 miles � Annual Vehicle Hours 2,340 hours � Annual Passenger Trips 1,248 trips
Final Report
11
April 2007
Western Arizona Regional Transportation Coordination Plan
Mohave Mental Health Center The Mohave Mental Health Center provides mental health services in the sub-region. They provide transportation services to support client needs. Additional information is provided in the Kingman Sub-region section. Other Providers Limited information is available about other transportation services in Bullhead City. It was reported that the Bullhead City Senior Center has two vehicles, the local taxicab service fluctuates, and there are several churches with buses. No inventory information was submitted by these organizations. Assessment of Needs Based on stakeholder meetings, the following unmet needs were identified. � BATS o Fixed Route on east side of city o Service for Mohave Blvd and New Hospital o Software for dispatch o Separate maintenance facility; currently by Bullhead City Fleet Shop o Highway turnouts for buses o Shelters/Lift Maintenance o Training o Need to address service connecting Kingman/Bullhead City, Laughlin, and Las Vegas. Partner with Silver Rider Transit � Silver Ridge Village o Struggles with balancing appointments for dialysis o Only one van; multiple elderly and disabled trips
Coordination Strategies to Address Needs Strategies that BATS has identified to implement coordination that include: � Technology support � New routes � Bullhead to County Court in Kingman � Coordinate schedules/service with Silver Rider, Silver Ridge � Work with Emergency Resource Center/Kingman Resource Center � Training � Vehicle sharing/insurance/maintenance
Final Report
12
April 2007
Western Arizona Regional Transportation Coordination Plan
�
Mohave County Seniors Program uses funds from the Title III Older Americans Act, WACOG transit funding, general fund, and LTAF II funds. The potential for transferring senior services to BATS is discussed in Chapter VI.
The three rural general public transportation providers, BATS (Bullhead City), KART (Kingman), and HAT (Lake Havasu) are meeting regularly to discuss opportunities for interagency coordination and expansion of regional service. A discussion of the proposed regional coordination projects is included in Chapter VIII, Regional Coordination and Summary of Projects. Sub-region Program of Projects Summary Desired projects by each agency (and funding sources) are listed below. The table on the following pages show the funding planned by BATS for the years 2007 through 2009. BATS FTA Section 5310 � Information about the purchase of replacement or expansion of vehicle for Senior Center Service provided by Mohave County in Chapter VI. FTA Section 5316 � No Projects FTA Section 5317 � No Projects FTA Section 5311 � Add Additional Deviated Fixed Route 1 New / 2 Replacement Vehicles per Year Purchase Scheduling Software Expand Marketing Program Additional Shelters Silver Ridge Village FTA Section 5310 � Purchase of replacement vehicle in 2008 FTA Section 5316 � No Projects FTA Section 5317 � No Projects FTA Section 5311 � No Projects
Final Report
13
April 2007
Western Arizona Regional Transportation Coordination Plan
PROJECT PLANNING WORKSHEET
Agency _Bullhead Area Transit System Phone __928-763-9400 x374 Contact Person _Ken Fulton E-mail transit1@bullheadcity.com
Project FTA Section 5310-E&D Capital Replacement vehicle Expanded service vehicle Radio equipment Mobility Management Other FTA Section 5316-Job Access Operating (new service) Vehicle (new/replacement) Radio equipment Mobility Management Other FTA Section 5317-New Freedom Operating (new service) Vehicle (new/replacement) Radio equipment Mobility Management Other FTA Section 5311-Rural General Public Operating Vehicle (new/replacement) Equipment Mobility Management Other FTA Section 5307-Urban General Public Operating Vehicle (new/replacement) Equipment Mobility Management Other
Project Description
Fiscal Year 2007 (1)
Anticipated Total Cost Fiscal Year Fiscal Year 2008 (1) 2009 (1)
Two Vehicles for RV Senior Center
0
0
130,000
Additional Deviated Fixed/1 Each Year 1 New / 2 Replacement Each Year Office Supplies/Equipment Purchase Scheduling Software/Maint. Marketing/Advertising/Printing/Shelter $
966,549 1,136,549 1,306,549 297,000 317,790 340,035 9,063 10,422 11,465 65,000 7,200 7,920 40,686 58,186 75,686 1,378,298 $ 1,530,147 $ 1,741,655
Notes: 1) FY 2007 funding will be available for use in calendar 2008; FY 2008 used in calendar 2009, etc.
Final Report
14
April 2007
Western Arizona Regional Transportation Coordination Plan
Agency Silver Ridge Village Phone 928-718-0718
Contact Person E-mail
Derren Vandeman redeemedandforgiven@hotmail.com
Project FTA Section 5310-E&D Capital Replacement vehicle Expanded service vehicle Radio equipment Mobility Management Other FTA Section 5316-Job Access Operating (new service) Vehicle (new/replacement) Radio equipment Mobility Management Other FTA Section 5317-New Freedom Operating (new service) Vehicle (new/replacement) Radio equipment Mobility Management Other FTA Section 5311-Rural General Public Operating Vehicle (new/replacement) Equipment Mobility Management Other FTA Section 5307-Urban General Public Operating Vehicle (new/replacement) Equipment Mobility Management Other
Project Description
Fiscal Year 2007 (1)
Anticipated Total Cost Fiscal Year Fiscal Year 2008 (1) 2009 (1)
Replace vehicle
$
44,000
Notes: 1) FY 2007 funding will be available for use in calendar 2008; FY 2008 used in calendar 2009, etc.
Final Report
15
April 2007
Western Arizona Regional Transportation Coordination Plan
IV. KINGMAN SUB-REGION
The Kingman Area Sub-region includes the City of Kingman and the service area of Kingman Area Regional Transit (KART). Existing Transportation Providers Kingman Area Regional Transit (KART) KART operates four deviated service routes, along with a dedicated curb-to-curb bus, Monday � Friday from 5 a.m. to 8 p.m. and on Saturday from 9 a.m. to 7 p.m. Two of the routes have been in operation for a short time and limited data is available about ridership. The service area is the Greater Kingman Area and serves many transit dependent clients in the Butler Area. Riders consist of the elderly, disabled, workers, medical appointments, shopping and a variety of ages. With a recent change in school bus service area, more students are expected to be riding KART. The six vehicle fleet, all lift equipped with two tie-downs, includes Vehicle Make Ford Ford Ford Ford Ford, Aerotech Ford, Aerotech Vehicle Model Bus Bus Bus Supreme Senator El Dorado El Dorado Year 2003 2003 2003 2004 2006 2006 # of Seats 15 Passenger 15 Passenger 15 Passenger 12 Passenger 15 Passenger 15 Passenger Condition/Vehicle # Fair COK#1910 Fair COK#1911 Fair COK#1912 Good COK#1913 Excellent COK#1914 Excellent COK#1915
Annual service data for 2006 include the following. � Annual passenger trips: � Annual vehicle hours: � Annual vehicle miles: � Total operating and administrative budget:
67,053 10,485 156,944 $546,083
Final Report
16
April 2007
Western Arizona Regional Transportation Coordination Plan
Mohave County Association of Retarded Citizens (MARC) Transit services are provided for special needs clients for training and living skills workshops and employment. Serving Greater Kingman area and surrounding communities. Vehicle Inventory: Vehicle Make 98 FORD 2000 Dodge 2002 Ford 94 Ford Vehicle Model Maxi van Maxi van w lift Maxi van Maxi van w lift # of Seats 15 9 15 9 # W/C Tie-Downs 0 2 0 2
Year 98 2000 2002 1994
Condition good good Very good fair
Annual Service Data: (for 2005) � Total Op. and Admin. Budget: � Annual Vehicle Miles � Annual Vehicle Hours � Annual Passenger Trips The Gardens Rehab and Care Center
$100,000 + 120,000 miles 4,160 hours 9,000 +
The Gardens is a skilled nursing facility serving the elderly and disabled populations of Kingman and surrounding areas. Two 5310 vans serve the public in transporting low and fixed income elderly and disabled residents to doctor's office visits, dialysis, x-rays, transportation between the (3) local hospitals, and for recreational activities for the nursing facility residents Silver Ridge Village has agreements to ensure that the needs of other related service organiations in the area can use these transportation services as their needs increase, including the River Gardens Rehab & Care Center, Rustler's Outpost Learning Center, The Gardens Rehab & Care Center, The Lingenfelter Center and The Lily Pad Day Care Center. Under this service plan, 90% of the van usage will be to service the primary medical transport necessities of the elderly/disabled population. The remaining 10% will encompass recreational activities or intergenerational activities with Rustler's Outpost and The Lily Pad Day Care Center. Mohave Mental Health Center The Mohave Mental Health Center provides mental health services in the region. They provide transportation services to support client needs. In addition to Kingman, they have vehicles based in Lake Havasu City and Bullhead City. Vehicle location is shown below.
Final Report
17
April 2007
Western Arizona Regional Transportation Coordination Plan
Bullhead City - 1993 Ford, 8 passenger van with lift; 1999 Ford, 12 passenger van-no lift, 2005 Chevy, 7 passenger van-no lift Lake Havasu City - 1992 Dodge, 8 passenger with lift, 1997 Dodge 12 passenger with lift, 2001 Dodge, 12 passenger-no lift Kingman - 1992 Ford, 15 passenger-no lift, 1994 Dodge, 8 passenger-no lift, 2000 Chevy, 8 passenger-no lift, 2002 Ford, 12 passenger-no lift, 2003 Ford, 8 passenger with lift, 2004 Ford, 8 passenger with lift Other Services Operation Blessing provides service for meals on wheels as well as support for the food bank. Recent changes in Health Department requirements for refrigeration will impact the service they can provide. There is also potential to coordinate services with the Kingman Work Activities Center. Assessment of Needs The following needs were identified by the stakeholders: � State provides AHCCCS to clients who need medical transportation but do not mandate "public" transportation as the first option of choice. � Local Council support of general funds or dedicated funding to support coordination efforts. � State has LTAF II but changes to the distribution formula is unpredictable and transit agencies cannot depend on funding. A dedicated source of funds needs to be developed. � No one-stop center for information. � No coordinated service center for total demand of transportation in the community. � Dispatch software. � Inter-agency insurance issues with drivers and vehicles. � Highways built with transit access in place on major highways in the State along with the City. � Need to address the growing senior population in the three cities as well as the county. � Providing transportation is not the only issue. Some individuals require much more assistance with transportation than arriving at the curb. What do you do with these clients when time is a factor, liability exposure and limited resources or funding to address these clients?
Final Report
18
April 2007
Western Arizona Regional Transportation Coordination Plan
Coordination Strategies to Address Needs Existing coordination efforts include: � KART started transportation of Section 5310 funded seniors from Mohave County Seniors Program on September 18, 2006 with passes purchased by Mohave County. Mohave County Seniors Program uses funds from the Title III Older American Act, WACOG transit funding, general fund, and LTAF II funds. The potential for transferring senior services to KART is discussed in Chapter VI. � KART also provides transportation to inter-agencies, such as D.E.S., State, Juvenile, Probation Department, County Court and extends a discounted fee for transporting their clients. Expanded coordination efforts include: � The three rural general public transportation providers, BATS (Bullhead City), KART (Kingman), and HAT (Lake Havasu) are meeting regularly to discuss opportunities for interagency coordination and expansion of regional service. A discussion of the proposed regional coordination projects is included in Chapter VIII, Regional Coordination and Summary of Projects. � On a local level, KART will continue to pursue coordination efforts with all agencies to streamline transportation for transit dependent clients and other agencies so that all agencies are utilizing funding to best suit the needs of the community for mobility. Sub-region Program of Projects Summary Desired project by each agency (or funding source) are listed below. The tables on the following pages show the funding planned by agency by year for 2007 through 2009. KART FTA Section 5310 � None at this time. FTA Section 5316 � Job Access The Kingman Industrial Park would like KART to resume transportation for their workers. There may be potential grant funding from the JARC program. However, no local matching funds are available from Kingman. FTA Section 5317 � New Freedom In order to expand our coordination efforts, KART maybe interested in funding under the "Mobility Management" to assist in these efforts. However, no local matching funds are available from Kingman. FTA Section 5311 � Rural General Public KART currently is operated by using Section 5311 grant funds and will be continuing in this program.
Final Report
19
April 2007
Western Arizona Regional Transportation Coordination Plan
Mohave Association of Retarded Citizens FTA Section 5310 � Requesting replacement vehicles in 2007 and 2009 Gardens Rehab Center FTA Section 5310 � Requesting replacement vehicle in 2007 Mohave Mental Health Center FTA Section 5310 - Requesting a 6-7 passenger minivan (no lift/no ramp) to expand our services in Kingman in 2007; a minivan in 2008 for Bullhead City and a minivan for Kingman in 2009.
Final Report
20
April 2007
Western Arizona Regional Transportation Coordination Plan
PROJECT PLANNING WORKSHEET
Agency __Kingman Area Regional Transit (KART)__ Phone ____928 718 1470___________ Contact Person Laura Henry E-mail lhenry@cityofkingman.go Anticipated Total Cost Fiscal Year Fiscal Year Fiscal Year 2007 (1) 2008 (1) 2009 (1)
Project FTA Section 5310-E&D Capital Replacement vehicle Expanded service vehicle Radio equipment Mobility Management Other FTA Section 5316-Job Access Operating (new service) Vehicle (new/replacement) Radio equipment Mobility Management Other FTA Section 5317-New Freedom Operating (new service) Vehicle (new/replacement) Radio equipment Mobility Management Other FTA Section 5311-Rural General Public
Project Description
IGA between Mojave County/City of Kingman under discussion.
Support Coordination Efforts
$38,000
$41,800
$45,980
Operating Vehicle (new/replacement) Equipment Mobility Management Other
Provide rural transit services in the Greater Kingman area with four deviated fixed routes and one dedicated curb-to-curb for Section 5310 clients. Operates Monday-Friday from 5 am to 8 pm, Saturday 9 am to 7 pm.
$821,600 $100,000 (New) $40,365
$903,760 $994,136 $140,550 $144,000 (Replace) (Replace) $1,900 $400 $9,500 $10,000 $27,000
Technology Upgrades Dispatching/Schedule Software Bus stop Shelters/Signs/Stops Maintenance/Transit Facility Study in 2007 ** City may build facility and lease to KART Section 5311 Subtotal
$68,000 $40,000
$1,635 $315,000** $1,071,600 $1,380,710
$1,165,536
FTA Section 5307-Urban General Public Operating Vehicle (new/replacement) Equipment Mobility Management Other Notes: 1) FY 2007 funding will be available for use in calendar 2008; FY 2008 used in calendar 2009, etc.
Final Report
21
April 2007
Western Arizona Regional Transportation Coordination Plan
PROJECT PLANNING WORKSHEET
Mohave Ass'n of retarded citizens same Contact Person __Karen S E-mail _________ same
Project FTA Section 5310-E&D Capital Replacement vehicle Expanded service vehicle Radio equipment Mobility Management Other FTA Section 5316-Job Access Operating (new service) Vehicle (new/replacement) Radio equipment Mobility Management Other FTA Section 5317-New Freedom Operating (new service) Vehicle (new/replacement) Radio equipment Mobility Management Other FTA Section 5311-Rural General Public Operating Vehicle (new/replacement) Equipment Mobility Management Other FTA Section 5307-Urban General Public Operating Vehicle (new/replacement) Equipment Mobility Management Other
Project Description
Fiscal Year 2007 (1)
Anticipated Total Cost Fiscal Year Fiscal Year 2008 (1) 2009 (1)
2007 & 2009 maxi van w lift
45,000
0
40,000
Notes: 1) FY 2007 funding will be available for use in calendar 2008; FY 2008 used in calendar 2009, etc.
Final Report
22
April 2007
Western Arizona Regional Transportation Coordination Plan
PROJECT PLANNING WORKSHEET
Agency The Gardens Rehab and Care Center Phone 928-718-0718 Contact Person E-mail Derren Vandeman redeemedandforgiven@hotmail.com
Project FTA Section 5310-E&D Capital Replacement vehicle Expanded service vehicle Radio equipment Mobility Management Other FTA Section 5316-Job Access Operating (new service) Vehicle (new/replacement) Radio equipment Mobility Management Other FTA Section 5317-New Freedom Operating (new service) Vehicle (new/replacement) Radio equipment Mobility Management Other FTA Section 5311-Rural General Public Operating Vehicle (new/replacement) Equipment Mobility Management Other FTA Section 5307-Urban General Public Operating Vehicle (new/replacement) Equipment Mobility Management Other
Project Description
Fiscal Year 2007 (1)
Anticipated Total Cost Fiscal Year Fiscal Year 2008 (1) 2009 (1)
Replace vehicle
$
44,000
Notes: 1) FY 2007 funding will be available for use in calendar 2008; FY 2008 used in calendar 2009, etc.
Final Report
23
April 2007
Western Arizona Regional Transportation Coordination Plan
PROJECT PLANNING WORKSHEET
Agency Mohave Mental Health Phone n/a Contact Person E-mail Mary Wagner MARY.MOHAVE2narbha.org
Project FTA Section 5310-E&D Capital Replacement vehicle Expanded service vehicle Radio equipment Mobility Management Other FTA Section 5316-Job Access Operating (new service) Vehicle (new/replacement) Radio equipment Mobility Management Other FTA Section 5317-New Freedom Operating (new service) Vehicle (new/replacement) Radio equipment Mobility Management Other FTA Section 5311-Rural General Public Operating Vehicle (new/replacement) Equipment Mobility Management Other FTA Section 5307-Urban General Public Operating Vehicle (new/replacement) Equipment Mobility Management Other
Project Description
Fiscal Year 2007 (1)
Anticipated Total Cost Fiscal Year Fiscal Year 2008 (1) 2009 (1)
2008 Bullhead City, 2009 Kingman Expand service for SMI clients
$23,000 $23,000
$23,000
Notes: 1) FY 2007 funding will be available for use in calendar 2008; FY 2008 used in calendar 2009, etc.
Final Report
24
April 2007
Western Arizona Regional Transportation Coordination Plan
V. LAKE HAVASU SUB-REGION
The Lake Havasu Area Sub-region includes Lake Havasu and the service area of Havasu Area Transit (HAT). Existing Transportation Providers Havasu Area Transit (HAT) HAT provides scheduled bus service with five fixed routes with Paratransit service for the elderly and disabled. All areas with in the city limits are available to the service. The county areas of Desert Hills and Horizon Six are also served. Hours of operation: Fixed Route: Monday � Friday 6:00am � 7:00pm and Saturday 6:00am � 6:00pm. Paratransit: Monday � Friday 7:00am � 7:00pm and Saturday 8:00am � 6:00pm for elderly and disabled. Curb to Curb service is available to all areas: Monday � Friday, 7:00pm � 9:00pm. 24 hour advanced reservations are required. The sixteen vehicle fleet, all lift equipped, includes: HAT Vehicle # of Seats/ Number Year WC Tie-Downs 1 2006 10/2 2 1998 8/2 3 1999 8/2 7 2000 8/2 8 2004 8/2 9 2002 8/2 10 2004 8/2 11 2004 8/2 112 2004 8/2 13 2004 8/2 17 2001 8/2 18 2001 8/2 19 2002 8/2 20 2002 8/2 21 2004 8/2 22 2004 8/2
Condition New Fair Fair Fair Good Fair Good Good Good Good Fair Fair Fair Fair Good Good
Two vehicles are out of service and scheduled to be sold at auction. Six new 20passenger vehicles will be delivered in May 2007.
Final Report
25
April 2007
Western Arizona Regional Transportation Coordination Plan
Annual service data for 2006 include the following. � Annual passenger trips: 132,553 � Annual vehicle hours: 43,289 � Annual vehicle miles: 549,945 � Total operating and administrative budget: $1,688,505 New Horizons Located in Lake Havasu, New Horizons provides transit services to the developmentally disabled community. In addition they provide transportation to the Special Olympics practices and competitions. A detailed inventory of services was not provided. Mohave Mental Health Center The Mohave Mental Health Center provides mental health services in the sub-region. They provide transportation services to support client needs. Additional information is provided in the Kingman Sub-region section. Assessment of Needs The following needs were identified by the stakeholders: � 5310 program, more providers of senior and disabled ride programs in Lake Havasu City. Currently, 95% of these rides are provided by HAT as 5310 programs did not flourish during the 20 years of demand response service provided by the city transit service. � Adult Day Care: fragile riders, require assistance � Special Olympics training sessions � Prestige Care Facility � need help with screening riders to determine specific health requirements/need for attendant. Serving a wide range of rider needs. Coordination Strategies to Address Needs Existing coordination efforts include: � Planning together successfully with BATS and KART � Transit Advisory Committee broad-based: School District, MMH, New Horizons, Hospital, Salvation Army, Special Olympics, Interagency (respite/adult day care). Very active during transition from DAR to fixed route. � New Horizons participates in all coordination planning meetings as well as sitting on the HAT transit committee. � Transit is the fastest growing program with the number of users and rides growing for New Horizons.
Final Report
26
April 2007
Western Arizona Regional Transportation Coordination Plan
Expanded coordination efforts include: � The three rural general public transportation providers, BATS (Bullhead City), KART (Kingman), and HAT (Lake Havasu) are meeting regularly to discuss opportunities for interagency coordination and expansion of regional service. A discussion of the proposed regional coordination projects is included in Chapter VIII, Regional Coordination and Summary of Projects. � Locally, HAT has been trying to get more 5310 programs started to help with the large number of elderly and disabled rides. Sub-region Program of Projects Summary Desired project by each agency (or funding source) are listed below. The tables on the following pages show the funding planned by agency by year for 2007 through 2009. HAT FTA Section 5310 None at this time. As HAT provides more service to the elderly, an evaluation of vehicle needs will be completed and a request for capital funding submitted if needed. FTA Section 5316 � Job Access FTA Section 5317 � New Freedom FTA Section 5311 � Rural General Public Havasu Area Transit � Operating, administration. Vehicle fleet enlargement, Mobile Data Terminals on vehicles. New facility construction in 2009 - 2010. FTA Section 5307 � Urban General Public To be addressed after the 2010 US Census. Lake Havasu may transfer into a small urbanized area (UZA) New Horizons FTA Section 5310 Requesting two vehicle, one replacement and one expansion in 2007 Requesting two vehicle, one replacement and one expansion in 2009
Final Report
27
April 2007
Western Arizona Regional Transportation Coordination Plan
PROJECT PLANNING WORKSHEET
Agency: _Havasu Area Transit Phone : 928-453-6455_ Contact: Email: Gary Parsons parsonsg@lhcaz.gov
Project FTA Section 5310-E&D Capital Replacement vehicle Expanded service vehicle Radio equipment Mobility Management Other FTA Section 5316-Job Access Operating (new service) Vehicle (new/replacement) Radio equipment Mobility Management Other FTA Section 5317-New Freedom Operating (new service) Vehicle (new/replacement) Radio equipment Mobility Management Other FTA Section 5311-Rural General Public Operating & Administration Vehicle (new/replacement) Equipment Mobility Management Facility Construction FTA Section 5307-Urban General Public Operating Vehicle (new/replacement) Equipment Mobility Management Other
Project Description
Fiscal Year 2007 (1)
Anticipated Total Cost Fiscal Year Fiscal Year 2008 (1) 2009 (1)
Fixed Route with Paratransit servic
1,500,000 580,000 45,000
1,630,000 180,000 15,000
1,780,000 192,000 5,000
5311 Subtotal
1,100,000 2,125,000 $ 1,825,000 $3,077,000
Notes: 1) FY 2007 funding will be available for use in calendar 2008; FY 2008 used in calendar 2009, etc.
Final Report
28
April 2007
Western Arizona Regional Transportation Coordination Plan
PROJECT PLANNING WORKSHEET
Agency New Horizons Phone 928-855-9392 Contact Person E-mail Terry Delia New_Horizons_Center@hotmail.com
Project FTA Section 5310-E&D Capital Replacement vehicle Expanded service vehicle Radio equipment Mobility Management Other FTA Section 5316-Job Access Operating (new service) Vehicle (new/replacement) Radio equipment Mobility Management Other FTA Section 5317-New Freedom Operating (new service) Vehicle (new/replacement) Radio equipment Mobility Management Other FTA Section 5311-Rural General Public Operating Vehicle (new/replacement) Equipment Mobility Management Other FTA Section 5307-Urban General Public Operating Vehicle (new/replacement) Equipment Mobility Management Other
Project Description
Fiscal Year 2007 (1)
Anticipated Total Cost Fiscal Year Fiscal Year 2008 (1) 2009 (1)
1 Replacement Mini-Van in 2007 and 2009 $ 1 Replacement Cutaway in 2007 and 2009 $
23,000 48,000
$ $
23,000 48,000
Notes: 1) FY 2007 funding will be available for use in calendar 2008; FY 2008 used in calendar 2009, etc.
Final Report
29
April 2007
Western Arizona Regional Transportation Coordination Plan
VI. MOHAVE COUNTY SUB-REGION
The Mohave County Sub-region includes the unincorporated areas in Mohave County. Historically, the County has provided support for the Title III-Older Americans Act transportation services provided by Senior Centers at various locations in the County. Colorado City was also included in this sub-region. Existing Transportation Providers Mohave County Senior Program The Mohave Senior Program provides door to door transit service for senior disabled citizens and senior citizens ages 60 and above. Handicap vehicles are available. All services are donation based. Services are provided to Mohave county residents except for citizens in extremely remote areas. Services are provided in most cases from 8:00 a.m. to 4:00 p.m. Remote areas received services on a part-time basis. A vehicle inventory is presented in Appendix C. Annual Service Data: (for 2005) � Total Op. and Admin. Budget: � Annual Vehicle Miles � Annual Vehicle Hours Est. � Annual Passenger Trips Current Coordination/Needs: Mohave County is in the process of negotiating IGA's with each of the major cities. The County plans to provide state LTAF II funding to the cities and purchase tokens/ vouchers/coupons in return for transit to senior citizens within the major cities. The county will then focus on transporting disabled citizens and seniors in the rural areas. Hualapai Tribal Nation The Hualapai Tribal Nation will provide transportation services that connect low-income residents on the Hualapai Indian Reservation with available jobs and entrepreneurial opportunities at Grand Canyon West (which is also on the Hualapai Reservation). Currently, the Hualapai Tribe provides transportation to elderly, disabled, and lowincome residents through the Hualapai Health Department. The Health Department possesses 10 vehicles, two of which were purchased with a grant from ADOT and the FTA 5310 program. The other vehicles were purchase with tribal funds. In addition, the Tribal enterprise � Grand Canyon Resort Corporation � provides limited transportation services from Peach Springs to Grand Canyon West using three older vans that are not durable for sustained travel on rugged dirt roads. Final Report April 2007 30 $128,000 Transit budget 166,742/current YTD est. 22,100 hours 48,659 trips
Western Arizona Regional Transportation Coordination Plan
WestCare WestCare contracts with child protective services with countywide referrals from case managers, WestCare provides services to and from appointments, visits, school, and work with in Mohave County seven days a week from 7am-7pm. Vehicle Inventory: Vehicle Make Chevy Chevy Ford Ford Chevy Chevy Plymouth Vehicle Model Venture Venture E-350 Bus E-350 Bus Uplander Astro Voyager # of Seats 7 7 10 10 7 8 7 # W/C Tie-Downs 0 0 2 2 0 0 0
Year 2003 2004 2003 2004 2006 1997 1991
Condition Fair Fair Good Good Good Poor Poor
Annual Service Data: (for 2005) � Total Op. and Admin. Budget: $300,000.00 � Annual Vehicle Miles Approximately 36,000 per vehicle � Annual Vehicle Hours Approximately 4,000 per vehicle � Annual Passenger Trips Approximately 17,000 Central Arizona Council for Developmentally Disabled This agency presently provides transportation services for folks with various types of disabilities and of all ages in Pinal and Gila Counties. Vehicles are used for transporting clientele to various types of doctor appointments, recreational facilities, religious and community activities. These services will be available 24 hours a day 7 days a week in all of Mohave County. Vehicle Inventory: Vehicle Make Ford Chevy Chevy Vehicle Model Econoline Uplander Uplander # of Seats 11 8 8 # W/C Tie-Downs 2
Year 2005 2005 2006
Condition Good Good Good
Annual Service Data: (for 2005) � Total Op. and Admin. Budget: Unknown at this point due to fluctuation in fuel costs. � Annual Vehicle Miles 25,000
Final Report
31
April 2007
Western Arizona Regional Transportation Coordination Plan
� �
Annual Vehicle Hours Annual Passenger Trips
1,040 312
Colorado City Colorado City operates one van under the FTA Section 5310 program. This vehicle provides service on-call, usually one person at a time. Most trips to St. George and Flagstaff. St. George is 45 minute drive and many trips are over 100 miles. For more economical operations on the long trips, Colorado City would like a smaller van/vehicle. Service is provided with no charge. Assessment of Needs The following needs were identified by the stakeholders: � WestCare needs include o GPS vehicle location service o Child seats o Vehicle have over 100,000 miles of service � Growing senior population in County. � Colorado City would like an AHCCCS provider for the area. � Colorado City is currently not able to serve other small towns in the area, especially three small areas south of Colorado City (Cane Beds, Centennial Park, as well as CO City. Tie to Fredonia and Page. Coordination Strategies to Address Needs Mohave County is negotiating IGA's with each of the major cities and will provide state LTAF II funding in return for transit services to disabled citizens and seniors within city limits. Mohave County currently purchases transit passes from the cities to ensure low income seniors and disabled citizens are able to access services. Mohave County is working with the cities to provide a link between our rural transit services and the city bus system. Currently there are bus stops at two of the County senior centers and are coordinating pick-ups and drop offs with the cities. Central Arizona Council on Developmental Disabilities is working with the Division of Developmental Disabilities to fund transportation services for DD customers. Based on the geographic location of Colorado City and the proximity to Utah, it is more reasonable to look for coordination opportunities to the north rather than in Mohave County.
Final Report
32
April 2007
Western Arizona Regional Transportation Coordination Plan
Sub-region Program of Projects Summary Desired project by each agency (or funding source) are listed below. The tables on the following pages show the funding planned by agency by year for 2007 through 2009. Mohave County Section 5310 Mohave County has a history of applying for 5310 vehicles. However, they will not apply for funding in 2007 with funding for replacement vehicles requested in 2008 and 2009. This level of vehicle replacement will not maintain the fleet. During this transition to partnership with the local transit agencies, KART, BATS, and HAT, there will need to be flexibility in the commitment to vehicle purchases if these agencies take possession of Mohave County vehicles and assess future fleet requirements. Previous recipient, Mohave Mental Health, did not submit requests for purchase of vehicles. FTA Section 5316 � Job Access � No Projects FTA Section 5317 � New Freedom � No Projects FTA Section 5311 � Rural General Public � No Projects FTA Section 5307 � Urban General Public � No Projects Central AZ Council on Developmental Disabilities FTA Section 5310 Considering expanded service with a wheelchair equipped van to provide transportation and community mobility to consumers who otherwise are not able to access the community due to their disabilities. Hualapai Tribal Nation FTA Section 5316 The Hualapai Tribal Nation will apply for a larger bus to transport employees from Peach Springs to the Sky walk at Grand Canyon West. Additionally, the Hualapai Tribal Nation has requested planning funds from the new FTA Tribal assistance program. WestCare FTA Section 5310 Replacement vehicle and additional vehicle to better assist the needs in community.
Final Report
33
April 2007
Western Arizona Regional Transportation Coordination Plan
PROJECT PLANNING WORKSHEET
Agency: Mohave County Senior Programs Phone: 928-753-0743 Contact Person __Brad Bixler E-mail _________ brad.bixler@co.mohave.az.us
Project FTA Section 5310-E&D Capital Replacement vehicle Expanded service vehicle Radio equipment Mobility Management Other FTA Section 5316-Job Access Operating (new service) Vehicle (new/replacement) Radio equipment Mobility Management Other FTA Section 5317-New Freedom Operating (new service) Vehicle (new/replacement) Radio equipment Mobility Management Other FTA Section 5311-Rural General Public Operating Vehicle (new/replacement) Equipment Mobility Management Other FTA Section 5307-Urban General Public Operating Vehicle (new/replacement) Equipment Mobility Management Other
Project Description
Fiscal Year 2007 (1)
Anticipated Total Cost Fiscal Year Fiscal Year 2008 (1) 2009 (1)
n/a
$25,000
$26,000
Notes: 1) FY 2007 funding will be available for use in calendar 2008; FY 2008 used in calendar 2009, etc.
Final Report
34
April 2007
Western Arizona Regional Transportation Coordination Plan
PROJECT PLANNING WORKSHEET
Agency _Central Arizona Council on Developmental Disabilities_________________Contact Person __Brittany McIntosh Phone _928-377-2298_______________________________ E-mail _brittany_NM@hotmail.com________________
Project FTA Section 5310-E&D Capital Replacement vehicle Expanded service vehicle Radio equipment Mobility Management Other FTA Section 5316-Job Access Operating (new service) Vehicle (new/replacement) Radio equipment Mobility Management Other FTA Section 5317-New Freedom Operating (new service) Vehicle (new/replacement) Radio equipment Mobility Management Other FTA Section 5311-Rural General Public Operating Vehicle (new/replacement) Equipment Mobility Management Other FTA Section 5307-Urban General Public Operating Vehicle (new/replacement) Equipment Mobility Management Other
Project Description Expanded service vehicle to provide transportation services for both ambulatory $ and non-ambulatory consumers so that this population has total access to the community
Fiscal Year 2007 (1)
Anticipated Total Cost Fiscal Year Fiscal Year 2008 (1) 2009 (1)
42,000 $
42,000 $
42,000
Notes: 1) FY 2007 funding will be available for use in calendar 2008; FY 2008 used in calendar 2009, etc.
Final Report
35
April 2007
Western Arizona Regional Transportation Coordination Plan
PROJECT PLANNING WORKSHEET
Agency _________WestCare______________________ Phone _________(928)768-1500_______________________ Contact Person __Michele Walker/ Debbie Marcusson E-mail _______michele.walker@westcare.com________ debbie.marcusson@westcare.com Anticipated Total Cost Fiscal Year Fiscal Year 2008 (1) 2009 (1)
Project FTA Section 5310-E&D Capital Replacement vehicle Expanded service vehicle Radio equipment Mobility Management Other FTA Section 5316-Job Access Operating (new service) Vehicle (new/replacement) Radio equipment Mobility Management Other FTA Section 5317-New Freedom Operating (new service) Vehicle (new/replacement) Radio equipment Mobility Management Other FTA Section 5311-Rural General Public Operating Vehicle (new/replacement) Equipment Mobility Management Other FTA Section 5307-Urban General Public Operating Vehicle (new/replacement) Equipment Mobility Management Other
Project Description
Fiscal Year 2007 (1)
In need of replacement vahicle Additional vehicles needed In need of GPS units/Cell Phones
$ $ $
25,000 52,000 6,000
$ $ $
54,000 26,000 6,000
$ $ $
27,000 52,000 6,000
$
83,000 $
86,000
$
85,000
Notes: 1) FY 2007 funding will be available for use in calendar 2008; FY 2008 used in calendar 2009, etc.
Final Report
36
April 2007
Western Arizona Regional Transportation Coordination Plan
PROJECT PLANNING WORKSHEET
Agency _________Hualapai Tribal Nation______________________ Phone _________(928)769-2216_______________________ Contact Person __Jack Erhardt E-mail ___hualapaiplanning@citilink.net___
Project FTA Section 5310-E&D Capital Replacement vehicle Expanded service vehicle Radio equipment Mobility Management Other FTA Section 5316-Job Access Operating (new service) Vehicle (new/replacement) Radio equipment Mobility Management Other FTA Section 5317-New Freedom Operating (new service) Vehicle (new/replacement) Radio equipment Mobility Management Other FTA Section 5311-Rural General Public Operating Vehicle (new/replacement) Equipment Mobility Management Other FTA Section 5307-Urban General Public Operating Vehicle (new/replacement) Equipment Mobility Management Other
Project Description
Fiscal Year 2007 (1)
Anticipated Total Cost Fiscal Year Fiscal Year 2008 (1) 2009 (1)
$ $ $
-
$ $ $
-
$ $ $
-
$ New service operating expenses Large bus $ $
30,000 85,000
$ $ $
-
$ $ $
-
Notes: 1) FY 2007 funding will be available for use in calendar 2008; FY 2008 used in calendar 2009, etc.
Final Report
37
April 2007
Western Arizona Regional Transportation Coordination Plan
VII. LA PAZ COUNTY SUB-REGION
The La Paz County Sub-region includes the Town of Quartzsite and other rural areas of La Paz County. Existing Transportation Providers La Paz County Service is currently provided in four passenger vans. Each van has a capacity of between eight and ten passengers. Service is funded by County and WACOG. Locations that are served include Parker, Ehrenburg, Bouse and Wickenburg and Surprise to the east. A donation of three dollars is suggested for the trip to Parker. Town of Quartzsite The Town of Quartzsite provides on demand service within Quartzsite Monday through Friday to riders who are elderly or disabled. Service is also provided to special community events on weekends. Once a week service is provided to surrounding communities of Blythe, Parker. Once a month service is provided to Lake Havasu City with twice a month service to Yuma. The vehicle fleet includes: Vehicle Make Dodge Dodge Ford Ford Vehicle Model Van Van Van Van Year 1995 1996 2001 2007 # of Seats/ WC Tie-Downs 8/1 8/1 10/1 9/2 Condition Poor Good Good New
Annual service data for 2006 include the following. � Annual passenger trips: 9,906 � Annual vehicle hours: 1,584 � Annual vehicle miles: 14,752 � Total operating and administrative budget: $55,143 Assessment of Needs The following needs were identified by the stakeholders: � Coordination is difficult due to distances/sparse population.
Final Report
38
April 2007
Western Arizona Regional Transportation Coordination Plan
�
Need to accommodate dramatic population increases in the winter months.
Coordination Strategies to Address Needs Existing coordination efforts include: � The two agencies will talk to see where they can assist each other or form agreements regarding who is serving who and when. Currently there are informal rules regarding who is serving who (communities). � For La Paz County, current coordination efforts have been in response to riders needs. There is a commitment to every effort to enable riders to get where they need to go, serving La Paz County, specifically, the Parker area, the outlying areas of Ehrenberg, Salome and Wenden. The Quartzsite area as they have their own transportation service. � A Town of Quartzsite local ordinance created the Health and Development Services Board to oversee the coordination of needs within the community. This municipal board has begun to assess transportation needs for the elderly, disabled, and general rural population in coordination with local churches, the senior center and health care providers. Expanded coordination efforts include: � Need to coordination better � information, referral, agreements re who is serving which communities, when and how they can work together to better serve the population of La Paz County. � Quartzsite has requested some help in getting their residents to Parker. La Paz County has agreed to provide service from our Ehrenberg route. This would consist of the La Paz van leaving Parker to Ehrenberg, continuing into Quartzsite, picking up riders from a centralized location, then returning to Parker. Return would follow the same route. Sub-region Program of Projects Summary Desired project by each agency (or funding source) are listed below. The tables on the following pages show the funding planned by agency by year for 2007 through 2009. La Paz County FTA Section 5310 Transportation will request two Mini Vans to help save the cost of fuel and provide most of the local services. Service is currently provided by 4 vans with operational lifts. Two are utilized in the outlying areas and two are available for use in the Parker area. The lift vans in the Parker area are the older vehicles. A Cutaway Van with lift in requested in 2008 or 2009. Final Report April 2007 39
Western Arizona Regional Transportation Coordination Plan
The Section 5310 program cannot provide funding for operations. However, La Paz County needs funds for driver's salaries and benefits. Full-time drivers have had a substantial increase this last year and the County is planning to increase the part-time driver's wages to get maintain better candidates for our positions. Funding level that is needed has been included at the bottom of the La Paz County budget. FTA Section 5316 � Job Access � No Projects FTA Section 5317 � New Freedom � No Projects FTA Section 5311 � Rural General Public � No Projects La Paz County would need to organize a general public transit service to qualify for funding under this program. FTA Section 5307 � Urban General Public � No Projects Town of Quartzsite FTA Section 5310 Requesting funding for a 10 passenger cutaway van with lift and 2 exterior scooter transportation units and for mobility management funds to improve and facilitate access to transportation services. The Town will be partnering with the senior center, churches and health care providers as well as providing information, referrals, and access to senior housing to improve service. FTA Section 5316 � No Projects FTA Section 5317 � New Freedom � No Projects FTA Section 5311 � Rural General Public � No Projects
Final Report
40
April 2007
Western Arizona Regional Transportation Coordination Plan
PROJECT PLANNING WORKSHEET
Agency _La Paz County Health Dept______ Phone ___928-669-1100_________________ Contact Person __Connie Mathewson E-mail __cmathewson@co.la-paz.az.us____________
Project FTA Section 5310-E&D Capital Replacement vehicle Expanded service vehicle Radio equipment Mobility Management Other FTA Section 5316-Job Access Operating (new service) Vehicle (new/replacement) Radio equipment Mobility Management Other FTA Section 5317-New Freedom Operating (new service) Vehicle (new/replacement) Radio equipment Mobility Management Other FTA Section 5311-Rural General Public Operating Vehicle (new/replacement) Equipment Mobility Management Other FTA Section 5307-Urban General Public Operating Vehicle (new/replacement) Equipment Mobility Management Other
Project Description
Fiscal Year 2007 (1)
Anticipated Total Cost Fiscal Year Fiscal Year 2008 (1) 2009 (1)
2 new Mini-Vans with duel A/C for 2007 and a Maxivan in 2009
$
60,000
$
50,000
Funding needed for operations. Not eligible under the Section 5310 program. Driver's Salaries and Benefits
$
110,497 $
120,497
$
120,497
Notes: 1) FY 2007 funding will be available for use in calendar 2008; FY 2008 used in calendar 2009, etc.
Final Report
41
April 2007
Western Arizona Regional Transportation Coordination Plan
PROJECT PLANNING WORKSHEET
Agency _Town of Quartzsite______ Phone ___928-927-4333_________________ Contact Person Alex Taft E-mail __ataft@quartzsite.az.us
Project FTA Section 5310-E&D Capital Replacement vehicle Expanded service vehicle Radio equipment Mobility Management Other FTA Section 5316-Job Access Operating (new service) Vehicle (new/replacement) Radio equipment Mobility Management Other FTA Section 5317-New Freedom Operating (new service) Vehicle (new/replacement) Radio equipment Mobility Management Other FTA Section 5311-Rural General Public Operating Vehicle (new/replacement) Equipment Mobility Management Other FTA Section 5307-Urban General Public Operating Vehicle (new/replacement) Equipment Mobility Management Other
Project Description
Fiscal Year 2007 (1)
Anticipated Total Cost Fiscal Year Fiscal Year 2008 (1) 2009 (1)
10 passenger cutaway/lift @ tiedown Minivan no lift Promotion and Facilitation Exterior Scooter Transport
$ $ $ $ 23,000 1,200 $ 2,545
55,000
1,500 $ $
1,750 2,650
Notes: 1) FY 2007 funding will be available for use in calendar 2008; FY 2008 used in calendar 2009, etc.
Final Report
42
April 2007
Western Arizona Regional Transportation Coordination Plan
VIII. REGIONAL PROGRAM OF PROJECTS SUMMARIES
While the WACOG region was divided into five sub-regions, it is important to recognize that the three communities that currently provide general public transit services, Lake Havasu City, Bullhead City and Kingman (sometimes referred to as the Tri-Cities) are currently working on the feasibility of establishing a regional connector service. Arizona Department of Transportation-Public Transportation Division has initiated a series of demonstration projects to provide transportation connections linking smaller, rural communities with critical medical, employment, nutrition and shopping services available only in larger urban centers. The Regional Transit Connector Service (RTCS) program utilizes a blend of federal, state and local funds. For example, after a four-year hiatus following funding cutbacks in 2001, the Ajo-Gila Bend Connector (to Phoenix) was inaugurated in spring 2005 using funds from this project. Other regional connector service pilot projects sites are Pima County/Green Valley to Tucson, Flagstaff Metro Area, and YMPO/Yuma County. The goal of the three Mohave County cities, Bullhead City, Lake Havasu, and Kingman, would be to develop a regional connector service with the assistance of the regional pilot connector program. The current transition of the Mohave County Senior Transportation programs to the cities with transit services will also be a significant coordination effort. A summary of the sub-region projects is provided on the following page. Overall, grant program requests are:
Summary of WACOG Grant Program Requests 5311 5310 5316 5317 Total 4,574,898 394,745 115,000 38,000 5,122,643 4,735,857 123,500 41,800 4,901,157 5,984,191 207,400 45,980 6,237,571 15,294,946 $ 725,645 $ 115,000 $ 125,780 $16,261,371
Year 2007 2008 2009 Total $
Final Report
43
April 2007
Western Arizona Regional Transportation Coordination Plan
WACOG REGION PROGRAM OF PROJECTS - 2007 to 2009
Sub-region 2007 Bullhead City BATS Kingman KART Mohave Assn of Ret C Gardens Mohave Mental Health Subtotal Lake Havasu HAT New Horizons Subtotal Mohave County Senior Transporation Central AZ DD WestCare Hualapai Tribal Nation Subtotal La Paz County La Paz County Health Town of Quartzsite Subtotal 2007 Region Total 5311- Rural 5310 - E&D Public Transit Capital 5316 - Job Access 5317 - New Freedom Total
$ 1,378,298 $ $ 1,071,600 $ $ $ $ $ 1,071,600 $ $ 2,125,000 $ $ $ 2,125,000 $ $ $ $ $ $ $ $ $ $ $
-
$
-
$ $
-
$ 1,378,298
$ 45,000 44,000 23,000 112,000 $ 71,000 71,000 $ $
-
$ $ $ $
38,000 $ 1,109,600 $ 45,000 $ 44,000 $ 23,000 38,000 $ 1,221,600 $ 2,125,000 $ 71,000 $ 2,196,000 $ $ $ $ $ 42,000 83,000 115,000 240,000
$
-
$ 42,000 83,000 $ 125,000 $ 60,000 26,745 86,745 394,745 $ $ $ $
115,000 115,000 $ 115,000 $ $ $ $
38,000
$ $ $ $ 4,574,898
$ 60,000 $ 26,745 $ 86,745 $ 5,122,643
Final Report
44
April 2007
Western Arizona Regional Transportation Coordination Plan
2008 Bullhead City BATS Silver Ridge Village Kingman KART Mohave Mental Health Lake Havasu HAT Mohave County Senior Transporation La Paz County La Paz County Health Town of Quartzsite 2008 Region Total 2009 Bullhead City BATS Kingman KART Mohave Mental Health Lake Havasu HAT Mohave County Senior Transporation La Paz County La Paz County Health Town of Quartzsite 2009 Region Total Three Year Total
$ 1,530,147 $ $ $ 1,380,710 $ $ $ 1,825,000 $ $ $
44,000
$
-
$
-
$ 1,530,147 $ 44,000
$ 23,000 $ $
-
$
41,800 $ 1,422,510 $ 23,000 $ 1,825,000 $ -
-
$ $ $ $ $
$ $ $ $ $ 4,735,857 $
$ 56,500 $ 123,500 $
$ $ 56,500 41,800 $ 4,901,157
$ 1,741,655 $ $ 1,165,536 $ $ $ 3,077,000 $ $ $
130,000
$
$
$ 1,871,655 45,980 $ 1,211,516 $ 23,000 $ 3,077,000 $ -
$ 23,000 $ $
-
$ $ $ $ $
$ $ $ $ $ 5,984,191 $ $ 15,294,946 $
50,000 $ 4,400 $ 207,400 $ 725,645 $
$ 50,000 $ 4,400 45,980 $ 6,237,571 125,780 $ 16,261,371
115,000 $
Final Report
45
April 2007
Western Arizona Regional Transportation Coordination Plan
APPENDIX A REGIONAL STAKEHOLDER MEETING SUMMARY
WACOG REGIONAL TRANSPORTATION COORDINATION PLAN MEETING
Kingman City Hall, Kingman December 7, 2006, 1:00 PM
Meeting Summary
Attendance Alex Taft, Town of Quartzsite Jack Kramer, City of Kingman M.E. "Gene" Helper, Mohave County Larren Vandman, Silver Ridge Village Ann Marie Wilkinson, WACOG Karren Anderson, La Paz County Connie Mathewson, La Paz County Dean Cooke, Colorado City John Barlow, Colorado City Laura Henry, KART Janet Ackerman, KRMC Larry Wiemken, BATS Ken Fulton, BATS Stan Usinowicz, Havasu Area Transit Gary Parsons, Havasu Area Transit Kim Mitchell, WestCare Arizona Terry Delia, New Horizons Suzanne Clarke, Kingman Aid Abused People Dave Cyra, FTA/CTAA Liaison Steve Rost, ADOT, Jim Dickey, ADOT, Amy Ostrander, Ostrander Consulting, Rick Evans, RAE Consultants, Inc. Getting Started Ann Marie Wilkinson of Western Area Council of Governments (WACOG) assisted with organizing the meeting in the absence of Dave Barber. After Rick Evans of RAE Consultants, Inc. provided an overview of the meeting, Jim Dickey, ADOT Public
Final Report
46
April 2007
Western Arizona Regional Transportation Coordination Plan
Transportation Division Director and Steve Rost were introduced. Steve provided information about the Safe Routes to School program. David Cyra, representing the Federal Transit Administration and Community Transportation Association of America was introduced. Dave is supporting various states in developing the required coordination plans. Amy Ostrander, Ostrander Consulting, Inc., primary contact for the WACOG plan, was introduced. Rick reviewed the purpose of the workshop which was to begin the process of developing a Regional Transportation Coordination Plan for the WACOG area. Coordination Plans are mandated in the new SAFETEA-LU federal transportation reauthorization legislation. Anyone requesting funding, beginning in 2007, under the Federal Transit Administration (FTA) 5310, 5316 and 5317, and indirectly 5311, programs must be included in a Transportation Coordination Plan. Participants then introduced themselves, including the type of transportation they provide and the location of there service. Gene Helper of Mohave County advised the group that the County is in the process of turning the operations of transit services provided by the County within the city limits of any town/city to that transit agency � in Kingman to KART, in Bullhead City to BATS, and in Lake Havasu to HAT. This will allow Mohave County to focus on providing better transit options to rural county residents. Based on these introductions, the attendees broke into four groups by areas: Kingman Bullhead City Lake Havasu Mohave County (including Colorado City) La Paz County These groups then discussed issues for their region: Existing Providers Current Coordination Unmet Needs Ideas for Coordination Subregion Reports Kingman Existing Providers � KART � Greater Kingman Service area 50 square miles. � In addition to non-profits, Greyhound important carrier. Current Coordination � Some coordination between KART and hospital � Insurance issues for more coordination � Donations in place of fixed fee for Seniors Unmet Needs � Hours of operations to 24 versus 8-10 currently Final Report 47
April 2007
Western Arizona Regional Transportation Coordination Plan
� No one-stop center for information � Pick up outside of city limits � Police department in Bullhead � Need software for coordination Ideas for Coordination � Investigating joint purchase of Trapeze software with Lake Havasu/Bullhead Bullhead City Existing Providers � BATS: 3 Fixed Routes, 4 Deviated/DAR vehicles. 1-2 wheelchairs per day. � WestCare � 6 vehicles, Referrals faxed in; 12 facilities served, trips range from 1 to 700 miles. Children under 12 account for 70% of riders. Local trips account for 25% of trips, DES funding comes from 10 categories. � Taxicabs � fluctuates. Maybe 2-3 � Legacy Foundation � Senior Center has two vehicles � Church Buses � School system Current Coordination � WestCare purchases BATS passes for able clients � CMS buys passes for clients to methadone clinic, counseling Unmet Needs � BATS � Fixed Route on east side � Service for Mohave/New Hospital � Software for dispatch � Separate maintenance facility; currently by Bullhead City Fleet Shop � Highway turnouts for buses � Shelters/Lift Maintenance � Training � WestCare � GPS vehicle Location system � Child seats � Vehicles have over 100,000 miles Ideas for Coordination � Bullhead to County Court in Kingman � Help for WestCare within city � Training � Vehicle sharing/insurance/maintenance
Final Report
48
April 2007
Western Arizona Regional Transportation Coordination Plan
Lake Havasu Existing Providers � New Horizons � Contract with DD � Mohave Mental Health � Senior Center � meals on wheels only � Havasu Area Transit (Section 5311) � DAV van Current Coordination � Planning together successfully � Transit Advisory Committee broad-based: School District, MMH, New Horizons, Hospital, Salvation Army, Special Olympics, Interagency (respite/adult day care). Very active during transition from DAR to fixed route. Unmet Needs � Adult Day Care: fragile riders, require assistance � Special Olympics training sessions � Prestige Care Facility � need help with screening riders to determine specific health requirements/need for attendant. Serving a wide range of rider needs. Ideas for Coordination � Back-up vehicle � Emergency preparedness training � Tri-City Council � began in 2006, good cooperative energy � Work force needs � No inter-city bus service � Senior Rides � concern with "client shedding" - transfer vehicles but not operating funds. Mohave County Existing Providers � Mohave County Seniors � County Supervisors want County to get out of transportation to the extent possible, out of large cities and focus on rule needs and meal delivery. Have 33 vehicles now, including those which focus on meal delivery (but also carry passengers when meal delivery in finished. Senior centers are located in Lake Havasu, Kingman, Bullhead and Golden Shore. Current Coordination � In process of negotiating IGAs with three large cities to turnover vehicles plus some AAA $ to transfer senior services to city operated services. Unmet Needs � Growing senior population in County Potential Future Coordination � Continue getting out of the transportation business, particularly in three large cities.
Final Report
49
April 2007
Western Arizona Regional Transportation Coordination Plan
Colorado City Existing Providers � City operates one van (5310). On-call, usually one person at a time. Most trips to St. George and Flagstaff. St. George is 45 minute drive. Would like a smaller van/vehicle. No charge for service. Lots of 100 mile trips. Current Coordination � No one really to coordinate with. In Utah for all practical purposes. Unmet Needs � Would like an AHCCCS provider for the area. Would like to serve other small towns in the area, especially three small areas south of Colorado City (Cane Beds, Centennial Park, as well as CO City. Tie to Fredonia and Page. Serve Mocasson Kaipai band of Paoautes. Potential Future Coordination � No obvious options for coordination. La Paz County Existing Providers � Quartzite Transit Service � 3 vehicles plus I new vehicle coming, 2 fulltime drivers and one part-time driver. Serve elderly and disabled. 2 days a week in Quartzite, 1 day in Blythe, 1 day in Parker, 1 day in Yuma and one day in Lake Havasu if enough people sign up (Lake Havasu only). Local trips are $1.00 donation. Long distance trips are roughly $7 donation (depending on distance). Lose money most on local trips, people think they shouldn't have to pay for local service. � La Paz County Transit � 4 9-10 passenger vans. Funded by County and WACOG. Serve Parker, Nuckenbar, Surprise, Enenburg, and Bust (spelling for all ???). $3 suggested donation to Parker. Current Coordination � Not much if any. Unmet Needs � Didn't really discuss. Potential Future Coordination � The two agencies will talk to see where they can assist each other or form agreements re who is serving who, when. Currently there are informal rules regarding who is serving who (communities). They need to coordinate better � information, referral, agreements regarding who is serving which communities, when and how they can work together to better swerve the population of La Paz County.
Final Report
50
April 2007
Western Arizona Regional Transportation Coordination Plan
Planning Framework An overview of the funding resources supporting transit in rural communities was reviewed. Rick stated that there is new 80% funding available for "mobility management" which could be used to fund staffing for a coordination lead agency. Rick then mentioned the problem of getting good up-to-date information on transportation providers in each region. He passed out two items. One was a preliminary summary of information on area providers taken from recent grant applications. Accompanying that was a second sheet which was a one-page Transportation Provider Inventory. He asked those present if they would complete the inventory and send it back to Dave Barber at WACOG by Friday, December 29th. As part of the discussion about transportation needs, Rick passed out a sheet including notes from the United We Ride workshop conducted in the fall of 2005. United We Ride Assessment The group then completed the federal United We Ride Assessment for Communities. The results are presented in Attachment A-1. In summary, WACOG covers a vast area and after considerable discussion, the assessment was completed for two subregions � Mohave and La Paz Counties. What's Coming? Rick then briefly reviewed a Program of Projects identifying elements the regions need for this first year of coordination planning. The table format presented a list of agencies to be funded down the left side and the FTA program funding categories across the top (5311, 5310, 5316 and 5317). The first year Regional Coordination Plans will need to show each project to be funded, for each agency, under each federal program. Ideally the Coordination Plans will have a three-year planning timeframe. Planning Framework A brief discussion then took place regarding the elements included in the framework for coordination planning. The following topics were addressed, as presented in the handout packet: Federal, state, regional and constituent roles Rural Transit Needs Assessment project Collaborative planning process Transit grant programs Coordination plan content Project evaluation Project schedule Final Report 51 � � � � � � �
April 2007
Western Arizona Regional Transportation Coordination Plan
Key points included: 1) the need to involve a broad variety of constituents in the planning process, including funding agencies and rider groups, to the extent possible; 2) the fact that the coordination planning requirements become more stringent in future years; 3) the availability of "mobility management" as an 80%-funded capital item under the all the FTA programs (including 5307 and 5311); and 4) the need for both ADOT and the regions to come up with specific criteria and priorities for funding under each of the FTA grant programs. Gregg Kiely stated that ADOT will be evaluating both of these issues and will provide information about ranking/priority with the grant application. What Is Coordination? The discussion then turned to the various activities that could be included under the definition of "coordination." Rick reviewed a sheet from the handout packet which presented a variety of potential activities. Based on the discussion the following appear to have the most potential in the WACOG area. � Kingman o Integrate senior transportation currently provided by County o Technology support � Bullhead City o Integrate senior transportation currently provided by County o Technology support o New routes � Lake Havasu o Integrate senior transportation currently provided by County o Regional connectivity o Technology support � Mohave County (including Colorado City) o Emphasis on serving rural areas � La Paz County o Begin dialogue Next Steps Next steps were then identified for the various participants in the Regional Coordination Plan process. ADOT and Consultant Team � Dave Barber will send a Transportation Provider Inventory form electronically. This form was provided in hard copy at the meeting and needs to be completed and returned to either electronically or by fax by DECEMBER 29TH to Amy Ostrander � aostranderconsulting@msn.com or 720-855-8984 with a copy to Dave at WACOG.
Final Report
52
April 2007
Western Arizona Regional Transportation Coordination Plan
�
� �
Dave Barber will send the Budget Format electronically for providers and/or others to complete regarding anticipated grant requests for a three-year time period for 2007, 2008 and 2009. This form was provided in hard copy at the meeting and needs to be completed and forwarded to Amy Ostrander by Friday, January 12th with a copy to Dave at WACOG. Dave Barber will send the five subregions a short list of agenda items prepared by the consultant team to be discussed at the 1-2 follow-up meetings in December and January. ADOT will develop evaluation criteria and priorities for each FTA funding program.
COGS � WACOG will refine the list of invitees and compare the list of invitees to the list of actual attendees and attempt to contact additional participants. � WACOG will monitor the follow-up meetings that were scheduled for each subregion. Local Providers and Other Stakeholders � Complete the Transportation Provider Inventory by the end of the year and send it to WACOG and Amy Ostrander by December 29th. � Prepare preliminary budget regarding FY 2007 to 2009 FTA grant requests and submit them to WACOG and Amy by January 14, 2007. � Attend subregion meetings: o Kingman, Lake Havasu, Bullhead and Mohave County to meet on Wednesday, Dec. 13th at 11:30. Meeting already scheduled to review software packages. o La Paz to schedule meeting. The workshop ended at approximately 4:30 PM.
Final Report
53
April 2007
Western Arizona Regional Transportation Coordination Plan
ATTACHMENT A-1 A Self-Assessment Tool for Communities
COMPLETED BY WACOG ON DECEMBER 7, 2006 FIRST COLUMN, LA PAZ, SECOND COLUMN, MOHAVE COUNTY Each item was rated according to the following: "1"-Needs to Begin, "2"-Needs Significant Action, "3"-Needs Action and "4"-Done Well. Section 1: Making Things Happen by Working Together LP M 2.5 2.5 1. Have leaders and organizations defined the need for change and articulated a new vision for the delivery of coordinated transportation services? 3 2. Is a governing framework in place that brings together providers, 1 agencies and consumers? Are there clear guidelines that all embrace? 2__3__ 3. Does the governing framework cover the entire community and maintain strong relationships with neighboring communities and state agencies? 2__4__ 4. Is there sustained support for coordinated transportation planning among elected officials, agency administrators, and other community leaders? 2__4__ 5. Is there positive momentum? Is there growing interest and commitment to coordinating human service transportation trips and maximizing resources? Section 2: Taking Stock of Community Needs and Moving Forward 1__2__ 1. Is there an inventory of community transportation resources and programs that fund transportation services? 1__2__ 2. Is there a process for identifying duplication of services, underused assets, and service gaps? 2__2__ 3. Are the specific transportation needs of various target populations well documented? 2__3__ 4. Has the use of technology in the transportation system been assessed to determine whether investment in transportation technology may improve services and/reduce costs? 3__3__ 5. Are transportation line items included in the annual budgets for all human service programs that provide transportation services? 3__4__ 6. Have transportation users and other stakeholders participated in the community transportation assessment process? 2__2__ 7. Is there a strategic plan with a clear mission and goals? Are the assessment results used to develop a set of realistic actions that improve coordination? 4__4__ 8. Is clear data systematically gathered on core performance issues such as cost per delivered trip, ridership, and on-time performance? Is the data systematically analyzed to determine how costs can be lowered and performance improved? 3__3__ 9. Is the plan for human services transportation coordination linked to and supported by other state and local plans such as the regional Transportation Plan or State Transportation Improvement Plan? 2__2__ 10. Is data being collected on the benefits of coordination? Are the results communicated strategically?
Final Report
54
April 2007
Western Arizona Regional Transportation Coordination Plan
Section 3: Putting Customers First 3__3__ 1. Does the transportation system have an array of user-friendly and accessible information sources? 1__3__ 2. Are travel training and consumer education programs available on an ongoing basis? 1__4__ 3. Is there a seamless payment system that supports user-friendly services and promotes customer choice of the most cost-effective service? 2__2__ 4. Are customer ideas and concerns gathered at each step of the coordination process? Is customer satisfaction data collected regularly? 3.5__3.5__ 5. Are marketing and communications programs used to build awareness and encourage greater use of the services? Section 4: Adapting Funding for Greater Mobility 1__1__ 1. Is there a strategy for systematic tracking of financial data access programs? 1__1__ 2. Is there an automated billing system in place that supports the seamless payment system and other contracting mechanisms? Section 5: Moving People Efficiently 1__2__ 1. Has an arrangement among diverse transportation providers been created to offer flexible service that is seamless to customers? 2__2__ 2. Are support services coordinated to lower costs and ease management burdens? 1__2__ 3. Is there a centralized dispatch system to handle requests for transportation services from agencies and individuals? 1__2 4. Have facilities been located to promote safe, seamless, and cost-effective transportation services?
Final Report
55
April 2007
Western Arizona Regional Transportation Coordination Plan
APPENDIX B REGIONAL STAKEHOLDER MEETING SUMMARY
WACOG REGIONAL TRANSPORTATION COORDINATION PLAN MEETING
Kingman City Hall, Kingman February 22, 2007, 10:00 AM
Meeting Summary
Attending the February 22, 2006 Regional Transportation Coordination Plan Workshop in Kingman: Alex Taft, Town of Quartzsite Brad Bixler, Mohave County Darren VanDeman, Silver Ridge Village Connie Mathewson, La Paz County Dean Cooke, Colorado City John Barlow, Colorado City Laura Henry, KART Janet Ackerman, KRMC Larry Wiemken, BATS Ken Fulton, BATS Don Bergen, Havasu Area Transit Gary Parsons, Havasu Area Transit Terry Delia, New Horizons Darla Tilley, T.O.P Senior Center Rob Long, Central AZ Council on DD Brittany Adkins, Central AZ Council on DD Glenda Holiday, Central AZ Council on DD Cherie Hart, Foundation for Senior Living Jeanne Caisse, Grand Vista Inc. Harold Van Hocore, Operation Blessing, RCOA Teri Williams, Hualapai Tribe Planning Department Joy Griego, Mohave Mental Health Dave Barber, WACOG Steve Rost, Gregg Kieley, Loretta Crimi, ADOT, Amy Ostrander, Ostrander Consulting, Rick Evans, RAE Consultants, Inc.
Final Report
56
April 2007
Western Arizona Regional Transportation Coordination Plan
Getting Started Rick Evans began the meeting and welcomed those present. He introduced Amy Ostrander, who was the consultant team member working specifically with the WACOG plan. He then thanked Dave Barber for hosting the meeting. Rick stated that the workshop would be conducted in two parts. In the morning the draft WACOG Regional Transportation Coordination Plan would be reviewed and discussed. In the afternoon ADOT staff would review the program application packets for the federal Transit Administration (FTA) 5310, 5316 and 5317 programs. He then asked those present to introduce themselves. General Comments on the Plans It was stated that the draft plans were a good start and Rick thanked the participating agencies for submitting information on their services and for considering new coordination opportunities. He said that before the plans are finalized by the end of March, two key date items were needed. First it will be important to make sure that all agencies in the region, who are providing transportation services now or who are considering it in the future, participate in the planning process and are included in the plan. Second, it is essential that participating agencies include their anticipated FTA grant requests in the plan. Rick then stated that all necessary information would need to be submitted to Amy Ostrander by Monday, March 12, at the latest. Plan Specifics Rick then turned the meeting over to Amy Ostrander to review the draft plan with those present. Amy reiterated that there were four sub-regions in the WACOG region and that she would go through the draft plan by sub-region. Each agency should comment on the narrative provided on its service as well as what was included in their anticipated grant requests for the next three years. Comments were then made by each of the agencies present. Additional comments were requested by March 12, 2007. Next Steps Two items were requested from each participating agency my March 12th; changes to the existing service descriptions, and information on anticipated grant requests. The Coordination Plan portion of the workshop ended at approximately 11:50 AM.
Final Report
57
April 2007
Western Arizona Regional Transportation Coordination Plan
APPENDIX C Mohave County Senior Program Vehicle Inventory
(Many of the vehicles listed below are only used for our meal delivery program)
Vehicle Vehicle Make Model Year 2006 Chevy ? 2003 F350 FORD VAN 2005 Chevy Uplander 2002 FORD EXPLORE 2001 FORD VAN W/LIFT 2000 2 DR. BLAZER (Meal delivery) 2000 2 DR. BLAZER (Meal delivery) 1999 DODGE VAN W/LIFT 1997 FORD MINI BUS W/LIFT (Back-up) 1998 DODGE MINI VAN (Meal delivery) 1998 DODGE MINI VAN (Meal delivery) 2000 2 DR. BLAZER (Meal delivery) 1999 CUTAWAY VAN W/LIFT 1995 Ford Econoline (Hauling) 2004 Chevy Venture mini-van 2005 Chevy Uplander 1999 Cutaway Van W/Lift (Back-up) 1998 DODGE MINI VAN (Meal delivery) 2003 Ford van W/Lift 2004 Chevy Venture mini-van 2001 DODGE MINI VAN (Meal delivery) 2000 DODGE CARAVAN (Meal delivery) 2000 DODGE CARAVAN (Meal delivery) 1998 DODGE MINI VAN (Meal delivery) 2002 CHEVY ASTRO 2002 CHEVY ASTRO 2003 Ford E-350 van w/lift 2001 Ford vanW/Lift 2001 MINI VAN (Meal delivery) 1994 FORD RANGER (Hauling) 1999 CUTAWAY VAN 1999 CUTAWAY VAN (Back-up) 2000 DODGE MAXIVAN W/LIFT 2000 DODGE CARAVAN (Meal delivery) 1998 DODGE MINI VAN (Meal delivery) # of Seats 7 12 7 3 8 3 3 8 7 5 5 3 8 n/a 5 7 8 5 8 5 5 5 5 5 5 5 8 8 5 n/a 9 9 8 5 5 # W/C Tie-Downs 0 0 0 0 2 0 0 1 1 0 0 0 1 0 0 0 1 0 2 0 0 0 0 0 0 0 2 1 0 0 0 0 2 0 0 Condition Excellent Good Excellent Good Fair Fair Poor Fair Fair Fair Fair Fair Fair Poor Good Excellent Fair Good Good Good Fair Fair Fair Fair Good Good Good Fair Fair Poor Fair Fair Fair Fair Fair
Final Report
58
April 2007