PERFORMANCE AUDIT
RADIATION REGULATORY
HEARING BOARD
Report to the Arizona Legislature
By the Auditor General
November 1984
84- 9
DOUGLAS R. NORTON. CPA
AUDITOR GENERAL
STATE OF ARIZONA
OFFICE OF THE
AUDITOR GENERAL
November 8, 1984
Members o f the Arizona Legislature
The Honorable Bruce Babbitt, Governor
Mr. Charles F. Tedford, Director
Arizona Radiation Regulatory Agency
Transmitted herewith i s a report of the Auditor General, A Performance
Audit of the Arizona Radiation Regulatory Agency and the Arizona Radiation
Regulatory Hearing Board. This report i s i n response t o an
A p r i l 27, 1983, resolution o f the J o i n t Legislative Oversight Committee.
The performance audit was conducted as a part o f the Sunset Review set
f o r t h i n A. R. S. § § 41- 2351 through 41 - 2379.
This performance a u d i t r e p o r t i s submitted t o the Arizona State
Legislature f o r use i n determining whether t o continue the Arizona
Radiation Regul atory Agency and the Arizona Radiation Regulatory Hearing
Board beyond i t s scheduled termination date o f July 1, 1986. The report
addresses the e f f i c i e n c y and effectiveness o f the Agency's X- ray and
radiation material s inspection program, and the adequacy o f the Agency's
Nuclear Emergency Management Fund f i n a n c i a l support.
Ply s t a f f and I w i l l be pleased t o discuss or c l a r i f y items i n the report.
Respectfully submitted,
~ o uaY~ Rl. Norton
Auditor General
Staff: William Thomson
Peter N. Francis
Stephen G. Adel s t e i n
Jayne M. Hewitt
Anthony J. Guarino
Dennis B. Murphy
Enclosure
1 1 1 WEST MONROE SUITE 600 PHOENIX. ARIZONA 85003 ( 602) 255- 4385
SUMMARY
The Office o f the Auditor General has conducted a performance a u d i t o f the
Arizona Radiation Regulatory Agency ( ARRA) i n response t o an A p r i l 27,
1983, r e s o l u t i o n o f the J o i n t L e g i s l a t i v e Oversight Committee. This
performance audit was conducted as p a r t o f the Sunset Review set f o r t h i n
Arizona Revised Statutes ( A. R. S. ) § § 41- 2351 through 41 - 2379.
The Arizona Radiation Regulatory Agency was established i n 1980 t o replace
the Arizona Atomic Energy Commission. The Agency's purpose i s t o protect
the pub1 i c health, safety and welfare i n a l l matters concerned w i t h the
use, storage and disposal o f r a d i a t i o n sources. The Agency does t h i s by
1 icensing r a d i o a c t i ve material s, r e g i s t e r i n g r a d i a t i o n machines, and
8 p e r i o d i c a l l y inspecting a1 1 1 icensees and registrants. I n addition, the
Agency's major responsibil i t i e s i n c l ude providing technical assistance f o r
incidents or emergencies i nvol ving radiation, and conducting environmental
surveillance around any f i x e d nuclear f a c i l i t y or uranium operation.
I,
Arizona Radiation Regulatory Agency's
Inspection A c t i v i t i e s Could Be Improved ( pages 15- 28)
The Agency does not conduct a1 1 i t s inspections i n a timely manner. X- ray
machine and r a d i o a c t i v e m a t e r i a l s inspections are not always done i n
accordance w i t h accepted c r i t e r i a regarding i nspection frequency. For
example, 29 percent o f the X- ray inspections reviewed i n the audit
exceeded Agency c r i t e r i a , almost h a l f of which exceeded the c r i t e r i a by
more than 6 months. Agency c r i t e r i a c a l l for X- ray inspections every 2 t o
4 years, depending on the type of r e g i s t r a t i o n . The more time t h a t passes
between inspections the greater the public health r i s k . Untimeliness i s
p a r t i a l l y the resul t o f an inadequate inspection schedul ing system. I n
addition, high turnover of professional staff has helped decrease
inspection frequency. Furthermore, the need t o devote resources t o the
Agency's Pal o Verde Nuclear Generating Station responsibil i t i e s serves t o
reduce the manpower avail able f o r inspections.
The X- ray and radioactive materials inspection programs would benefit
greatly from the development of a systematic scheduling system. If such a
system were kept up to date, the Agency could concentrate i t s resources on
those f a c i l i t i e s that most urgently need to be inspected. In addition,
the Agency should imp1 ement sal ary increases recommended by the Personnel
Division of the Department of Administration and should continue to
evaluate i t s abil i ty to retain professional s t a f f .
The Arizona Radiation Reaulatorv Aaencv
1
Of I t s tnforcement Actions ( pages 29- 33)
The Agency could take stronger or more timely enforcement actions i n some
instances. The X- ray program's enforcement philosophy seems t o r e s u l t i n
limited action in some cases that warrant stronger action. Actions that
were taken were often poorly documented i n Agency f i l e s , making i t
d i f f i c u l t to assess enforcement effectiveness. In addition, i n the
radi oacti ve materi a1 s program, enforcement actions were not ful ly
documented for some cases and follow- up actions were sometimes not taken
on a timely basis. The Nuclear Regulatory Commission also noted
timeliness and documentation problems i n i t s most recent review of the
radioacti ve material s program. Further, coordination and communication
w i t h State medical boards coul d be improved.
The Agency should pursue stronger enforcement actions i n cases that merit
such actions. The Agency should also ensure that all licensing and
enforcement actions a r e f u l l y documented and taken on a timely basis.
Finally, the Agency should communicate with the appropriate State medical
board when a practitioner i s found to repeatedly expose patients to
radiation 1 eve1 s exceeding establ ished norms.
The Arizona Radiation Reaul atorv Aaencv
Has Not Recei ved N u c ~ ~ E m e r g e n cMya nagement
Funds Sufficient To Cover the Costs Of I t s
Pal o Verde Activities ( ~ a q e s41 - 55)
The Arizona Radiation Regulatory Agency has not received adequate funding
from the Nuclear Emergency Management Fund ( NEMF) to finance a1 1 costs
re1 a t i ng t o i t s Pal o Verde Nuclear Generating Station i nvol vement. ARRA
has not adequately tracked i t s Palo Verde related costs and therefore, has
been underestimating these costs. I n addition, the Arizona Division o f
Emergency Services, the administrator o f the NEMF, has not requested
s u f f i c i e n t funds t o cover ARRA's estimates. Emergency Services improperly
l i m i t e d i t s NEMF recommendation t o an amount budgeted by Arizona Public
Service Company. Consequently, ARRA has financed more than $ 1 60,000 o f
i t s Palo Verde costs over the past 2 years w i t h i t s General Fund
appropriations. Because Emergency Services did not request s u f f i c i e n t
funds t o cover a l l Palo Verde related costs, A. R. S. $ 26- 306.01 was
violated. A. R. S. $ 26- 306.01. B requires the Arizona D i vision o f Emergency
Services t o make an annual recommendation t o the Legislature which i s a
reasonable estimate o f an amount necessary t o develop, maintain and
support the State nuclear emergency response plan.
ARRA should track i t s actual Palo Verde related expenditures. This
information should be used i n developing ARRA's NEMF requests. The
Division o f Emergency Services shoul d comply w i t h the provisions o f A. R. S.
926- 306.01 by recommending a NEMF assessment t h a t i s a reasonable estimate
of an amount adequate t o cover a l l costs of a l l agencies involved i n Palo
Verde r e l a t e d a c t i v i t i e s . The Legislature would then be i n a position t o
determine the appropriate NEMF assessment.
Arizona Radiation Regulatory Agency's
1- rav Proaram Could Be Im~ roved( ~ a a e s5 7- 65)
The effectiveness and efficiency of the X- ray machine r e g i s t r a t i o n and fee
0 c o l l ection process coul d be improved. Currently, the Agency ' s requirement
t h a t a11 X- ray machines be registered i s not being adequately enforced.
Machine owners are not being held responsible f o r r e g i s t e r i n g t h e i r
machines. Consequently, the Agency's information on machine locations i s
C incomplete, which hinders the inspection process. I n addition, the
r e g i s t r a t i o n function i s not coordinated with the fee c o l l e c t i o n process.
Fees are due annually i n January but r e g i s t r a t i o n s take place anytime
throughout the year and are good for 4 years. As a r e s u l t , fee c o l l e c t i o n
i s unnecessarily i n e f f i c i e n t , and improperly requires inspector
invol vement. Final ly, the Agency's authori ty over radiation machine
i n s t a l l e r s i s not clear.
The fee coll ection process and registration function should be combined
into one annual process. Machine owners should be held responsible for
registering their own machines and paying re1 ated fees. Inspectors shoul d
not be involved i n fee collection. Finally, the Legislature should
consider amending the statutes to require radiation machine instal 1 ers to
report all installations to the Agency.
TABLE OF CONTENTS
ARIZONA RADIATION REGULATORY AGENCY
Page
INTRODUCTION AND BACKGROUND . . . . . . . . . . . . . . . . . . . . . . 1
SUNSETFACTORS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
FINDING I : ARIZONA RADIATION REGULATORY AGENCY ' S
INSPECTION ACTIVITIES COULD BE IMPROVED . . . . . . . . . . 15
ARRA's Inspection Programs . . . . . . . . . . . . . . . . . . . . . 1 5
Inspection Time1 iness Could Be Improved . . . . . . . . . . . . . . 17
Schedul ing Practices. Staffing Probl ems And PVNGS
Have Adversely Affected Inspection Time1 iness . . . . . . . . . . . 23
Recommendations . . . . . . . . . . . . . . . . . . . . . . . . . . 2 8
FINDING 11: THE ARIZONA RADIATION REGULATORY AGENCY
COULD STRENGTHEN AND IMPROVE THE TIMELINESS
OF ITS ENFORCEMENT ACTIONS . . . . . . . . . . . . . . . . 29
ARRA' s Enforcement Authority I s Adequate . . . . . . . . . . . . . 2 9
The X- ray Program's Enforcement Actions Could Be Stronger And Documentation Improved . . . . . . . . . . . . . . . . 3 0
Radioactive Material s Follow Up and Documentation Of Enforcement Actions Could Be Improved . . . . . . . . . . . . . . . 32
Enforcement Philosophy ~ o udl B e More Aggressive . . . . . . . . . . 3 6
Coordination With Medical Boards Could Be Improved. . . . . . . . . 38
Recommendations . . . . . . . . . . . . . . . . . . . . . . . . . . 39
FINDING 111: THE ARIZONA RADIATION REGULATORY AGENCY HAS NOT
RECEIVED NUCLEAR EMERGENCY MANAGEMENT FUNDS SUFFICIENT
TO COVER THE COSTS OF ITS PAL0 VERDE ACTIVITIES . . . . . 41
ARRA Has S i g n i f i c a n t PVNGS Responsibilities . . . . . . . . . . . . 42
ARRA Has Paid For A Considerable Portion O f I t s PVNGS
A c t i v i t i e s With General Funds . . . . . . . . . . . . . . . . . . . 43
Arizona D i v i s i o n Of Emergency Services Has Not
Requested S u f f i c i e n t NEMFs For ARRA . . . . . . . . . . . . . . . . 49
NEMF Appropriations Not I n Line With Statutes . . . . . . . . . . . 54
Recommendations . . . . . . . . . . . . . . . . . . . . . . . . . . 55
TABLE OF CONTENTS ( cont .
Page
FINDING I V : ARIZONA RADIATION REGULATORY AGENCY'S
X- RAY PROGRAM COULD BE IMPROVED . . . . . . . . . . . . . 57
Agency Management O f Registration I s Inadequate . . . . . . . . . . 57
Machine I n s t a l l a t i o n s Should Be Reported To The Agency . . . . . . . 6 1
Recommendations . . . . . . . . . . . . . . . . . . . . . . . . . . 64
OTHER PERTINENT INFORMATION . . . . . . . . . . . . . . . . . . . . . . 67
AREA FOR FURTHER AUDIT WORK . . . . . . . . . . . . . . . . . . . . . . 71
AGENCY RESPONSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73
ARIZONA RADIATION REGULATORY HEARING BOARD
INTRODUCTION AND BACKGROUND . . . . . . . . . . . . . . . . . . . . . . 75
SUNSET FACTORS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77
BOARD RESPONSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81
APPENDIX
LEGISLATIVE COUNCIL MEMORANDUM . . . . . . . . . . . . . . . . . . . . . A- 1
LIST OF TABLES
Page
TABLE 1 -
TABLE 2 -
TABLE 3 -
TABLE 4 -
TABLE 5 -
TABLE 6 -
TABLE 7 -
TABLE 8 -
Inspection and Licensing A c t i v i t i e s
For Fiscal Years 1980- 81 Through 1983- 84 . . . . . . . . . 5
General Fund And License And Registration
Fund Revenues And Expenditures For Fiscal
Years 1980- 81 Through 1983- 84. . . . . . . . . . . . . . . 6
Nuclear Emergency Management Fund Revenues
And Expenditures For Fiscal Years 1980- 81
Through 1984- 85. . . . . . . . . . . . . . . . . . . . . . 7
Inspections Exceeding C r i t e r i a For The Period
January 1, 1982 Through A p r i l 30, 1984 . . . . . . . . . 19
Inspection Frequency Data For Twelve Hospitals . . . . . 22
Available FTE's I n The X- ray And Radioactive
Materials Programs For Fiscal Years 1981 Through 1984. . 26
Time Spent On PVNGS. . . . . . . . . . . . . . . . . . . 43
NEMF Assistance And PVNGS Expenditures. . . . . . . . . . 45
INTRODUCTION AND BACKGROUND
The Office o f the Auditor General has conducted a performance audit of
the Arizona Radiation Regulatory Agency i n response t o an A p r i l 27, 1983,
resolution o f the J o i n t L e g i s l a t i v e Oversight Committee. This
performance audit was conducted as p a r t o f the Sunset Review set f o r t h i n
A. R. S. § § 41- 2351 through 41 - 2379.
The Arizona Radiation Regulatory Agency ( ARRA) was established i n 1980 t o
rep1 ace the Arizona Atomic Energy Commission ( AAEC). ARRA's
r e s p o n s i b i l i t i e s include regulating the use and storage o f radioactive
material s, providing technical assistance f o r incidents, accidents, and
emergencies invol ving r a d i o a c t i ve material s, and conducting environmental
b
surveillance around any f i x e d nuclear f a c i l i t y or uranium operation.
Development O f Arizona's Radiation Protection Program
D Before 1964 the State Department o f Health conducted the a c t i v i t i e s
r e l a t i n g t o r a d i a t i o n control i n Arizona. The AAEC was created i n 1964;
however, the Department o f Heal t h continued t o perform inspections f o r
the AAEC u n t i l the end o f f i s c a l year 1967- 68.
I n 1967 Arizona became the 16th " Agreement State" by entering i n t o an
agreement with the United States Atomic Energy Commission ( c u r r e n t l y the
Nuclear Regulatory Commi ssion) . This agreement transferred t o the State
regul atory control o f radioactive source material s, small quantities o f
special nuclear material, radioactive by- products from reactors and
uranium and thorium m i l 1 t a i l ings, and permanent disposal of 1 ow- 1 eve1
waste. I n 1980 the Governor amended t h i s agreement, opting not t o r e t a i n
a u t h o r i t y over uranium mining and m i l l t a i l i n g s . The State, however,
reserves the r i g h t t o regain t h i s a u t h o r i t y when it sees f i t t o do so.
ARRA' s activities are currently divided into the fol 1 owing five programs.
Radioactive Materials Licensing Program - This program carries out the
1 icensing of radiological materials, fulfil 1 i ng Arizona's Agreement State
requirements. Currently ARM oversees almost 400 radioactive material s
licensees. Inspection a c t i v i t i e s f o r the past 3 years and estimates for
fiscal year 1983- 84 are shown i n Table 1 ( page 5). Radioactive materials
1 icensure i ncl udes the regul ation of medical appl ications of radiol ogical
materi a1 s, gauges used i n highway and mineral industries, and radiographs
to determine depth. ARRA collects radioactive materials licensing fees
annually.
X- ray and Noni oni zi ng Compl i ance Program - This program i s responsi bl e
for the registration and periodic inspection of radiation machines i n
Arizona. X- ray i nspecti on acti vi ties are presented i n Tabl e 1.
Presently ARRA has more than 2,300 X- ray registrants. ARRA also registers
X- ray equi pment i nstal 1 ers and servi cers. Duri ng fiscal year 1 982- 83 the
nonionizing portion of the program handled laser and microwave
consul tations and surveys. Regi stration and compl iance i nspection of
nonionizing devices i s expected to s t a r t i n fiscal year 1984- 85
subsequent to promulgation of appl icabl e regulations.
Emergency Response Program - This program carries out ARRA's
responsibilities for providing technical support in the case of any
radiol ogical i nci dent, accident or emergency wi t h i n Arizona. Program
personnel developed a suppl ement to the off- site emergency response plan
for the Palo Verde Nuclear Generating Station ( PVNGS). This supplement
provides directions for assessing and protecting against radiation
hazards in the event of an emergency. In addition, program staff train
and coordinate the Radio1 ogical Emergency Assistance Team ( REAT). The
REAT, which consists of volunteer personnel from county and State
agencies, assists ARRA i n f u l f i l 1 i ng i t s PVNGS off- si te monitoring
responsibil i ties. Tabl e 1 presents emergency response activities since
fiscal year 1980- 81 .
Environmental Survei 11 ance Program - This program's p r i o r i t y i s the
o f f - s i t e environmental monitoring around PVNGS. Preoperational
environmental surveillance and emergency sampling and analysis i n the
event o f an accident are p a r t o f the program's PVNGS r e s p o n s i b i l i t i e s .
The s t a f f a1 so provides 1 aboratory analyses f o r ARRA' s other programs.
Laboratory analysis a c t i v i t i e s are shown i n Table 1.
Low- 1 evel Radioactive Waste Disposal Program - This newly establ i shed
program was set up t o oversee Arizona's provisions f o r disposal o f
low- 1 evel and possibly high- 1 evel radioactive waste. Program s t a f f , i n
conjunction w i t h the state o f California, drafted l e g i s l a t i o n t h a t w i l l
provide f o r a low- level waste compact w i t h California. The Arizona
Legislature passed t h i s 1 egi s l a t i on i n 1984; the C a l i f o r n i a Legi sl ature
adjourned i n 1984 without passing the l e g i s l a t i o n but w i l l reconsider the
proposal i n t h e i r next session i n January 1985.
Budget and Personnel
b
ARRA's revenues come from the General Fund, the Radiation Regulatory
Licensing and Registration Fund, and the Nucl ear Emergency Management
Fund ( NEMF). The NEMF was established i n f i s c a l year 1980- 81 t o provide
funding from the u t i l i t i e s f o r Arizona's nuclear generating s t a t i o n
D
emergency response a c t i v i t i e s . General Fund revenues and expenditures
f o r f i s c a l years 1979- 80 through 1982- 83 and estimated amounts for f i s c a l
year 1983- 84 are shown i n Table 2 ( page 6). NEMF revenues and
expenditures since f i s c a l year 1980- 81 are shown i n Tab1 e 3 ( page 6).
D
ARRA had 28 f u l l - t i m e equivalent positions i n f i s c a l year 1983- 84; two o f
these positions are funded from the NEMF. No a d d i t i o n a l p o s i t i o n s w i l l
be added i n f i s c a l year 1984- 85.
D
Audit Scope and Purpose
Our audit o f ARRA addressed issues set f o r t h i n the 12 Sunset Factors i n
A. R. S. $ 41- 2354. Additional detailed work was done on the following
issues.
@ Whether the Agency's inspection and enforcement activities are
effective and a t an adequate 1 eve1 .
@ Whether the Agency i s being properly reimbursed for i t s Palo
Verde related activities.
( I Whether efficiency and effectiveness can be improved i n the
foll owing administrative areas:
1. X- ray machine registration and fee col lection process.
2. Notification system regarding install ation of new
radiation machines.
In addition, we conducted a 1 imited review of ARRA's licensing and
registration fee system and of other states' systems for funding activity
re1 ated to nuclear generati ng stations.
The Auditor General and staff express appreciation to the director and
staff of the Arizona Radiation Regulatory Agency for their cooperation
and assistance during the course of our audit.
TABLE 1
INSPECTION AND LICENSING ACTIVITIES
FOR FISCAL YEARS 1980- 81 THROUGH 1983- 84
Ac tua 1
1980- 81
Lab Sample Analyses 4,580
X- ray Registrants Inspected 90 7
Machines Inspected 1,442
Tubes Inspected 1,737
Microwave 5 0
Laser 2
Radioactive Material s Licenses 41 5
New Licenses and
License Renewals 4 7
Inspections 231
Emergency Response Incidents 5
Ac tua 1
1981 - 82
Actual Estimated
1982- 83 1983- 84
Source : Arizona Radiation Regul atory Agency budget request f o r f i s c a l
year 1984- 85
Ir: ( 1 ) Lab sample analyses increased s i g n i f i c a n t l y i n f i s c a l year 1982- 83 as
a r e s u l t o f a s h i f t o f resources toward actual sample analysis and
away from i ni t i a l development o f 1 ab procedures.
( 2) X- ray inspection a c t i v i t y decreased s i g n i f i c a n t l y i n f i s c a l year
1982- 83 as a r e s u l t o f inspectors devoting time to: 1 ) the newly
established fee c o l l e c t i o n process, 2) Pal o Verde re1 ated a c t i v i t i e s ,
and 3) an attempt t o manually establish d e t a i l e d inspection
schedul i ng.
TABLE 2
GENERAL FUND AND LICENSE AND REGISTRATION FUND
REVENUES AND EXPENDITURES FOR FISCAL YEARS 1980- 81 THROUGH 1983- 84
FY 1980- 81
Actual
Authorized Full - Time
Equi val ent Positions 2 7
Revenues:
General Fund
Appropriation $ 1,106,400
Licensing/
Registration Fees
Carry- Forward
From Prior Year
Total
Revenues $ 1.106.400 ( 1 )
Expenditures:
Personal Services 367,600
Employee Re1 ated 72,000
Professional/ Outside
Services 95,400
Travel :
In- State 26,300
Out- Of- State 13,000
Other Operating
Ex~ endtiu res 222 . OOO
~ ~ pmuent i 147; 900
Total
Expenditures 944,200
Amount Reverted to
General Fund 162,300
Licensing Fees
Carry- Forward
Remit To General Fund
FY 1981- 82 FY 1982- 83
Actual Actual
FY 1983- 84
Estimated
Total $ 1.106.500 $ 1.036.800 $ 1.029.200 $ 1.239.800
( 2 1
4
( 21
Sources: Arizona Radiation Regulatory Agency unaudited annual reports for 1981
through 1983 and ARRA budget requests
( 1 ) Differences between revenues and expenditures i n fiscal year 1- 980- 81 through
1982- 83 are due to rounding and other immaterial discrepancies that ARRA 4
personnel coul d not expl ai n.
( 2) Totals for fiscal years 1982- 83 and 1983- 84 r e f l e c t both General Fund
appropriations plus accumulated 1 icensing fees; however these total s do not
ref1 ect amounts actually available to the Agency, as the Agency's expenditures
are 1 imited to its General Fund appropriation i n any one year. ( I
TABLE 3
NUCLEAR EMERGENCY MANAGEMENT FUND REVENUES AND EXPENDITURES
FOR FISCAL YEARS 1980- 81 THROUGH 1984- 85
FY 80- 81
Actual
FY 81 - 82
Actual
FY 82- 83 FY 83- 84
Actual Estimated
Full Time
Equival ent Posi tions
Revenues:
NEMF A1 location $ 30,400
Carry- Forward From
Prior Year
Total Revenues $ 30.400 ( 2 )
Expenditures :
Personal Services
Empl oyee Re1 a ted
Professional And
Outside Services
Travel :
In- State
Out- Of- State
Other Opera ti ng
Expenditures
Equipment 98,100 268,000 92,100
I)
25,000
Total
Expenditures 24,900 ( 1 ) 120,800 351,800 233,000 1 22,800
Carry- Forward 5,400 26,900 11,500 11,500 ( 3)
@ Total $ 30.300 ( 2 ) $ 147.700 ( 2) $ 363.300 ( 2 ) $ 244.500 $ 1 22.800
Sources: Revenues were obtained from Arizona Radiation Regul atory Agency appropriation
b i l l s . Expenditure detail was obtained from various ARRA documents.
( 1 ) Detailed expenditure data was not avail able f o r f i s c a l year 1980- 81.
8 ( 2) Differences between revenues and expenditures i n fiscal years 1980- 81 through
1982- 83 are due to rounding and other immaterial discrepancies that ARRA personnel
could not explain.
( 3) The difference between the carry- forward from fiscal year 1983- 84 and the
carry- forward t o fiscal year 1984- 85 is due to the fact that original estimates are
shown f o r f i s c a l year 1983- 84 expenditures; however, the Agency 1 ater projected that
C i t would incur vacancy savings and incorporated these savings i n its fiscal year
1984- 85 request, increasing the carry- f orward from fiscal year 1983- 84 ( see Fi ndi ng
111, page 46).
SUNSET FACTORS
I n accordance w i t h A. R. S. $ 41 - 2354, the Legi s l a t u r e s houl d consider the
f o l lowing 12 factors i n determining whether the Arizona Radiation
Regul atory Agency shoul d be continued or terminated.
1. Objective and purpose i n establishing the Agency
L e g i s l a t i v e i n t e n t i n establ ishing the Arizona Radiation Regulatory
Agency ( ARRA) i s t o m i t i g a t e the r i s k s t o the public inherent i n
exposure t o radiation. Laws 1980, chapter 206 $ 1 states:
" It i s declared t o be the p o l i c y of t h i s state t o
protect the public health and safety by regulating the
use and sources of r a d i a t i o n t o provide f o r ( 1 ) use of
methods and procedures r e l a t i n g t o r a d i a t i o n which are
demonstrated t o be safe; and ( 2) maintaining exposure
to sources o f r a d i a t i o n i n amounts as low as i s
reasonably achievable by means o f good r a d i a t i o n
protection planning, practice and enforcement."
Consequently, the Agency's overall objective i s t o safeguard the
public health and safety i n a l l matters concerned w i t h the use,
storage, and disposal o f sources o f radiation. This includes taking
necessary action w i t h regard t o accidents, incidents or emergencies
invol ving radiation.
2. The effectiveness w i t h which the Agency has met i t s objective and
purpose and the e f f i c i e n c y w i t h which the Agency has operated
The Agency has generally met i t s objectives and purpose. The Agency
1 icenses radioactive material s and r e g i s t e r s r a d i a t i o n machines. Both
licensees and r e g i s t r a n t s are subject t o compliance inspections.
However, the Agency could improve i t s effectiveness i n the area of
compl i ance inspection frequency, enforcement of i t s r u l es and
regulations, and documentation o f enforcement a c t i v i t i e s ( see
Finding I, page 15, and Finding 11, page 29).
ARRA has e f f e c t i v e l y responded t o r a d i a t i o n - r e l a t e d emergencies and
incidents w i t h i n the State. ARRA has been praised f o r i t s actions
re1 a t i ng t o a r e c e n t i n c i d e n t i nvol ving r a d i o a c t i v e rebar imported
from Mexico. ARRA has also been r a t e d h i g h l y i n past exercises t h a t
tested the State's capabil i t i e s f o r reaction t o p o t e n t i a l emergencies
i n v o l ving r a d i a t i o n emissions from the Pal o Verde Nuclear Generating
Station.
3. The extent t o which the Agency has operated w i t h i n the p u b l i c i n t e r e s t
The Agency's inspection, emergency response, and environmental P
s u r v e i l lance functions serve the publ i c i n t e r e s t by attempting t o
monitor and mi t i g a t e the publ i c ' s exposure t o r a d i a t i o n . However, the
p u b l i c i n t e r e s t could be b e t t e r served i f the Agency adopted more of
an enforcement oriented philosophy ( see Finding 11, page 29). With
regard t o emergency response, the U. S. Nucl ear Regul atory Commission
( NRC) r e c e n t l y commended ARRA f o r i t s handling o f the 1984
contaminated Mexican rebar incident. ARRA was praised f o r ". . . prompt and thorough actions taken t o c o n t r o l t h e r a d i o l o g i c a l
hazards of t h i s i n c i d e n t and p r o t e c t t h e p u b l i c h e a l t h and safety."
4. The extent t o which r u l e s and regulations promulgated by the Agency
a r e c o n s i s t e n t w i t h the 1 egis1 a t i ve mandate
The Agency has been updating i t s r u l e s and regulations over t h e p a s t 3
years. Several a r t i c l e s are close t o being approved f o r consistency
w i t h s t a t u t e s b y t h e Attorney General. However, a problem w i t h one
a r t i c l e arose d u r i n g t h e Attorney General ' s review w i t h regard t o a
requirement f o r the r e g i s t r a t i o n o f X- ray machine i n s t a l l e r s t h a t was
i n c o n s i s t e n t w i t h the statutes ( see Finding I V , page 57). Other
a r t i c l e s have not y e t been reviewed by the Attorney General and are a t
various stages o f development.
The Nuclear Regulatory Commission has c i t e d ARRA f o r f a i l u r e t o have
updated regul a t i ons t h a t a r e c o n s i s t e n t w i t h t h e i r s . This consistency
i s a requirement o f ARRA's agreement w i t h the NRC. The NRC noted t h i s
problem i n l e t t e r s t o ARRA dated January 1982, May 1983 and June 1984.
5. The extent t o which the Aaencv has encouraaed i n ~ u tfr om the ~ u bi cl
before promulgating i t s r u l e s and regulations and the extent t o which
it has informed the p u b l i c as t o i t s actions and t h e i r expected impact
on t h e p u b l i c
The Agency f i l e s notices w i t h the Secretary o f State regarding public
r u l e s and regulations hearings. Four such f i l i n g s have been made
since 1982. The Agency also sends notices o f hearings t o trade and
professional organizations. The Agency appears t o have compl i e d w i t h
open meeting law requirements f o r these hearings. The Agency also
generally informs the p u b l i c o f i t s a c t i v i t i e s through a periodic
news1 e t t e r and press re1 eases.
6. The extent t o which the Agency has been able t o i n v e s t i g a t e and
resol ve complaints t h a t are w i t h i n i t s j u r i s d i c t i o n
Compl a i nts t h a t have been recei ved appeared t o have been adequately
i n v e s t i g a t e d and resolved. The Agency generally does not appear t o
r e c e i v e a g r e a t volume o f complaints from the p u b l i c regarding
r a d i a t i o n hazards. However, approximately 6,000 i n q u i r i e s were
r e c e n t l y received from the media and t h e p u b l i c regarding r a d i a t i o n
hazards o f imported Mexican rebar steel.
7. The extent t o which the Attorney General or any o t h e r a p p l i c a b l e
agency of State government has the a u t h o r i t y t o prosecute actions
under enabl i ng 1 egi s l ation
The Agency has s p e c i f i c s t a t u t o r y a u t h o r i t y t o assess c i v i l penal t i e s ,
impound dangerous radi a t i on sources, and suspend, modify or revoke
1 icenses. A. R. S. $ 30- 685 s p e c i f i c a l ly g i ves the Attorney General the
a u t h o r i t y upon Agency request t o make a p p l i c a t i o n t o the appropriate
court f o r an order enjoining any a c t t h a t v i o l a t e s ARRA's statutes,
rules or regulations. I n addition, A. R. S. $ 30- 687. A requires the
Attorney General t o b r i n g actions necessary t o c o l l e c t c i v i l
penalties. Further, A. R. S. $ 30- 689 establishes t h a t any person
v i o l a t i n g ARRA's statutes, rules, or regulations i s g u i l t y o f a class
2 misdemeanor. This a u t h o r i t y granted by t h e s t a t u t e s appears t o be
adequate.
8. The extent t o which the Agency has addressed d e f i c i e n c i e s i n the
enabl ing statutes which prevent it from f u l f i l l ing i t s s t a t u t o r y
mandate
The Agency proposed 1 egis1 ation t o enabl e a 1 ow- 1 eve1 waste disposal
compact w i t h the state o f California. This l e g i s l a t i o n was passed as
Senate B i l l 1365 i n 1984. This b i l l designates ARRA as the agency
responsible f o r administrative and enforcement duties i n Arizona not
s p e c i f i c a l l y assigned t o the Governor. At the present time, the
Agency does not perceive any d e f i c i e n c i e s i n i t s statutes.
9. The extent t o which changes are necessary i n the laws o f the Agency t o
adequately comply w i t h the f a c t o r s 1 i s t e d i n the Sunset Law
One change i s needed i n the Agency's statutes. A. R. S. $ 30- 672 should
be amended t o g i v e t h e Agency the a u t h o r i t y t o r e q u i r e r a d i a t i o n
machine i n s t a l l e r s t o f i l e reports on a l l i n s t a l l a t i o n s o f machines
( see Finding I V Y page 57).
10. The extent t o which t h e t e r m i n a t i o n o f the Agency would s i g n i f i c a n t l y
harm the publ i c heal th, safety o r we1 fare
Termination of the Agency could s i g n i f i c a n t l y harm the publ i c heal t h y e
safety and we1 fare. Radiation exposure poses consi derabl e heal t h
r i s k s . E f f o r t s should be made t o keep p u b l i c r a d i a t i o n exposure as
1 ow as reasonably possible t o mi t i g a t e these risks. ARRA's inspection
( i n c l uding 1 icensing and r e g i s t r a t i o n ) , environmental s u r v e i l lance,
and emergency response a c t i v i t i e s are important t o t h i s goal.
11. The extent t o which the 1 eve1 o f regulation exercised by the Agency i s
appropriate and whether less or more stringent l e v e l s o f regulation
would be a ~ ~ r o ~ r i a t e
Currently, the l e v e l o f regulation exercised by the Agency appears to
be generally appropriate. However, the Agency could sometimes take
stronger enforcement actions as a r e s u l t o f i t s radioacive materials
and X- ray inspection a c t i v i t i e s ( see Finding 11, page 29). There are
also several areas i n t o which the Agency could expand i n the f u t u r e i f
deemed necessary, including drinking water analysis, nonionizing
surveillance ( microwave and lasers), monitoring uranium m i l l t a i l i n g s ,
monitoring material s used i n home construction f o r r a d i o a c t i v i t y , and
devel oping techniques f o r recovery a f t e r a major accident i nvol ving
r a d i a t i o n ( such as a t a nuclear plant).
12. The extent t o which the Agency has used p r i v a t e contractors i n the
performance o f i t s duties and how e f f e c t i v e use o f p r i v a t e contractors
coul d be accom~ ils h ed
The Agency does not use p r i v a t e contractors t o a s i g n i f i c a n t degree i n
the performance of i t s primary duties. However, the Agency does
contract out analysis o f i t s employees' f i l m badges. These f i l m
badges are used t o assess r a d i a t i o n exposure of i n d i v i d u a l s who work
near r a d i a t i o n sources. I n addition, p r i vate contractors have been
used for s t a f f t r a i n i n g ( p a r t i c u l a r l y r e l a t i n g t o emergency response
and Palo Verde), preparation of educational material s, evaluation of
Palo Verde emergency response plans, instrument c a l i b r a t i o n , and
assistance i n s e t t i n g up a new computer system i n the environmental
surveil 1 ance 1 aboratory. ARRA's d i r e c t o r considers using p r i vate
contractors whenever the experti se or manpower i s not avai 1 abl e
in- house t o perform a needed function.
FINDING I
ARIZONA RADIATION REGULATORY AGENCY'S INSPECTION ACTIVITIES COULD BE
IMPROVED
The Arizona Radiation Regulatory Agency ( ARRA) coul d improve i t s
inspection a c t i v i t i e s . The Agency, through the X- ray compliance and
radioactive material s programs, has not conducted timely i nspections o f
X- ray machines and radioactive materials. Scheduling practices, s t a f f i n g
problems and Palo Verde Nuclear Generating Station a c t i v i t i e s have
adverse1 y impacted the X- ray and radioactive materi a1 s programs.
ARRA' s Inspection Programs
ARRA i s instructed by statute t o " Regulate the use, storage and disposal
o f sources o f radiation." This rather broad mandate d i r e c t s the Agency t o
adopt inspection and enforcement regulations and programs t o adequately
protect the public from excessive exposure t o r a d i a t i o n sources.
Currently, ARRA operates two regulatory programs - X- ray compliance and
radioactive materials. Each program i s empowered t o regulate the use and
possession o f various sources of radiation. These programs serve t o
protect the public from radiation health hazards.
X- Ray Compl iance - The X- ray compl iance program regulates i o n i z i n g
( X- rays) and nonionizing ( lasers, microwaves, radar and other forms o f
electromagnetic r a d i a t i o n ) r a d i a t i o n sources. To accompl i sh i t s
regulatory duty, the X- ray program registers f a c i l i t i e s t h a t possess
i o n i z i n g r a d i a t i on- produci ng sources. Approximately 2,400 regi s t r a t i ons
are on f i l e with the Agency a t t h i s time, representing 4,447 X- ray
machines and 5,489 X- ray tubes, according t o the X- ray program manager.
I n addition, the X- ray compliance program i s required t o conduct i n i t i a l
and periodic inspections o f registered f a c i 1 i t i e s possessing i o n i z i n g
r a d i a t i o n producing sources. The frequency of the periodic inspections i s
determined by c r i t e r i a established by the X- ray program and i s compatible
with c r i t e r i a developed by the Conference of Radiation Control Program
Directors. The Conference's c r i t e r i a are meant t o be guidelines f o r state
programs. The X- ray program' s schedule, which requires inspections every
2 t o 4 years depending on f a c i l i t y type, i s presented i n Table 4 alongside
the Conference ' s g u i del i nes.
Beyond p e r i o d i c o r r o u t i n e inspections, both the X- ray program and the
Conference consider t h e i n s p e c t i o n o f new f a c i l i t i e s a high p r i o r i t y .
While the Conference suggests t h a t i n i t i a l inspections be conducted w i t h i n
1 year o f i n s t a l l a t i o n , the Agency i s more s t r i n g e n t , r e q u i r i n g t h a t
i n i t i a l inspections be conducted w i t h i n 30 days o f i n s t a l l a t i o n . I n
addition, the Conference recommends t h a t every f a c i l i t y be inspected or
surveyed a t l e a s t once every 5 years, while ARRA allows a maximum o f 4
years.
Radioactive Materials - Under the Agreement State Contract w i t h the
Nuclear Regul atory Commission ( NRC) , ARRA i s responsi b l e f o r t h e c o n t r o l
of r a d i o a c t i v e by- product material.* This contract requires t h a t ARRA's
r u l e s and regulations be compatible w i t h the NRC's Administrative Law
Code, 10 CFR 20. To f u l f i l l the Agreement State Contract, t h e r a d i o a c t i v e
material s program 1 icenses the users of by- product material s.
Approximately 300 s p e c i f i c and 150 general medical 1 icenses are c u r r e n t l y
issued by the Agency according t o the program manager.
The r a d i o a c t i ve materials program i s responsible for conducting i n i t i a l
and periodic inspections of licensed r a d i a t i o n source users. The
frequency o f inspections i s determined by c r i t e r i a establ ished by the
Agency and the Nuclear Regulatory Commission. ARRA, through the Agreement
State Contract, i s required t o " use i t s best e f f o r t s t o maintain
continuing c o m p a t i b i l i t y w i t h the NRC's program" of regulating r a d i a t i o n
source users. Although the NRC's c r i t e r i a are meant t o be the minimum
l e v e l of inspection frequency, the Agency had r e c e n t l y changed from i t s own
* By- product material i s any r a d i oacti ve material ( except special
nuclear material ) y i e l d e d i n o r made r a d i o a c t i v e by exposure t o the
r a d i a t i o n i n c i d e n t t o the process o f producing o r u t i l i z i n g special
nuclear material s. Special nuclear materials i n q u a n t i t i e s s u f f i c i e n t
t o form c r i t i c a l mass are licensed by the NRC.
more stringent c r i t e r i a * t o a version o f the NRC's c r i t e r i a . * *
Radiation Health Risks - ARRA's two inspection programs were created t o
p r o t e c t the pub1 i c from the potenti a1 ly serious heal t h r i s k s i nvol v i ng
excessive exposure t o radiation. The Committee on Federal Research on the
Biological and Health E f f e c t s o f Ionizing Radiation has c l a s s i f i e d four
major types o f e f f e c t s o f i o n i z i n g radiation:
" Cancer may be induced . . . i n d i f f e r e n t tissues and
appear a f t e r various lengths o f time ( l a t e n t periods)
f o l 1 owing r a d i a t i o n exposure. The minimal 1 atent
periods may vary from 2 [ years] f o r leukemia t o 15
[ years] o r longer f o r some s o l i d cancers.
Genetic or h e r i t a b l e changes . . . may occur i n . . .
[ offspring] and i n f u t u r e generations derived from
exposed humans.
. . . developmental changes may occur during the
development o f the embryo or fetus exposed t o r a d i a t i o n
during gestation.
Degenerative changes may occur as expressions o f l o c a l
r a d i a t i o n i n j u r y , e. g. , cataractogenesi s, impai rment of
f e r t i l ity, and a1 tered immune responses. "
ARRA must adopt strong inspection and enforcement programs i f the public
i s t o be properly protected from such hazards.
Inspection Timeliness
Could Be Improved
ARRA could increase the frequency o f X- ray and radioactive materials
inspections. W i t h i n the X- ray compl iance program, excessive time has
elapsed between routine inspections o f registered r a d i a t i o n sources. I n
addition, the radioactive material s program has experienced d i f f i c u l t y i n
conducting timely inspections o f licensed r a d i a t i o n source users.
* The Agency's c r i t e r i a required an inspection of a l l radioactive
material s 1 icenses wi t h i n 18 months.
** The exact time o f t h i s t r a n s i t i o n i s unclear. The NRC states t h a t
ARRA changed i n A p r i l of 1983, while the radioactive material s program
manager has stated t h a t the t r a n s i t i o n took place sometime around
January o f 1984.
X- ray Inspections Have Been Untimely - The X- ray compliance program has
had d i f f i c u l t y conducting inspections i n a timely manner. A random sample
o f the program's r e g i s t r a t i o n f i l e s indicated problems with inspection
timeliness.* I n many instances the time between inspections f o r
i n d i v i d u a l f aci 1 i ty type exceeds Agency and n a t i onal c r i t e r i a .
Furthermore, the survey i d e n t i f i e d cases i n which excessive time elapsed
between new i n s t a l 1 a t i ons and i ni ti a1 inspections.
Tab1 e 4 ill ustrates the untimel i ness o f the X- ray program's inspections.
Twenty- nine percent o f the inspections reviewed i n the random sample
exceeded the Agency's c r i t e r i a , almost ha1 f o f which exceeded the c r i t e r i a
by more than 6 months. I n addition, 11 percent o f the f a c i l i t i e s reviewed
were past due f o r t h e i r next inspection as o f A p r i l 30, 1984, under the
Agency's c r i t e r i a .
* A random sample o f the Agency's r e g i s t r a t i o n and licensing f i l e s was
u t i l i z e d i n which 250 X- ray r e g i s t r a t i o n f i l e s and 70 radioactive
materi a1 s 1 icensi ng f i 1 es were drawn.
18
TABLE 4
INSPECTIONS EXCEEDING CRITERIA
FOR THE PERIOD JANUARY 1, 1982 THROUGH APRIL 30, 1984
Time Since
6 mos. More Than Last Inspection
Number of Total Inspections or Less 6 Mos. Over Over Agency C r i t e r i a
Registrant F a c i l i t i e s Inspections Within Agency Over Agency Agency 6 Mos. or 6 Mos. or Agency Conference
Category I n Sample Conducted C r i t e r i a C r i t e r i a C r i t e r i a Less More C r i t e r i a C r i t e r i a
Hospital s
Medical
Chi ropractic
Veterinary
Dental
I n d u s t r i a l
Podi a t r i c
Osteopathic
Educational
Total
Source: Random sample o f ARRA's X- ray r e g i s t r a n t f i l e s
Extreme instances of untimely inspections were also evident. The survey
noted individual instances of registered f a c i l i t i e s that had not been
inspected for substantial periods of time. For example:
a Four hospital s had n o t been inspected for more than 36 months.
a Six medical f a c i l i t i e s had not been inspected for more than 40
months.
a One veterinary facility had not been inspected for more than 87
months.
a The University of Arizona Medical Center, w i t h almost 50
regi stered machines, had not been i nspected si nce September of
1981 ( 31 months).
Initial inspections of f a c i l i t i e s w i t h newly installed machines have also
been untimely. Many f a c i l i t i e s operated well over the program's 30- day
c r i t e r i a before an initial inspection occurred. The survey identified
that since 1981 there were 14 f a c i l i t i e s w i t h new machine installations
that operated for more than 12 months before an initial inspection was
conducted.
Extreme cases of untimely initial inspections were also identified. For
example, a t the time of the random sample:
a Amedical facility had operated for 42months w i t h o u t an initial
inspection.
a A dental facility had operated for 57 months w i t h o u t an initial
inspection.
A veterinary facility had operated for more than 87 months
without an initial , inspection.
Untimely Radioactive Material s Inspections - The radioactive material s
program could also improve i t s inspection frequency. A random sample of
the radioactive materials 1 icenses identified numerous instances i n which
excessive time elapsed between inspections of licensed users. These
intervals exceed inspection frequency criteria established by the Agency
and, according t o the Nuclear Regul atory Commission, have 1 owered the
program's frequency o f inspections t o the minimum accepted by the Nuclear
Regul atory Commission.
Several cases o f untimely inspections were i d e n t i f i e d through the random
sample, encompassing the 18 types o f r a d i o a c t i v e m a t e r i a l s 1 icenses.
However, the sample r e s u l t s on the inspection frequency o f hospitals best
i l l u s t r a t e s t h i s point.
Hospital inspections are a high p r i o r i t y o f ARRA and the NRC since the
d i r e c t use o f by- product material w i t h p a t i e n t s and the use o f unsealed
sources* c r e a t e a greater r i s k t o pub1 i c health and safety. A1 though NRC
c r i t e r i a require an inspection o f each hospital a t a minimum o f once every
24 months, the Agency believes t h a t t h e p o t e n t i a l hazards warrant an
D inspection o f hospitals a t a minimum o f once every 18 months.
Twelve o f the approximately 44 hospitals licensed by ARRA f o r the
possession o f r a d i o a c t i v e m a t e r i a l s were reviewed i n the random sample.
R A l l 12 o f these h o s p i t a l s a r e 1 icensed t o use by- product material and
unsealed sources f o r diagnostic and therapeutic treatment. Analyses
included the number o f days since the l a s t inspection was conducted and
the number o f days between previous inspections. Table 5 summarizes the
inspection frequency o f the 12 hospital s.
* Unsealed sources a r e r a d i o a c t i v e m a t e r i a l s t h a t are not permanently
bonded or f i x e d i n capsules t o prevent release o f radiation.
TABLE 5
INSPECTION FREQUENCY DATA FOR 12 HOSPITALS
Date of Time Elapsed Date of Time Elapsed
Hospital Last Inspection ( Months) ) Previous Inspection ( Months) ( 2 )
August 1982
March 1 982
March 1982
March 1984
May 1982
March 1984
March 1 984
December 1983
March 1 984
April 1984
April 1984
April 1984
August 1980
December 1981
( 3)
September 1982
( 3
( 3
April 1982
September 1980
December 1982
December 1982
Source: Compiled by Auditor General s t a f f from the random sample of
radioactive material s 1 icense f i l e s ( I
( 1) Denotes the months elapsed between the date of 1 ast inspection and
the date the sample was taken ( May 25, 1984).
( 2) Denotes the months elapsed between the date of 1 ast inspection and
the previous inspection of the facility.
( 3) Last inspection was i n i t i a l inspection of the f a c i l i t y . ( I
Tab1 e 5 reveal s that the radioactive material s program, in most instances,
did not meet i t s own inspection frequency c r i t e r i a for conducting hospital
inspections and, i n some instances, exceeded the minimum c r i t e r i a
4
established by the NRC.
Presently, the program's frequency of inspections is a t the minimum level
accepted by the Nuclear Regulatory Commission. In its most recent audit, I
the NRC calculated the backlog of all inspections a t 10 t o 25 percent.*
* The NRC employed two methods to calculate the percentage of backlog: 4
1) Dividing the number of overdue inspections i n the 1- year period of
April 8, 1983, to April 8, 1984, by the total number of radioactive
licenses - 30 divided by 288 = 10.4 percent. 2) Dividing the number
of overdue inspections during the 1- year period by the number of
scheduled inspections during the same period - 30 divided by 117 =
25.6 percent. 4
According t o the NRC, the Agency's i n a b i l i t y t o maintain a consistent
l e v e l o f inspection frequency w i t h i n the X- ray compliance and radioactive
materials programs could adversely affect pub1 i c health and safety by
p o t e n t i a l l y increasing the number of items o f noncompliance c i t e d on
subsequent overdue inspections. An expert i n the f i e l d stated t h a t the
more time t h a t passes between inspections, the greater t h e h e a l t h r i s k .
This i s the underlying premise f o r s e t t i n g inspection frequency c r i t e r i a .
Schedul ing Practices, S t a f f i n g Problems And
PVNGS Have Adverse1 v Affected Insoectinn Time1 iness
The X- ray compliance and r a d i o a c t i v e m a t e r i a l s programs' inspection
time1 iness have been adversely impacted by schedul ing practices, s t a f f i n g
problems and Pal o Verde Nuclear Generating Station ( PVNGS) a c t i v i t i e s .
Inadequate Sc hedul ing Practices Have Decreased Inspecti on Time1 i ness - An
inadequate system o f schedul ing X- ray r e g i s t r a t i o n and r a d i o a c t i ve
material 1 icensing inspections has contributed t o the Agency's i nabil i ty
t o conduct inspections i n a timely manner. Both programs use a manually
maintained card f i 1 e* t o schedule inspections, which i s i n e f f i c i e n t and
contributes t o the untimeliness o f inspections. Automation of the
schedul ing system could g r e a t l y increase inspection e f f i c i e n c y .
a The X- ray compl iance program's inspection schedul ing inadequacies are
due t o the lack o f a prepared schedule. Presently, the program's
primary scheduling tool i s a card f i l e containing information on the
more than 2,400 r e g i s t r a t i o n s issued by the Agency. This system o f
schedul ing i s i n e f f i c i e n t and r e s u l t s i n untimely inspections.
The X- ray program does not schedule inspections from a predetermined
schedule. The current method a1 1 ows the program's inspectors to
select a majority o f t h e i r own inspection s i t e s from the card f i l e .
* The cards are f i l e d alphabetically w i t h i n subgroups of county and
d i s c i p l i n e and each card has the r e g i s t r a n t o r licensee's name and
address, the number o f registered X- ray machines and tubes or the type
of licensed r a d i a t i o n source, and the date o f l a s t inspection.
Scheduling inspections from the card f i l e i s i n e f f i c i e n t . I n many
instances, f a c i l i t i e s are inspected because they are noticed by an
inspector during the inspection o f another f a c i l i t y w i t h i n the area.
Consequently, some f a c i l i t i e s are inspected before required by Agency
c r i t e r i a , while other f a c i 1 i t i e s remain uninspected f o r unacceptable
periods.
Another probl em i nvol ves the vul nerabil i ty o f the cards themselves.
In the past, cards have been l o s t or misplaced. Consequently,
f a c i l i t i e s have gone without inspections f o r years without Agency
personnel being aware of t h e i r existence, a1 though a separate
r e g i s t r a t i o n f i l e f o r the f a c i l i ty was maintained by the Agency.
I n addition t o problems caused by the card f i l e , inspections are often
p r i o r i t i z e d based on geographic 1 ocation. According t o the X- ray
compliance program manager, t o compensate f o r a lack o f manpower,
inspections have been concentrated i n geographic areas t h a t contained
proportionately more r a d i a t i o n machines. Therefore, machines i n urban
areas have tended t o be inspected more frequently than machines i n
r u r a l areas. The program manager stated that the purpose o f t h i s
practice was t o keep the t o t a l number o f inspections per year a t an
acceptabl e 1 eve1 .
The radioactive materi a1 s program's i nspection schedul i ng problems are
also due t o an inadequate scheduling system. A1 though an 18 month
inspection schedule has been created, it f a i l s t o i d e n t i f y overdue
inspections, repeat v i o l a t o r s and follow- up inspections i n a timely
manner. I n addition, the current scheduling system does not r e f l e c t
the NRC's inspection frequency c r i t e r i a .
The r a d i o a c t i v e materials program u t i l i z e s a card f i l e t o generate an
18 month inspection schedule. The program manager reviews the cards
and establishes the p r i o r i t y and inspection frequency for each
license. Procedures f o r the use o f t h i s schedule c a l l f o r individual
inspectors t o select inspections t h a t are overdue or are due for the
current month. Those inspections not selected are assigned by the
program manager.
Once produced, the 18 month i nspection schedule i s i nfrequently
updated, because the cards are used as a source f o r the schedule.
Since the schedule becomes fixed once created, it i s d i f f i c u l t f o r the
status o f overdue inspections and inspections with previous c i t a t i o n s
of noncompliance, which require more attention from program personnel,
t o be r e f l e c t e d on the schedule i n a timely manner.
I n addition, the 18 month schedule does not r e f l e c t the NRC's
inspection frequency c r i t e r i a . As mentioned previously, the program
recently abandoned i t s own c r i t e r i a and adopted a version o f the NRC
inspection frequency c r i t e r i a . However, the 18 month schedul e from
which the Agency i s currently operating has not been altered t o
r e f l e c t t h i s substantial change i n the program's inspection
frequency. Due t o the i n f l e x i b i l i t y o f the fixed schedule, it was
d i f f i c u l t f o r the program manager t o make the necessary changes i n a
timely manner.
0 Automation of the X- ray compl iance and radioactive material s programs'
scheduling systems shoul d increase inspection frequency and
efficiency. It w i l l allow the programs t o engage i n longer range and
more systemati c schedul i ng , thereby increasing the programs ' abi 1 i ty
t o maintain an information data base on the status and condition o f
inspection and enforcement a c t i v i t i e s .
Other state radiation control programs, such as Georgia and South
Carol ina, have completely automated t h e i r 1 icensi ng f i l e s . Both
states have had favorable experiences with such a system, noting
considerabl e advantage over a manual schedul i ng system, p a r t i c u l a r l y
one derived from a card f i l e .
According t o the deputy director, ARRA has begun t o computerize the
Agency's 1 icensing f i l e s for schedul i ng inspections and enforcement
actions. The Agency's existing computer system i s sufficient to begin
automati on. However, additional hardware and software may be
necessary for ARRA to implement a computer system capable of providing
an adequate data base.
Staff Turnover Has Reduced Inspection Frequency - ARRA's problems in
retaining experienced technical and cl erical staff have a1 so contributed
to the untimeliness of inspections. Staff turnover has been one of the
Agency's major concerns, and reduces the amount of inspectors' time
available and increases training time necessary for new recruits.
Turnover has negatively affected program performance. The X- ray and
radi oacti ve materi a1 s programs have historical ly operated with 1 ess staff
than has been authorized. By calculating worker months* available for
each fiscal year, a total number of available full- time equivalent
positions ( FTEs) can be derived for each of the l a s t 4 fiscal years.
Table 6 compares available FTEs with authorized FTEs.
TABLE 6
AVAILABLE FTES IN THE X- RAY AND RADIOACTIVE MATERIALS PROGRAMS
FOR FISCAL YEARS 1981 THROUGH 1984
X- ray Compliance
FTEs Authorized 4 4 4 5
FTEs Available 3 4 3.4 3.9
Radioacti ve Material s
FTEs Authorized 5.5 5.5 5 5
FTEs Avai 1 abl e 4.7 5 3.1 3.3
Source: Compil ed by Auditor General staff from ARRA personnel i nformation
Besides lessening available manpower for 1 ong periods of time, continuous
turnover diverts time normally spent on inspections to the necessary task
of training new personnel. Furthermore, each new inspector requires a
significant period of time before working a t a level comparable t o veteran
inspectors.
* One FTE working for 1 full month equals 1 worker month. Twelve worker
months equates to the availability of one FTE for 1 year.
2 6
According to the Agency, the increasing national demand for health
physicists has negatively affected i t s ability to retain and recruit
qual ified staff professionals. ARRA's turnover reached i t s peak in fiscal
year 1983, when 44 percent of the Agency's staff resigned. According to
the deputy director, the recruitment effort that followed was much longer
and more difficult than anticipated.
The Agency's turnover problem has recently been reviewed by the Personnel
Division of the Department of Administration. In i t s report, the
Personnel Divi sion reached the fol 1 owi ng conclusions:
" 1 ) Present classifications and class specifications
are inadequately serving these positions, the empl oyees
who work in them and the Arizona Radiation Regulatory
Agency.
2) Compensation levels for the current series examined
in the review appear to be inconsistent when compared
w i t h other job classes i n state agencies."
The Personnel Division addressed the Agency's turnover problem by
recommending a reclassification of Agency technical positions t o provide
for compensation increases and career development for the Agency Is
technical staff.
The evidence avail able indicates that the Agency's i nabil i ty to offer
competitive salaries compared w i t h other entities in the region that
employ health physicists, has hampered i t s efforts to hire and retain
qual ified personnel. The PVNGS project, for example, has been S U C C ~ S S ~ U ~
i n attracting ARRA personnel by offering higher salaries. However, i t i s
not clear whether higher salaries alone will resolve the Agency's turnover
problem.
Palo Verde Nuclear Generating Station Activities - PVNGS exercises have
reduced the amount of time available for inspections i n both the X- ray and
radioactive material s programs ( see Fi ndi ng I 11, page 42). Agency records
indicate that X- ray and radioactive material inspectors devote
approximately 10 percent of their time to PVNGS exercises. However, since
ARRA i s required by statute to: " Assume primary responsibility for and
provi de necessary technical assistance t o hand1 e any i nci dents, accidents
and emergencies involving r a d i a t i o n or sources o f r a d i a t i o n occurring
w i t h i n t h i s state," Agency s t a f f time devoted t o PVNGS a c t i v i t i e s i s
unavoidable. Thi s added responsi b i l i t y makes it even more important f o r
the Agency t o properly schedule inspections so they can be conducted i n a
timely manner.
CONCLUSIONS
The i nspection a c t i v i t i e s o f the Arizona Radiation Regulatory Agency coul d
be improved. Scheduling practices, s t a f f i n g problems and Pa10 Verde
Nuclear Generating Station a c t i v i t i e s have adversely affected the X- ray
compl i ance and radioactive materi a1 s programs ' abi 1 i ty t o conduct
inspections i n a timely manner.
RECOMMENDATIONS
1. The Agency should improve i t s system o f scheduling inspections f o r
both the X- ray compliance and r a d i o a c t i v e materials programs.
2. The Agency should imp1 ement the Personnel D i v i s i o n ' s recommendations
and continue t o evaluate i t s a b i l i t y t o compensate professional staff
a t competitive rates.
FINDING I1
THE ARIZONA RADIATION REGULATORY AGENCY COULD STRENGTHEN AND IMPROVE THE
TIMELINESS OF ITS ENFORCEMENT ACTIOtJS
The Arizona Radiation Regulatory Agency's ( ARRA) X- ray and radioacti ve
materials enforcement actions have been weak and untimely i n some
instances. ARRA's enforcement authority i s adequate. However, w i t h i n the
X- ray compliance program, we i d e n t i f i e d cases i n which stronger
enforcement actions may have been merited or actions were poorly
documented. I n addition, instances were revealed i n which the radioacti ve
materials program f a i l e d t o adequately document enforcement actions and
required excessive amounts o f time t o complete them. These problems
D r e s u l t a t 1 east p a r t i a l l y from a 1 enient enforcement phi1 osophy,
p a r t i c u l a r l y w i t h i n the X- ray program, which has adversely impacted the
Agency's a b i l i t y t o properly pursue enforcement actions. Furthermore, the
X- ray compl iance program's coordination with the State's various medical
b boards could be improved.
ARRA' s Enforcement
l ut h o r i t v I s Adeaua te
The Agency i s adequately empowered t o enforce i t s administrative
regul ations. A. R. S. S30- 688 states:
" To enforce t h i s chapter, the agency shall by r u l e and
regul a t i on, prescribe procedures for imp1 ementi ng an
escalated enforcement action. An escal ated enforcement
action may include actions such as an informal hearing,
impounding o f radiation sources, assessment of c i v i 1
penal t i e s , an order modifying, suspending, or revoking
a license issued under t h i s chapter or recommending
prosecution o f a criminal action. "
I n addition, A. R. S. $ 30- 685 states:
" When the agency finds t h a t any person has engaged i n
or i s about t o engage i n any act or practice which
constitutes or w i l l constitute a v i o l a t i o n of any
provision of t h i s chapter or any rule, regulation or
order issued under t h i s chapter, the attorney general
may, upon request o f the agency, make a p p l i c a t i o n t o the
appropriate court f o r an order enjoining such acts or practices
or f o r an order d i r e c t i n g compliance. Upon a showing by the
agency t h a t such person has engaged or i s about t o engage i n any
such a c t o r practice, a permanent o r temporary i n j u n c t i o n , or
r e s t r a i n i n g order or other order may be granted."
The s t a t u t e authorizing ARRA t o impose c i v i l penal t i e s has been i n effect
since J u l y 31, 1980. Rules and r e g u l a t i o n s s p e c i f y i n g such penal t i e s were
added by ARRA i n June 1983. ARRA r e c e n t l y assessed i t s f i r s t c i v i l
penalty, which was f o r $ 3,000.
The X- ray and r a d i o a c t i v e m a t e r i a l s programs have developed standard
operating procedures f o r f a c i l i t i e s found not t o be i n compliance w i t h
Agency admini s t r a t i ve regulations. A 1 e t t e r o f noncompl iance i s
transmitted t o the v i o l a t o r g i v i n g 30 days t o c o r r e c t the v i o l a t i o n ( s ) .
If s a t i s f a c t o r y remedial actions are not taken or i f a v i o l a t o r f a i l s t o
respond, a second l e t t e r i s sent g i v i n g 10 days t o c o r r e c t the
v i o l a t i o n ( s ) . If a v i o l a t o r has been repeatedly c i t e d f o r noncompliance
or continuously f a i l s t o respond t o the Agency's correspondence, escalated
enforcement i s pursued.
Adequate enforcement a u t h o r i t y i s c r i t i c a l because research has shown t h a t
exposure t o sources o f i o n i z i n g r a d i a t i o n can be harmful t o humans ( see
Finding I, page 17). A1 though it i s impossible t o p r e d i c t whether a
p a r t i c u l a r low- dose exposure t o an i n d i v i d u a l w i l l cause damage, i t i s
extremely important t o reduce the amount of r a d i a t i o n received by the
p u b l i c t o l e v e l s as low as reasonably achievable. Consequently, the X- ray
and r a d i o a c t i v e material s programs must enforce standards t h a t 1 essen
unnecessary exposures. F a i l u r e t o enforce these standards i n a timely
manner could r e s u l t i n increased occurrences of cancer and genetic damage.
The X- ray Program's Enforcement
a c t i o n s Could Be Stronger And
Documentation Improved
I n c e r t a i n instances, the X- ray program s houl d consider stronger
enforcement practices. A random sample of the r e g i s t r a t i o n f i l e s revealed
1 imited enforcement a c t i v i t y . O f the 250 X- ray f i l e s drawn i n the random
sample, none contained inspections t h a t resul ted i n escalated enforcement
I) actions. Because o f poor documentation o f enforcement actions, it i s
often d i f f i c u l t t o d i s t i n g u i s h between lack o f action and undocumented
action. Two cases are presented t o i l l u s t r a t e instances i n which stronger
enforcement actions may have been merited, and i n which documentation o f
actions was poor.
Case 1
On September 17, 1980, a veterinary c l i n i c ' s X- ray machine was
c i t e d f o r two items of noncompliance. One item o f noncompliance
invol ved i n s u f f i c i e n t f i l t r a t i o n i n the primary X- ray beam. The
second concerned the beam diameter, which was found t o p r o j e c t
beyond the " area o f c l i n i c a l i n t e r e s t . " Both items o f
noncompliance resulted i n a higher dosage o f r a d i a t i o n than
Agency standards allow. A f t e r two enforcement l e t t e r s were sent
by the Agency, the f a c i l i t y ' s owner, on November 26, 1980,
informed the Agency t h a t the machine would not be used u n t i l the
repairs were made. The f a c i l i t y was subsequently contacted by
the Agency on the following dates: February 3, 1981; A p r i l 1,
1981; and May 4, 1981. I n a l l three instances the f a c i l i t y ' s
owner claimed t h a t the machine was not i n use and would not be
used u n t i l it was repaired. The f a c i l i t y ' s f i l e contained no
further reference t o the machine's status.
IOn November 10, 1981, ARRA conducted a routine inspection of a
second veterinary f a c i l i t y w i t h the same owner as the f i r s t . The
machine c i t e d a t the f i r s t f a c i l i t y and repeatedly reported by
the r e g i s t r a n t as being stored was found i n use and was c i t e d for
the same two items of noncompliance as before. The inspection
WpOrt c l e a r l y mentions the fact t h a t t h i s was the same machine
as c i t e d i n the September 17, 1980 inspection. However, a
standard enforcement l e t t e r was sent t o the r e g i s t r a n t with no
mention o f the previous c i t e s of noncompliance or t h e f a l s e
statements made by the r e g i s t r a n t t o the Agency.
Comment: A1 though the r e g i s t r a n t apparently made fa1 se
statements to the Agency concerning the status and use of the
X- ray machine, no enforcement actions were taken by the Agency.
When informed o f the case, the program manager stated t h a t he d i d
not believe a t the time t h a t additional enforcement was c a l l e d
for because the s i t u a t i o n did not m e r i t such action. Because the
Agency took no enforcement action i n t h i s case, the r e g i s t r a n t
was successful i n using false statements t o continue the use of
substandard equipment.
Case 2
On December 1, 1981, a medical f a c i l i t y was c i t e d f o r two items
o f noncompliance. One item concerned r a d i a t i o n output from an
X- ray machine t h a t exceeded Agency standards and had been c i t e d
on the previous inspection. Three days l a t e r , a l e t t e r was sent
to the f a c i l i t y giving the r e g i s t r a n t 30 days t o correct the
items. A one- page inspection sheet dated January 6, 1982,
indicated t h a t the r a d i a t i o n output problem did not e x i s t , but
did not explain why. A notation on t h i s sheet f u r t h e r indicated
t h a t the physician who owned the f a c i l i t y was given the name o f a
r e p a i r service and a possible solution t o the remaining i tems of
noncompliance. There was no other correspondence i n the f i l e
u n t i l May 12, 1982, when the Agency sent a l e t t e r n o t i f y i n g the
f a c i l i t y t h a t it was " now i n compliance w i t h Agency
regulations . . . ," more than 5 months a f t e r it was cited.
Coment: I n t h i s case, 5 months elapsed before ARRA concluded
t h a t the r e g i s t r a n t took necessary remedial action. During t h i s
time, although the Agency has stated t h a t the r e g i s t r a n t ' s
progress was monitored and communication was maintained, nothing
was documented i n the f i l e s . I n t h i s case, poor documentation
make it impossible t o determine what actions were a c t u a l l y taken.
Radioacti ve Material s F- ol1 o- w I- J D
' And Documentation O f Enforcement
Act~ ons Could Be Improved
The r a d i o a c t i v e m a t e r i a l s program could improve i t s f o l l o w up and
documentation o f enforcement actions. A random sample of 70 program
1 icensing f i l e s revealed cases i n which the reinspection o f 1 icensees
found i n noncompliance was untimely and the documentation o f enforcement
actions was defi c i ent. The Nucl ear Regul atory Commi ssi on ( NRC) a1 so found
the program's documentation of enforcement actions t o be inadequate. I n
addition, the random sample i d e n t i f i e d the untimely t r a n s m i t t a l o f
enforcement 1 etters.
Cases I l l u s t r a t e Untimely Enforcement and Incomplete Documentation - The
random sample i d e n t i f i e d instances i n which enforcement actions, i n the
form of follow- up inspections, were untimely and the documentation o f
these actions was deficient. The following cases i l l u s t r a t e these points.
Case 1
I n September o f 1982, ARRA conducted a routine inspection o f a
medical f a c i l i ty. One i tem o f noncompl iance was cited, i nvol v i ng
a f a i l u r e t o leak t e s t a radium- 226 source.* The licensee had
been c i t e d f o r t h i s v i o l a t i o n i n the two previous inspections, i n
1977 and 1979. The 1 icensee's response t o the enforcement l e t t e r
from the Agency was regarded as unsatisfactory by Agency
personnel and a reinspection was scheduled f o r January o f 1983.
However, i n November o f 1982 the licensee corresponded w i t h the
Agency informing it t h a t he could not get his radium source leak
tested and asked i f Agency personnel knew o f anyone who might
want to buy the source.
The next and l a s t item t h a t appears i n the f i l e i s an X- ray
compliance inspection report dated August 10, 1983, almost 11
months a f t e r the o r i g i n a l v i o l a t i o n was cited. During a routine
X- ray inspection, the inspectors were requested by the f a c i l i ty ' s
staff t o survey the radium source. The inspectors were informed
by the s t a f f t h a t approximately 1 year e a r l i e r a p r i v a t e
consultant had found the source to be leaking and advised the
1 icensee t o dispose o f the source. However, due to a " breakdown
of the system," the consultant never returned t o dispose o f the
source. The X- ray inspectors found the source t o be leaking
excessively. The radi oacti ve materi a1 s program manager was
contacted and, according t o the X- ray report, conducted an
inspection t o determine the extent o f possible contamination.
However, there i s no report i n the f i l e concerning the program
manager's inspection o f the f a c i l i ty.
According t o an Agency o f f i c i a l , the radium source was properly
disposed o f i n a low- 1 eve1 radioactive waste disposal s i t e i n May
o f 1984, 20 months a f t e r the i n i t i a l inspection c i t i n g the
violation. However, when the f i l e was reviewed, there was no
documentation of t h i s fact. The excessive time elapsed because
there was some d i f f i c u l t y i n f i n d i n g an authorized disposal s i t e
and the licensee did not want t o pay the approximately $ 650 to
have the source disposed o f properly.
Comment: The Agency f a i l e d to conduct timely follow- up
inspections o f the f a c i l i ty and adequately document a1 1 re1 evant
occurrences and informati on. Because the Agency's actions were
untimely, the 1 icensee's source 1 eaked excessive amounts o f
r a d i a t i o n for a t l e a s t 1 year. This resulted i n the licensee's
employees and t h e p u b l i c being exposed t o unnecessary l e v e l s o f
radiation. Additional informati on provided by the Agency
suggests t h a t the excessive r a d i a t i o n l e v e l s observed by the
X- ray inspectors were due t o the misplacement o f a lead shield.
This information was not found i n t h e l i c e n s e e ' s - f i l e , and
f u r t h e r indicates a f a i l u r e t o document a l l relevant information.
* Leak tests are conducted t o ensure t h a t a sealed source i s not
re1 easing radioactive material. The f a i l ure t o perform adequate and
timely leak tests can r e s u l t i n contamination of the surrounding-envi
ronment.
Case 2
ARRA conducted an i n i t i a l inspection of an i n d u s t r i a l 1 icensee on
October 21, 1980. Four items of noncompliance were cited,
including f a i l u r e t o perform leak tests and unauthorized place o f
use and storage. A f t e r r e c e i v i n g two enforcement l e t t e r s , the
licensee responded f o r the f i r s t time on January 8, 1981. After
an undocumented meeting w i t h the licensee, the items o f
noncompl iance were c l eared on March 2, 1981 , more than 4 months
a f t e r they were cited.
On September 15, 1982, a routine inspection was conducted. Three
i tems o f noncompl iance were cited, i n c l udi ng unauthorized
i n d i v i d u a l s using radioactive material s and f a i l u r e to perform
leak tests. The Agency transmitted an enforcement l e t t e r on
November 24, 1982, 70 days a f t e r the inspection.
According t o a f i l e memorandum from the program manager dated
February 18, 1983, a telephone conference was held w i t h a
representative o f the licensee on February 11, 1983, 79 days
a f t e r the Agency sent the 30- day enforcement l e t t e r . The
representative was t h e l i c e n s e e ' s new r a d i a t i o n safety o f f i c e r
and was unfamil i a r with the 1 icensee's previous violations.
However, the representative stated he would respond t o ARRA
immediately out1 i n i n g the 1 icensee's steps t o c o r r e c t the i tems
o f noncompl iance.
Comment: On May 15, 1984, the f i l e was reviewed as p a r t o f the
random sample. Since the Agency had taken no actions on the
three items of noncompliance, the f i l e ' s status was brought to
the a t t e n t i o n o f t h e r a d i o a c t i v e m a t e r i a l s program manager. A
follow- up inspection was conducted on May 24, 1984, 15 months
a f t e r the v i o l a t i o n s had been cited. Six items o f noncompliance
were cited, four o f which had been c i t e d on e i t h e r one or the
other of the two previous inspections.
Case 3
During a 12 month period, from March of 1981 through March o f
1982, a h o s p i t a l 1 icensee experienced di f f i c u l ty with the
disposal of i t s radioactive waste and the loss o f a r a d i o a c t i v e
implant source. Agency reports i n the l i c e n s i n g f i l e i d e n t i f y
problems w i t h the hospital ' s r a d i a t i o n safety program, including
inadequate r a d i a t i o n surveys* and i n s u f f i c i e n t i n s t r u c t i o n s to
a1 1 employees regarding the hand1 ing and disposal o f r a d i o a c t i ve
'* A survey i s an evaluation of the production, use, release, disposal or
presence of sources o f r a d i a t i o n under a s p e c i f i c set of conditions t o
determine actual or poten ti a1 r a d i a t i o n hazards.
material s. One report concl udes: " A1 though the r a d i a t i o n
surveys and swipe tests performed by the inspector indicated t h a t
the r a d i a t i o n l e v e l s were safe a t the time o f inspection, the
1 icensee, a t present, has a substandard r a d i a t i o n safety program. "
ARRA r a d i o a c t i ve materi a1 s inspectors conducted four separate
inspections o f the f a c i l i t y over a 4 month period, w i t h the l a s t
inspection occurring on March 23, 1982. Two items o f
noncompliance were cited, one of which invol ved the f a i l u r e to
properly t r a i n personnel i n r a d i o a c t i ve imp1 ant therapy. The
second item concerned the f a i l u r e o f a committee, required by
1 icensure, t o meet and address the r a d i a t i o n safety a c t i vi t i e s
agreed t o i n the hospital ' s r a d i o a c t i ve material s 1 icense. At
the time o f the f i l e survey, 26 months had elapsed since the
f a c i l i t y was 1 ast inspected.
Comment: Despite the obvious problems a f f e c t i n g the hospital and
t h e r a o r d i n a r y a t t e n t i o n paid by the Agency t o the licensee i n
1982, a follow- up inspection o f the f a c i l i t y had not been
conducted by the time o f the f i l e survey. Many o f the actions
taken by the licensee to improve i t s r a d i a t i o n safety program
merited close observation by ARRA. These observations woul d have
ensured the proper completion o f these actions by the licensee
and i t s r a d i a t i o n safety program.
The NRC Found Inadequate Enforcement Documentation - I n i t s 1984 annual
review, the NRC also noted the program's f a i l u r e t o adequately document
enforcement actions. It commented:
" I n interviewing inspectors and examining the resul t s
of a follow- up inspection i n the f i l e s , it was
determined t h a t the Agency had verbally ordered a
licensee t o take c e r t a i n actions t o be i n compliance.
These actions were never documented and the enforcement
documentation was not issued u n t i l the completion o f a
f o l l ow- up inspection."
The NRC ' s recommendation was that:
". . . any enforcement action taken by the ARRA be
documented f u l l y i n the f i l e a t the time o f the
enforcement action. This issue i s especially important
i n l i g h t o f the new c i v i l penalty a u t h o r i t y recently
granted t o the Agency."
I n a second comment, the NRC states:
" Some inspection reports reviewed did not document
i n v e s t i g a t i o n and close out o f previous items o f
noncompl i ance. "
I t s recommendation was t h a t :
". . . t h e i n s p e c t i o n form be modified t o show i n v e s t i g a t i o n and
close out o f previous items o f noncompliance. We f e e l t h i s i s
necessary f o r maintaining a h i s t o r y o f the 1 icensee's
performance. "
The Agency's Enforcement Actions Could Be More Timely - The program's
enforcement actions are not always timely. I n the random sample, the
average number o f days t h a t elapsed between the date o f inspections w i t h
items o f noncompliance and t h e t r a n s m i t t a l o f enforcement l e t t e r s by the
Agency was greater than Agency standards. O f the f i l e s drawn i n the
sample i n which enforcement l e t t e r s were sent since January 1, 1981, the
average number of elapsed days was 40, while Agency standards c a l l f o r a
maximum o f 30 days. A1 though some enforcement 1 e t t e r s were sent i n as few
as 4 days, t h e t r a n s m i t t a l o f several l e t t e r s exceeded 60 days.
NRC representatives be1 ieve the delay i n t h e t r a n s m i t t a l o f enforcement
l e t t e r s reduces the Agency's a b i l i t y t o properly enforce rules and
regulations and p r o t e c t p u b l i c health and safety.
The NRC, i n i t s most recent review, also noted the untimeliness o f the
Agency's enforcement actions. I n i t s r e p o r t the NRC comments:
" I n the review o f the compliance f i l e , there were
several instances o f delays i n taking enforcement
action. These delays ran up t o f o u r months."
The NRC recommended " t h a t the ARRA e s t a b l i s h a t i c k l e r f i l e t o ensure
prompt enforcement actions i n accordance w i t h the ARRA r o u t i n e procedure."
Enforcement P h i l osophy
Could Be More Aggressive
Two factors have produced weak enforcement actions. The Agency's a b i l i ty
t o conduct enforcement actions has been affected by the problems i n i t s
inspection program. However, when problems are i d e n t i f i e d a 1 enient
enforcement phi1 osophy has affected the actions t h a t are taken.
As o u t l i n e d previously ( see page 17), ARRA has not conducted inspections
i n a t i m e l y manner. Since enforcement a c t i v i t i e s are an i n t e g r a l p a r t of
each inspection program, t h i s f a i l u r e a f f e c t s the programs' enforcement
effectiveness.
However, another f a c t o r producing weak enforcement i s the Agency's
enforcement p h i l osophy. The X- ray compl iance program operates w i t h the
philosophy t h a t it i s imperative t o maintain a good working r e l a t i o n s h i p
w i t h i t s r e g i s t r a n t s . T h i s stems from a b e l i e f t h a t a trend toward more
escalated enforcement a c t i v i t y would be counterproducti ve. An Agency
o f f i c i a l stated t h a t he fears a more s t r i n g e n t enforcement p o l i c y would
a1 ienate r e g i s t r a n t s and resul t i n pol i t i c a l r e t r i b u t i o n by medical and
dental lobbying groups. I n addition, he stated t h a t the program depends
on r e g i s t r a n t s ' cooperation during inspections. This i s p a r t i c u l a r l y t r u e
i n hospital inspections, where inspectors are dependent upon hospital
s t a f f t o clear rooms and set up procedures t o simulate normal usage o f
equipment. The o f f i c i a l concluded t h a t aggravated r e g i s t r a n t s can
s i g n i f i c a n t l y hamper the inspection process.
A1 though t h i s p h i l osophy might benefi t the X- ray compl iance program's
a b i l i t y t o conduct inspections w i t h 1 i t t l e resistance from r e g i s t r a n t s , it
reduces the Agency's a b i l i t y t o properly carry out i t s s t a t u t o r y mandate
t o p r o t e c t pub1 i c heal t h and safety from excessi ve exposure t o r a d i a t i o n
sources. It should be pointed out, however, t h a t there has been
considerable improvement i n the program's a t t i t u d e toward enforcement i n
recent years. V i o l a t i o n s t h a t would not have r e s u l t e d i n action several
years ago are now a c t i v e l y pursued. Further improvement i s needed however.
As i l l u s t r a t e d by the case examples, the r a d i o a c t i v e m a t e r i a l s program has
been l a x i n i t s f o l l o w up and documentation o f enforcemen- t actions.
According t o the program manager, i n the past a greater emphasis was
p l aced upon conducting i nspections and 1 ess upon pursuing enforcement
actions. A1 though an e f f o r t i s being made t o c o r r e c t t h i s philosophy, the
programs' turnover and Pal o Verde Nuclear Generating S t a t i o n a c t i v i t i e s
have hampered the process.
Coordination With Medical
Boards Could Be Im~ roved
Agency coordination wi t h t h e S t a t e ' s various medical boards coul d
beimproved. X- ray compliance program inspectors are i n an ideal p o s i t i o n
t o observe instances i n which medical p r a c t i t i o n e r s use techniques t h a t
expose p a t i e n t s t o excessive l e v e l s o f radiation. However, ARRA has no
a u t h o r i t y over these p r a c t i t i o n e r s . A. R. S. $ 30- 671 . A mandates that:
" Radiation protection standards adopted i n r u l e s and
regulations promulgated by the agency under t h i s
chapter s h a l l n o t be construed t o l i m i t the k i n d or
amount o f r a d i a t i o n t h a t may be i n t e n t i o n a l l y applied
t o a person o r animal f o r diagnostic o r therapeutic
purposes by o r under the d i r e c t i o n o f a l i c e n s e d
p r a c t i t i o n e r o f the heal i n g arts. "
I n addition, A. R. S. $ 30- 672. D mandates that:
" Persons licensed i n t h i s state t o p r a c t i c e as a
denti st, c h i r o p o d i s t o r v e t e r i n a r i a n o r 1 icensed i n
t h i s state t o p r a c t i c e medicine, surgery, osteopathy,
c h i r o p r a c t i c o r naturopathy s h a l l n o t be required by
the agency t o obtain any other l i c e n s e f o r the use of
an X- ray machine b u t are governed by t h e i r own
1 icensing acts. "
ARRA personnel r e p o r t t h a t inspectors have noted instances i n which
p r a c t i t i o n e r s expose patients t o r a d i a t i o n 1 eve1 s exceeding establ i shed
norms. The program manager stated t h a t i n these cases the inspector on
the scene informal 1y recommends a course of action. Subsequent
inspections show t h a t while some p r a c t i t i o n e r s heed i nspectors' advice,
others do not. The program manager stated t h a t if a r e g i s t r a n t ignores an
inspector' s advice, he would consider contacting the re1 evant medical
board. However, o f f i c i a l s from the Medical , Osteopathic, Dental and
Chiropractic Boards r e p o r t t h a t t h e y r e c e i v e no correspondence from the
Agency regarding r a d i a t i o n practices. A1 1 have expressed i n t e r e s t i n
being n o t i f i e d o f cases t h a t the X- ray program cannot resolve informally.
A r e g u l a r 1 ine o f communication between the Agency and the State's medical
boards could improve p u b l i c health and safety. The X- ray program should
pursue a p o l i c y i n which interested medical boards are r o u t i n e l y contacted
when t h e i r licensees do not conform t o contemporary standards f o r
r a d i a t i o n exposure.
CONCLUSIONS
The Arizona Radiation Regul atory Agency ' s enforcement actions have not
always been as strong or timely as was warranted. Problems i n the
Agency's inspection program are compounded by the Agency's 1 enient
enforcement phi1 osophy. These factors have adversely affected the X- ray
compl i ance and radioactive materi a1 s programs' abi 1 i ty t o conduct and
adequately document enforcement actions i n a timely manner. F i n a l l y , ARRA
could improve i t s l i n e s o f communication w i t h t h e S t a t e ' s medical boards.
RECOMMENDATIONS
1. The Agency should pursue stronger enforcement actions i n those cases
t h a t m e r i t such action.
2. The Agency should ensure t h a t licensing and enforcement actions are
adequately documented.
3. The Agency should communicate with the various State medical boards
when p r a c t i t i o n e r s repeatedly expose patients t o radiation l e v e l s
exceeding establ i shed norms.
FINDING I11
THE ARIZONA RADIATION REGULATORY AGENCY HAS NOT RECEIVED NUCLEAR
EMERGENCY MANAGEMENT FUNDS SUFFICIENT TO COVER THE COSTS OF ITS PAL0
VERDE ACTIVITIES
The Arizona Radiation Regulatory Agency ( ARRA) has not recei ved adequate
funding from the Nuclear Emergency Management Fund ( NEMF) t o finance the
costs o f i t s Palo Verde Nuclear Generating Station i n v o l vement. Because
ARRA1s Nuclear Emergency Management Fund appropriations have paid only
p a r t o f i t s Palo Verde costs, the Agency has financed a s i g n i f i c a n t
p o r t i o n o f these a c t i v i t i e s w i t h i t s General Fund appropriation. The
Arizona D i v i s i o n o f Emergency Services, the NEMF administrator, has had a
negative impact on ARRAts Pal o Verde cost recovery. I n addition, the
Nuclear Emergency Management Fund appropriations are n o t i n l i n e w i t h the
statutes.
The Nuclear Emergency Management Fund was established i n 1981 t o provide
funding f o r administering and enforcing the State plan f o r o f f - s i t e
response t o emergencies caused by accidents a t commerci a1 nuclear
generating stations. ARRA i s e n t i t l e d t o NEMF f i n a n c i a l assistance for
i t s Pal o Verde Nuclear Generating Station ( PVNGS) a c t i v i ti es. A. R. S.
926- 306.01 states t h a t the annual assessment 1 evied against those engaged
i n constructing o r operating a commercial nuclear generating s t a t i o n was
establ ished:
". . . t o provide f o r the development and maintenance
of a state plan f o r o f f - s i t e response t o an emergency
caused by an accident a t a commercial nuclear
generating s t a t i o n and t o provide for the equipment,
personnel , f a c i l i ti es, t r a i n i ng and t e s t i n g necessary
t o comply w i t h c r i t e r i a for preparation and evaluation
of radio1 ogi cal emergency response p l ans and
preparedness i n support of commercial nucl ear
generating stations prescribed by the United States
nucl ear regulatory commission and the federal emergency
management agency. "
ARRA Has S i g n i f i c a n t
mNGS Responsibil i t i e s
ARRA's emergency response and environmental survei 11 ance a c t i v i t i e s are
c r u c i a1 t o the Pal o Verde Nucl ear Generating Station Is* Nucl ear
Regul atory Commi ssion ( NRC) operating 1 icense. Without ARRA's support,
the State would n o t be able t o s a t i s f y the Federal Emergency Management
Agency's ( FEMA) response requirements and, hence, the NRC would not issue
an operating l i c e n s e f o r PVNGS. According t o NRC and FEFIA o f f i c i a l s ,
although ARRA's response c a p a b i l i t y i s not t h e o n l y f a c t o r considered
when a l i c e n s e i s issued, an operating license w i l l not be issued i f ARRA
cannot e f f e c t i v e l y f u l f i l 1 i t s PVNGS responsibil i t i e s . ARRA's a b i l i ty t o
c a r r y out i t s PVNGS functions was evaluated by FEMA during an exercise
held i n May 1983. According t o a FEMA o f f i c i a l , ARRA responded q u i t e
we1 1 during t h i s exercise and woul d be able t o p r o t e c t the pub1 i c heal th,
safety, and welfare i n the case o f an o f f - s i t e release from PVNGS. ARRA
i s responsible f o r providing r a d i o l ogical technical assistance d u r i n g a
PVNGS emergency. The Agency's responsibil t i e s , aimed a t minimizing the
adverse health e f f e c t s from an accident a t PVNGS, were established i n
l i g h t o f the NRC's " C r i t e r i a for Preparation and Evaluation o f
Radi 01 o g i c a l Emergency Response Pl ans and Preparedness i n Support o f
Nuclear Power Pl ants. " ( NUREG 0654) ARRA' s PVNGS functions i n c l ude the
i n i t i a l and ongoing eval uation o f the p o t e n t i a l r a d i o l ogical consequences
from a release o f r a d i o a c t i v e m a t e r i a l s outside PVNGS and the p r o t e c t i v e
action recommendations t o minimize r a d i a t i o n dose. ARRA also recommends
actions t o control r a d i a t i o n i n food chains and water supplies.
ARRA s t a f f has expended a considerable amount o f time t o f u l f i l l i t s
PVNGS obligations. I n f i s c a l years 1983 and 1984, the s t a f f s o f two ARRA
programs spent a t l e a s t 70 percent** of t h e i r time on PVNGS ( see Table
7). I n f i s c a l year 1983 the r a d i o a c t i v e m a t e r i a l s and X- ray programs
* PVNGS i s being constructed 55 miles west o f Phoenix by a consortium
o f p u b l i c u t i l i t y corporations and i s scheduled t o go on- line i n
1985. The managing agent f o r PVNGS i s Arizona Public Service Company.
** Time devoted t o PVNGS was determined by reviewing Agency time
sheets. According t o ARRA o f f i c i a l s , s t a f f have not always
c o n s i s t e n t l y recorded the time spent on PVNGS. For t h i s reason,
PVNGS percentages are considered by ARRA t o be conservative estimates.
s t a f f s devoted approximately 13 percent o f t h e i r e f f o r t s towards PVNGS,
while 17 percent of the a d m i n i s t r a t i v e and support personnel time was
spent on PVNGS a c t i v i t i e s . For f i s c a l year 1984 PVNGS a c t i v i t i e s f o r
these programs and the support s t a f f have decreased. However, as s t a f f
prepare f o r the September 1984 FEMA Exercise Eva1 uation, Agency o f f i c i a l s
expect t h a t PVNGS a c t i v i t i e s w i l l increase. O f f i c i a l s estimate t h a t
during years when FEMA evaluations are held, approximately every 2 years,
10 percent o f the r a d i o a c t i v e materials, X- ray, and support s t a f f time
w i l l be devoted t o PVNGS. This time cannot then be devoted t o these ARRA
programs. *
TABLE 7
TIME SPENT ON PVNGS
ARRA Program FY 1983 FY 1984
Emergency Response
Environmental Survei 11 ance
Radioacti ve Material s
X- ray
Admini s t r a t i ve/ Support
Source: Compiled by Auditor General s t a f f from ARRA time sheets
( 1 ) Less than 1 percent
ARRA Has Paid For A Considerable
Portion O f I t s PVNGS A c t i v i t i e s
ki t h General Funds
A1 though e n t i t l e d t o NEMFs, the Agency has used General Funds t o pay f o r
many o f i t s PVNGS costs. NEMF appropriations have not been adequate t o
cover a l l PVNGS expenses. This has occurred p a r t l y because ARRA has
n e i t h e r tracked a l l o f i t s actual PVNGS costs nor summarized the time
spent on PVNGS.
* Di version of resources from r a d i a t i o n p r o t e c t i o n programs i s common
t o states w i t h nuclear generating stations. I n a r e p o r t prepared by
the National Governo. rls Association it i s noted t h a t the necessity
f o r state and l o c a l governments to p a r t i c i p a t e i n emergency
preparedness exercises i s consuming vast amounts o f s t a f f time, t o
the detriment o f other aspects o f states r a d i a t i o n protection
programs t h a t provide substantial protection t o the public.
NEMF Appropriations I n s u f f i c i e n t - Because NEMF r e c e i p t s have not been
adequate, the Agency used General Funds t o cover PVNGS costs i n f i s c a l
years 1983 and 1984. Projections f o r f i s c a l year 1985 also i n d i c a t e t h a t
ARRA's 1985 NEMF appropriation w i l l not pay f o r a l l i t s PVNGS a c t i v i t i e s .
NEMF appropriations have n o t been s u f f i c i e n t t o cover 100 percent o f
PVNGS costs f o r f i s c a l years 1983 or 1984.* I n f i s c a l year 1983 ARRA
received $ 337,270 from the NEMF; however, ARRA expended approximately
$ 94,700 more than i t s appropriation, as shown i n Table 8. For f i s c a l
year 1984 it i s estimated t h a t ARRA w i l l expend $ 70,100 for PVNGS from
i t s General Fund appropriation. The State has paid f o r a t l e a s t $ 164,800
o f the PVNGS a c t i v i t i e s i n f i s c a l years 1983 and 1984. The t o t a l o f
General Funds used for PVNGS i s l i k e l y even greater than t h i s amount
since the personnel t o t a l s are considered by ARRA t o be conservative and
t h e a n a l y s i s performed does not include f i s c a l years 1981 and 1982.
3 The Agency has received NEMFs since 1981 ; however, the approximate
cost o f i t s PVNGS a c t i v i t i e s p r i o r t o f i s c a l year 1983 cannot be
determined because ARRA d i d not record PVNGS personnel time. Based
on Agency estimates o f time expended on Palo Verde it has been ( I
determined, though, t h a t NEMF assistance d i d not exceed costs
incurred.
TABLE 8
NEMF ASSISTANCE AND PVNGS EXPENDITURES
FY 1983 NEMF FY 1983 FY 1984 NEMF FY 1984
PVNGS Cost Assistance Difference PVNGS Cost Assistance Difference
Personal Services and
Empl oyee- Re1 ated Expend. $ 1 97,700 $ 5,000 $( 192,700) $ 1 50,500 $ 59,800 $( 90,700)
Trai n i ng/ Travel
In- State 2,300 ( 2,300) 4,100 11,200 7,100
Out- Of- State 10,900 19,000 8,100 8,300 20,100 11,800
Other Operating
Expenditures 71,000 41 ,900 ( 29,100) 53,300 48,900 ( 4,400)
Equipment 1 71 ,000 271 ,400 100,400 69,900 93,000 23,100
Total s $ 452.900 $ 337.300 $( 115.600) $ 286.100 $ 233.000 $( 53.100)
Carry- Forward From
Prior Fiscal Year $ 26,900 $ 11,500
Carry- Forward To
Next Fiscal Year ( 11,500) ( 40,000)
NRC Environmental
Surveil 1 ance Contract
Total PVNGS Expenditures
Paid Nith General Funds
Source: Compiled by Auditor General s t a f f from NEMF funding requests for f i s c a l years 1983
and 1984, ARRA time sheets, ARRA internal accounts payable ledgers and other
mi scel 1 aneous expenditure documentation
Personal services* and empl oyee- re1 ated expenditures** c o n s t i t u t e the
major p o r t i o n o f the n e t d e f i c i t . I n f i s c a l year 1983 ARRA employees
spent 31 percent o f t h e i r time on PVNGS. ARRA expended $ 192,700 more f o r
salaries and empl oyee- re1 ated expenditures than it received from the
NEMF. For f i s c a l year 1984 ARRA's projected personnel costs f o r i t s
PVNGS a c t i v i t i e s are $ 90,700 greater than NEMF r e c e i p t s f o r personnel .
I n addition, ARRA has not recovered a l l i t s PVNGS- related other operating
expenditures from the NEMF.
NEMF appropriations f o r equipment*** expenditures have o f f s e t some o f
ARRA's PVNGS personnel costs and other operating expenditures. The
p a r t i a l compensation i s due t o the f a c t t h a t equipment purchased w i t h
NEMFs i s not used only f o r PVNGS. ARRA has purchased s t a t e - o f - t h e - a r t
1 aboratory and emergency response equipment wi t h i t s NEMF
appropriations. Much o f i t can be used f o r r a d i a t i o n protection programs
other than PVNGS. S i m i l a r l y , two vehicles purchased w i t h NEMFs are
available f o r projects and emergencies not r e l a t e d t o PVNGS. I n f i s c a l
year 1983 ARRA received approximately $ 100,400 more than the equipment
expenditures a t t r i b u t a b l e t o PVNGS. For f i s c a l year 1984 the NEMF
appropriation was $ 23,100 greater than the actual PVNGS equipment costs.
ARRA may not recover a1 1 i t s f i s c a l year 1985 PVNGS costs from the NEMF.
ARRA's 1985 NEMF appropriation i s $ 1 02,800. Additionally, ARRA has
declared a $ 20,000**** carry- forward from i t s 1984 NEMF appropriation and
projected t h a t $ 20,000 more w i l l be brought forward i n t o f i s c a l year 1985.
3r These expenditures were determined by applying each employee ' s
hourly wage against the time recorded f o r PVNGS.
** 20 percent of the PVNGS personal services expenditures was used t o
determine PVNGS- re1 ated empl oyee re1 ated expenses. The Agency
average i s 22 percent.
*** Equipment costs were obtained by determining the projected use for
PVNGS a c t i v i t i e s over the equipments' expected l i f e and applying
t h i s f i g u r e a g a i n s t the purchase p r i c e of , an item. This method
incorporates the consideration t h a t equipment purchased w i t h NEMFs
i s a1 so used f o r other purposes.
**** The carry- forward does not represent a r e a l savings i n personnel
costs f o r PVNGS. The carry- forward r e s u l t e d from vacancy savings
f o r two PVNGS dedicated positions funded w i t h NEMFs.
Thus, ARRA w i l l have $ 142,800 available f o r 1985 PVNGS a c t i v i t i e s .
$ 60,000 o f the a l l o c a t i o n i s f o r personnel costs. Calculations based on
Agency estimates f o r f i s c a l year 1985 i n d i c a t e t h a t ARRA w i l l expend
approximately $ 250,000 on s a l a r i e s and empl oyee- re1 ated expenditures for
PVNGS a c t i v i t i e s . Moreover, ARRA o f f i c i a l s acknowledge t h a t the
appropriation w i l l not be s u f f i c i e n t t o cover PVNGS- re1 ated costs for
expendables, equipment cal i b r a t i o n and mobile f a c i l i ty maintenance. The
undeclared carry- forward w i l l be used t o cover f i s c a l year 1985
PVNGS- re1 ated t r a i n i n g and t r a v e l costs, a1 ong wi t h mi nor equi pment
repair. These items were c u t from ARRA's i n i t i a l NEMF request, b u t are
necessary t o maintain ARRA' s PVNGS response capabi 1 i ty.
PVNGS Expenditures Not Known - ARRA has not tracked actual PVNGS
expenditures. Because ARRA has not summarized i t s actual PVNGS costs or
D time spent on PVNGS, it has underestimated i t s NEMF requests. Maricopa
County and the Texas Department o f Health provide methods f o r cost
tracking. By recording a c t u a l PVNGS costs, ARRA would have b e t t e r
j u s t i f i c a t i o n f o r i t s NEMF requests.
D
A1 though, ARRA monitors i t s NEMF expenditures, it has not recorded actual
PVNGS costs. Presently, ARRA's NEMF requests are based on the operating
expenditures and equipment needs o f the emergency response and
B environmental s u r v e i l 1 ance programs, a1 ong w i t h minimal funding for
personnel. However, i n some cases NEMFs are used t o pay equipment and
t r a v e l expenditures t h a t re1 ate p a r t i a l l y or completely t o other programs
( see equipment and t r a v e l expenditures on Table 8, page 45). By
contrast, personal services and employee- related expenditures for ARRA's
PVNGS a c t i v i t i e s are much greater than the personnel costs paid w i t h
NEMFs. According t o ARRA o f f i c i a l s , ARRA has never recorded actual PVNGS
costs. ARRA has recorded time spent on PVNGS, however, t h i s information
has n o t been summarized. Because ARRA has not recorded i t s actual PVNGS
costs or compiled PVNGS time, ARRA has operated without f u l l knowledge of
the f i n a n c i a l impact and the diversion o f resources t h a t PVNGS has had on
the Agency. Consequently, ARRA has not requested s u f f i c i e n t funds from
the NEMF t o pay f o r PVNGS a c t i v i t i e s .
ARRA i n i t i a l l y requested $ 209,100 f o r PVNGS- re1 ated personnel and
operational needs. However, c a l c u l ations based on ARRA estimates for
f i s c a l year 1985 PVNGS personnel support indicate t h a t ARRA w i l l incur
$ 250,000 f o r t h i s item alone. If ARRA had calculated t h e t o t a l PVNGS
personnel costs from i t s time records, the Agency would have known i t s
request would not be s u f f i c i e n t to cover i t s costs.
ARRA could u t i l i z e methods developed by Maricopa County C i v i l Defense and
Emergency Services ( MCCDES) and other states t o track costs a t t r i butabl e
t o nuclear generating s t a t i o n a c t i v i t i e s . MCCDES uses a monthly time
report t o summarize personnel time f o r PVNGS. Applying salary figures t o
the time spent allows Maricopa County t o determine actual personnel costs
f o r PVNGS. A l l other expenditures d i r e c t l y a t t r i b u t a b l e t o PVNGS are
coded as such. By using t h i s method, Maricopa County has complete,
up- to- date information f o r a l l PVNGS expenditures.
The Texas Department o f Health uses a time a l l o c a t i o n method f o r tracking
actual personnel expendi tures associated with nuclear generating s t a t i o n
a c t i v i t i e s . According t o Department o f Heal t h o f f i c i a l s, empl oyees
charge t h e i r time and travel t o specific a c t i v i t y codes. Other operating
expenditures are a1 1 ocated accordingly and equipment costs are prorated
based on usage. U t i l i z i n g t h i s method, Texas' Department o f Health i s
able t o summarize the costs associated w i t h i t s nuclear generating
s t a t i o n a c t i v i t i e s .
ARRA's NEblF requests should be developed by projecting t o t a l costs f o r
the upcoming year. If ARRA tracked and summarized i t s actual PVNGS
expenditures, it woul d have stronger documentation f o r i t s NEMF
requests. Expenditures should be f u l l y j u s t i f i a b l e i n terms o f r e l a t i n g
t o Palo Verde and protecting the pub1 i c heal t h y safety and we1 fare. A1 1
personnel expenditures f o r PVNGS shoul d be projected and the appropriate ( I
number o f f u l l - time equivalent positions shoul d be requested from the
NEMF to cover actual costs. Equipment costs f o r PVNGS should be prorated
based on projected PVNGS use t o ensure t h a t the u t i l i t y consortium pays
only the actual cost a t t r i b u t a b l e t o PVNGS a c t i v i t i e s . Other operating
expenditures should include not only the emergency response and
environmental surveillance programs' costs but also a portion o f the
4 8
r e s t o f ARRA's other operating expenditures. Projections f o r other
operating expenditures can be based on a percentage o f personnel time for
PVNGS. By u t i l i z i n g actual cost figures and projecting the next year's
needs, ARRA's NEMF requests woul d be developed to finance 100 percent of
ARRA's PVNGS a c t i v i t i e s .
Arizona Division O f Emergency Services
Has Not Requested S u f f i c i e n t NEMI- s For ARRA
ARRA has a l s o n o t recovered a l l PVNGS costs p a r t i a l l y because the Arizona
Di vision o f Emergency Services ( ADES) has not requested s u f f i c i e n t funds
from the Legislature. ADES has not f u l f i l l e d i t s NEMF statutory
obl igation t o consider a1 1 governmental costs o f developing, maintaining
and supporting the State pl an. NEMF appropri a t i ons shoul d be determi ned
a t the 1 e g i s l a t i v e level.
D
ADES i s the lead agency and has the overall primary r e s p o n s i b i l i t y f o r
development o f a State plan f o r o f f - s i t e response t o an emergency caused
by an accident a t a commercial nuclear generating station. ADES i s
D required t o develop the plan i n consultation w i t h the following State
agencies :
Radiati on Regul atory Agency
Commission of Agricul ture and Horticul ture
State Dairy Commissioner
Department o f Heal t h Services
Department o f Pub1 i c Safety
Department o f Transportation
Office o f Economic P l anning and Development
Division o f M i l i t a r y Affairs w i t h i n the Department of Emergency
and M i l i t a r y A f f a i r s
Arizona Corporation Commission
Any other agencies or o f f i c e s deemed necessary by the D i v i s i o n
of Emergency Services
ADES i s required by A. R. S. $ 306.01. B. t o make an annual recommendation t o
t h e L e g i s l a t u r e of ". . . an amount necessary t o develop, maintain and
support t h e s t a t e [ nuclear emergency response] plan. " It i s the opinion
of the L e g i s l a t i v e Council t h a t t h i s r e q u i r e s t h e d i r e c t o r o f ADES t o
include a reasonable estimate o f a l l costs a t t r i b u t a b l e t o other State
and l o c a l agencies, together w i t h ADES' own costs, i n the annual overall
amount recommended.
ADES V i o l a t e d S t a t u t o r y Requirements - ADES has not complied w i t h
statutory requirements f o r the assessment on commerci a1 nucl ear
generating stations. ADES has not recommended an amount s u f f i c i e n t t o
cover the costs o f ARRA's PVNGS a c t i v i t i e s or the costs t o Maricopa
County and other State agencies.
Despite statutory requirements, ADES' recommendations t o t h e L e g i s l a t u r e
have not included a reasonable estimate o f ARRA's PVNGS costs t o support
the State plan. I n f i s c a l year 1983, ARRA expended $ 1 92,700 more than it
received from the NEMF f o r PVNGS personnel costs. For example, i n t h a t
year ARRA's request f o r administrative services support was decreased by
$ 5,000. ADES also deleted funds for s t a f f and monitor t r a i n i n g , items
t h a t had t o be financed w i t h General Funds. For f i s c a l year 1984 it i s
projected t h a t ARRA w i l l use General Funds t o cover a t l e a s t $ 90,700 i n
personnel expenditures. ADES decreased ARRA's NEMF request f o r personal
services assistance by $ 13,100. I n addition, according t o ARRA o f f i c i a l s
a former d i r e c t o r o f ADES imposed requirements f o r several years t h a t no
personnel costs were t o be funded.
I n addition t o not requesting s u f f i c i e n t funds f o r ARRA's PVNGS costs,
ADES has not included reasonable estimates o f a l l the costs o f a l l the
agencies invol ved i n t h e S t a t e ' s emergency response plan. MCCDES has
worked on PVNGS emergency response pl ans since 1975, however, NEMF
assistance was not provided u n t i l 1983. According t o an ADES o f f i c i a l , a
former d i r e c t o r o f ADES refused t o recognize t h a t Maricopa County was an
el i g i b l e NEMF participant. MCCDES o f f i c i a l s estimate t h a t MCCDES
expended $ 300,000 on PVNGS pl anni ng e f f o r t s before recei ving NEMF
assistance.
Presently, Maricopa County i s included i n the NEMF requests, however, the
funds received have not been adequate t o pay a l l o f Maricopa County's
PVNGS costs. For f i s c a l year 1983, Maricopa County received $ 86,600 i n
NEMF assistance. MCCDES o f f i c i a l s stated t h a t an additional $ 14,800 was
expended i n f i s c a l year 1983 i n support o f PVNGS emergency response
a c t i v i t i e s . For f i s c a l year 1984 Maricopa County received $ 32,000 i n
NEMF assistance, however, MCCDES o f f i c i a l s estimate t h a t an additional
$ 57,600 was spent for PVNGS as o f May 1984.
F i n a l l y , ADES has also not included i n i t s recommendations the costs t o
many State agencies f o r the Radi 01 ogical Emergency Assistance Team
monitors. The monitors a s s i s t ARRA i n performing PVNGS o f f - s i t e
environmental surveillance duties. There are 26 monitors from several
State agencies including the Department o f Health Services, the
D Agriculture and H o r t i c u l t u r e Commission, the Office o f the State Chemist,
the State Land Department, the State Agriculture Laboratory, and the
Corporation Commission. According t o an ARRA o f f i c i a l , monitors spend up
t o 1 week each year on PVNGS.
D
ADES' 1985 NEMF Recommendation Was Influenced by APS' Budget - ADES
improperly considered APS' NEMF budget f o r the f i s c a l year 1985
recommended assessment. ARRA w i l l have t o use General Funds t o cover
f i s c a l year 1985 PVNGS costs, p a r t i a l l y because ADES l i m i t e d the
assessment recommendati on based on APS ' budgetary constraints.
ADES' 1985 NEMF recommendation t o t h e L e g i s l a t u r e was improperly based on
APS' NEMF budget projections. APS' emergency planning organization had a
budget o f $ 300,000 for the annual assessment and t o l d ADES t h a t emergency
planning o f f i c i a l s would have t o meet w i t h top l e v e l consortium
management i f the recommendation was greater than $ 300,000. Not wishing
t o create a problem f o r APS' emergency planning organization, ADES kept
the t o t a l assessment recommendation below $ 300,000.
ARRA o f f i c i a l s do n o t f e e l t h a t the 1985 NEMF appropriation w i l l be
s u f f i c i e n t t o cover a l l o f the Agency's PVNGS costs. ARRA's i n i t i a l 1985
NEMF request, which probably was not s u f f i c i e n t t o cover a l l PVNGS costs,
included $ 209,100 for personnel and operational needs and $ 41,000 for
future equi pmen t repl acement. The future equipment repl acemen t monies
were deleted, according to an ADES o f f i c i a l , because the PVNGS consortium
has not agreed to a mechanism for this process. An APS o f f i c i a l s a i d
that APS would prefer to deal with equipment replacement on a
piece- by- piece basis as the equipment breaks down. ARRA would rather
establish a fund for equipment replacement so the funds are available
when they are needed.
In addition to not being able to establish an account for equipment
replacement, ARRA officials were forced to cut other necessary funds from
the NEMF request. ARRA o f f i c i a l s were told of the $ 300,000 limit on
funds available for the NEMF and were asked to decrease the NEMF request
to a minimum 1 evel. T h i s $ 122,800 budget developed by ARRA will r e s u l t
in a funding deficiency for some PVNGS operational requirements,
according to ARRA officials. The budget, which includes only $ 60,000 for
personnel costs, will not be adequate to cover the $ 250,000 projected for
personnel expendi tures.
Maricopa County officials also feel that the 1985 NEMF allocation will be
inadequate to cover County PVNGS costs. Maricopa County i n i t i a l l y
requested $ 184,000 from the NEMF, however, ADES decreased its
recommendation to $ 83,800. According to the director of MCCDES, some
PVNGS training and exercise personnel costs will have to be absorbed by
the County. Similarly, supplies needed for PVNGS a c t i v i t i e s will have to
be purchased w i t h County funds. The $ 300,000 funding 1 imit contributed
to a funding shortfall, which will have to be made up by public funds.
ADES violated A. R. S. S26- 306.01. B. by 1 imi ting the recommended assessment
to an amount budgeted by APS. In a memorandum dated May 25, 1984 ( see
Appendix, page A- 1 ), the Legislative Council stated: 4
" Ctlhere is no ' allowance for considering the expenses
to or financial condition or any other interest of the
power pl ant consorti um i n either recommending or
setting the amount of the appropriation and
assessment. These commerci a1 considerations are
irrelevant t o the purpose of the appropriation and
assessment. The government does not dicker with the
taxpayer over the amount of taxes i t levies. A
taxpayer cannot hamper the taxing power of sovereignty
by inserting i t s e l f in the taxing process, except as
allowed by law, and the government may n o t bargain i t s
taxing power. Constitution of Arizona Art. IX, sec 1.
Thus insofar as the ADES recommendation of an amount of
appropriation and assessment reflects an amount
bargained and agreed to by and for the expediency of
the consortium rather than the amount of the
governmental costs of developing, maintaining and
supporting the state plan . . . the ADES negotiations
violate legislative expectations, the statutes, and the
state constitution."
Legislature Needs Complete Information - The Legislature does not have
adequate information to determine the amount that ARRA and other agencies
should receive from the the NEMF. By receiving complete information
regarding the State ' s nucl ear emergency response needs, the Legi sl ature
will be able to determine the appropriate NEMF level.
The Legislature needs complete information for the State's nucl ear
emergency response efforts. ADES, as advisor to the Legisl ature, shoul d
ensure that the amount recommended i s sufficient to cover the States
nucl ear emergency response efforts. Accordi ng to the Legi sl ati ve
Council, "[ tlhe legislature is only required to ' hear' ADES'
recommendation and may legally accept, reject, ignore, or modify the
recommendation. "
The decision t o use General Funds to support PVNGS activities should be
made a t the 1 egi sl ati ve 1 eve1 i n accordance with statutory provisions
governing the NEMF. If the Legislature receives recommendations
sufficient to cover the total costs of the State's nuclear emergency
response capabilities, i t can then determine the NEMF appropriation and
corresponding assessment. For t h i s reason, agencies receiving NEMFs
need to track all actual PVNGS costs and be prepared to present this
information to the Legislature. This historical data will enable the
Legislature to make an informed decision regarding the assessment and the
NEMF appropriation.
NEMF Appropriations Not
I n Line With Statutes
The Legislature has seen the need t o a l l o c a t e NEMFs d i r e c t l y t o ARRA due
t o past problems between ADES and ARRA. The statutes provide f o r ADES'
use of the NEMF t o administer and enforce the nuclear emergency response
plan, however, since 1982 the Legislature has decided t o a1 1 ocate NEMFs
d i r e c t l y t o p a r t i c i p a n t s .
The NEMF s t a t u t e , A. R. S. $ 26- 306.02, provides f o r ADES' use o f the Fund.
According t o the statute, ADES has a c o n t i n u i n g a p p r o p r i a t i o n t o use the
fund f o r " administering and enforcing t h e s t a t e p l a n f o r o f f - s i t e
response t o an emergency caused by an accident a t a commercial nuclear
generating station. "
I n recent years t h e L e g i s l a t u r e has allocated NEMFs d i r e c t l y t o
participants. Since 1982 the 1 egi s l ature has overridden the general
s t a t u t e by enacting session laws. This p r a c t i c e was s t a r t e d when
problems developed between ADES and ARRA. From f i s c a l year 1981 through
p a r t of 1983, ARRA's NEMF- related claims were handled by ADES. I n some
cases, there were disagreements between ADES and ARRA over the payment of
claims. I n a d d i t i o n , a former d i r e c t o r o f ADES allegedly used some NEMFs
f o r purposes n o t r e l a t e d t o PVNGS.* By a l l o c a t i n g NEMFs d i r e c t l y t o
ARRAY the Legislature ensured t h a t ARRA would get a l l o f i t s NEMFs. If
the Legislature intends t o continue the p r a c t i c e o f a l l o c a t i n g NEMFs
d i r e c t l y t o p a r t i c i p a n t s , the Legislature may wish t o consider r e v i s i n g
the NEMF statute.
* The NEMF was not t e s t e d d u r i n g t h e 1983 performance a u d i t of the
Department of Emergency and M i l i t a r y Affairs, D i v i s i o n o f Emergency
Services. However, inappropriate expenditures and improper transfers
were found i n the State and Federal funds t h a t were tested.
CONCLUSION
ARRA has not received NEMFs adequate to cover the costs of its PVNGS
activities. ARRA has used General Funds to finance a significant portion
of its PVNGS a c t i v i t i e s . ARRA has not recovered a l l PVNGS costs because
i t has not tracked its actual PVNGS costs and ADES has not requested
sufficient funds from the Legislature. Additional ly, NEMF appropriations
have not been made i n line w i t h the NEMF statutes.
RECOMMENDATIONS
1. ARRA should account for and summarize its actual PVNGS expenditures.
This information should be used i n developing and justifying ARRA's
NEMF requests.
2. ADES should comply w i t h the provisions of A. R. S. $ 26- 306.01. The
assessment recommendation shoul d be a reasonabl e estimate of an
amount adequate to cover a l l costs of a l l agencies involved i n
nucl ear emergency response activities. The Legislature shoul d
consider requiring ADES to submit the agencies i n i t i a l requests along
with the recommended budget.
3. The Legislature may wish to consider amending A. R. S. $ 26- 306.02.8 to
provide for NEMF a1 location directly to participating agencies,
bringing the statute i n 1 ine w i t h the present appropriation process.
FINDING I V
ARIZONA RADIATION REGULATORY AGENCY'S X- RAY PROGRAM COULD BE IMPROVED
Arizona Radiation Regul atory Agency's ( ARRA) X- ray r e g i s t r a t i o n needs t o
be reformed and strengthened. The X- ray program would operate more
producti vely i f r e g i s t r a t i o n were enforced and coordinated with fee
collection. The r e g i s t r a t i o n process would be f u r t h e r improved i f the
Agency's authority over i n s t a l l e r s o f r a d i a t i o n equipment were c l a r i f i e d .
Agency Management O f
Registration I s Inadequate
ARRA's r e g i s t r a t i o n process i s not operating adequately. The Agency's
rules and regulations require t h a t a1 1 radiation equipment be registered.
Machine locations are often unknown because the Agency does not enforce
t h i s requirement. As a r e s u l t of t h i s f a i l u r e , the fee c o l l e c t i o n process
i s unnecessarily i n e f f i c i e n t . The X- ray program would be more productive
i f r e g i s t r a t i o n were enforced and coordinated wth fee collection.
The Agency has the statutory authority t o r e g i s t e r radiation machines.
A. R. S. S30- 672. B states:
" The agency may require r e g i s t r a t i o n . . . o f . .
sources o f radiation i f it has been determine;
necessary t o protect pub1 i c health and safety."
The Agency has incorporated t h i s provision i n i t s rules and regulations,
which require that:
" The owner or person having possession of any radiation
machine shall apply for r e g i s t r a t i o n of such machine
with the [ Radiation Regulatory Agency] w i t h i n t h i r t y
( 30) days a f t e r acquisition o f such machines. "
Registration provides necessary information t o the X- ray program. It
compiles data on the number, type and l o c a t i o n of r a d i a t i o n machines, from
which inspection p r i o r i t i e s are determined. The frequency i n which
f a c i l i t i e s are inspected, for example, varies according t o the number and
type of machines used. Further, i n order f o r machines t o be inspected a t
a1 1, the Agency must know their 1 ocations. Consequently, registration i s
essential for an effective inspection program.
A1 though a registration period i s not stipulated i n the Agency's rules and
regul ations, i t has become accepted X- ray program practi ce to register
machines for 4 years. Machines can be registered any time during the year
and expiration dates are usually assigned to be exactly 4 years after the
registration date.* Therefore, expirations occur randomly throughout the
year.
The introduction of fee collection i n fiscal year 1983 increased the
importance of registration data. The fee a facility i s charged i s based
upon the number of machines owned. This information i s obtained from the
registration files. A1 though fee collection and registration are closely
related, Agency management has not recognized the need for greater
coordination between the two functions. Fees are due from a1 1 X- ray
registrants i n January every year. They provide the State with revenues
of approximately $ 89,000** a year. The annual fee for radiation machines
i s currently $ 20 per machine.
Machine Locations Are Often Unknown - The current registration process i s
not operating effectively. Under the present system, the number and k i n d
of machines a facility i s operating i s often unknown until the time of i t s
next inspection. This i s the result of registrants not being held
responsible for properly registering their machines.
Under the current system, w i t h its 4 year registration period, machine
registrations often expire and are n o t renewed by the owners. The Agency
does not monitor expiration dates, which occur randomly throughout the
* There i s one common exception t o this 4 year rule. Recently, the
Agency has tried to have the registration of all the machines operated
by a given facility expire on the same date. Consequently, f a c i l i t i e s
with more than one machine could have the expiration date of a newly
purchased machine assigned to correspond w i t h the date of i t s other
machines.
** The Agency collects approximately $ 140,000 annually from all fee
collections. The remainder is from radioactive materials licensing
fees.
5 8
year, and does not usually send renewal notices t o registrants. As a
r e s u l t , X- ray machines often remain unregistered u n t i l renewed by an
inspector a t the time o f a f a c i l i t y ' s next inspection.
S i m i l a r l y , the movement or d i s p o s i t i o n o f X- ray machines and new
acquisitions o f machines are usually not reported t o the Agency by
registrants. One f a c i l i t y t r i p l e d the number o f machines it had but d i d
not n o t i f y the Agency and r e g i s t e r the new machines. Consequently, the
Agency was unaware o f the new acquisitions u n t i l the f a c i l i t y ' s next
schedul ed inspection.
The reason f o r t h i s problem i s t h a t X- ray machine owners are not held
responsible f o r the r e g i s t r a t i o n and renewal o f t h e i r machines.
Nonregistration and other r e l a t e d v i o l a t i o n s are not considered noteworthy
by the Agency, even though A. R. S. $ 30- 673 makes it unlawful t o operate an
unregistered machine. When inspections reveal unregistered machines or
unreported machine movement, inspectors do not record the v i o l a t i o n s i n
t h e i r reports. On the contrary, instead o f considering nonregistration a
v i o l ation, inspectors have been assuming the responsi b i l i t y o f regi s t e r i n g
machines f o r the owners. For example, a review o f 250 f a c i l i t i e s ' f i l e s
showed t h a t 133 of them had a t l e a s t one instance i n which an X- ray
machine was not registered u n t i l a f t e r an inspection. This means t h a t
f a c i l i t i e s can repeatedly operate unregistered X- ray machines for 1 ong
periods o f time without fear o f any enforcement action. Stronger
enforcement o f e x i s t i n g requirements i s needed t o a1 1 eviate t h i s probl em.
Fee Coll ection I s Unnecessarily I n e f f i c i e n t - Inadequate r e g i s t r a t i o n and
a lack o f coordination has reduced t h e e f f i c i e n c y o f fee collection. Fee
re1 ated f o l l ow- up work i s d i r e c t l y a t t r i b u t a b l e t o inaccurate<