ARIZONA DEPARTMENT OF TRANSPORTATION
AERONAUTICS DIVISION
FIVE- YEAR
AIRPORT DEVELOPMENT PROGRAM
FY 2010 – 2014
Goodyear Airport
Airport of the Year
2008
Arizona Department of Transportation
Aeronautics Division
Five - Year Airport Development Program
FY 2010 - 2014
i
Table of Contents
Airport Development Program Overview .......................................................................... ii
Airport Development Programming Guidelines................................................................. iv
Glossary ............................................................................................................................... v
Map of Primary & Secondary Airports .............................................................................. vi
Airport Development Program
2009 - 2010 Airport Development Program........................................................................ 1
2010 - 2011 Airport Development Program...................................................................... 17
2011 - 2012 Airport Development Program...................................................................... 32
2012 - 2013 Airport Development Program...................................................................... 46
2013 - 2014 Airport Development Program...................................................................... 58
Alphabetical Listing by Airport, FY 2010 - 2014 ............................................................. 69
FY 2010 – 2014 Summary............................................................................................... 111
Arizona Department of Transportation
Aeronautics Division
Five - Year Airport Development Program
FY 2010 - 2014
ii
Program Overview
In conjunction with the state’s public airport and the Federal Aviation Administration ( FAA), ADOT Aeronautics develops the Five- Year
Airport Capital Improvement Program ( ACIP) to parallel the FAA’s Airport Capital Improvement Program and the ADOT Highway’s
Program with the dual objective of maximizing the effective use of State dollars for airport development and maximizing FAA funding for
Arizona airports. Federal monies are derived mainly from taxes on airline tickets and are distributed by the Federal Aviation Administration
to local airports through the National Airport Improvement Program. State funds come mainly from flight property tax, aircraft lieu taxes
and aviation fuel taxes.
The ACIP development process allocates money from the State Aviation Fund and distributes these funds across three major categories of
airport development assistance. The State Transportation Board approves this program annually. The three categories and their associated
sub- categories are:
1. Airport Development Grants Program
• Projects utilizing Federal, State and Local funds
Safety, Security & Capacity Enhancement
Maintenance
Environmental, Planning and Land Acquisition
• Projects utilizing State and Local funds only
Safety, Security & Capacity Enhancement
Environmental, Planning and Land Acquisition
2. Airport Preventive Maintenance Services ( APMS)
• Projects maintaining and protecting aviation pavement surfaces
3. Airport Loan Program
• Economic development/ revenue generating loans
• Grant match loans
Arizona Department of Transportation
Aeronautics Division
Five - Year Airport Development Program
FY 2010 - 2014
iii
Program Overview ( continued)
Arizona airport sponsors of 58 public airports submitted 779 projects for consideration worth $ 1.4B over the 5- year program period. These
projects represent all Federal and State funding desires on the part of the airport sponsors. This document, the State’s proposed Five- Year
ACIP, totals $ 922.9 million. This is an approximately 46.8% increase from the previous year’s program. This is due to Sponsors doubling
their request to the FAA over last year. State funding, proposed at $ 67.9M, is 45.9% lower than last year’s total of $ 125.5M. This 5- year
investment of State funds will support about $ 817.0M in Federal aid and require about $ 37.9M from airport sponsors.
The State’s Airport Assistance Programs for the Five- Year ACIP are designed to provide 50% of a sponsor’s share of a federally funded
project. Expected sponsor obligations on federal projects beginning with FY 2010 will be 5.0% of a projects total cost, making the state
share 2.5%. Each year, the ACIP will set aside between $ 3.0MS-$ 5.0M to match federal grants. As airport sponsors receive a federal grant,
they will apply to the state for the matching funds.
The Five- Year Program also provides for State funded grants. These documents show those projects for State- local funding that have met
the State Transportation Board’s qualifying priority rating. When the Board approves the Five- Year Program, no projects for fiscal year
2010 will be issued new State/ Local grants. All other fiscal year’s projects are subject to subsequent annual review and approval by the State
Transportation Board.
This ACIP Document is formatted into four sections: Program Overview; Airport Development Program by fiscal year; Alphabetical Listing
of projects by sponsor name; and a Summary of Project Totals. Although Subprogram categories are not listed, the individual information is
retained in the State’s Aviation Database. The Five- Year Program’s contributions for Maintenance projects total $ 20.5M or 43.4%; Safety
and Capacity Enhancement projects total $ 25.2M or 53.4%; and Environmental, Planning, and Land Acquisition projects total $ 1.5M or
3.1%. State- local funding distributions among the airport categories are: $ 15.8M designated for commercial service airports; $ 32.8M for
reliever airports; $ 12.2M for public- general aviation airports and $ 1.4M for secondary airports. The maximum grant funds any one sponsor
can receive can not exceed 10% of the available funds for airport development. The maximum State/ Local grant funds for the fiscal year
2010 Program is zero.
Arizona Department of Transportation
Aeronautics Division
Five - Year Airport Development Program
FY 2010 - 2014
iv
Programming Guidelines
1. Projects proposed for inclusion in the program must be rated by the latest
approved version of the Arizona Department of Transportation's ( ADOT)
Airport Priority Rating System and confirmed as being recommended for
inclusion in the program.
2. Projected public ownership of a facility and availability for public use are
both required for programming a project at that facility.
3. There are three categories in the Program:
• Airport Development Grants
• Airport Preventative Maintenance Services ( APMS)
• Airport Loans
4. There are three types of projects in the Grants category:
• Projects that are related to Maintenance.
• Projects that are related to Safety and/ or Capacity Enhancement.
• Projects that are related to Environmental Studies, Planning or Land
Acquisition.
5. Funds are to be programmed with approximately 80% to commercial
service/ reliever airports, 18% to public, general aviation airports and 2% to
secondary airports.
6. During each year of the program, funds to match FAA grants are set aside
based on the amount of funds the FAA programs for airports in the state.
These funds are to be programmed to provide up to 50% of the Local share
of all eligible items contained in FAA airport project grants.
7. The program is developed with the intention to maximize the use of
Federal funds at airports in Arizona.
8. In addition to federal match grants, the State may issue grants comprised of
only state and local dollars. These grants are separate from federal match
grants and are subject to a rigorous priority rating and may be awarded to
airports whether they receive federal grants or not. These grants typically
fund up to 90% of a primary airport project and 95% of a secondary airport
project with no Federal participation.
9. The maximum grant funds any one airport sponsor may receive during any
single fiscal year will not exceed 10% of the available monies in the
Aviation Fund.
10. Consideration will be given to research and development projects that have
a potential for significant economic and/ or technical benefit to Arizona
airports and/ or airport users.
11. The Grants and APMS categories are facilities/ capital improvements
programs that parallel the Federal Airport Improvement Program in terms
of eligible grant items with the exception that the State does not fund
capital equipment, routine operating maintenance items or revenue
producing projects. The Airport Loan category is intended to accommodate
revenue- producing projects specific to an airport’s economic welfare.
12. The program was developed using approved Transportation Board
Policies. Where a diversion from the approved policy is requested by an
airport sponsor, a new policy must be presented to the Board for their
consideration and approval.
13. After a grant has been issued, the scope of work for the project receiving
grant funds shall not be modified by the sponsor unless a grant amendment
has been submitted to the Aeronautics Division for review and approved
by the State Transportation Board, if necessary. Any grant funds
remaining after the initial work in the grant has been completed shall be
returned to the State Aviation Fund. Grant offers not executed for
State/ Local projects within four months of receiving the offer, may be
withdrawn and the funds will be made available for other eligible projects.
14. Grant duration is 4 years except for acquiring airport land, which is subject
to individual review, but under no circumstances, may exceed 8 years.
Arizona Department of Transportation
Aeronautics Division
Five - Year Airport Development Program
FY 2010 - 2014
v
Glossary of Terms
ALP Airport Layout Plan
Apron Aircraft Parking Area
ARFF Aircraft Rescue and Fire Fighting
ASR Airport Surveillance Radar
ATCT Air Traffic Control Tower
AWOS Automatic Weather Observation System
DCC Defense Contractor Cargo
EA Environmental Assessment
EMAS Engineering Materials Arresting System
FAA Federal Aviation Administration
FBO Fixed Base Operator
FOD Foreign Object Debris
FAR Federal Aviation Regulations
GA General Aviation
GPS Global Positioning System
GVGI Generic Visual Glideslope Indicator
HIRL High Intensity Runway Lights
ILS Instrument Landing System
MIRL Medium Intensity Runway Lights
MITL Medium Intensity Taxiway Lights
NAVAID Navigational Aid
NDB Non- Directional Beacon ( a navigational aid
to find the airport)
PAPI Precision Approach Path Indicator
PCC Portland Cement Concrete
Pave Pres Pavement Preservation
Ph. 1 Phase 1 of a Multi- year Project
REILS Runway End Identifier Lights
ROFA Runway Obstacle Free Area
RSA Runway Safety Area
RSAT Runway Safety Action Team
RPZ Runway Protection Zone
RVZ Runway Visibility Zone
Rwy Runway
SASP State Airport System Plan
Set Aside A fund allocation for a specific reason
SRE Snow Removal Equipment
TLOF Touchdown and Liftoff Area
TVOR Terminal Very High Frequency Omni-directional
Range Navigation Aid
Twy Taxiway
Arizona Department of Transportation
Aeronautics Division
Five - Year Airport Development Program
FY 2010 - 2014
vi
Arizona Department of Transportation - Aeronautics Division 1
FY 2010 State & Local Grants
There are no grants schduled for Ficsal Year 2010
Arizona Department of Transportation - Aeronautics Division 2
Page is intentionally left Blank
FY 2010 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
AVI SUQUILLA LA PAZ
Apron: Expand Apron - Capacity Reconstruction and new construction of about
28,000 SY of asphalt concrete paved GA apron
area including storm drainage improvements.
$ 39,125 $ 39,125 $ 1,486,750 $ 1,565,000
Ground
Transportation:< Construct/ Expand/ Improve/ Modify/ Reha
bilitate> Access Road - Other
Reconstruction of 8,000 SY of access road
including curb and gutter, storm drainage
improvements, asphalt concrete pavement and
rerouting of electrical and communications lines.
$ 18,375 $ 18,375 $ 698,250 $ 735,000
Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities>
[ MAP] - Other
Construction of about 5,600 ft of looped 12 inch fire
line connected to CRIT public water system and
construction of about 1,600 ft of sanitary sewer line
in order to abandon existing septic system serving
the GA terminal and GA hangar area.
$ 23,000 $ 23,000 $ 874,000 $ 920,000
Other:< Construct/ Rehabilitate> Parking Lot [ non
revenue producing- non hub/ MAP] - Other
Rehabilitate and reconstruct 11,000 SY of public
parking at the GA terminal and FBO area including
asphalt concrete pavement, correcting existing
drainage problems and relocating water/ sewer
utilities.
$ 10,750 $ 10,750 $ 408,500 $ 430,000
Airport Total: $ 91,250 $ 91,250 $ 3,467,500 $ 3,650,000
BENSON MUNICIPAL COCHISE
Heliport:< Construct/ Expand/ Improve/ Modify/ Rehabilitate>
Helipad/ Heliport - Standards
Design Helipads on East end of Apron ( 50 ft x 50 ft) $ 1,250 $ 1,250 $ 47,500 $ 50,000
Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities>
[ MAP] - Other
Install Emergency Generator $ 8,750 $ 8,750 $ 332,500 $ 350,000
Planning:< Conduct/ Update> ( e. g., Pavement
Maintenance Plan, PCI, NPDES, etc.)
Conduct Airport Drainage Master Plan $ 3,750 $ 3,750 $ 142,500 $ 150,000
Runways:< Extend/ Widen/ Strengthen> Runway [ to meet
standards] - Standards
Install Airport Perimeter/ Security Fence and Gates
( 15,774 ft)
$ 18,750 $ 18,750 $ 712,500 $ 750,000
Airport Total: $ 32,500 $ 32,500 $ 1,235,000 $ 1,300,000
BISBEE DOUGLAS INTL COCHISE
Apron: Rehabilitate Apron - Reconstruction Pavement overlay 25,000 sy ( S. portion of PCC
Apron)
$ 20,000 $ 20,000 $ 760,000 $ 800,000
Planning:< Conduct/ Update> < Airport Master Plan Study
{ ALP, EA, etc.}>
Master Plan Update $ 5,000 $ 5,000 $ 190,000 $ 200,000
Airport Total: $ 25,000 $ 25,000 $ 950,000 $ 1,000,000
BISBEE MUNI COCHISE
Apron: Expand/ Strengthen Apron - Standards Reconstruct existing apron & expand apron to
south ( approx. 22,300 SY of asphalt pavement).
$ 5,625 $ 5,625 $ 213,750 $ 225,000
Planning:< Conduct/ Update> < Airport Master Plan Study
{ ALP, EA, etc.}>
Update Master Plan $ 4,375 $ 4,375 $ 166,250 $ 175,000
Arizona Department of Transportation - Aeronautics Division 3
FY 2010 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
Taxiways:< Extend/ Widen/ Strengthen> Taxiway -
Standards
Widen Twy A from 35 ft to 50 ft; Reconstruct
existing pavement ( 5,900 ft x 50 ft)
$ 5,000 $ 5,000 $ 190,000 $ 200,000
Airport Total: $ 15,000 $ 15,000 $ 570,000 $ 600,000
BUCKEYE MUNI MARICOPA
Land: Acquire land/ easement for approaches Purchase approximately 25 acres of land north of
the airport to secure RPZ and allow for future Rwy
extension ( Phase 1).
$ 137,500 $ 137,500 $ 5,225,000 $ 5,500,000
Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities>
[ MAP] - Other
Design and construct a well site and water storage
tank to provide fire protection and domestice
service for airport facilities.
$ 75,000 $ 75,000 $ 2,850,000 $ 3,000,000
Runways:< Extend/ Widen/ Strengthen> Runway [ to meet
standards] - Standards
Design a Rwy widening and strengthening project
to increase the total width to 100 ft and the strength
to 75,000 lbs.
$ 3,000 $ 3,000 $ 114,000 $ 120,000
Airport Total: $ 215,500 $ 215,500 $ 8,189,000 $ 8,620,000
CASA GRANDE MUNI PINAL
Apron: Expand Apron - Capacity Design/ Construct 13,800 sy Apron, 7032 sy Vehicle
Parking, Interior Fire Hydrants, Water, drainage,
sewer & Electric South East & West of Native Air
Complex
$ 30,000 $ 30,000 $ 1,140,000 $ 1,200,000
Land: Acquire < land/ easement> for
development/ relocation
Purchase 225+/- Acres for Planned Rwy Ext. Land
located NW, N, SW & S of the existing airport land.
EA & New Airport Plan are underway & to be
completed during 1st Qtr CY 2009.
$ 112,500 $ 112,500 $ 4,275,000 $ 4,500,000
Other: Improve Airport < Drainage/ Erosion
Control/ miscellaneous improvements> - Standards
Design 80 ft x 6,800 ft relocation of Drainage Ditch
running from NW to SW portion of airport that is
currently protecting portions of land N. of Rwy 5- 23
and passing through existing Rwy 5 RPZ.
$ 2,000 $ 2,000 $ 76,000 $ 80,000
Runways:< Construct/ Extend/ Improve> Runway Safety
Area [ Non- Primary Airports] - Standards
Extend Rwy 5- 23 100ft x 3,650 ft Rwy Ext. including
relocation & 75 ft x 3,650 ft Twy B Ext., Relocated
Rwy 23 threshold by 1,000 ft new Rwy Access/ Exit
Twys & associated lighting, signage, marking,
utilities, drainage, security fencing & service
roadways
$ 5,000 $ 5,000 $ 190,000 $ 200,000
Airport Total: $ 149,500 $ 149,500 $ 5,681,000 $ 5,980,000
CHANDLER MUNI MARICOPA
Equipment: Install Weather Reporting Equipment
{ describe, e. g., AWOS } - Standards
Design & Construct AWOS replacement. $ 4,325 $ 4,325 $ 164,350 $ 173,000
Other: Install < Guidance/ other> Signs [ not Part 139] -
Standards
Design replacement/ modification of approx. 75
airfield signs
$ 1,988 $ 1,987 $ 75,525 $ 79,500
Taxiways: Construct Taxiway ( environmental mitigation) EA for planned Twy B extension from existing Twy
N to approach end of Rwy 04L including connectors.
$ 5,338 $ 5,337 $ 202,825 $ 213,500
Arizona Department of Transportation - Aeronautics Division 4
FY 2010 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
Taxiways: Extend Taxiway - Capacity Design pavement for 5,500 LF x 40 ft Twy,
connectors & runup areas ( 29,000 SY).
$ 4,638 $ 4,637 $ 176,225 $ 185,500
Taxiways: Install Taxiway Lighting ( e. g., SMGCS,
reflectors, MITL) - Standards
Design MITL & signs for 5,500 LF Twy, connectors
& runup areas.
$ 3,550 $ 3,550 $ 134,900 $ 142,000
Airport Total: $ 19,839 $ 19,836 $ 753,825 $ 793,500
CIBECUE NAVAJO
New Airports: Construct New Airport - Standards New Site for Cibecue Airport, approx. 163 Acres
Phase I Grading and Drainage.
$ 225,000 $ 225,000 $ 8,550,000 $ 9,000,000
Airport Total: $ 225,000 $ 225,000 $ 8,550,000 $ 9,000,000
COCHISE COUNTY COCHISE
Apron: Construct Apron - Standards Overlay 4,500 sy on Twy and Apron area adjacent
to fuel site and terminal area
$ 12,500 $ 12,500 $ 475,000 $ 500,000
Runways: Rehabilitate Runway < Lighting/ Electrical Vault> Upgrade MIRL along Rwy 3- 21 with associated
electrical upgrades
$ 10,000 $ 10,000 $ 380,000 $ 400,000
Taxiways: Rehabilitate Taxiway - Reconstruct Reconstruct SW half of Twy A 11,860 sy $ 21,250 $ 21,250 $ 807,500 $ 850,000
Airport Total: $ 43,750 $ 43,750 $ 1,662,500 $ 1,750,000
COLORADO CITY MUNI MOHAVE
Land: Acquire < land/ easement> for
development/ relocation
Land, Acquire land for taxiway expansions, BLM
land transfers costs
$ 3,000 $ 3,000 $ 114,000 $ 120,000
Runways: Rehabilitate Runway - Reconstruct Runway Pavement, Crack and Fog Seal $ 3,750 $ 3,750 $ 142,500 $ 150,000
Airport Total: $ 6,750 $ 6,750 $ 256,500 $ 270,000
COOLIDGE MUNI PINAL
Apron: Rehabilitate Apron - Reconstruction Phase II of apron rehabilitation N and W of Main
Hangar ( Ph I completed 2006)
$ 35,750 $ 35,750 $ 1,358,500 $ 1,430,000
Runways: Install < full/ partial> Instrument Approach Aid -
Standards
Rwy 5- 23 & Rwy 17- 35 PAC/ SAC Survey $ 1,175 $ 1,175 $ 44,653 $ 47,003
Runways: Rehabilitate Runway - Reconstruct Reconstruct Rwy 5/ 23 ( 5,500 ft x 150 ft) $ 44,000 $ 44,000 $ 1,672,000 $ 1,760,000
Airport Total: $ 80,925 $ 80,925 $ 3,075,153 $ 3,237,003
COTTONWOOD YAVAPAI
Equipment: Install Weather Reporting Equipment
{ describe, e. g., AWOS } - Standards
Design and construct an AWOS. $ 8,375 $ 8,375 $ 318,250 $ 335,000
Airport Total: $ 8,375 $ 8,375 $ 318,250 $ 335,000
ELOY MUNI PINAL
Taxiways: Install Taxiway Lighting ( MITL) [ non Part 139
CS] - Statutory Emphasis Programs
Installation of MITLs and conduit/ cable; Installation
of new rotating beacon and tower.
$ 12,500 $ 12,500 $ 475,000 $ 500,000
Arizona Department of Transportation - Aeronautics Division 5
FY 2010 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
Terminal Development: Construct Terminal Building -
Capacity
Design new terminal building, design utilities and
parking lot to serve new terminal building
$ 5,000 $ 5,000 $ 190,000 $ 200,000
Airport Total: $ 17,500 $ 17,500 $ 665,000 $ 700,000
ERIC MARCUS MUNICIPAL PIMA
Apron: Construct Apron - Standards Crack seal repair Twy A- 3 ( appox 24,000 sf) $ 1,625 $ 1,625 $ 61,750 $ 65,000
Airport Total: $ 1,625 $ 1,625 $ 61,750 $ 65,000
ERNEST A. LOVE FIELD YAVAPAI
Buildings:< Construct/ Expand/ Improve/ Modify/ Rehabilitat
e> Aircraft Rescue & Fire Fighting Building [ Pt. 139
only] - Safety/ Security
Build 13,000 SF ARFF Station at midfield. $ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000
Equipment: Acquire Aircraft Rescue & Fire Fighting
Safety Equipment [ required by Part 139] - Safety/ Security
Purchase new Index B ARFF truck. $ 12,500 $ 12,500 $ 475,000 $ 500,000
Equipment: Acquire Security Equipment/ Install Fencing
[ required by Part 107] - Safety/ Security
Build security upgrades to include 29,000 LF
fencing, cameras, and access control devices.
$ 50,000 $ 50,000 $ 1,900,000 $ 2,000,000
Equipment: Acquire Security Equipment/ Install Fencing
[ required by Part 107] - Safety/ Security
Design security upgrades to include 29,000 LF
fencing, cameras, and access control devices.
$ 3,750 $ 3,750 $ 142,500 $ 150,000
Land: Acquire land/ easement for approaches Acquire 61.3 Acres. $ 125,000 $ 125,000 $ 4,750,000 $ 5,000,000
Runways: Extend Runway- Capacity Design Drainage Improvements. $ 3,750 $ 3,750 $ 142,500 $ 150,000
Runways: Extend Runway- Capacity Design Rwy 21L/ 3R and Twys C, D & H extensions
to minimum of 9,300 ft and 200K lbs.
$ 8,750 $ 8,750 $ 332,500 $ 350,000
Runways: Install Runway Lighting ( HIRL, MIRL)
[ Required by Part 139] - Safety/ Security
Relocate Vault - Upgrade Rwy 3R/ 21L to HIRL. $ 6,250 $ 6,250 $ 237,500 $ 250,000
Airport Total: $ 272,500 $ 272,500 $ 10,355,000 $ 10,900,000
FALCON FLD MARICOPA
Other: Install < Guidance Signs/ Runway Incursion
Caution Bars> [ non Part 139 CS] - Statutory Emphasis
Programs
Design reconfiguration of existing Twy B and
Installation of a Rwy guard light system.
$ 3,750 $ 3,750 $ 142,500 $ 150,000
Other: Install < Guidance Signs/ Runway Incursion
Caution Bars> [ non Part 139 CS] - Statutory Emphasis
Programs
Phase 1 - Reconfigure Twy B and Install Rwy guard
lights along primary Rwy 4R- 22L.
$ 37,500 $ 37,500 $ 1,425,000 $ 1,500,000
Runways:< Construct/ Extend/ Improve> Runway Safety
Area [ Non- Primary Airports] - Standards
Install upgrades to seven ( 7) storm drain inlets in
the safety areas of the airport's Rwys
$ 12,500 $ 12,500 $ 475,000 $ 500,000
Airport Total: $ 53,750 $ 53,750 $ 2,042,500 $ 2,150,000
FLAGSTAFF PULLIAM COCONINO
Taxiways: Rehabilitate Taxiway - Reconstruct Reconstruct and repave existing segment of
Taxiway A from connector A- 6 southward through A-
9. Work includes improving subgrade, drainage,
paving and restriping. Also upgrade existing airfield
runway and taxiway lighting and sign circuits.
$ 137,638 $ 137,638 $ 5,230,245 $ 5,505,521
Arizona Department of Transportation - Aeronautics Division 6
FY 2010 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
Airport Total: $ 137,638 $ 137,638 $ 5,230,245 $ 5,505,521
GILA BEND MUNI MARICOPA
Land: Acquire land/ easement for approaches Acquire land in approaches for Rwy 4 and 22. $ 2,125 $ 2,125 $ 80,750 $ 85,000
Runways: Install < full/ partial> Instrument Approach Aid -
Standards
Install survey monuments on both ends of Rwy
4/ 22.
$ 550 $ 550 $ 20,900 $ 22,000
Terminal Development:< Improve/ Modify/ Rehabilitate>
Terminal Building - Capacity
Rehabilitate existing Terminal Building in
accordance with completed plans.
$ 5,000 $ 5,000 $ 190,000 $ 200,000
Airport Total: $ 7,675 $ 7,675 $ 291,650 $ 307,000
GLENDALE MUNICIPAL MARICOPA
Equipment: Acquire Security Equipment/ Install Fencing
[ required by Part 107] - Safety/ Security
Acquire Security Equipment ( cameras) along
perimeter ( 81,000 LF) of Airport.
$ 37,500 $ 37,500 $ 1,425,000 $ 1,500,000
Other:< Light/ Mark/ Remove> Obstructions - Standards Remove Blast Fence. $ 7,500 $ 7,500 $ 285,000 $ 300,000
Planning:< Conduct/ Update> < Airport Master Plan Study
{ ALP, EA, etc.}>
Conduct Capacity Study. $ 2,500 $ 2,500 $ 95,000 $ 100,000
Planning: Conduct < Environmental
Assessment/ Environmental Impact
Statement/ Feasibility> < study/ update>
Update Environmental Assessment. $ 5,000 $ 5,000 $ 190,000 $ 200,000
Runways: Construct Runway - Capacity Pave 21,000 SY Rwy Shoulders - Design Only. $ 1,875 $ 1,875 $ 71,250 $ 75,000
Runways: Construct Runway - Capacity Pave 21,000 SY Rwy Shoulders. $ 31,525 $ 31,525 $ 1,197,950 $ 1,261,000
Runways: Rehabilitate Runway - Reconstruct Pavement Maintenance - slurry seal hangars, Twy,
and Rwy.
$ 5,000 $ 5,000 $ 190,000 $ 200,000
Taxiways: Construct Taxiway - Capacity Pave 28,300 SY Twy Shoulders - Design Only. $ 1,875 $ 1,875 $ 71,250 $ 75,000
Taxiways: Construct Taxiway - Capacity Pave 28,300 SY Twy Shoulders. $ 42,700 $ 42,700 $ 1,622,600 $ 1,708,000
Airport Total: $ 135,475 $ 135,475 $ 5,148,050 $ 5,419,000
GRAND CANYON WEST MOHAVE
Runways: Construct Runway [ includes relocation] -
Standrads
Runways: Shift and construct Runway 17/ 35,
5,000' x 75'. Project also includes grading,
drainage, paving, lighting and visual aids - Phase II
$ 250,000 $ 250,000 $ 9,500,000 $ 10,000,000
Airport Total: $ 250,000 $ 250,000 $ 9,500,000 $ 10,000,000
GREENLEE COUNTY GREENLEE
Apron: Rehabilitate Apron - Reconstruction Rehabilitate 8,600 SY PCCP Apron $ 7,500 $ 7,500 $ 285,000 $ 300,000
Equipment: Acquire Security Equipment/ Install Fencing
[ required by Part 107] - Safety/ Security
Construct 9,700 LF Perimeter Fencing $ 12,500 $ 12,500 $ 475,000 $ 500,000
Other:< Light/ Mark/ Remove> Obstructions - Standards Obstruction Removal ( overhead electrical & phone
box [ OFA])
$ 12,500 $ 12,500 $ 475,000 $ 500,000
Other: Improve Airport < Drainage/ Erosion
Control/ miscellaneous improvements> - Standards
Construct Drainage Improvements $ 23,750 $ 23,750 $ 902,500 $ 950,000
Arizona Department of Transportation - Aeronautics Division 7
FY 2010 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
Planning: Conduct < Environmental
Assessment/ Environmental Impact
Statement/ Feasibility> < study/ update>
EA for RPZ Rwy 7 & Road 78 Realignment & 18
acre land acquisition
$ 2,500 $ 2,500 $ 95,000 $ 100,000
Runways: Install Runway < vertical/ visual> Guidance
System [ PAPI/ VASI/ REIL/ ALS/ etc.] - Standards
Construct Guidance Sign Installation $ 11,875 $ 11,875 $ 451,250 $ 475,000
Airport Total: $ 70,625 $ 70,625 $ 2,683,750 $ 2,825,000
H. A. CLARK MEMORIAL FIELD COCONINO
Apron: Rehabilitate Apron - Reconstruction Reconstruct orginal apron ( approx 4,500 sy). $ 31,250 $ 31,250 $ 1,187,500 $ 1,250,000
Equipment: Acquire < Snow Removal Equipment/ Urea
Truck/ etc.> - Standards
Acquire Snow Removal Equipment $ 6,250 $ 6,250 $ 237,500 $ 250,000
Other: Construct Aircraft Rescue & Fire Fighting Training
Facility/ Regional Burn Pit/ Mobile Training Facility -
Standards
This is the completion of the ARFF Building as
designed.
$ 6,250 $ 6,250 $ 237,500 $ 250,000
Planning:< Conduct/ Update> < Airport Master Plan Study
{ ALP, EA, etc.}>
Prepare PArt 139 Certification Manual $ 1,250 $ 1,250 $ 47,500 $ 50,000
Planning: Conduct < Environmental
Assessment/ Environmental Impact
Statement/ Feasibility> < study/ update>
Revalidate Environmental Assessment completed
previously
$ 1,875 $ 1,875 $ 71,250 $ 75,000
Airport Total: $ 46,875 $ 46,875 $ 1,781,250 $ 1,875,000
HOLBROOK MUNI NAVAJO
Runways: Construct Runway [ includes relocation] -
Standards
Construct Crosswind Runway 11/ 29 4,900' x 60'
( including lighting, signage & visual aids)
$ 112,500 $ 112,500 $ 4,275,000 $ 4,500,000
Taxiways: Construct Taxiway - Capacity Construct Parallel Taxiway to Runway 11/ 29 ( 4,900
x 35 ft) including lighting and signage
$ 75,000 $ 75,000 $ 2,850,000 $ 3,000,000
Airport Total: $ 187,500 $ 187,500 $ 7,125,000 $ 7,500,000
KAYENTA NAVAJO
Apron: Construct Apron - Standards Apron, Construct North East of existing apron,
approx. 16,000 sy.
$ 25,000 $ 25,000 $ 950,000 $ 1,000,000
Ground
Transportation:< Construct/ Expand/ Improve/ Modify/ Reha
bilitate> Access Road - Capacity
Access Road, Construct main access road to
Center Field, 2,000' x 24'.
$ 25,000 $ 25,000 $ 950,000 $ 1,000,000
Airport Total: $ 50,000 $ 50,000 $ 1,900,000 $ 2,000,000
KINGMAN MOHAVE
Apron: Construct Apron - Capacity Construct aircraft parking apron between Flightline
Drive and the South Ramp ( approx. 14,000 sy).
$ 27,500 $ 27,500 $ 1,045,000 $ 1,100,000
Apron: Rehabilitate Apron - Reconstruction Reconstruct the northern portion of the main aircraft
parking ramp ( approx. 60,000 sy).
$ 100,000 $ 100,000 $ 3,800,000 $ 4,000,000
Arizona Department of Transportation - Aeronautics Division 8
FY 2010 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
Other: Install < Guidance Signs/ Runway Incursion
Caution Bars> [ required by Part 139] - Safety/ Security
Paint Rwy edge markings on 3- 21 and 17- 35,
perform pavement maintenance and re- striping on
Rwy 3- 21 and modify, relocate and add new
guidance signs.
$ 20,000 $ 20,000 $ 760,000 $ 800,000
Airport Total: $ 147,500 $ 147,500 $ 5,605,000 $ 5,900,000
LAKE HAVASU CITY MOHAVE
Other: Install < Guidance/ other> Signs [ not Part 139] -
Standards
Airfield Signage Improvements and
Modifications/ Pavement Modifications: ( a) Assess
Airfield Information Signs and Replace;
( b) Construct Bravo Twy Edge Lighting; ( c) Install S-
1 Cutouts on Regulators; ( d) Add North Ramp
Connects to Twy A; ( e) Add hydrant prote
$ 7,100 $ 7,100 $ 269,800 $ 284,000
Airport Total: $ 7,100 $ 7,100 $ 269,800 $ 284,000
LAUGHLIN/ BULLHEAD INTERNATIONAL MOHAVE
Buildings:< Construct/ Expand/ Improve/ Modify/ Rehabilitat
e> Aircraft Rescue & Fire Fighting Building [ Pt. 139
only] - Safety/ Security
Construct new ARFF Building ( Phase I). This
project will include the site preparation, drainage,
infrastructure, and new generator.
$ 29,250 $ 29,250 $ 1,111,500 $ 1,170,000
Equipment: Acquire Aircraft Rescue & Fire Fighting
Vehicle [ required by Part 139 only] - Safety/ Security
The project includes the acquisition of a new ARFF
Vehicle.
$ 21,250 $ 21,250 $ 807,500 $ 850,000
Equipment: Acquire Equipment ( e. g., Sweepers, etc.) -
Standards
The project includes the acquisition of a high- speed
pavement sweeper.
$ 4,625 $ 4,625 $ 175,750 $ 185,000
Planning:< Conduct/ Update> < Airport Master Plan Study
{ ALP, EA, etc.}>
The project will involve the preparation of an
Environmental Assessment for the acquisition of
approximately 300 acres of property.
$ 7,500 $ 7,500 $ 285,000 $ 300,000
Runways:< Construct/ Extend/ Improve> Runway Safety
Area [ Primary Airports] - Safety/ Security
This project will include misc. erosion protection
and drainage improvements along Rwy 16- 34
( Phase I).
$ 23,684 $ 23,684 $ 900,000 $ 947,368
Runways: Extend Runway- Capacity The project will include the design necessary to
extend Rwy 16- 34 1,000 ft to the south.
$ 25,000 $ 25,000 $ 950,000 $ 1,000,000
Terminal Development: Expand Terminal Building -
Capacity
The project will involve enclosing the existing bag
claim area ( 4,500 SF) and creating an all- weather
environment for passengers.
$ 25,625 $ 25,625 $ 973,750 $ 1,025,000
Airport Total: $ 136,934 $ 136,934 $ 5,203,500 $ 5,477,368
MARANA REGIONAL PIMA
Buildings:< Construct/ Expand/ Improve/ Modify/ Rehabilitat
e> Building - Standards
Construct Air Traffic Control Tower $ 162,500 $ 162,500 $ 6,175,000 $ 6,500,000
Buildings:< Construct/ Expand/ Improve/ Modify/ Rehabilitat
e> Building - Standards
Construct public use terminal on east side of
airport, 12,000SF
$ 125,000 $ 125,000 $ 4,750,000 $ 5,000,000
Arizona Department of Transportation - Aeronautics Division 9
FY 2010 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
Taxiways: Construct Taxiway - Capacity Construct Taxiway K. 50 feet x 1500 feet. The work
to be done will include clearing and grubbing,
preparing the subgrade to proposed elevations,
placing aggregate base course and asphalt
concrete pavement, upgrade taxiway edge lighting,
and install strip
$ 47,500 $ 47,500 $ 1,805,000 $ 1,900,000
Airport Total: $ 335,000 $ 335,000 $ 12,730,000 $ 13,400,000
Maricopa Municipal
New Airports: Acquire [ existing] Airport - Standards This project involves the acquisiton of 342 acres of
land from the Arizona State Land Department.
$ 427,500 $ 427,500 $ 16,245,000 $ 17,100,000
New Airports: Construct New Airport - Capacity Design of projects included in the initial
development of the airport.
$ 52,058 $ 52,058 $ 1,978,185 $ 2,082,300
Airport Total: $ 479,558 $ 479,558 $ 18,223,185 $ 19,182,300
NOGALES INTL SANTA CRUZ
Other: Improve Airport < Drainage/ Erosion
Control/ miscellaneous improvements> - Standards
Construct 1.75 acre slope stabilization & erosion
control on East Side
$ 36,500 $ 36,500 $ 1,387,000 $ 1,460,000
Airport Total: $ 36,500 $ 36,500 $ 1,387,000 $ 1,460,000
PAGE MUNI COCONINO
Apron: Expand Apron - Capacity Construct approx. 19,000 syds of apron space
between the North Apron Twy and Rwy 7- 25.
$ 35,050 $ 35,050 $ 1,331,900 $ 1,402,000
Buildings:< Construct/ Expand/ Improve/ Modify/ Rehabilitat
e> Building - Standards
Relocate the portable hangars from the main ramp
to the expanded north ramp between Rwy 7- 25 and
the North Apron Twy.
$ 9,950 $ 9,950 $ 378,100 $ 398,000
Airport Total: $ 45,000 $ 45,000 $ 1,710,000 $ 1,800,000
PAYSON GILA
Apron: Construct Apron - Standards 10- 02 - Constructon expansion of the east side of
Echo Ramp, approximately 5200 square yards of
asphalt
$ 15,750 $ 15,750 $ 598,500 $ 630,000
Land: Acquire < land/ easement> for
development/ relocation
10- 01 - Purchase of 13.5 acres located adjacent to
the south side of the airport at the west end.
$ 55,000 $ 55,000 $ 2,090,000 $ 2,200,000
Other: Install < Guidance/ other> Signs [ not Part 139] -
Standards
10- 04 - Signage and lighting along the runway and
taxiway
$ 7,750 $ 7,750 $ 294,500 $ 310,000
Runways:< Construct/ Extend/ Improve> Runway Safety
Area [ Non- Primary Airports] - Standards
10- 03 - Install runup area at the east end of
Taxiway ' A', 2600 square yards asphalt pavement
$ 16,250 $ 16,250 $ 617,500 $ 650,000
Airport Total: $ 94,750 $ 94,750 $ 3,600,500 $ 3,790,000
PHOENIX DEER VALLEY MARICOPA
Apron: Rehabilitate Apron - Reconstruction Rebuild ramp in the south and northwest areas -
Phase 2.
$ 180,350 $ 180,350 $ 6,853,300 $ 7,214,000
Arizona Department of Transportation - Aeronautics Division 10
FY 2010 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
Planning: Conduct < Environmental
Assessment/ Environmental Impact
Statement/ Feasibility> < study/ update>
Conduct an Environmental Assessment for future
projects at the Airport.
$ 12,500 $ 12,500 $ 475,000 $ 500,000
Runways:< Construct/ Extend/ Improve> Runway Safety
Area [ Primary Airports] - Safety/ Security
Complete improvements to the runway safety area,
recommended by the RSAT - Phase 1.
$ 115,000 $ 115,000 $ 4,370,000 $ 4,600,000
Runways:< Extend/ Widen/ Strengthen> Runway [ to meet
standards] - Standards
Construct aircraft run- up areas at the ends of
Runway 7L- 25R and 7R- 25L.
$ 50,000 $ 50,000 $ 1,900,000 $ 2,000,000
Airport Total: $ 357,850 $ 357,850 $ 13,598,300 $ 14,314,000
PHOENIX GOODYEAR MARICOPA
Planning: Conduct < Environmental
Assessment/ Environmental Impact
Statement/ Feasibility> < study/ update>
Conduct environmental study for projects not
covered by a Categorical Exclusion.
$ 12,500 $ 12,500 $ 475,000 $ 500,000
Taxiways:< Extend/ Widen/ Strengthen> Taxiway -
Standards
Stengthen taxiway connectors A- 5, A- 6, and A- 7 to
meet Category D- IV airport design standards.
Replace Taxiway A- 4 with two high speed taxiway
exits.
$ 80,450 $ 80,450 $ 3,057,100 $ 3,218,000
Airport Total: $ 92,950 $ 92,950 $ 3,532,100 $ 3,718,000
PHOENIX SKY HARBOR INTL MARICOPA
Other: Noise Mitigation Measures [ miscellaneous] Sound mitigation and acquisition of eligible
properties.
$ 3,812,500 $ 3,812,500 $ 22,875,000 $ 30,500,000
Planning:< Conduct/ Update> < Airport Master Plan Study
{ ALP, EA, etc.}>
Conduct FAR Part 150 study update. $ 187,500 $ 187,500 $ 1,125,000 $ 1,500,000
Runways:< Construct/ Extend/ Improve> Runway Safety
Area [ Primary Airports] - Safety/ Security
Install recommended alternative from
environmental assessment to comply with 1,000 ft
FAA RSA standards.
$ 1,825,000 $ 1,825,000 $ 10,950,000 $ 14,600,000
Taxiways: Construct Taxiway - Capacity Construct acute angle taxiway connector between
Runway 7R- 25L and Taxiway H.
$ 506,250 $ 506,250 $ 3,037,500 $ 4,050,000
Airport Total: $ 6,331,250 $ 6,331,250 $ 37,987,500 $ 50,650,000
PHOENIX- MESA GATEWAY MARICOPA
Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities>
[ MAP] - Other
Design/ Construct a 100,000 gal. expansion to the
existing 150,000 gallon Jet- A fuel farm and
rehabilitate fuel farm pavements. This is a MAP
project request.
$ 57,800 $ 57,800 $ 2,196,400 $ 2,312,000
Other:< Construct/ Rehabilitate> Parking Lot [ non
revenue producing- non hub/ MAP] - Other
Design approximately 1,700 parking spaces for
terminal parking. This is a MAP project request.
$ 7,100 $ 7,100 $ 269,800 $ 284,000
Other:< Construct/ Rehabilitate> Parking Lot [ non
revenue producing- non hub/ MAP] - Other
Terminal Parking Construction of approximately
1,700 parking spaces. This is a MAP project
request.
$ 108,750 $ 108,750 $ 4,132,500 $ 4,350,000
Other: Improve Airport < Drainage/ Erosion
Control/ miscellaneous improvements> - Standards
Airfield/ Apron Drainage Improvements from Twy V
to Twy L
$ 95,000 $ 95,000 $ 3,610,000 $ 3,800,000
Arizona Department of Transportation - Aeronautics Division 11
FY 2010 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
Taxiways:< Extend/ Widen/ Strengthen> Taxiway -
Standards
Construct Twy B Ph IV between Twy L & Twy N
with drainage 77,333 SY signage/ markings- 8% &
lighting- 15% construction costs
$ 269,847 $ 269,847 $ 10,254,186 $ 10,793,880
Taxiways:< Extend/ Widen/ Strengthen> Taxiway -
Standards
Txy L Construct from Twy A to South Tract, 75 ft W
with 35 ft shoulders each side x 2600 ft L ( 21,700
SY), includes Twy A to allow for radius connections.
$ 225,594 $ 225,594 $ 8,572,567 $ 9,023,755
Terminal Development: Expand Terminal Building -
Capacity
Construct West Terminal Expansion Ph II -
Increase existing 34,000 SF of terminal space by
20,000 SF. This is a MAP project request.
$ 163,500 $ 163,500 $ 6,213,000 $ 6,540,000
Terminal Development: Expand Terminal Building -
Capacity
Terminal Expansion Ph II Design adds 20,000 SF
to existing 34,000 SF of terminal space. MAP
project request.
$ 16,625 $ 16,625 $ 631,750 $ 665,000
Airport Total: $ 944,216 $ 944,216 $ 35,880,203 $ 37,768,635
POLACCA NAVAJO
Planning: Conduct < Environmental
Assessment/ Environmental Impact
Statement/ Feasibility> < study/ update>
Conduct environmental assessment for Rwy and
apron.
$ 3,750 $ 3,750 $ 142,500 $ 150,000
Airport Total: $ 3,750 $ 3,750 $ 142,500 $ 150,000
RYAN FIELD PIMA
Equipment: Acquire Security Equipment/ Install Perimeter
Fencing [ not Part 107] - Standards
Install new chain link fencing ( approx. 13,000 lf),
24in paved service road ( apprx. 18,000 lf 2in AC
with 6in ABC), striping and signage, gates and
plunge basins
$ 67,042 $ 67,043 $ 2,547,615 $ 2,681,700
Other: Improve Airport < Drainage/ Erosion
Control/ miscellaneous improvements> - Standards
Convert airfield drainage system to closed storm
drain system or treat the ends of exposed drainage
culverts with grated drainage structures
$ 25,000 $ 25,000 $ 950,000 $ 1,000,000
Runways: Rehabilitate Runway - Reconstruct Rwy 6L- 24R, Pulverize 3in AC pavement,
regrade/ lime treat subgrade. Place new 3in AC
pavement & 10in wide erosion control, paint striping
and marking.
$ 55,219 $ 55,219 $ 2,098,312 $ 2,208,750
Airport Total: $ 147,261 $ 147,262 $ 5,595,927 $ 5,890,450
SAFFORD REGIONAL GRAHAM
Runways:< Extend/ Widen/ Strengthen> Runway [ to meet
standards] - Standards
Remove existing Rwy 12/ 30 pavement & base;
reconstruct base & pavement.
$ 64,848 $ 64,847 $ 2,464,205 $ 2,593,900
Airport Total: $ 64,848 $ 64,847 $ 2,464,205 $ 2,593,900
SAN MANUEL PINAL
Other:< Light/ Mark/ Remove> Obstructions - Standards Obstruction Survey for Instrument Approach $ 1,875 $ 1,875 $ 71,250 $ 75,000
Planning:< Conduct/ Update> < Airport Master Plan Study
{ ALP, EA, etc.}>
Airport Master Plan ( including Compatible Land
Use Planning)
$ 3,750 $ 3,750 $ 142,500 $ 150,000
Arizona Department of Transportation - Aeronautics Division 12
FY 2010 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
Taxiways: Construct Taxiway - Capacity Construct Parallel Twy for Rwy 11/ 29 ( 4700 ft x 35
ft)
$ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000
Terminal Development: Construct Terminal Building -
Capacity
Install terminal utilities ( Phase II) and install AWOS $ 12,500 $ 12,500 $ 475,000 $ 500,000
Airport Total: $ 80,625 $ 80,625 $ 3,063,750 $ 3,225,000
SCOTTSDALE MARICOPA
Apron: Rehabilitate Apron - Reconstruction This project will involve reconstructing the large
aircraft parking apron located on the west side of
the airfield near the Landmark Aviation ( main)
facility. 34,000 sq. yards.
$ 57,500 $ 57,500 $ 2,185,000 $ 2,300,000
Runways: Rehabilitate Runway - Reconstruct Rwy 03/ 21. This project will involve removing and
replacing the existing P402 Rwy surface course
and associated Rwy markings. 114,000 sq. yds.
$ 50,000 $ 50,000 $ 1,900,000 $ 2,000,000
Airport Total: $ 107,500 $ 107,500 $ 4,085,000 $ 4,300,000
SEDONA YAVAPAI
Apron: Construct Apron - Capacity This project will expand Apron A to the southwest. It
is the first phase of a two phase project. Phase I
will include a 300 X 550 ft expansion.
$ 38,678 $ 38,677 $ 1,469,745 $ 1,547,100
Other: Improve Airport < Drainage/ Erosion
Control/ miscellaneous improvements> - Standards
This project will include the grading and erosion
control of the infield area between Twy A and the
Rwy.
$ 11,288 $ 11,287 $ 428,925 $ 451,500
Taxiways:< Extend/ Widen/ Strengthen> Taxiway -
Standards
Construct Txy A extension from Txy A8 to the Rwy
3 end, approx. 900 ft X 35 ft
$ 12,799 $ 12,800 $ 486,376 $ 511,975
Taxiways: Extend Taxiway - Capacity Construct taxilanes B4, B5 and hangar pad
extensions, approx. 400 X 100ft.
$ 10,819 $ 10,820 $ 411,139 $ 432,778
Taxiways: Rehabilitate Taxiway - Reconstruct Design and construct pavement maintenance and
treatment for Taxiway A.
$ 4,375 $ 4,375 $ 166,250 $ 175,000
Airport Total: $ 77,959 $ 77,959 $ 2,962,435 $ 3,118,353
SHOW LOW REGIONAL NAVAJO
Apron: Construct Apron - Capacity Construct East Apron approx. 16,000 sy ( Ph 1) ( 10-
2)
$ 33,750 $ 33,750 $ 1,282,500 $ 1,350,000
Other: Construct Deicing Containment Facility - Standards Construct deicing facility on main terminal apron,
110 ft x 110 ft ( 10- 3)
$ 6,250 $ 6,250 $ 237,500 $ 250,000
Planning: Conduct < Environmental
Assessment/ Environmental Impact
Statement/ Feasibility> < study/ update>
EA for Rwy 18/ 36 & Parallel Twy D ( 10- 5) $ 8,750 $ 8,750 $ 332,500 $ 350,000
Taxiways: Construct Taxiway - Capacity Construct Twy D south of Twy A, 35 ft x 1000 ft ( 10-
4)
$ 17,500 $ 17,500 $ 665,000 $ 700,000
Airport Total: $ 66,250 $ 66,250 $ 2,517,500 $ 2,650,000
Arizona Department of Transportation - Aeronautics Division 13
FY 2010 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
SIERRA VISTA MUNI- LIBBY AAF COCHISE
Runways: Rehabilitate Runway - Reconstruct Rwy 12/ 30 Reconstruct 5365 ft x 100 ft ( approx.
60000 sy of Airport rwy).
$ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000
Airport Total: $ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000
SPRINGERVILLE MUNI APACHE
Planning:< Conduct/ Update> < Airport Master Plan Study
{ ALP, EA, etc.}>
An ALP review and update will be conducted in
order to evaluate the capital needs of the Airport.
$ 1,250 $ 1,250 $ 47,500 $ 50,000
Runways:< Construct/ Extend/ Improve> Runway Safety
Area [ Non- Primary Airports] - Standards
The RSA will be completed to meet standards
( Construction)
$ 10,000 $ 10,000 $ 380,000 $ 400,000
Runways: Rehabilitate Runway - Reconstruct Runway to be phased for funding purposes and
complete resurfacing phase 2 in 2010.
$ 40,000 $ 40,000 $ 1,520,000 $ 1,600,000
Airport Total: $ 51,250 $ 51,250 $ 1,947,500 $ 2,050,000
ST JOHNS INDUSTRIAL AIR PARK APACHE
Apron: Rehabilitate Apron - Reconstruction Apron, Construct South West of Rwy 14/ 32,
approx. 500' x 200'.
$ 37,525 $ 37,525 $ 1,425,950 $ 1,501,000
Other:< Light/ Mark/ Remove> Obstructions - Standards Other: Remove tall trees in terminal area. $ 1,250 $ 1,250 $ 47,500 $ 50,000
Taxiways: Rehabilitate Taxiway - Reconstruct Twys: Construct South West of Rwy 14/ 32, approx.
3,000' x 35'.
$ 37,500 $ 37,500 $ 1,425,000 $ 1,500,000
Airport Total: $ 76,275 $ 76,275 $ 2,898,450 $ 3,051,000
TAYLOR NAVAJO
Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities>
[ MAP] - Other
Relocate Fuel Farm/ Replace Fuel System $ 8,750 $ 8,750 $ 332,500 $ 350,000
Runways: Rehabilitate Runway - Reconstruct Reconstruct Rwy 3/ 21, 7,000 ft x 75 ft. $ 75,000 $ 75,000 $ 2,850,000 $ 3,000,000
Airport Total: $ 83,750 $ 83,750 $ 3,182,500 $ 3,350,000
TUCSON INTL PIMA
Planning:< Conduct/ Update> < Airport Master Plan Study
{ ALP, EA, etc.}>
Update the 2004 Master Plan $ 53,640 $ 53,640 $ 1,092,720 $ 1,200,000
Runways:< Construct/ Extend/ Improve> Runway Safety
Area [ Primary Airports] - Safety/ Security
Address any Runway Safety Area Drainage
Improvements recommended by the Airfield
Drainage Study currently underway
$ 178,800 $ 178,800 $ 3,642,400 $ 4,000,000
Runways: Rehabilitate Runway - Reconstruct Reconstruct portion of keel section of Rwy 3/ 21
( approx. 18,200 sy) and all/ part of Twys A2 & 3
( approx. 10,000 sy) with AC. Remarking &
regrooving ( rwy only) is part of the work.
$ 61,307 $ 61,306 $ 1,248,902 $ 1,371,515
Taxiways: Rehabilitate Taxiway - Reconstruct Reconstruct all/ part Twys A, A7, A10, Air Freight,
Customs, Condo & D ( approx. 215,800 sy) with AC
and remark.
$ 82,557 $ 82,557 $ 1,681,802 $ 1,846,916
Arizona Department of Transportation - Aeronautics Division 14
FY 2010 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
Airport Total: $ 376,304 $ 376,303 $ 7,665,824 $ 8,418,431
WHITERIVER NAVAJO
Equipment: Install Weather Reporting Equipment
{ describe, e. g., AWOS } - Standards
Install AWOS III. $ 7,500 $ 7,500 $ 285,000 $ 300,000
Airport Total: $ 7,500 $ 7,500 $ 285,000 $ 300,000
WICKENBURG MUNI MARICOPA
Apron: Construct Apron - Capacity This project involves the construction of a new
15,000 SY aircraft parking apron ( Phase II) at
approximately mid- Field on the south side of the
Rwy.
$ 27,575 $ 27,575 $ 1,047,850 $ 1,103,000
Apron: Rehabilitate Apron - Reconstruction This project will provide for the pavement
preservation of all apron and taxilane pavements
( approximately 100,000 SY) on the airport.
$ 5,250 $ 5,250 $ 199,500 $ 210,000
Ground
Transportation:< Construct/ Expand/ Improve/ Modify/ Reha
bilitate> Access Road - Capacity
Design a 1,300 foot extension to the access road
on the south side of the airport.
$ 1,100 $ 1,100 $ 41,800 $ 44,000
Planning:< Conduct/ Update> < Airport Master Plan Study
{ ALP, EA, etc.}>
Update the Airport Master Plan. $ 5,250 $ 5,250 $ 199,500 $ 210,000
Airport Total: $ 39,175 $ 39,175 $ 1,488,650 $ 1,567,000
WINSLOW- LINDBERGH REGIONAL NAVAJO
Apron: Rehabilitate Apron - Reconstruction Construct 16,600 SY South Apron - Phase II. $ 42,500 $ 42,500 $ 1,615,000 $ 1,700,000
Other: Improve Airport < Drainage/ Erosion
Control/ miscellaneous improvements> - Standards
Conduct airport drainage study to include levee
assessment.
$ 5,000 $ 5,000 $ 190,000 $ 200,000
Planning: Conduct < Environmental
Assessment/ Environmental Impact
Statement/ Feasibility> < study/ update>
Environmental Assessment for Land Acquisitions. $ 5,000 $ 5,000 $ 190,000 $ 200,000
Runways: Rehabilitate Runway - Reconstruct Design 308,000 SY Pavement Rehabilitation for
Rwys and Twys.
$ 4,375 $ 4,375 $ 166,250 $ 175,000
Taxiways: Install Taxiway Lighting ( MITL) [ Required by
Part 139] - Safety/ Security
Install PAPI's for Rwys 4, 22 & 29 & taxiway edge
lights ( MITL) required by Part 139
$ 15,000 $ 15,000 $ 570,000 $ 600,000
Airport Total: $ 71,875 $ 71,875 $ 2,731,250 $ 2,875,000
YUMA MCAS/ YUMA INTL YUMA
Apron: Construct Apron - Capacity CONSTRUCT: 20,000 sy apron ( 10,000 rehab,
10,000 expand). Adjacent to Twy F3, south of 40th
Street.
$ 72,368 $ 72,369 $ 2,750,000 $ 2,894,737
Apron: Rehabilitate Apron - Reconstruction DESIGN 150 yd x 170 yd asphalt apron between
GA hangar complex and CareFlight ( FBO), at the
end of Fortuna Ave. Approx 1,200 lf of security
fencing with gate and card reader needed.
$ 6,579 $ 6,579 $ 250,000 $ 263,158
Arizona Department of Transportation - Aeronautics Division 15
FY 2010 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
Airport Total: $ 78,947 $ 78,948 $ 3,000,000 $ 3,157,895
Total Fiscal Year Grants: $ 12,548,929 $ 12,548,926 $ 267,625,502 $ 292,723,356
Arizona Department of Transportation - Aeronautics Division 16
FY 2011 State & Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
ADOT Aeronautics
APMS - Runway Pavement Preservation Consulting and construction services $ 3,042,630 $ 0 $ 0 $ 3,042,630
Planning: Planning Studies Conduct $ 500,000 $ 0 $ 0 $ 500,000
Airport Total: $ 3,542,630 $ 0 $ 0 $ 3,542,630
BENSON MUNICIPAL COCHISE
Runways: Runway Construct Design Rwy 10/ 28 Extension - Ph I ( approx 1,400
LF)
$ 135,000 $ 15,000 $ 0 $ 150,000
Airport Total: $ 135,000 $ 15,000 $ 0 $ 150,000
CHANDLER MUNI MARICOPA
Terminal Development: Auto Parking Construct Design/ Const 50 unit parking lot - appr 2,350 SY
paving.
$ 227,700 $ 25,300 $ 0 $ 253,000
Airport Total: $ 227,700 $ 25,300 $ 0 $ 253,000
DOUGLAS MUNI COCHISE
Other: Fencing ( Security) Install Install security fencing around hanger area, aircraft
parking apron area, and new terminal area
( approx. 1,200 ft)
$ 108,000 $ 12,000 $ 0 $ 120,000
Airport Total: $ 108,000 $ 12,000 $ 0 $ 120,000
ERNEST A. LOVE FIELD YAVAPAI
Buildings: Buildings Construct/ relocate Design new 11,300 SY Maintenance Facility. $ 10,740 $ 189,260 $ 0 $ 200,000
Runways: Runway Construct Design to pave 8,000 LF of Rwy and Twy
Shoulders.
$ 180,000 $ 20,000 $ 0 $ 200,000
Terminal Development: Terminal Construct ( CS Only) Design new 21,000 SF Terminal Building. $ 405,000 $ 45,000 $ 0 $ 450,000
Airport Total: $ 595,740 $ 254,260 $ 0 $ 850,000
FALCON FLD MARICOPA
Other: Instrument Approach System Install Design/ Install an AWOS system $ 225,000 $ 25,000 $ 0 $ 250,000
Airport Total: $ 225,000 $ 25,000 $ 0 $ 250,000
FLAGSTAFF PULLIAM COCONINO
Apron: Apron Reconstruct Joint repairs between commercial ramp concrete
slabs. Project would include replacing backer rod
spacers and permanently sealing joints.
$ 201,339 $ 22,371 $ 0 $ 223,710
Airport Total: $ 201,339 $ 22,371 $ 0 $ 223,710
MARANA REGIONAL PIMA
Runways: Runway Structural Upgrade Overlay Runway 12- 30 6900 x 100 $ 595,740 $ 1,304,260 $ 0 $ 1,900,000
Arizona Department of Transportation - Aeronautics Division 17
FY 2011 State & Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
Airport Total: $ 595,740 $ 1,304,260 $ 0 $ 1,900,000
PHOENIX DEER VALLEY MARICOPA
Apron: Apron Reconstruct Rebuild ramp on the south and northwest areas -
Phase 3. Approximate Total Area: 193,000 square
yards. State/ local = 15,857 square yards.
$ 499,500 $ 55,500 $ 0 $ 555,000
Airport Total: $ 499,500 $ 55,500 $ 0 $ 555,000
PHOENIX GOODYEAR MARICOPA
Ground Transportation: Access Rd. Construct north side on- airport access road and
utility extension - Phase 1. Roadway dimensions:
Approximate Total Area: 6,600 feet in length by 24
feet in width ( 15,840 square feet or 17,600 square
yards).
$ 495,900 $ 55,100 $ 0 $ 551,000
Airport Total: $ 495,900 $ 55,100 $ 0 $ 551,000
RYAN FIELD PIMA
Runways: Runway Construct Construct new 75 ft x 105 ft AC Rwy ext. on
6L/ 24R, new 35 ft x 105 ft AC ext. on Twy A; & new
35 ft x 650 ft AC Twys to replace the existing Twy
A5
$ 595,740 $ 319,828 $ 0 $ 915,568
Airport Total: $ 595,740 $ 319,828 $ 0 $ 915,568
SEDONA YAVAPAI
Apron: Apron Construct Design expansion of Apron A to the north including
the demolition of the restaurant building. The
expansion is approx. 500ft X 500ft and construction
will be seperated into two phases.
$ 99,000 $ 11,000 $ 0 $ 110,000
Airport Total: $ 99,000 $ 11,000 $ 0 $ 110,000
SELIGMAN YAVAPAI
Other: Fencing ( Perimeter) Install Relocate and install additional fencing at both
runway ends, and also install a culvert which would
eliminate drainage channel.
$ 71,250 $ 3,750 $ 0 $ 75,000
Airport Total: $ 71,250 $ 3,750 $ 0 $ 75,000
SIERRA VISTA MUNI- LIBBY AAF COCHISE
Other: Fencing ( Wildlife) Install Install two wildlife fencing enclosures: on NE and
on SE corners of Airport. ( approx. 300 ft x 300 ft
each)
$ 90,000 $ 10,000 $ 0 $ 100,000
Airport Total: $ 90,000 $ 10,000 $ 0 $ 100,000
Arizona Department of Transportation - Aeronautics Division 18
FY 2011 State & Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
TUCSON INTL PIMA
Land: Land ( Protection) Acquisition Reimbursement of the purchase of approximately 8
acres in RPZ for Rwy 21.
$ 595,740 $ 1,115,153 $ 0 $ 1,710,893
Airport Total: $ 595,740 $ 1,115,153 $ 0 $ 1,710,893
Total Fiscal Year Grants: $ 8,078,279 $ 3,228,522 $ 0 $ 11,306,801
Arizona Department of Transportation - Aeronautics Division 19
FY 2011 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
AVI SUQUILLA LA PAZ
Buildings:< Construct/ Expand/ Improve/ Modify/ Rehabilitat
e> Aircraft Rescue & Fire Fighting Building [ Pt. 139
only] - Safety/ Security
Design and construction of 5,000 sf Aircraft Rescue
and Fire Fighting ( ARFF) station.
$ 46,875 $ 46,875 $ 1,781,250 $ 1,875,000
Ground
Transportation:< Construct/ Expand/ Improve/ Modify/ Reha
bilitate> Service Road - Other
Pave the perimeter road with aggregate base and
asphalt concrete pavement - 16- ft wide,
approximately 42,000 SY of pavement, extend
culverts.
$ 32,500 $ 32,500 $ 1,235,000 $ 1,300,000
Other: Improve Airport < Drainage/ Erosion
Control/ miscellaneous improvements> - Standards
The Rwy and Twy shoulders will be stabilized by
soil cement at the top of the ditch break paralleling
the runway and taxiways where the erosion is
occuring - ditch backslopes will also be stabilized
with soil cement.
$ 27,500 $ 27,500 $ 1,045,000 $ 1,100,000
Taxiways: Rehabilitate Taxiway Lighting - Reconstruct Rehabilitate MITL system on old 4,800 ft Rwy and
4,800 ft parallel Twy and connecting Twys
( approximately 10,600 LF) - replace existing
underground electrical conductor, transformers and
lights with new materials.
$ 11,625 $ 11,625 $ 441,750 $ 465,000
Airport Total: $ 118,500 $ 118,500 $ 4,503,000 $ 4,740,000
BAGDAD YAVAPAI
Apron: Construct Apron - Standards Runway safety areas will be lengthened and
widened to meet FAA design standards
$ 11,875 $ 11,875 $ 451,250 $ 475,000
Airport Total: $ 11,875 $ 11,875 $ 451,250 $ 475,000
BENSON MUNICIPAL COCHISE
Heliport:< Construct/ Expand/ Improve/ Modify/ Rehabilitate>
Helipad/ Heliport - Standards
Construct Helipads adjacent to east Apron ( 50 ft x
50 ft)
$ 6,250 $ 6,250 $ 237,500 $ 250,000
Land: Acquire < land/ easement> for
development/ relocation
Acquire approx 83 acres to extend Rwy 10 and
Parallel Twy ( both ends)
$ 20,000 $ 20,000 $ 760,000 $ 800,000
Airport Total: $ 26,250 $ 26,250 $ 997,500 $ 1,050,000
BISBEE DOUGLAS INTL COCHISE
Apron: Construct Apron - Capacity Reconstruct Apron 16,700 sy for light aircraft
service and maintenance
$ 20,000 $ 20,000 $ 760,000 $ 800,000
Airport Total: $ 20,000 $ 20,000 $ 760,000 $ 800,000
BISBEE MUNI COCHISE
Other: Install < Guidance/ other> Signs [ not Part 139] -
Standards
Install new Rwy 17/ 35 signs at locations where
existing signs are failing, install new signs at
locations where they are needed but none are
existing.
$ 3,750 $ 3,750 $ 142,500 $ 150,000
Arizona Department of Transportation - Aeronautics Division 20
FY 2011 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
Planning: Conduct < Environmental
Assessment/ Environmental Impact
Statement/ Feasibility> < study/ update>
EA for 6.40 acres of land. $ 3,750 $ 3,750 $ 142,500 $ 150,000
Taxiways:< Extend/ Widen/ Strengthen> Taxiway -
Standards
Widen Twy A from 35 ft to 50 ft; Reconstruct the
existing 35 ft width ( 5,900 ft x 50 ft).
$ 30,000 $ 30,000 $ 1,140,000 $ 1,200,000
Taxiways: Install Taxiway Lighting ( MITL) [ non Part 139
CS] - Statutory Emphasis Programs
Install MITLs, cable & conduit along Twy A &
connecting Twys. Construct new vault and install
new vault equipment.
$ 17,875 $ 17,875 $ 679,250 $ 715,000
Airport Total: $ 55,375 $ 55,375 $ 2,104,250 $ 2,215,000
BUCKEYE MUNI MARICOPA
Ground
Transportation:< Construct/ Expand/ Improve/ Modify/ Reha
bilitate> Access Road - Other
Reconstruct the airport entrance road from the
main apron to Palo Verde Road. ( approx. 1,700').
$ 25,000 $ 25,000 $ 950,000 $ 1,000,000
Land: Acquire land/ easement for approaches Purchase approximately 25 acres of land north of
the airport to secure RPZ and allow for future Rwy
extension ( Phase 2).
$ 137,500 $ 137,500 $ 5,225,000 $ 5,500,000
Runways:< Extend/ Widen/ Strengthen> Runway [ to meet
standards] - Standards
Construct Rwy widening and strengthening to
increase the total width to 100 ft and the strength to
75,000 lbs.
$ 50,000 $ 50,000 $ 1,900,000 $ 2,000,000
Taxiways: Construct Taxiway - Capacity Design and construct Twy E, including Twy edge
lighting.
$ 30,000 $ 30,000 $ 1,140,000 $ 1,200,000
Airport Total: $ 242,500 $ 242,500 $ 9,215,000 $ 9,700,000
CHANDLER MUNI MARICOPA
Apron: Construct Apron - Capacity Design 29,500 SY apron area. $ 5,950 $ 5,950 $ 226,100 $ 238,000
Other: Install < Guidance Signs/ Runway Incursion
Caution Bars> [ non Part 139 CS] - Statutory Emphasis
Programs
Construct replacement/ modification of approx. 75
airfield signs.
$ 15,388 $ 15,387 $ 584,725 $ 615,500
Taxiways: Extend Taxiway - Capacity Construct pavment for 5,500 LF x 40 ft Twy,
connectors & runup areas ( 29,000 SY).
$ 58,512 $ 58,513 $ 2,223,475 $ 2,340,500
Taxiways: Install Taxiway Lighting ( e. g., SMGCS,
reflectors, MITL) - Standards
Construct MITL & signs for 5,500 LF Twy &
connectors.
$ 44,875 $ 44,875 $ 1,705,250 $ 1,795,000
Airport Total: $ 124,725 $ 124,725 $ 4,739,550 $ 4,989,000
CIBECUE NAVAJO
New Airports: Construct New Airport - Standards At new Cibecue Airport Site, Rwy 75' x 5,00' Phase
II Paving and Fencing.
$ 162,500 $ 162,500 $ 6,175,000 $ 6,500,000
Airport Total: $ 162,500 $ 162,500 $ 6,175,000 $ 6,500,000
COCHISE COUNTY COCHISE
Planning:< Conduct/ Update> < Airport Master Plan Study
{ ALP, EA, etc.}>
Update 1997 Master Plan $ 4,375 $ 4,375 $ 166,250 $ 175,000
Arizona Department of Transportation - Aeronautics Division 21
FY 2011 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
Airport Total: $ 4,375 $ 4,375 $ 166,250 $ 175,000
COLORADO CITY MUNI MOHAVE
Equipment: Acquire Security Equipment/ Install Perimeter
Fencing [ not Part 107] - Standards
Equipment, Perimeter Wildlife Fencing ( approx.
38,000 linear feet)
$ 22,500 $ 22,500 $ 855,000 $ 900,000
Airport Total: $ 22,500 $ 22,500 $ 855,000 $ 900,000
COOLIDGE MUNI PINAL
Equipment: Acquire Security Equipment/ Install Fencing
[ required by Part 107] - Safety/ Security
Install security fencing around the perimeter of the
airport ( approx. 30,000 ft)
$ 24,391 $ 24,390 $ 926,842 $ 975,623
Ground
Transportation:< Construct/ Expand/ Improve/ Modify/ Reha
bilitate> Access Road - Capacity
Move A Street to perimeter of airport property N &
E of Rwy 5- 23
$ 14,429 $ 14,429 $ 548,312 $ 577,170
Airport Total: $ 38,820 $ 38,819 $ 1,475,154 $ 1,552,793
COTTONWOOD YAVAPAI
Planning: Conduct < Environmental
Assessment/ Environmental Impact
Statement/ Feasibility> < study/ update>
Conduct an environmental assessment of 22 acres
along the southwest side of the existing airport
property.
$ 5,000 $ 5,000 $ 190,000 $ 200,000
Airport Total: $ 5,000 $ 5,000 $ 190,000 $ 200,000
ELOY MUNI PINAL
Apron: Rehabilitate Apron - Reconstruction Construct approx. 15,450 SY of asphalt pavement
apron ( approx. 200 ft x 700 ft), and install apron
lighting.
$ 3,750 $ 3,750 $ 142,500 $ 150,000
Land: Acquire land/ easement for approaches Acquire approx. 21 acres land for RPZs of
proposed Rwy 2- 20 extension
$ 10,000 $ 10,000 $ 380,000 $ 400,000
Terminal Development: Construct Terminal Building -
Capacity
Construct new terminal building and parking/ utilities
to serve new terminal building
$ 30,000 $ 30,000 $ 1,140,000 $ 1,200,000
Airport Total: $ 43,750 $ 43,750 $ 1,662,500 $ 1,750,000
ERIC MARCUS MUNICIPAL PIMA
Runways:< Extend/ Widen/ Strengthen> Runway [ to meet
standards] - Standards
Crack seal and seal coat Rwy ( approx. 228,000 sf). $ 6,250 $ 6,250 $ 237,500 $ 250,000
Airport Total: $ 6,250 $ 6,250 $ 237,500 $ 250,000
ERNEST A. LOVE FIELD YAVAPAI
Apron: Construct Apron - Standards Construct Electrical Vault Relocation; Construct
HIRL and sign install for Rwy 21L Extension.
$ 25,000 $ 25,000 $ 950,000 $ 1,000,000
Ground
Transportation:< Construct/ Expand/ Improve/ Modify/ Reha
bilitate> Service Road - Other
Construct Service Road ( 12,500 x 50) for Rwy 21L
Extension.
$ 10,000 $ 10,000 $ 380,000 $ 400,000
Arizona Department of Transportation - Aeronautics Division 22
FY 2011 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
Airport Total: $ 35,000 $ 35,000 $ 1,330,000 $ 1,400,000
FALCON FLD MARICOPA
Other: Install < Guidance Signs/ Runway Incursion
Caution Bars> [ non Part 139 CS] - Statutory Emphasis
Programs
Phase 2 - Reconfigure Twy B & Install Rwy guard
lights along secondary Rwy 4L- 22R.
$ 37,500 $ 37,500 $ 1,425,000 $ 1,500,000
Planning: Conduct < Environmental
Assessment/ Environmental Impact
Statement/ Feasibility> < study/ update>
EA for Twy between airports Rwys ( approx. 5100 ft
long & 75 ft wide.
$ 2,500 $ 2,500 $ 95,000 $ 100,000
Runways: Construct Runway - Capacity Design high- speed Rwy exits between Rwy 4L- 22R
and Twy E
$ 1,875 $ 1,875 $ 71,250 $ 75,000
Airport Total: $ 41,875 $ 41,875 $ 1,591,250 $ 1,675,000
FLAGSTAFF PULLIAM COCONINO
Ground
Transportation:< Construct/ Expand/ Improve/ Modify/ Reha
bilitate> Access Road - Capacity
Mill and overlay or otherwise reconstruct Pulliam
Drive from John Wesley Powell Blvd around in front
of the Airport terminal building and back to where
the road reconnects with itself approaching John
Wesley Powell.
$ 78,977 $ 78,976 $ 3,001,108 $ 3,159,061
Airport Total: $ 78,977 $ 78,976 $ 3,001,108 $ 3,159,061
GLENDALE MUNICIPAL MARICOPA
Apron: Install Apron Lighting - Standards Install Lighting for 132,000 SY Apron. $ 7,550 $ 7,550 $ 286,900 $ 302,000
Land: Acquire land/ easement for approaches Acquire 18 acres north of Rwy 19 ( Acres 1- 18). $ 187,500 $ 187,500 $ 7,125,000 $ 7,500,000
Planning: Conduct < Environmental
Assessment/ Environmental Impact
Statement/ Feasibility> < study/ update>
Environmental Assessment for Northwest Ramp
and Eastside Twy.
$ 6,250 $ 6,250 $ 237,500 $ 250,000
Runways: Rehabilitate Runway - Reconstruct Pavement Maintenance - slurry seal hangars, Twy,
an Rwy.
$ 5,000 $ 5,000 $ 190,000 $ 200,000
Airport Total: $ 206,300 $ 206,300 $ 7,839,400 $ 8,252,000
GRAND CANYON NATIONAL PARK COCONINO
Terminal Development: Construct Terminal Building -
Capacity
Terminal location per ALP is mid field $ 100,000 $ 100,000 $ 3,800,000 $ 4,000,000
Airport Total: $ 100,000 $ 100,000 $ 3,800,000 $ 4,000,000
GRAND CANYON WEST MOHAVE
Runways: Construct Runway [ includes relocation] -
Standrads
Runways: Shift and construct Runway 17/ 35,
5,000' x 75'. Project also includes connecting
taxiways including grading, drainage, paving,
lighting & visual aids ( Phase III)
$ 250,000 $ 250,000 $ 9,500,000 $ 10,000,000
Airport Total: $ 250,000 $ 250,000 $ 9,500,000 $ 10,000,000
Arizona Department of Transportation - Aeronautics Division 23
FY 2011 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
GREENLEE COUNTY GREENLEE
Ground
Transportation:< Construct/ Expand/ Improve/ Modify/ Reha
bilitate> Access Road - Other
Design 3,100 ft x 24 ft entrance road relocation and
120 ft x 130 ft parking lot rehabilitation.
$ 4,375 $ 4,375 $ 166,250 $ 175,000
Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities>
[ MAP] - Other
Utility Construction $ 5,000 $ 5,000 $ 190,000 $ 200,000
Airport Total: $ 9,375 $ 9,375 $ 356,250 $ 375,000
H. A. CLARK MEMORIAL FIELD COCONINO
Land: Acquire land/ easement for approaches Acquire land off of rwy ends ( 277 acres) for rpz
protection and accommodate rev generating
activities. EA currently underway.
$ 18,750 $ 18,750 $ 712,500 $ 750,000
Runways: Extend Runway- Capacity Extend Rwy 18 and parallel Txwy $ 50,000 $ 50,000 $ 1,900,000 $ 2,000,000
Runways: Install Runway < vertical/ visual> Guidance
System [ PAPI/ VASI/ REIL/ ALS/ etc.] - Standards
Upgrade PAPI to 4 Light System $ 1,875 $ 1,875 $ 71,250 $ 75,000
Airport Total: $ 70,625 $ 70,625 $ 2,683,750 $ 2,825,000
HOLBROOK MUNI NAVAJO
Apron: Expand Apron - Capacity North east Apron Expansion ( 300 x 50 feet) $ 8,750 $ 8,750 $ 332,500 $ 350,000
Ground
Transportation:< Construct/ Expand/ Improve/ Modify/ Reha
bilitate> Access Road - Other
Install Security Gates ( Main Gate) $ 2,250 $ 2,250 $ 85,500 $ 90,000
Heliport:< Construct/ Expand/ Improve/ Modify/ Rehabilitate>
Helipad/ Heliport - Standards
Install Helipad Lighting $ 1,125 $ 1,125 $ 42,750 $ 45,000
Other:< Light/ Mark/ Remove> Obstructions - Standards Relocate Fuel Station near Ramp Area $ 7,000 $ 7,000 $ 266,000 $ 280,000
Planning: Conduct < Environmental
Assessment/ Environmental Impact
Statement/ Feasibility> < study/ update>
Environmental Assessment for North end Rwy 3/ 21 $ 4,375 $ 4,375 $ 166,250 $ 175,000
Airport Total: $ 23,500 $ 23,500 $ 893,000 $ 940,000
KAYENTA NAVAJO
Buildings:< Construct/ Expand/ Improve/ Modify/ Rehabilitat
e> Building - Standards
Construct a building 60' x 40' to house SRE &
Broom equipment.
$ 10,000 $ 10,000 $ 380,000 $ 400,000
Equipment: Acquire Security Equipment/ Install Perimeter
Fencing [ not Part 107] - Standards
Wildlife fence airport perimeter, approx. 16,000 sy. $ 15,000 $ 15,000 $ 570,000 $ 600,000
Heliport:< Construct/ Expand/ Improve/ Modify/ Rehabilitate>
Helipad/ Heliport - Capacity
Construct helicopter parking pads north east of
midfield apron.
$ 12,500 $ 12,500 $ 475,000 $ 500,000
Taxiways: Construct Taxiway - Capacity Construct parallel Twy to Rwy 5/ 23 and connectors,
35' x 7,100' ( Grading and Drainage- Phase I).
$ 30,000 $ 30,000 $ 1,140,000 $ 1,200,000
Airport Total: $ 67,500 $ 67,500 $ 2,565,000 $ 2,700,000
KINGMAN MOHAVE
Arizona Department of Transportation - Aeronautics Division 24
FY 2011 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
Apron: Rehabilitate Apron - Reconstruction Reconstruct the South Ramp ( approx. 66,100 sy). $ 100,000 $ 100,000 $ 3,800,000 $ 4,000,000
Land: Acquire land/ easement for approaches Purchase 80 acres northeast of the Rwy 21 end. $ 60,000 $ 60,000 $ 2,280,000 $ 2,400,000
Runways:< Extend/ Widen/ Strengthen> Runway [ to meet
standards] - Standards
Design a pavement strengthening for Rwy 3- 21 and
Twy D.
$ 5,000 $ 5,000 $ 190,000 $ 200,000
Airport Total: $ 165,000 $ 165,000 $ 6,270,000 $ 6,600,000
LAKE HAVASU CITY MOHAVE
Land: Acquire < land/ easement> for
development/ relocation
Provide a Land Assessment ( Appraisal) of 23 Acres. $ 3,125 $ 3,125 $ 118,750 $ 125,000
Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities>
[ MAP] - Other
Replace existing metal airfield electrical vault with
pre- engineered unit meeting current electrical
codes.
$ 8,000 $ 8,000 $ 304,000 $ 320,000
Planning: Conduct < Environmental
Assessment/ Environmental Impact
Statement/ Feasibility> < study/ update>
Provide an Environmental Assessment of 23 Acres. $ 3,750 $ 3,750 $ 142,500 $ 150,000
Airport Total: $ 14,875 $ 14,875 $ 565,250 $ 595,000
LAUGHLIN/ BULLHEAD INTERNATIONAL MOHAVE
Buildings:< Construct/ Expand/ Improve/ Modify/ Rehabilitat
e> Aircraft Rescue & Fire Fighting Building [ Pt. 139
only] - Safety/ Security
The project involves the construction of a new
8,000 SF ARFF Building.
$ 60,000 $ 60,000 $ 2,280,000 $ 2,400,000
Land: Acquire < land/ easement> for
development/ relocation
The project involves the acquisition of 75 acres of
ASLD property ( Phase 1).
$ 93,750 $ 93,750 $ 3,562,500 $ 3,750,000
Runways: Extend Runway- Capacity This project will provide the site
preparation/ earthwork for the 1,000 foot southerly
extension to Rwy 16- 34.
$ 125,000 $ 125,000 $ 4,750,000 $ 5,000,000
Airport Total: $ 278,750 $ 278,750 $ 10,592,500 $ 11,150,000
MARANA REGIONAL PIMA
Land: Acquire < land/ easement> for
development/ relocation
Aquire Land - 244 Acres $ 152,500 $ 152,500 $ 5,795,000 $ 6,100,000
Planning: Conduct < Environmental
Assessment/ Environmental Impact
Statement/ Feasibility> < study/ update>
EA for new Rwy & other airport projects $ 8,750 $ 8,750 $ 332,500 $ 350,000
Runways: Rehabilitate Runway - Reconstruct Reconstruct Rwy 3- 21 $ 10,000 $ 10,000 $ 380,000 $ 400,000
Taxiways: Construct Taxiway - Capacity Construct Twy H - NW of Rwy 3/ 21 $ 70,000 $ 70,000 $ 2,660,000 $ 2,800,000
Taxiways: Rehabilitate Taxiway - Reconstruct Rehabilitate Twy A, Twy B, Twy E $ 18,750 $ 18,750 $ 712,500 $ 750,000
Airport Total: $ 260,000 $ 260,000 $ 9,880,000 $ 10,400,000
Maricopa Municipal
Equipment: Acquire Security Equipment/ Install Perimeter
Fencing [ not Part 107] - Standards
The project will include the installation of
approximately 30,000 LF of perimeter fencing.
$ 24,818 $ 24,818 $ 943,065 $ 992,700
Arizona Department of Transportation - Aeronautics Division 25
FY 2011 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
New Airports: Acquire [ existing] Airport - Standards The project involves the acquisition of 342 acres of
ASLD property.
$ 427,500 $ 427,500 $ 16,245,000 $ 17,100,000
New Airports: Construct New Airport - Capacity The project ivolves the grading and drainage of 644
acres of property for the initial airport development.
$ 123,008 $ 123,008 $ 4,674,285 $ 4,920,300
Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities>
[ MAP] - Other
Installation of water, sewer, energy, and
communication utilities for the initial 684 acres of
new airport development.
$ 14,175 $ 14,175 $ 538,650 $ 567,000
Airport Total: $ 589,500 $ 589,500 $ 22,401,000 $ 23,580,000
NOGALES INTL SANTA CRUZ
Ground
Transportation:< Construct/ Expand/ Improve/ Modify/ Reha
bilitate> Service Road - Other
Construct 10,000 LF x 16 ft Perimeter Service Road
around S End of Rwy 3- 21
$ 7,500 $ 7,500 $ 285,000 $ 300,000
Other: Improve Airport < Drainage/ Erosion
Control/ miscellaneous improvements> - Standards
Construct Water, Sanitary Sewer, Power & Comm.
Extension to serve future hangar development in
Terminal area
$ 10,000 $ 10,000 $ 380,000 $ 400,000
Airport Total: $ 17,500 $ 17,500 $ 665,000 $ 700,000
PAGE MUNI COCONINO
Apron: Expand/ Strengthen Apron - Standards Strengthen approximately 5,000 syds of the main
apron to 75,000 lbs to accommodate larger aircraft.
$ 15,000 $ 15,000 $ 570,000 $ 600,000
Runways: Rehabilitate Runway - Reconstruct Reconstruct the intersection of 15- 33 and 7- 25 and
the east portion of 7- 25 to create a manageable
slope for landing aircraft.
$ 20,000 $ 20,000 $ 760,000 $ 800,000
Airport Total: $ 35,000 $ 35,000 $ 1,330,000 $ 1,400,000
PAYSON GILA
Apron: Construct Apron - Standards 11- 02 - South of parallel taxiway, 21200 +/- square
yards of asphalt pavement
$ 5,000 $ 5,000 $ 190,000 $ 200,000
Ground
Transportation:< Construct/ Expand/ Improve/ Modify/ Reha
bilitate> Service Road - Other
11- 01 - south side of airport, 2600 +/- sy of asphalt
roadway and 2300 linear feet of fence
$ 11,750 $ 11,750 $ 446,500 $ 470,000
Airport Total: $ 16,750 $ 16,750 $ 636,500 $ 670,000
PHOENIX DEER VALLEY MARICOPA
Runways:< Construct/ Extend/ Improve> Runway Safety
Area [ Primary Airports] - Safety/ Security
Complete improvements to the runway safety area,
recommended by the RSAT - Phase 2.
$ 101,300 $ 101,300 $ 3,849,400 $ 4,052,000
Taxiways: Rehabilitate Taxiway - Reconstruct Reconstruct Taxiway A. $ 101,300 $ 101,300 $ 3,849,400 $ 4,052,000
Airport Total: $ 202,600 $ 202,600 $ 7,698,800 $ 8,104,000
PHOENIX GOODYEAR MARICOPA
Equipment:< Acquire/ Install/ Rehabilitate> Emergency
Generator - Standards
Acquire emergency generator for ATCT. $ 2,500 $ 2,500 $ 95,000 $ 100,000
Arizona Department of Transportation - Aeronautics Division 26
FY 2011 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
Ground
Transportation:< Construct/ Expand/ Improve/ Modify/ Reha
bilitate> Access Road - Capacity
Construct north side on- airport access road and
utility extension - Phase 1.
$ 13,775 $ 13,775 $ 523,450 $ 551,000
Other: Environmental Mitigation Relocate Superfund cleanup wells. $ 8,750 $ 8,750 $ 332,500 $ 350,000
Runways:< Construct/ Extend/ Improve> Runway Safety
Area [ Non- Primary Airports] - Standards
Shift Runway 3- 21 by 300 feet to the southwest. $ 40,000 $ 40,000 $ 1,520,000 $ 1,600,000
Taxiways: Construct Taxiway - Capacity Construct west parallel taxiway and exits. $ 552,500 $ 552,500 $ 20,995,000 $ 22,100,000
Airport Total: $ 617,525 $ 617,525 $ 23,465,950 $ 24,701,000
PHOENIX SKY HARBOR INTL MARICOPA
Apron: Rehabilitate Apron - Reconstruction Reconstruct West Cargo - East Apron in asphalt. $ 814,125 $ 814,125 $ 4,884,750 $ 6,513,000
Other: Noise Mitigation Measures [ miscellaneous] Sound mitigation and acquisition of eligible
properties.
$ 1,875,000 $ 1,875,000 $ 11,250,000 $ 15,000,000
Planning:< Conduct/ Update> < Airport Master Plan Study
{ ALP, EA, etc.}>
Conduct Airport Master Plan $ 625,000 $ 625,000 $ 3,750,000 $ 5,000,000
Taxiways: Rehabilitate Taxiway - Reconstruct Replace Taxiway A asphalt with concrete and install
new electrical airfield lighting.
$ 1,938,719 $ 1,938,719 $ 11,632,312 $ 15,509,750
Airport Total: $ 5,252,844 $ 5,252,844 $ 31,517,062 $ 42,022,750
PHOENIX- MESA GATEWAY MARICOPA
Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities>
[ MAP] - Other
Airfield/ Apron Drainage Improvements South of
Twy L and including the South Industrial Area.
$ 90,520 $ 90,520 $ 3,439,762 $ 3,620,802
Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities>
[ MAP] - Other
ATCT building code requirements assessment,
foam basin construction and fire line extension
construction are needed to comply with City of
Mesa Bulding Code. MAP project requests.
$ 77,895 $ 77,895 $ 2,960,010 $ 3,115,800
Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities>
[ MAP] - Other
Preliminary Planning required for east side terminal
area infrastructure - utilities and drainage. Required
before design phase. MAP project request.
$ 16,250 $ 16,250 $ 617,500 $ 650,000
Other:< Light/ Mark/ Remove> Obstructions [ hazard only
e. g., approaches] - Safety/ Security
Design/ Construction of relocation of ASR pending
site for East Side Terminal ( FAA may do this on
their own)
$ 55,000 $ 55,000 $ 2,090,000 $ 2,200,000
Planning: Conduct < Environmental
Assessment/ Environmental Impact
Statement/ Feasibility> < study/ update>
EA for extension of Rwy 12L/ 30R, new terminal,
fuel farm, roads, archeological areas, and other
improvements. ( Archeological Clearance to be
included). MAP project request.
$ 33,575 $ 33,575 $ 1,275,850 $ 1,343,000
Taxiways:< Extend/ Widen/ Strengthen> Taxiway -
Standards
Design Twy C Extension from Twy J to Twy K &
Txy K from Rwy 30L to Twy C. 10,000 SY PCCP,
9,334 SY Asphalt
$ 12,500 $ 12,500 $ 475,000 $ 500,000
Taxiways: Rehabilitate Taxiway - Reconstruct Design/ Reconstruct Twy P, 75 ft W by 2,000 ft L
with 35 ft shoulders each side. ( 16,700 SY)
$ 154,650 $ 154,650 $ 5,876,700 $ 6,186,000
Taxiways: Rehabilitate Taxiway - Reconstruct Twy V Reconstruct Between Twy B & A
( intersecton West on Twy V) 75 ft W x 800 ft L with
35 ft shoulders each side ( 12,900 SY)
$ 29,348 $ 29,349 $ 1,115,243 $ 1,173,940
Arizona Department of Transportation - Aeronautics Division 27
FY 2011 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
Terminal Development: Construct Terminal Building -
Capacity
Preliminary Plan. for East Side Terminal Area.
Conceptual Layout of Terminal bldg., roads,
vehicle/ aircraft parking, support facilities. MAP
project request.
$ 10,800 $ 10,800 $ 410,400 $ 432,000
Airport Total: $ 480,538 $ 480,539 $ 18,260,465 $ 19,221,542
POLACCA NAVAJO
Runways: Construct Runway - Capacity Construct Rwy ( 75' x 5,000') and apron ( Phase 1-
Grading and Drainage).
$ 150,000 $ 150,000 $ 5,700,000 $ 6,000,000
Airport Total: $ 150,000 $ 150,000 $ 5,700,000 $ 6,000,000
RYAN FIELD PIMA
Equipment:< Acquire/ Install/ Rehabilitate> Emergency
Generator - Standards
Install 170 KW/ 192 KVA 120/ 208 volt three phase
four wire standby generator
$ 7,744 $ 7,744 $ 294,278 $ 309,766
Equipment:< Acquire/ Install/ Rehabilitate> Emergency
Generator - Standards
Install a 230 KW 120/ 240 volt single phase standby
generator to provide backup for all current & future
airfield lighting
$ 5,209 $ 5,209 $ 197,942 $ 208,360
Equipment: Acquire Equipment ( e. g., Sweepers, etc.) -
Standards
Acquire a new Rwy sweeper $ 4,548 $ 4,548 $ 172,816 $ 181,912
Runways: Install Runway Lighting ( HIRL, MIRL, TDZ,
LAHSO or CL) - Standards
Install an electronic system to monitor and control
the airfield lighting system
$ 15,636 $ 15,636 $ 594,177 $ 625,449
Airport Total: $ 33,137 $ 33,137 $ 1,259,213 $ 1,325,487
SAFFORD REGIONAL GRAHAM
Equipment: Acquire Equipment ( e. g., Sweepers, etc.) -
Standards
Acquire sweeper. $ 3,750 $ 3,750 $ 142,500 $ 150,000
Other:< Construct/ Rehabilitate> Parking Lot [ non
revenue producing- non hub/ MAP] - Other
Expand auto parking area & reconstruct existing
auto parking area ( approx. 100 ft x 200 ft).
$ 1,875 $ 1,875 $ 71,250 $ 75,000
Runways: Rehabilitate Runway < Lighting/ Electrical Vault> Remove/ Replace existing MITLs/ bases and
associated conduit/ cable; install new vault
equipment.
$ 3,750 $ 3,750 $ 142,500 $ 150,000
Terminal Development: Construct Terminal Building -
Capacity
Design new terminal building and associated
utilities.
$ 6,250 $ 6,250 $ 237,500 $ 250,000
Airport Total: $ 15,625 $ 15,625 $ 593,750 $ 625,000
SAN MANUEL PINAL
Planning: Conduct < Environmental
Assessment/ Environmental Impact
Statement/ Feasibility> < study/ update>
EA of Airport Property plus parcel A and B ( 200
acres)
$ 3,125 $ 3,125 $ 118,750 $ 125,000
Runways: Install Runway Lighting ( HIRL, MIRL, TDZ,
LAHSO or CL) - Standards
Install Runway Lighting, approx. 4,214 lf $ 16,250 $ 16,250 $ 617,500 $ 650,000
Airport Total: $ 19,375 $ 19,375 $ 736,250 $ 775,000
Arizona Department of Transportation - Aeronautics Division 28
FY 2011 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
SCOTTSDALE MARICOPA
Apron: Rehabilitate Apron - Reconstruction This project will involve reconstructing the large
aircraft parking apron located on the west side of
the airfield near the Landmark Aviation ( south)
facility 34,000 sy.
$ 57,500 $ 57,500 $ 2,185,000 $ 2,300,000
Runways:< Construct/ Extend/ Improve> Runway Safety
Area [ Primary Airports] - Safety/ Security
This project will involve installing concrete pads or
other similar material in the airport's retention basin.
$ 6,750 $ 6,750 $ 256,500 $ 270,000
Airport Total: $ 64,250 $ 64,250 $ 2,441,500 $ 2,570,000
SEDONA YAVAPAI
Apron: Construct Apron - Standards The project will expand Apron A to the southwest. It
is the second phase of a two phase project. Phase
2 will include a 350 ft by 410 ft expansion.
$ 33,405 $ 33,405 $ 1,269,400 $ 1,336,210
Apron: Rehabilitate Apron - Reconstruction Reconstruct Apron A, approx. 31,100 SY. $ 58,497 $ 58,496 $ 2,222,869 $ 2,339,862
Other:< Construct/ Rehabilitate> Parking Lot [ non
revenue producing- non hub/ MAP] - Other
Construct terminal parking lot expansion to the
north approx. 200 ft X 250 ft.
$ 13,056 $ 13,055 $ 496,110 $ 522,221
Taxiways: Construct Taxiway - Capacity Construct Taxilane B- 6 and new hangar pads. $ 7,500 $ 7,500 $ 285,000 $ 300,000
Airport Total: $ 112,458 $ 112,456 $ 4,273,379 $ 4,498,293
SHOW LOW REGIONAL NAVAJO
Apron: Construct Apron - Capacity Construct East Apron Ph 2, approx. 13,000 square
yards ( 11- 1)
$ 20,000 $ 20,000 $ 760,000 $ 800,000
Equipment: Acquire < Snow Removal Equipment/ Urea
Truck/ etc.> - Standards
Acquire SRE Equipment ( 11- 2) $ 9,375 $ 9,375 $ 356,250 $ 375,000
Airport Total: $ 29,375 $ 29,375 $ 1,116,250 $ 1,175,000
SIERRA VISTA MUNI- LIBBY AAF COCHISE
Taxiways: Rehabilitate Taxiway - Reconstruct Construct Twy J realignment between Rwy 12/ 30 &
Twy G ( approx. 1570 ft x 75 ft, 13100 sy).
$ 87,500 $ 87,500 $ 3,325,000 $ 3,500,000
Airport Total: $ 87,500 $ 87,500 $ 3,325,000 $ 3,500,000
SPRINGERVILLE MUNI APACHE
Runways: Rehabilitate Runway - Reconstruct Runway 3/ 21 resurfacing phase 3 ( construction) $ 50,000 $ 50,000 $ 1,900,000 $ 2,000,000
Taxiways:< Extend/ Widen/ Strengthen> Taxiway -
Standards
Construct new taxilanes on the southeast side of
Runway 11/ 29 ( Design only)
$ 2,500 $ 2,500 $ 95,000 $ 100,000
Taxiways: Construct Taxiway [ includes relocation] Parallel taxiway for Runway 3/ 21 the project will be
phased ( Design)
$ 5,750 $ 5,750 $ 218,500 $ 230,000
Airport Total: $ 58,250 $ 58,250 $ 2,213,500 $ 2,330,000
ST JOHNS INDUSTRIAL AIR PARK APACHE
Arizona Department of Transportation - Aeronautics Division 29
FY 2011 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
Buildings:< Construct/ Expand/ Imp/ Modify/ Rehabilitate>
< Snow Removal Equipment/ Chemical Storage
Building/ etc.> - Standards
Buildings: Construct South of Rwy 14/ 32, approx.
40' x 50'.
$ 8,750 $ 8,750 $ 332,500 $ 350,000
Airport Total: $ 8,750 $ 8,750 $ 332,500 $ 350,000
TAYLOR NAVAJO
Apron: Expand Apron - Capacity Expand NE of existing apron, approx. 7,000 sf. $ 50,000 $ 50,000 $ 1,900,000 $ 2,000,000
Other:< Light/ Mark/ Remove> Obstructions - Standards Remove tall trees in Terminal Area $ 1,250 $ 1,250 $ 47,500 $ 50,000
Other: Improve Airport < Drainage/ Erosion
Control/ miscellaneous improvements> - Standards
Remove mobile home from Terminal Area to off
airport property, approx. 40' x 50'.
$ 500 $ 500 $ 19,000 $ 20,000
Airport Total: $ 51,750 $ 51,750 $ 1,966,500 $ 2,070,000
TUCSON INTL PIMA
Apron: Rehabilitate Apron - Reconstruction Remove and replace portion of apron with 16in
PCC pavement.
$ 98,177 $ 98,177 $ 2,000,000 $ 2,196,354
Buildings:< Construct/ Expand/ Improve/ Modify/ Rehabilitat
e> Building - Standards
Relocate EOC to old customs area and provide
approx. 1,600 sf of operating space.
$ 33,019 $ 33,019 $ 672,637 $ 738,675
Runways: Construct Runway - Capacity Design engineering, surveying & geo- technical
services to establish grading, drainage, paving,
lighting, signage, marking and appurtenances for
the proposed construction of a parallel rwy.
$ 403,986 $ 403,986 $ 8,229,747 $ 9,037,719
Runways: Construct Runway [ includes relocation] -
Standrads
Reconstruct existing twy, construct new access
roads, taxiways, drainage, fencing, lighting, water
service, sewer service, electric and telephone for
new GA area. Demo existing yard building and
relocate drainageway.
$ 164,971 $ 164,970 $ 3,360,678 $ 3,690,619
Runways: Install Runway < vertical/ visual> Guidance
System [ PAPI/ VASI/ REIL/ ALS/ etc.] - Standards
Install lighting control and monitoring system for all
Rwy and Twy lighting systems.
$ 111,830 $ 111,830 $ 2,278,135 $ 2,501,795
Airport Total: $ 811,983 $ 811,982 $ 16,541,197 $ 18,165,162
WHITERIVER NAVAJO
Taxiways: Construct Taxiway - Capacity Construct Connector Twy. $ 8,750 $ 8,750 $ 332,500 $ 350,000
Airport Total: $ 8,750 $ 8,750 $ 332,500 $ 350,000
WICKENBURG MUNI MARICOPA
Ground
Transportation:< Construct/ Expand/ Improve/ Modify/ Reha
bilitate> Access Road - Capacity
Construct a 1,300 foot extension to the access road
on the south side of the airport.
$ 14,075 $ 14,075 $ 534,850 $ 563,000
Airport Total: $ 14,075 $ 14,075 $ 534,850 $ 563,000
WINSLOW- LINDBERGH REGIONAL NAVAJO
Arizona Department of Transportation - Aeronautics Division 30
FY 2011 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
Equipment: Acquire Security Equipment/ Install Perimeter
Fencing [ not Part 107] - Standards
Install 3,500 LF Perimeter Fencing along the
approach end of Rwy 29 - Phase II.
$ 10,000 $ 10,000 $ 380,000 $ 400,000
Heliport:< Construct/ Expand/ Improve/ Modify/ Rehabilitate>
Helipad/ Heliport - Capacity
Construct 184' x 160' Heliport. $ 10,000 $ 10,000 $ 380,000 $ 400,000
Heliport:< Construct/ Expand/ Improve/ Modify/ Rehabilitate>
Helipad/ Heliport - Capacity
Construct electrical associated with 184' x 160'
heliport.
$ 2,500 $ 2,500 $ 95,000 $ 100,000
Land: Acquire land/ easement for approaches Acquire 30 acres land for RSA/ OFA. $ 6,250 $ 6,250 $ 237,500 $ 250,000
Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities>
[ MAP] - Other
Utility improvements for future airport development. $ 12,500 $ 12,500 $ 475,000 $ 500,000
Runways: Rehabilitate Runway - Reconstruct Construct 308,000 SY Airfield Pavement
Preservation.
$ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000
Taxiways: Construct Taxiway - Capacity Taxilanes off of South Apron for future airport
development.
$ 20,000 $ 20,000 $ 760,000 $ 800,000
Airport Total: $ 123,750 $ 123,750 $ 4,702,500 $ 4,950,000
YUMA MCAS/ YUMA INTL YUMA
Apron: Construct Apron - Standards CONSTRUCT: DCC apron Phase 2 ( approximately
26,000 sy, 150 yd x 170 yd). Apron is adjacent to
40th Street apron constructed in 2007.
$ 72,368 $ 72,369 $ 2,750,000 $ 2,894,737
Taxiways:< Extend/ Widen/ Strengthen> Taxiway -
Standards
DESIGN widening of Twys Z, Z2 and Z3 to Design
Group III. Approximately 35,000 sy of asphalt
needed to widen from 35 ft to 50 ft.
$ 6,579 $ 6,579 $ 250,000 $ 263,158
Airport Total: $ 78,947 $ 78,948 $ 3,000,000 $ 3,157,895
Total Fiscal Year Grants: $ 11,364,429 $ 11,364,426 $ 249,443,128 $ 272,171,983
Arizona Department of Transportation - Aeronautics Division 31
FY 2012 State & Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
ADOT Aeronautics
APMS - Runway Pavement Preservation $ 4,932,000 $ 548,000 $ 0 $ 5,480,000
Planning: Planning Studies Conduct $ 300,000 $ 0 $ 0 $ 300,000
Airport Total: $ 5,232,000 $ 548,000 $ 0 $ 5,780,000
BENSON MUNICIPAL COCHISE
Apron: Apron Construct Design Apron Expansion ( approx. 23,000 sy, E. of
existing Apron)
$ 90,000 $ 10,000 $ 0 $ 100,000
Airport Total: $ 90,000 $ 10,000 $ 0 $ 100,000
CHANDLER MUNI MARICOPA
Apron: Apron Construct Design 22,400 SY apron area. $ 162,000 $ 18,000 $ 0 $ 180,000
Apron: Apron Construct Design 26,100 SY apron area ( So. Side) $ 2,100 $ 206,900 $ 0 $ 209,000
Apron: Apron Construct Design 35,400 SY apron area. ( So. Side) $ 232,200 $ 25,800 $ 0 $ 258,000
Apron: Apron Construct Design 45,700 SY apron area. ( So. Side) $ 288,000 $ 32,000 $ 0 $ 320,000
Airport Total: $ 684,300 $ 282,700 $ 0 $ 967,000
ERIC MARCUS MUNICIPAL PIMA
Other: Pavement Marking Install Re- paint non- precision Rwy markings ( includes
existing Threshold markers, Rwy numbers,
centerline & border striping), Add fixed distance
markers.
$ 22,500 $ 2,500 $ 0 $ 25,000
Airport Total: $ 22,500 $ 2,500 $ 0 $ 25,000
ERNEST A. LOVE FIELD YAVAPAI
Taxiways: Taxiway Construct Design 1,200' x 50' Twy F Extension. $ 45,000 $ 5,000 $ 0 $ 50,000
Taxiways: Taxiway Construct Design 1,500 ft x 50 ft Twy B Extension. $ 45,000 $ 5,000 $ 0 $ 50,000
Airport Total: $ 90,000 $ 10,000 $ 0 $ 100,000
FALCON FLD MARICOPA
Apron: Apron Construct Design apron expansion of existing Anzio Ramp &
secondary ramp at old fuel farm location. ( 780 ft x
220 ft)
$ 135,000 $ 15,000 $ 0 $ 150,000
Runways: REIL Upgrade/ Modification Design upgrade of existing 2- box PAPI units to 4-
box PAPI units for Rwy 4R- 22L and relocate the
REILs.
$ 67,500 $ 7,500 $ 0 $ 75,000
Runways: Runway Construct Design 100 ft x 75 ft blast pads at ends of Rwy
4L/ 22R
$ 67,500 $ 7,500 $ 0 $ 75,000
Airport Total: $ 270,000 $ 30,000 $ 0 $ 300,000
Arizona Department of Transportation - Aeronautics Division 32
FY 2012 State & Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
FLAGSTAFF PULLIAM COCONINO
Taxiways: Taxiway Reconstruct Evaluate and Design existing taxilanes between
and around hangars and shades. Construct
drainage improvements
$ 498,886 $ 55,432 $ 0 $ 554,318
Airport Total: $ 498,886 $ 55,432 $ 0 $ 554,318
GREENLEE COUNTY GREENLEE
Runways: Runway Construct Design Rwy Extension ( 300 ft x 100 ft) and Twy
Extension ( 500 ft x 50 ft)
$ 157,500 $ 17,500 $ 0 $ 175,000
Airport Total: $ 157,500 $ 17,500 $ 0 $ 175,000
H. A. CLARK MEMORIAL FIELD COCONINO
Apron: Apron Construct Design GA Apron Phased Expansion - North
( approx. 4,000 sy)
$ 67,500 $ 7,500 $ 0 $ 75,000
Airport Total: $ 67,500 $ 7,500 $ 0 $ 75,000
MARANA REGIONAL PIMA
Land: Land ( Protection) Acquisition Aquire land - 129 Acres $ 684,300 $ 2,540,700 $ 0 $ 3,225,000
Airport Total: $ 684,300 $ 2,540,700 $ 0 $ 3,225,000
PHOENIX DEER VALLEY MARICOPA
Apron: Apron Reconstruct Reconstruct north ramp. Approximate Total Area:
388,000 square yards. State/ local = 15,857 square
yards.
$ 499,500 $ 55,500 $ 0 $ 555,000
Airport Total: $ 499,500 $ 55,500 $ 0 $ 555,000
PHOENIX GOODYEAR MARICOPA
Terminal Development: Auto Parking Reconstruct Reconstruct employee paved parking lot.
Approximate Total Area: 125,000 square feet or
13,888 square yards.
$ 42,300 $ 4,700 $ 0 $ 47,000
Airport Total: $ 42,300 $ 4,700 $ 0 $ 47,000
PHOENIX SKY HARBOR INTL MARICOPA
Apron: Apron Reconstruct Reconstruct West Hold Bay in asphalt - Phase 1.
Total approximate area = 61,111 square yards.
State/ Local approximate area = 17,343 square
yards.
$ 499,500 $ 55,500 $ 0 $ 555,000
Airport Total: $ 499,500 $ 55,500 $ 0 $ 555,000
PHOENIX- MESA GATEWAY MARICOPA
Apron: Apron Construct Design/ construct compass rose for aircraft testing. $ 7,680 $ 836,500 $ 0 $ 844,180
Arizona Department of Transportation - Aeronautics Division 33
FY 2012 State & Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
Other: Fire Protection Design/ Construct 2 additional pumps for fire
protection system for South Central area and
extend pipeline to remaining lots.
$ 676,620 $ 75,180 $ 0 $ 751,800
Airport Total: $ 684,300 $ 911,680 $ 0 $ 1,595,980
RYAN FIELD PIMA
Runways: MIRL/ HIRL Install Install MIRL on Rwy 6L/ 24R $ 675,000 $ 75,000 $ 0 $ 750,000
Taxiways: MITL/ HITL Install Install MITL for Twy A & connecting Twys from Rwy
6L/ 24R. Also included are entire lengths of Twys
A2, A4, B2 & B4
$ 9,300 $ 740,700 $ 0 $ 750,000
Airport Total: $ 684,300 $ 815,700 $ 0 $ 1,500,000
SAFFORD REGIONAL GRAHAM
Other: Fencing ( Perimeter) Install Install 6- foot chain link perimeter fence
( approx. 4,000 LF) with 3- strand barb- wire.
$ 36,000 $ 4,000 $ 0 $ 40,000
Airport Total: $ 36,000 $ 4,000 $ 0 $ 40,000
SHOW LOW REGIONAL NAVAJO
Runways: Runway Construct Design standard EMAS for Rwy 6 end ( 12- 1) $ 202,500 $ 22,500 $ 0 $ 225,000
Airport Total: $ 202,500 $ 22,500 $ 0 $ 225,000
TUCSON INTL PIMA
Other: Perimeter Road Reconstruction Construct new 24 ft AC pavement perimeter road
from Twy D3 to A13.
$ 684,300 $ 609,513 $ 0 $ 1,293,813
Airport Total: $ 684,300 $ 609,513 $ 0 $ 1,293,813
WICKENBURG MUNI MARICOPA
Heliport: Heliport Construct This project includes the construction ( Phase II) of
the future Heliport development area ( 6,000 SY).
The area is located northeast of the existing T-Hangar
area.
$ 567,000 $ 63,000 $ 0 $ 630,000
Airport Total: $ 567,000 $ 63,000 $ 0 $ 630,000
Total Fiscal Year Grants: $ 11,696,686 $ 6,046,425 $ 0 $ 17,743,111
Arizona Department of Transportation - Aeronautics Division 34
FY 2012 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
AVI SUQUILLA LA PAZ
Taxiways:< Extend/ Widen/ Strengthen> Taxiway -
Standards
Completion of Parallel Twy to Rwy 1- 19
approximately 4800' x 50' - completes full parallel
Twy to Rwy and allows Exit Twy A2 to be
reconfigured or eliminated.
$ 42,800 $ 42,800 $ 1,626,400 $ 1,712,000
Taxiways: Install Taxiway Lighting ( e. g., SMGCS,
reflectors, MITL) - Standards
MITL and Guidance signs for 4,800 LF parallel Twy
constructed above to meet FAA standards.
$ 8,125 $ 8,125 $ 308,750 $ 325,000
Airport Total: $ 50,925 $ 50,925 $ 1,935,150 $ 2,037,000
BENSON MUNICIPAL COCHISE
Ground
Transportation:< Construct/ Expand/ Improve/ Modify/ Reha
bilitate> Access Road - Other
Reconstruct/ Rehab Access Rd ( Approx. 750 LF) $ 3,750 $ 3,750 $ 142,500 $ 150,000
Land: Acquire < land/ easement> for
development/ relocation
Land Acquisition ( 239 acres) So. Side of Airport $ 37,500 $ 37,500 $ 1,425,000 $ 1,500,000
Runways: Extend Runway- Capacity Extend Rwy/ Twy Ph I ( approx 1,400 LF, West End) $ 41,250 $ 41,250 $ 1,567,500 $ 1,650,000
Runways: Install Runway < vertical/ visual> Guidance
System [ PAPI/ VASI/ REIL/ ALS/ etc.] - Standards
Upgrade PAPI to 4 Light System $ 1,875 $ 1,875 $ 71,250 $ 75,000
Taxiways: Construct Taxiway - Capacity Construct connector Twys/ Taxilanes ( approx. 80x35
& 120x75, Connect Rwy to Prtl. Twy E. of Rwy 10
end & Taxilane W of T- Hangar Pads)
$ 8,750 $ 8,750 $ 332,500 $ 350,000
Airport Total: $ 93,125 $ 93,125 $ 3,538,750 $ 3,725,000
BISBEE DOUGLAS INTL COCHISE
Apron: Construct Apron - Standards Pavement overlay 25,000 sy on existing PCC apron
( north end)
$ 20,000 $ 20,000 $ 760,000 $ 800,000
Airport Total: $ 20,000 $ 20,000 $ 760,000 $ 800,000
BISBEE MUNI COCHISE
Apron: Expand/ Strengthen Apron - Standards Expand main apron to accomodate existing hangar
locations, reconstruct existing apron pavement
( 22,300 SY of asphalt pavement).
$ 32,500 $ 32,500 $ 1,235,000 $ 1,300,000
Land: Acquire land/ easement for approaches Land acquistion - approximately 6.40 acres. $ 6,250 $ 6,250 $ 237,500 $ 250,000
Other:< Construct/ Rehabilitate> Parking Lot [ non
revenue producing- non hub/ MAP] - Other
Construct paved ( asphalt) parking lot adjacent to
new terminal building ( approximately 65 ft x 465 ft).
$ 1,875 $ 1,875 $ 71,250 $ 75,000
Other: Install < Guidance/ other> Signs [ not Part 139] -
Standards
Install new Rwy 17/ 35 guidance signs at locations
where existing signs are broken, install new signs
at locations where needed but do not currently have
signs.
$ 21,250 $ 21,250 $ 807,500 $ 850,000
Terminal Development: Construct Terminal Building -
Capacity
Construct new terminal building ( including utilities). $ 8,750 $ 8,750 $ 332,500 $ 350,000
Airport Total: $ 70,625 $ 70,625 $ 2,683,750 $ 2,825,000
Arizona Department of Transportation - Aeronautics Division 35
FY 2012 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
BUCKEYE MUNI MARICOPA
Land: Acquire land/ easement for approaches Purchase approximately 25 acres of land north of
the airport to secure RPZ and allow for future Rwy
extension ( Phase 3).
$ 137,500 $ 137,500 $ 5,225,000 $ 5,500,000
Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities>
[ MAP] - Other
Design and construct an aircraft wash rack
adjacent to the south ramp.
$ 7,500 $ 7,500 $ 285,000 $ 300,000
Other:< Construct/ Rehabilitate> Parking Lot [ non
revenue producing- non hub/ MAP] - Other
Design and construct an automobile parking area
outside the interior security fence.
$ 20,000 $ 20,000 $ 760,000 $ 800,000
Airport Total: $ 165,000 $ 165,000 $ 6,270,000 $ 6,600,000
CHANDLER MUNI MARICOPA
Apron: Construct Apron - Capacity Construct 29,500 SY apron area. $ 73,875 $ 73,875 $ 2,807,250 $ 2,955,000
Runways:< Construct/ Extend/ Improve> Runway Safety
Area [ Primary Airports] - Safety/ Security
Design/ construct, mark 95,000 SY of stabilized
shoulder ( emulsified asphalt & aggregate mix).
$ 23,462 $ 23,463 $ 891,575 $ 938,500
Airport Total: $ 97,337 $ 97,338 $ 3,698,825 $ 3,893,500
CIBECUE NAVAJO
New Airports: Construct New Airport - Standards New Cibecue Airport Site, Phase III Lighting and
Visual Aids.
$ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000
Airport Total: $ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000
COCHISE COUNTY COCHISE
Runways: Rehabilitate Runway - Reconstruct Reconstruct NW section of Rwy 14- 32 ( open turf) $ 12,500 $ 12,500 $ 475,000 $ 500,000
Airport Total: $ 12,500 $ 12,500 $ 475,000 $ 500,000
COLORADO CITY MUNI MOHAVE
Taxiways: Extend Taxiway - Capacity SE portion of parallel Twy on NE side of Rwy 11/ 29 $ 17,500 $ 17,500 $ 665,000 $ 700,000
Airport Total: $ 17,500 $ 17,500 $ 665,000 $ 700,000
COOLIDGE MUNI PINAL
Taxiways: Construct Taxiway - Capacity Construct new Twy extending from Twy F ( 1,000 ft
to E and then 800 ft to N)
$ 24,176 $ 24,176 $ 918,680 $ 967,032
Airport Total: $ 24,176 $ 24,176 $ 918,680 $ 967,032
COTTONWOOD YAVAPAI
Land: Acquire < land/ easement> for
development/ relocation
Purchase 11 acres of property at the southwest
corner of the airport.
$ 17,500 $ 17,500 $ 665,000 $ 700,000
Planning:< Conduct/ Update> < Airport Master Plan Study
{ ALP, EA, etc.}>
Update the Airport Master Plan $ 5,000 $ 5,000 $ 190,000 $ 200,000
Airport Total: $ 22,500 $ 22,500 $ 855,000 $ 900,000
Arizona Department of Transportation - Aeronautics Division 36
FY 2012 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
ELOY MUNI PINAL
Apron: Rehabilitate Apron - Reconstruction Reconstruction of approx. 15,450 SY of asphalt
concrete pavement ( approx. 200 ft x 700 ft) apron,
and installation of apron lighting
$ 25,000 $ 25,000 $ 950,000 $ 1,000,000
Runways: Extend Runway- Capacity Construct Rwy 2- 20 extensions ( 750 ft on north
side, 850 ft on south side), Construct Twy A
extension, and Construct two new end connector
Twys
$ 40,000 $ 40,000 $ 1,520,000 $ 1,600,000
Airport Total: $ 65,000 $ 65,000 $ 2,470,000 $ 2,600,000
ERNEST A. LOVE FIELD YAVAPAI
Other: Improve Airport < Drainage/ Erosion
Control/ miscellaneous improvements> - Standards
Construct Drainage Improvements as part of Rwy
and Twy Extension.
$ 37,500 $ 37,500 $ 1,425,000 $ 1,500,000
Planning: Conduct < Environmental
Assessment/ Environmental Impact
Statement/ Feasibility> < study/ update>
Conduct Environmental Assessment Update for
construction of Rwy 21L Extension and new
Terminal Building.
$ 6,250 $ 6,250 $ 237,500 $ 250,000
Runways: Construct Runway - Capacity Construct Rwy 21L and Twys C, D, & H extensions
to minimum of 9,300 ft and 200K lbs.
$ 250,000 $ 250,000 $ 9,500,000 $ 10,000,000
Terminal Development: Construct Terminal Building -
Capacity
Construct 21,000 SF Terminal Building. $ 332,500 $ 332,500 $ 12,635,000 $ 13,300,000
Airport Total: $ 626,250 $ 626,250 $ 23,797,500 $ 25,050,000
FALCON FLD MARICOPA
Runways: Construct Runway - Capacity Construct 4- 6 high- speed Rwy exits on Rwy 4L- 22R. $ 19,700 $ 19,700 $ 748,600 $ 788,000
Taxiways: Construct Taxiway - Capacity Design a 5100 x 75 ft Twy between Rwys $ 6,250 $ 6,250 $ 237,500 $ 250,000
Airport Total: $ 25,950 $ 25,950 $ 986,100 $ 1,038,000
FLAGSTAFF PULLIAM COCONINO
Taxiways: Rehabilitate Taxiway - Reconstruct Phase 1 - Rebuild existing taxilanes between and
around hangars and shades. Construct drainage
improvements throughout.
$ 71,968 $ 71,969 $ 2,734,795 $ 2,878,732
Airport Total: $ 71,968 $ 71,969 $ 2,734,795 $ 2,878,732
GILA BEND MUNI MARICOPA
Heliport:< Construct/ Expand/ Improve/ Modify/ Rehabilitate>
Helipad/ Heliport - Capacity
Construct a lighted helicopter pad including
rotorcraft parking.
$ 3,375 $ 3,375 $ 128,250 $ 135,000
Planning:< Conduct/ Update> < Airport Master Plan Study
{ ALP, EA, etc.}>
Prepare an Environmental Assessment for the
extension of Rwy 4/ 22 1,300 feet to the northeast.
$ 3,000 $ 3,000 $ 114,000 $ 120,000
Runways: Install Runway < Vertical/ Visual> Guidance
System [ PAPI/ VASI/ REIL/ ALS/ etc.] - Statutory
Emphasis Programs
Install REIL on both ends of Rwy 4/ 22. $ 1,750 $ 1,750 $ 66,500 $ 70,000
Airport Total: $ 8,125 $ 8,125 $ 308,750 $ 325,000
Arizona Department of Transportation - Aeronautics Division 37
FY 2012 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
GLENDALE MUNICIPAL MARICOPA
Land: Acquire < land/ easement> for
development/ relocation
Acquire 7 acres - northwest corner. $ 70,825 $ 70,825 $ 2,691,350 $ 2,833,000
Land: Acquire land/ easement for approaches Acquire 18 acres of land north of Rwy 19 ( Acres 18-
36).
$ 187,500 $ 187,500 $ 7,125,000 $ 7,500,000
Runways: Rehabilitate Runway - Reconstruct Pavement Maintenance - slurry seal hangars, Twy,
and Rwy.
$ 5,000 $ 5,000 $ 190,000 $ 200,000
Airport Total: $ 263,325 $ 263,325 $ 10,006,350 $ 10,533,000
GRAND CANYON NATIONAL PARK COCONINO
Terminal Development: Construct Terminal Building -
Capacity
Terminal building located at mid point of airport per
ALP.
$ 100,000 $ 100,000 $ 3,800,000 $ 4,000,000
Airport Total: $ 100,000 $ 100,000 $ 3,800,000 $ 4,000,000
GRAND CANYON WEST MOHAVE
Apron: Construct Apron - Standards Apron: Construct east edge of main apron, approx.
800' x 200'
$ 11,250 $ 11,250 $ 427,500 $ 450,000
Planning:< Conduct/ Update> < Airport Master Plan Study
{ ALP, EA, etc.}>
Update Airport Master Plan $ 5,000 $ 5,000 $ 190,000 $ 200,000
Runways: Construct Runway [ includes relocation] -
Standrads
Runways: Shift and construct Runway 17/ 35,
5,000' x 75'. Project also includes connecting
taxiways including grading, drainage, paving,
lighting and visual aids. ( Phase IV)
$ 250,000 $ 250,000 $ 9,500,000 $ 10,000,000
Taxiways: Construct Taxiway [ includes relocation] Taxiways: Construct parallel taxiway to Runway
17/ 35, 5,000' x 75' and convert temporary runway to
parallel taxiway A ( including lighting)
$ 14,500 $ 14,500 $ 551,000 $ 580,000
Airport Total: $ 280,750 $ 280,750 $ 10,668,500 $ 11,230,000
GREENLEE COUNTY GREENLEE
Ground
Transportation:< Construct/ Expand/ Improve/ Modify/ Reha
bilitate> Access Road - Other
Construct 3,100 ft x 24 ft entrance road relocation
and 120 ft x 130 ft parking lot rehabilitation.
$ 13,750 $ 13,750 $ 522,500 $ 550,000
Runways: Extend Runway- Capacity Construct Runway Extension ( 300 ft x 100 ft) $ 18,750 $ 18,750 $ 712,500 $ 750,000
Runways: Install Runway Lighting ( HIRL, MIRL)
[ Required by Part 139] - Safety/ Security
Construct electrical associated with Rwy Extension $ 2,500 $ 2,500 $ 95,000 $ 100,000
Runways: Rehabilitate Runway - Reconstruct Design 82,000 SY pavement rehabilitation for Rwy
and Twy
$ 1,875 $ 1,875 $ 71,250 $ 75,000
Taxiways: Extend Taxiway - Capacity Construct 500 ft x 50 ft Twy A Extension $ 8,750 $ 8,750 $ 332,500 $ 350,000
Taxiways: Install Taxiway Lighting ( MITL) [ Required by
Part 139] - Safety/ Security
Construct electrical associated with Twy A
Extension
$ 1,875 $ 1,875 $ 71,250 $ 75,000
Airport Total: $ 47,500 $ 47,500 $ 1,805,000 $ 1,900,000
Arizona Department of Transportation - Aeronautics Division 38
FY 2012 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
H. A. CLARK MEMORIAL FIELD COCONINO
Ground
Transportation:< Construct/ Expand/ Improve/ Modify/ Reha
bilitate> Access Road - Other
Rehabilitate Airport Access Road ( approx 1,000 lf) $ 18,750 $ 18,750 $ 712,500 $ 750,000
Ground
Transportation:< Construct/ Expand/ Improve/ Modify/ Reha
bilitate> Service Road - Other
Construct Perimeter Road ( appox) 18,000 lf $ 18,750 $ 18,750 $ 712,500 $ 750,000
Airport Total: $ 37,500 $ 37,500 $ 1,425,000 $ 1,500,000
HOLBROOK MUNI NAVAJO
Land: Acquire land/ easement for approaches Land Acqisition for Runway 3/ 21 Extention ( north
end runway 3/ 21)
$ 12,500 $ 12,500 $ 475,000 $ 500,000
Airport Total: $ 12,500 $ 12,500 $ 475,000 $ 500,000
KAYENTA NAVAJO
Taxiways: Construct Taxiway - Capacity Construct parallel Twy to Runway 5/ 23 and
connectors, 35' x 7,100' ( Paving- Phase II).
$ 45,000 $ 45,000 $ 1,710,000 $ 1,800,000
Taxiways: Install Taxiway Lighting ( e. g., SMGCS,
reflectors, MITL) - Standards
Install along Rwy 5/ 23' s parallel Twy 35' x 7,100'. $ 10,000 $ 10,000 $ 380,000 $ 400,000
Airport Total: $ 55,000 $ 55,000 $ 2,090,000 $ 2,200,000
KINGMAN MOHAVE
Other: Improve Airport < Drainage/ Erosion
Control/ miscellaneous improvements> - Standards
Phase 1 - Construct airfield drainage improvements. $ 25,000 $ 25,000 $ 950,000 $ 1,000,000
Planning:< Conduct/ Update> < Airport Master Plan Study
{ ALP, EA, etc.}>
Update the Airport Master Plan. $ 5,000 $ 5,000 $ 190,000 $ 200,000
Runways:< Extend/ Widen/ Strengthen> Runway [ to meet
standards] - Standards
Construct pavement strenghtening of Rwy 3- 21 and
Twy D.
$ 67,500 $ 67,500 $ 2,565,000 $ 2,700,000
Airport Total: $ 97,500 $ 97,500 $ 3,705,000 $ 3,900,000
LAKE HAVASU CITY MOHAVE
Apron: Construct Apron - Standards Redesignate portion of North Parking Apron to
accommodate air cargo aircraft during loading and
unloading operations.
$ 5,275 $ 5,275 $ 200,450 $ 211,000
Apron: Install Apron Lighting - Standards Replace existing aircraft parking apron lights and
beacon.
$ 6,700 $ 6,700 $ 254,600 $ 268,000
Ground
Transportation:< Construct/ Expand/ Improve/ Modify/ Reha
bilitate> Access Road - Other
Construct Auto Truck Access/ Parking on North
Apron to accommodate air cargo ground vehicles
during loading and unloading operations.
$ 7,050 $ 7,050 $ 267,900 $ 282,000
Other:< Light/ Mark/ Remove> Obstructions - Standards Remove existing out- of- service 150,000 gallon
water storage tank.
$ 3,525 $ 3,525 $ 133,950 $ 141,000
Airport Total: $ 22,550 $ 22,550 $ 856,900 $ 902,000
Arizona Department of Transportation - Aeronautics Division 39
FY 2012 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
LAUGHLIN/ BULLHEAD INTERNATIONAL MOHAVE
Land: Acquire < land/ easement> for
development/ relocation
The project involves the acquisition of 75 acres of
ASLD property ( Phase 2).
$ 93,750 $ 93,750 $ 3,562,500 $ 3,750,000
Runways: Extend Runway- Capacity This project involves the 1,000 foot extension
( 17,000 SY) to the south end of Rwy 16- 34.
$ 137,500 $ 137,500 $ 5,225,000 $ 5,500,000
Runways: Install Runway Lighting ( HIRL, MIRL)
[ Required by Part 139] - Safety/ Security
This project will involve the installation of 1,000 feet
of MIRL on the Rwy 16- 34 extension.
$ 12,500 $ 12,500 $ 475,000 $ 500,000
Taxiways: Extend Taxiway - Capacity This project will include the 1,000 foot extension
( 6,000 SY) of the parallel Twy to Rwy 16- 34.
$ 72,500 $ 72,500 $ 2,755,000 $ 2,900,000
Taxiways: Install Taxiway Lighting ( MITL) [ Required by
Part 139] - Safety/ Security
This project involoves the installation of 1,400 feet
of MITL on the parallel Twy extension.
$ 12,500 $ 12,500 $ 475,000 $ 500,000
Airport Total: $ 328,750 $ 328,750 $ 12,492,500 $ 13,150,000
MARANA REGIONAL PIMA
Land: Acquire < land/ easement> for
development/ relocation
Aquire Land - 548 Acres $ 342,500 $ 342,500 $ 13,015,000 $ 13,700,000
Planning:< Conduct/ Update> < Airport Master Plan Study
{ ALP, EA, etc.}>
Master plan update $ 6,875 $ 6,875 $ 261,250 $ 275,000
Planning:< Conduct/ Update> < Airport Master Plan Study
{ ALP, EA, etc.}>
Part 150 Noise Study Update $ 8,125 $ 8,125 $ 308,750 $ 325,000
Taxiways: Construct Taxiway - Capacity Construct Taxiways $ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000
Airport Total: $ 420,000 $ 420,000 $ 15,960,000 $ 16,800,000
Maricopa Municipal
Apron: Construct Apron - Capacity Construct 31,000 SY Aircraft Parking Apron
( 400' x600').
$ 46,193 $ 46,193 $ 1,755,315 $ 1,847,700
Ground
Transportation:< Construct/ Expand/ Improve/ Modify/ Reha
bilitate> Access Road - Capacity
Construct Airport Access Road ( 4,600 LF). $ 10,193 $ 10,193 $ 387,315 $ 407,700
Land: Acquire land/ easement for approaches The project involves the acquisition of
approximately 62 acres of property for approach
protection.
$ 77,500 $ 77,500 $ 2,945,000 $ 3,100,000
Other:< Construct/ Rehabilitate> Parking Lot [ non
revenue producing- non hub/ MAP] - Other
Construct public automobile parking lot ( 14,000 SY). $ 7,875 $ 7,875 $ 299,250 $ 315,000
Runways: Construct Runway - Capacity Construct New Rwy ( 5,500' x 100'). $ 105,875 $ 105,875 $ 4,023,250 $ 4,235,000
Runways: Install Runway < vertical/ visual> Guidance
System [ PAPI/ VASI/ REIL/ ALS/ etc.] - Standards
Install Airport Rotating Beacon. $ 1,800 $ 1,800 $ 68,400 $ 72,000
Runways: Install Runway < vertical/ visual> Guidance
System [ PAPI/ VASI/ REIL/ ALS/ etc.] - Standards
Install PAPIs on each Rwy end. $ 2,520 $ 2,520 $ 95,760 $ 100,800
Runways: Install Runway < vertical/ visual> Guidance
System [ PAPI/ VASI/ REIL/ ALS/ etc.] - Standards
Install REIL's for each Rwy end. $ 1,575 $ 1,575 $ 59,850 $ 63,000
Runways: Install Runway Lighting ( HIRL, MIRL, TDZ,
LAHSO or CL) - Standards
Install MIRL and marking ( 5,500' x 100'). $ 25,380 $ 25,380 $ 964,440 $ 1,015,200
Arizona Department of Transportation - Aeronautics Division 40
FY 2012 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
Taxiways: Construct Taxiway - Capacity Construct 3 700' x35' T- Hangar Taxilanes ( 10,000
SY).
$ 20,993 $ 20,993 $ 797,715 $ 839,700
Airport Total: $ 299,903 $ 299,903 $ 11,396,295 $ 11,996,100
PAGE MUNI COCONINO
Apron: Expand/ Strengthen Apron - Standards Strengthen approximately 15,000 sq yds of the
main apron to accommodate larger aircraft.
$ 47,500 $ 47,500 $ 1,805,000 $ 1,900,000
Airport Total: $ 47,500 $ 47,500 $ 1,805,000 $ 1,900,000
PAYSON GILA
Apron: Construct Apron - Standards Construct Alpha Ramp Phase 1 - East Half, South
of Paralley Taxiway, Approximately 12200 Square
Yards of Asphalt Pavement
$ 30,000 $ 30,000 $ 1,140,000 $ 1,200,000
Taxiways: Rehabilitate Taxiway - Reconstruct Construct new taxiway east of new Alpha Ramp,
1200 +/- square yards of asphalt pavement
$ 13,500 $ 13,500 $ 513,000 $ 540,000
Airport Total: $ 43,500 $ 43,500 $ 1,653,000 $ 1,740,000
PHOENIX DEER VALLEY MARICOPA
Apron: Rehabilitate Apron - Reconstruction Reconstruct north ramp. $ 287,400 $ 287,400 $ 10,921,200 $ 11,496,000
Airport Total: $ 287,400 $ 287,400 $ 10,921,200 $ 11,496,000
PHOENIX GOODYEAR MARICOPA
Apron: Construct Apron - Capacity Construct west public ramp - Phase 1. $ 97,500 $ 97,500 $ 3,705,000 $ 3,900,000
Ground
Transportation:< Construct/ Expand/ Improve/ Modify/ Reha
bilitate> Access Road - Capacity
Reconstruct Public Access Road. $ 100,000 $ 100,000 $ 3,800,000 $ 4,000,000
Runways:< Construct/ Extend/ Improve> Runway Safety
Area [ Non- Primary Airports] - Standards
Shift Runway 3- 21 by 300 feet to the southwest. $ 46,775 $ 46,775 $ 1,777,450 $ 1,871,000
Taxiways:< Extend/ Widen/ Strengthen> Taxiway -
Standards
Strengthen Taxiway A to meet FAA standards for
270,000 pound dual tandem wheel aircraft.
$ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000
Airport Total: $ 306,775 $ 306,775 $ 11,657,450 $ 12,271,000
PHOENIX SKY HARBOR INTL MARICOPA
Other: Noise Mitigation Measures [ miscellaneous] Sound mitigation and acquisition of eligible
properties.
$ 1,875,000 $ 1,875,000 $ 11,250,000 $ 15,000,000
Taxiways: Extend Taxiway - Capacity Construct one acute angle taxiway connector
between Runway 7R- 25L and Taxiway F, and
construct three acute angle taxiway connectors
between Runway 7L- 25R and Taxiway F.
$ 1,100,000 $ 1,100,000 $ 6,600,000 $ 8,800,000
Airport Total: $ 2,975,000 $ 2,975,000 $ 17,850,000 $ 23,800,000
PHOENIX- MESA GATEWAY MARICOPA
Arizona Department of Transportation - Aeronautics Division 41
FY 2012 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
Apron: Construct Apron - Standards Construction of Twy A between Twy L & Twy P,
PCCP 3,100 ft L by 75 ft W with 35 ft wide
shoulders each side ( 39,000 SY) incl. lighting and
drainage.
$ 223,400 $ 223,400 $ 8,489,200 $ 8,936,000
Apron: Construct Apron - Standards Design apron for east side passenger terminal
( 82,200 SY)
$ 12,500 $ 12,500 $ 475,000 $ 500,000
Equipment: Acquire Aircraft Rescue & Fire Fighting
Vehicle [ required by Part 139 only] - Safety/ Security
Acquire 1,500 Gallon ARFF Vehicle $ 20,000 $ 20,000 $ 760,000 $ 800,000
Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities>
[ MAP] - Other
Develop, design and construct fire protection
system in South Industrial Area to accommodate
foam systems associated with aircraft hangars.
MAP project request.
$ 200,475 $ 200,475 $ 7,618,050 $ 8,019,000
Other:< Construct/ Improve/ Repair> < Fuel Farm/ Utilities>
[ MAP] - Other
Drainage Improvements for mid- airfield to SW. $ 33,059 $ 33,059 $ 1,256,251 $ 1,322,369
Other:< Construct/ Rehabilitate> Parking Lot [ non
revenue producing- non hub/ MAP] - Other
Design surface parking for East Terminal Area to
accommodate 3,000 parking spaces.
$ 12,500 $ 12,500 $ 475,000 $ 500,000
Planning: Conduct Noise Compatibility Plan study/ update FAR Part 150 plan Update $ 12,500 $ 12,500 $ 475,000 $ 500,000
Taxiways:< Extend/ Widen/ Strengthen> Taxiway -
Standards
Design Twy C Extension from Twy K to Rwy 30R.
55,555 SY PCCP, 51,800 SY asphalt
$ 11,250 $ 11,250 $ 427,500 $ 450,000
Taxiways: Rehabilitate Taxiway - Reconstruct Twy G/ B Intersection Reconstruction. 30,117 SY $ 72,250 $ 72,250 $ 2,745,500 $ 2,890,000
Terminal Development: Construct Terminal Building -
Capacity
Design East Terminal Building 160,000 SF. $ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000
Airport Total: $ 660,434 $ 660,434 $ 25,096,501 $ 26,417,369
POLACCA NAVAJO
Runways: Construct Runway - Capacity Construct Rwy ( 75' x 5,000') an apron ( Phase 2-
Paving and Lighting).
$ 100,000 $ 100,000 $ 3,800,000 $ 4,000,000
Airport Total: $ 100,000 $ 100,000 $ 3,800,000 $ 4,000,000
RYAN FIELD PIMA
Other: Improve Airport < Drainage/ Erosion
Control/ miscellaneous improvements> - Standards
Airfield Drainage Improvements as recommended
by the Airfield Drainage Study that is currently
underway
$ 25,000 $ 25,000 $ 950,000 $ 1,000,000
Airport Total: $ 25,000 $ 25,000 $ 950,000 $ 1,000,000
SAFFORD REGIONAL GRAHAM
Land: Acquire land/ easement for approaches Land acquisition ( 18.85 acres). $ 5,000 $ 5,000 $ 190,000 $ 200,000
Other:< Construct/ Rehabilitate> Parking Lot [ non
revenue producing- non hub/ MAP] - Other
Expand parking lot ( asphalt) and reconstruct
existing parking area ( approx. 100 ft x 200 ft).
$ 8,750 $ 8,750 $ 332,500 $ 350,000
Runways: Install Runway Lighting ( HIRL, MIRL) [ non Part
139 CS] - Statutory Emphasis Programs
Remove existing light fixtures/ bases and associated
conduit/ cable, install new MITLs, bases,
conduit/ cable, and install new vault equipment.
$ 15,000 $ 15,000 $ 570,000 $ 600,000
Arizona Department of Transportation - Aeronautics Division 42
FY 2012 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
Taxiways: Construct Taxiway - Capacity Grade and pave new 35 ft wide taxilanes for GA
hangar area development.
$ 1,250 $ 1,250 $ 47,500 $ 50,000
Terminal Development: Construct Terminal Building -
Capacity
Construct new terminal building and associated
utilities.
$ 37,500 $ 37,500 $ 1,425,000 $ 1,500,000
Airport Total: $ 67,500 $ 67,500 $ 2,565,000 $ 2,700,000
SAN MANUEL PINAL
Land: Acquire < land/ easement> for
development/ relocation
Acquire Land, airport property plus parcel A and B
( 200 acres)
$ 50,000 $ 50,000 $ 1,900,000 $ 2,000,000
Airport Total: $ 50,000 $ 50,000 $ 1,900,000 $ 2,000,000
SCOTTSDALE MARICOPA
Apron: Rehabilitate Apron - Reconstruction This project will involve reconstructing the large
aircraft parking apron located on the west side of
the airfield near the Landmark Aviation ( north)
facility 34,000 sy.
$ 57,500 $ 57,500 $ 2,185,000 $ 2,300,000
Airport Total: $ 57,500 $ 57,500 $ 2,185,000 $ 2,300,000
SEDONA YAVAPAI
Apron: Construct Apron - Standards Construct Phase 2 of the apron A expansion to the
north. The expansion is approx. 500 ft X 250 ft and
includes the demolition of the restaurant building.
$ 31,076 $ 31,077 $ 1,180,902 $ 1,243,055
Apron: Construct Apron - Capacity Construct Phase I of the Apron A Expansion to the
north. The expansion is approx. 500 ft X 250 ft and
includes the demolition of the restaurant building.
$ 31,076 $ 31,077 $ 1,180,902 $ 1,243,055
Other: Construct Aircraft Rescue & Fire Fighting Training
Facility/ Regional Burn Pit/ Mobile Training Facility -
Standards
Construct a 10,000 SF facility adjacent to the apron
near Txy A4.
$ 62,500 $ 62,500 $ 2,375,000 $ 2,500,000
Taxiways: Extend Taxiway - Capacity Construct extensions of Taxilanes B1, B2 and B3
and the adjacent hangar pads. The total area of the
extensions is approx. 2,400 SY.
$ 6,014 $ 6,015 $ 228,551 $ 240,580
Airport Total: $ 130,666 $ 130,669 $ 4,965,355 $ 5,226,690
SHOW LOW REGIONAL NAVAJO
Runways: Construct Runway [ includes relocation] -
Standrads
Construct Rwy 18/ 36 & Parallel Twy D, ( 75 ft x
6100 ft and 35 ft x 5100 ft) ( 12- 3)
$ 150,000 $ 150,000 $ 5,700,000 $ 6,000,000
Airport Total: $ 150,000 $ 150,000 $ 5,700,000 $ 6,000,000
SIERRA VISTA MUNI- LIBBY AAF COCHISE
Taxiways:< Extend/ Widen/ Strengthen> Taxiway -
Standards
Design/ Construct Twy D Extensiont from NE end of
existing Twy D. ( approx. 1000 ft x 75 ft, 8500 sy. of
12 in thick concrete.)
$ 42,500 $ 42,500 $ 1,615,000 $ 1,700,000
Arizona Department of Transportation - Aeronautics Division 43
FY 2012 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
Taxiways: Rehabilitate Taxiway Lighting - Reconstruct Construct Twy J Realignment Lighting & Signing
( apporx. 4,000 LF lighting and 10 new signs)
$ 18,750 $ 18,750 $ 712,500 $ 750,000
Airport Total: $ 61,250 $ 61,250 $ 2,327,500 $ 2,450,000
SPRINGERVILLE MUNI APACHE
Taxiways: Construct Taxiway - Capacity This project will include all construction for taxilanes
on SE side of Runway 11/ 29.
$ 27,500 $ 27,500 $ 1,045,000 $ 1,100,000
Taxiways: Construct Taxiway [ includes relocation] This project is a phased project and the design was
completed prior ( Construction).
$ 74,075 $ 74,075 $ 2,814,850 $ 2,963,000
Airport Total: $ 101,575 $ 101,575 $ 3,859,850 $ 4,063,000
ST JOHNS INDUSTRIAL AIR PARK APACHE
Runways:< Construct/ Extend/ Improve> Runway Safety
Area [ Non- Primary Airports] - Standards
Rwys: Pave both ends of Rwy 14/ 32, 300' x 75'
each end.
$ 37,500 $ 37,500 $ 1,425,000 $ 1,500,000
Airport Total: $ 37,500 $ 37,500 $ 1,425,000 $ 1,500,000
TAYLOR NAVAJO
Planning: Conduct < Environmental
Assessment/ Environmental Impact
Statement/ Feasibility> < study/ update>
Aquire parcel 4,5,6& 7 for approach & BRL
protection ( approx. 7 total acres).
$ 2,500 $ 2,500 $ 95,000 $ 100,000
Airport Total: $ 2,500 $ 2,500 $ 95,000 $ 100,000
TUCSON INTL PIMA
Apron: Rehabilitate Apron - Reconstruction Remove/ replace portion of apron with 16 in PCC
pavement.
$ 98,177 $ 98,177 $ 2,000,000 $ 2,196,354
Other:< Light/ Mark/ Remove> Obstructions - Standards Demolition of any building in the West Ramp area
that are deemed obstructions for new parallel Rwy.
$ 502,875 $ 502,875 $ 10,244,250 $ 11,250,000
Runways: Construct Runway - Capacity Construct a new PCC Rwy 11R/ 24L, conversion of
existing Rwy 11R/ 29L to 75 ft parallel Twy and 75 ft
cross Twy ( includes grading, drainage, paving,
lighting, signage, marking, NAVAIDS and
appurtenances)
$ 2,626,821 $ 2,626,821 $ 53,511,926 $ 58,765,568
Airport Total: $ 3,227,873 $ 3,227,873 $ 65,756,176 $ 72,211,922
WHITERIVER NAVAJO
Equipment: Acquire < Snow Removal Equipment/ Urea
Truck/ etc.> - Standards
Purchase SRE equipment to remove snow from
airfield pavements.
$ 7,500 $ 7,500 $ 285,000 $ 300,000
Airport Total: $ 7,500 $ 7,500 $ 285,000 $ 300,000
WICKENBURG MUNI MARICOPA
Apron: Expand Apron - Capacity This project involves a 4,000 SY expansion of the
south apron area.
$ 7,875 $ 7,875 $ 299,250 $ 315,000
Arizona Department of Transportation - Aeronautics Division 44
FY 2012 Federal/ State/ Local Grants
Airport Name
Project Component
County
Project Description State Share Local Share Federal Share Project Total
Ground
Transportation:< Construct/ Expand/ Improve/ Modify/ Reha
bilitate> Access Road - Capacity
This project will involve the construction on a new
terminal access road and parking lot ( 1,000 SY).
$ 5,25